Amendment 0004

View the file

Other files

File Type Posted
PAVE_PAWS_As-builts.pdf PDF
A07.02_-_Amd_0003_Atch_13_-_4160v_Switchgear_shop_drawings_27Mar18.pdf PDF
A07.02_-_Amd_0003_Atch_15_-_Interconnect_combined-_Generator_Console,_field_and_switchgear_27Nov12.pdf PDF
A07.02_-_Amd_0003_Atch_17_-_PCI_Switchgear_Operation_Sequence_08_18_17.pdf PDF
A07.02_-_Amd_0003_Atch_14_-_Data_Highway_Plus_Interconnection_Diagram_14Mar18.pdf PDF
A07.02_-_Amd_0003_Atch_16_-_Mimic_Panel_Elevation_Diagram_14Mar18.pdf PDF
Amendment_0003.pdf PDF
A07.02_-_Amd_0003_Atch_18_-_Dimensions.docx DOCX document
Atch_12_-_Air_Force_Manual_17-1301_Computer_Security_Manual_10Feb17.pdf PDF
Atch_7_-_PAVE_PAWS_Q_&_A's_Am_0002,_13_Mar_18.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
Atch_9_-_EasyPower_Model_14Mar18.pdf PDF
Atch_8_-_PLC_SCADA_Configuration_Diagram_14Mar18.pdf PDF
PAVE_PAWS_Q_&_A's_Am_0002,_13_Mar_18.xlsx XLSX spreadsheet
Amendment_2.pdf PDF
Air_Force_Manual_17-1301_Computer_Security_Manual_10Feb17.pdf PDF
PLC_SCADA_Configuration_Diagram_14Mar18.pdf PDF
EasyPower_Model_14Mar18.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
PAVE_PAWS_SPECS_18_JAN_2018.pdf PDF
PAVE_PAWS_AMENDMENT_1.pdf PDF
PAVE_PAWS_Q_&_A's_Am_0001,_1_Mar_18.xlsx XLSX spreadsheet
PAVE_PAWS_SPECS_18_JAN_2018.pdf PDF
Atch_4__Acknowlegement_Form_19Dec17.docx DOCX document
Entry_Access_List_Form_Beale_AFB.xls XLS spreadsheet
Atch_2_Supplemental_Contract_Requirements.docx DOCX document
Atch_1_SOW_04Aug17.pdf PDF
18R0021_Official_Sol.pdf PDF
Atch_3_Wage_Determination_26Jan18.docx DOCX document
Visit_Authorization_Request_Form_Beale_AFB.doc DOC document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: 1) include the PAVE PAWS As-builts as Attachment 10 and 2) update section 00 22 00, paragraph 3.2.

Amendment 0005 w ill be issued on Monday, March 26 w hich w ill only include the changes to Specification section 01 10 10 and the SOW w hich correspond to response sent in the bidder inquiry system.

As a reminder, the proposal due date is March 28, 2018 at 2pm.

1. CONTRACT ID CODE PAGE OF PAGES

1 30

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0021

X 9B. DATED (SEE ITEM 11)

05-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Mar-2018

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 PAVE PAWS SPECS 18

JAN 2018

548 18-JAN-2018

Attachment 02 Atch 2 Supplemental Contract Requirements

1 05-JAN-2018

Attachment 03 Atch 3 Wage Rate Determination 26Jan18

51 26-JAN-2018

Attachment 04 Atch 4 Acknowledgement Form 19Dec17

3 19-DEC-2017

Attachment 05 PAVE PAWS Q&As Am

0001, 01MAR18

1 01-MAR-2018

Attachment 06 Site Visit Sign In Sheet 4 22-FEB-2018 Attachment 07 Pave Paws Q&As, Am

