Attachment 4
ACKNOWLEDGEMENT STATEMENT
The offeror agrees to perform the work required at the prices specified and in strict accordance with the terms of the Solicitation.
1. Name, Address, and DUNS Number of Contractor
2. Telephone Number
3. Solicitation #.: W91238-18-R-0021
4. Title of Project: Repair PAVE PAWS Electrical System, Beale AFB, California
5. Name and Title of Person Authorized to Sign Offer: Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
6. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:
7. Signature:
8. Offer Date:
9. Amendments (Number & Date of Acknowledgement):
a. Note that your statement must include your acknowledge of all amendments.
b. Include the completed CLIN schedule.
CLIN Schedule CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
| LINE ITEM | UNIT OF | TOTAL |
| NO. DESCRIPTION QUANTITY MEASURE | PRICE |
CLIN
| 0001 | Provide all Design & | |||
| Construction Services | 1 | JOB | $__________ | |
| Services for complete | ||||
| Installation, repairs | ||||
| and operation of PAVE | ||||
| PAWS system at Beale AFB | ||||
| in accordance with RFP, plans, | ||||
| specifications, and all contract documents |
| 000101 | Provide all Construction | 1 | JOB | $__________ |
| Services for Phase 1 complete | ||||
| of PAVE PAWS system at Beale AFB | ||||
| in accordance with RFP, plans, | ||||
| specifications, and all contract documents |
| 000102 | Provide all Construction | 1 | JOB | $__________ |
| Services for Phase 2 complete | ||||
| of PAVE PAWS system at Beale AFB | ||||
| in accordance with RFP, plans, | ||||
| specifications, and all contract documents |
| 000103 | Provide all Construction | 1 | JOB | $__________ |
| Services for Phase 3 complete | ||||
| of PAVE PAWS system at Beale AFB | ||||
| in accordance with RFP, plans, | ||||
| specifications, and all contract documents |
| 000104 | Provide all Construction | 1 | JOB | $__________ |
| Services for Phase 4 complete | ||||
| of PAVE PAWS system at Beale AFB | ||||
| in accordance with RFP, plans, | ||||
| specifications, and all contract documents |
| 000105 | Provide all Construction | 1 | JOB | $__________ |
| Services for Phase 5 complete | ||||
| of PAVE PAWS system at Beale AFB | ||||
| in accordance with RFP, plans, | ||||
| specifications, and all contract documents |
0002 Contractor Manpower Reporting 1 JOB $_________________ This CLIN is used for pricing the collection And reporting of Contractor Manpower Reporting data. Reporting period will be the period of Performance not to exceed twelve months ending 30 September of each Government Fiscal Year and must be reported by 31 October of each calendar year.
Total Base Price (Items 0001- 0002) $_________________
Notes:
1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable".
2. If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule.
3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the CLIN Schedule. The Government will review all submitted CLIN Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".
4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
UAI 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of offers, the following will be utilized in the resolving arithmetic discrepancies found on the face of CLIN Schedule as submitted by the offeror:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the offeror intends the offer to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the offer will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which offer is low.