0002 13 MAR 18

1 18-MAR-2018

Attachment 08 PLC_Scada Configuration Diagram 14Mar18

1 14-MAR-2018

Attachment 09 EasyPower Model 14Mar18

78 14-MAR-2018

Attachment 12 Air Force Manual 17- 1301 Computer Security Manual 10Feb17

69 10-FEB-2017

Attachment 13 4160v Switchgear Shop Drawings 27Mar18

121 27-MAR-2018

Attachment 14 Data Highway Plus_Interconnection Diagram 14Mar18

1 14-MAR-2018

Attachment 15 Interconnect Combined- Generator Console, Field and Switgear

14 27-NOV-2012

Attachment 16 Mimic Panel Elevation Diagram 14Mar18

1 14-MAR-2018

Attachment 17 PCI Switchgear Operation Sequence_08 18 17

53 18-AUG-2017

Attachment 18 Attachment 18: Project Dimensions

1 21-MAR-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 PAVE PAWS SPECS 18

JAN 2018

548 18-JAN-2018

Attachment 02 Atch 2 Supplemental Contract Requirements

1 05-JAN-2018

Attachment 03 Atch 3 Wage Rate Determination 26Jan18

51 26-JAN-2018

Attachment 04 Atch 4 Acknowledgement Form 19Dec17

3 19-DEC-2017

Attachment 05 PAVE PAWS Q&As Am

0001, 01MAR18

1 01-MAR-2018

Attachment 06 Site Visit Sign In Sheet 4 22-FEB-2018 Attachment 07 Pave Paws Q&As, Am

0002 13 MAR 18

1 18-MAR-2018

Attachment 08 PLC_Scada Configuration Diagram 14Mar18

1 14-MAR-2018

Attachment 09 EasyPower Model 14Mar18

78 14-MAR-2018

Attachment 10 PAVE PAWS As-builts 10-MAR-1992 Attachment 12 Air Force Manual 17-

1301 Computer Security Manual 10Feb17

69 10-FEB-2017

Attachment 13 4160v Switchgear Shop Drawings 27Mar18

121 27-MAR-2018

Attachment 14 Data Highway Plus_Interconnection Diagram 14Mar18

1 14-MAR-2018

Attachment 15 Interconnect Combined- Generator Console, Field and Switgear

14 27-NOV-2012

Attachment 16 Mimic Panel Elevation Diagram 14Mar18

1 14-MAR-2018

Attachment 17 PCI Switchgear Operation Sequence_08 18 17

53 18-AUG-2017

Attachment 18 Attachment 18: Project Dimensions

1 21-MAR-2018

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

The following have been modified:

EVALUATION CRITERIA

PROPOSAL BASIS OF AWARD

GENERAL SUBMISSION REQUIREMENTS AND

INSTRUCTIONS, EVALUATIONS AND CONTRACT

AWARD

1. OVERVIEW

This action is a "Best Value" solicitation for the Design-Build Electronic Power System (Pave Paws) Repair at Beale AFB, CA. The Contracting Officer will award to the responsible Offeror whom the Source Selection Authority determines offers the best overall value to the

Government, considering all non-price factors described herein, and the proposed price of the project.

This solicitation utilizes a one-phase source selection process requiring one proposal submittal to include a non-price technical volume and a price volume. The selection process will consist of an evaluation of price and non-price factors.

2. BASIS OF AWARD

2.1 ELIGIBILITY FOR CONTRACT AWARD

In accordance with the requirements of Part 9 of the Federal Acquisition Regulation (FAR), no contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

2.2 SOURCE SELECTION USING THE TRADE-OFF PROCESS

The Government will select the offer that represents the best value to the Government by using the tradeoff process described in FAR Part 15. This process permits tradeoffs between price and technical (“non-price”) factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative analysis and an integrated assessment of proposals against all source selection criteria in the solicitation.

2.3 RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL EVALUATION

FACTORS

All non-price evaluation factors, when combined, are significantly more important than cost or price. All non-price factors are considered in descending order of importance. The Government is concerned with striking the most advantageous balance between technical merit (“quality”) and cost to the Government (i.e., the price). If competing technical proposals are determined to be essentially equal, price could become the controlling factor.

3. INSTRUCTIONS

3.1 GENERAL INSTRUCTIONS

3.1.1 Media, Page Size, Margins, Fonts, and Page Limitations

Submit only the hard-copy paper documents and electronic files specifically authorized in this section. Do not include links to information on websites in lieu of incorporating the information physically into the proposal. Except where another size is specifically authorized for a specific submission, use only 8 1/2” x 11” paper. Use at least 1 inch margins, which may include headers and footers. Do not justify the right margin. Ensure that all text and graphics are clearly legible.

For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, a foldout sheet will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are excluded from page limitations.

3.1.2 Proposal Binding

The preferred method for assembling proposals is a method that enables the rapid insertion or deletion of pages such as three ring binders. Ensure recommended capacity is not exceeded and that pages turn freely. Do not use spring clamps, spiral binding systems, or heat binding systems.

3.1.3 Conditioning of Offer

Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer; see “Inquiries”, located in Section 00 21 16, for points of contact. Notwithstanding the above, the offeror must clearly describe in the proposal cover sheet submitted with the price volume any exceptions, within the offer, to the contractual and/or technical terms and conditions of the solicitation.

3.1.4 Restrictions on Offeror-Provided Information

“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”. Files shall not contain classified data.

3.2 GENERAL PROPOSAL PREPARATION

The proposal shall be submitted as summarized below and as required by the specifications.

a. Proposal.

(1) Volume I – Technical Volume

(a) Submittal Information:

--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.

--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.

--Joint Venture Agreement --Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section 00 45 00).

(b) (a) Preface

(c) (b) Technical Factors

(1) Factor 1: Experience and Capability

(2) Factor 2: Technical Approach

(3) Factor 3: Project Schedule

(4) Factor 4: Past Performance

(2) Volume II – Price Volume

(a) Proposal Cover Sheet

(b) Standard Form 1442, Acknowledgement of Amendments, Joint Venture Agreement

(c) CLIN Schedule

(d) Work Breakdown Structure

(e) Representations and Certifications

(f) Bid Guarantee

(g) Pre-Award Survey Information

Each offeror must submit a proposal consisting of both a “price” volume and a “technical” volume. The price volume includes the signed offer and the offeror’s proposed prices. The price volume must include one original and one copy. The technical volume includes all required information relating to the “non-price” evaluation factors. The technical volume must include one original and four copies. The two volumes must be submitted as separate, physically distinct volumes. Both volumes must be received at the location shown in Block 8 of Standard Form 1442, not later than the date and time specified in Block 13 of Standard Form 1442. The information in the two volumes is evaluated separately and independently. Therefore, all information intended by the offeror to be evaluated as part of the price volume must be submitted as part of the price volume. All information intended by the offeror to be evaluated as part of the technical volume must be submitted as part of the technical volume. Do not merely cross-reference similar material between the technical and price volumes.

3.2.1 Marking of Proposal Volumes

Mark each volume as either the “Price Volume” or the “Technical Volume”. In addition, mark the outside front cover of each volume with the project title and location, solicitation number, name and address of the offeror, and volume copy number. Markings which identify the offeror are not required on either the back cover or on the spine/binding. Designate each factor under a different tab.

3.2.2 Table of Contents

Include a table of contents for each volume

3.2.3 PRICE PROPOSAL VOLUME

TAB CONTENTS OF THE PRICE PROPOSAL

1 Proposal Cover Sheet

2 SF 1442; Acknowledgement of Amendments; (Joint Venture Agreement (if applicable))

3 CLIN Schedule

4 Work Breakdown Structure

5 Representations and Certifications

6 Bid Guarantee

7 Pre-Award Survey Information

DETAILED SUBMISSION REQUIREMENTS FOR THE PRICE PROPOSAL.

Tab 1 Proposal Cover Sheet

The proposal cover sheet is required by FAR 52.215-1 (c)(2). The format and content for the proposal cover sheet follows:

1. Solicitation Number:

2. The name, address, DUNS number, and telephone and facsimile numbers of the offeror.

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the Solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.

4. Names, titles, email addresses, and telephone and facsimile numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

6. The Price Proposal is to be submitted in one hard “original” and two (2) copies. In addition, submit one complete copy of the price proposal on Compact Disk (CD).

(End of Proposal Cover Sheet)

Tab 2 of the Price Proposal: SF 1442; Acknowledgement of Amendments; Joint Venture Agreement.

The Standard Form (SF) 1442 must be completed by the offeror and duly executed with an original signature by the official(s) identified in the proposal cover sheet as authorized to bind the offeror in accordance with FAR 4.102, which includes specific instructions pertaining to individuals, partnerships, corporations, Joint Venture participants, and agents. Include the offeror’s DUNS number in block 14 of the SF 1442, along with the offeror’s address. All amendments must be acknowledged in accordance with the instructions on the Standard Form 30, Amendment. If the offeror is a Joint Venture (JV), include a copy of the JV agreement and indicate its status. (Note: It is preferred, but not required, that you use a document protector in lieu of punching holes in the original SF 1442.)

Tab 3 of the Price Proposal: CLIN Schedule.

Submit the completed CLIN Schedule with the offeror’s proposed contract prices inserted in the appropriate spaces. Prices must be proposed for all contract line items. Unit prices must be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off the extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission. Any qualification of pricing may render the proposal unacceptable and therefore not eligible for award. (Note: It is preferred, but not required, that you use a document protector in lieu of punching holes in the completed “original” CLIN schedule.)

Tab 4 of the Price Proposal: Work Breakdown Structure.

Submit a Work Breakdown Structure of the offeror’s proposed contract prices for each CLIN using the format below, in accordance with Unified Facilities Criteria (UFC) 3-740-05. The contractor shall submit the following breakdown within two (2) business days after the offer due date; this breakdown will support the proposed price at the time of the offer due date. No change in price will be accepted. This shall be submitted via EMAIL to Karen.Scott@usace.army.mil.

The subject line should read “W91238-18-R-0021, Work Breakdown Structure”.

1 SUBSTRUCTURE 11 ELECTRIC POWER AND LIGHTING

2 SUPERSTRUCTURE 12 ELECTRICAL SYSTEMS

3 EXTERIOR CLOSURE 13 EQUIPMENT

4 ROOFING 14 FURNISHINGS

5 INTERIOR CONSTRUCTION 15 SPECIAL CONSTRUCTION

6 INTERIOR FINISHES 16 SELECTIVE BUILDING DEMOLITION

7 CONVEYING SYSTEMS 17 SITE PREPARATION

8 PLUMBING 18 SITE IMPROVEMENTS

9 HVAC M2 19 SITE CIVIL/MECHANICAL UTILITIES

10 FIRE PROTECTION SYSTEMS 20 SITE ELECTRICAL UTILITIES

Tab 5 of the Price Proposal: Representations and Certifications.

The offeror must have electronically completed the annual representations and certifications on the System for Award Management (SAM) website in accordance with FAR 52.204-8. The offeror is responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in Section 00 45 00 of the solicitation. If the offeror is a Joint Venture, all participants must separately complete annual representations and certifications and Section 00 45 00.

Tab 6 of the Price Proposal: Bid Guarantee.

All offerors must submit a bid guarantee (e.g., Standard Form 24, Bid Bond) which complies with the requirements of FAR 28.101 Bid Guarantees, and any Defense and Army supplements thereto.

Tab 7 of the Price Proposal: Pre-Award Survey Information.

The Contracting Officer is required to make an affirmative pre-award determination of the prospective contractor’s responsibility in accordance with the mandatory requirements of Part 9 of the Federal Acquisition Regulation (FAR) and its supplements. The Contracting Officer must have sufficient information available to determine that a prospective contractor meets these minimum standards. Therefore, the offeror is requested to provide the pre-award survey information described below with its price proposal:

(1) The completed Construction Contractor Data Form with Supplemental Schedules A-C (see format which follows). If the offeror is a large multi-segmented business concerns, the data provided on the supplemental schedules may be limited to information that directly pertains to the specific segment of the business concern (e.g., the division, group, unit, etc.) proposed to perform work under the prospective contract with its own work force. If the offer is being submitted by a Joint Venture, submit a separate form for each Joint Venture participant. The offeror may submit pre-award survey information in another format, provided that the information furnished is substantially the same as that which would be furnished on the Construction Contractor Data Form and its supplemental schedules.

(2) Current financial statements. If the financial statement is more than 60 days old, submit a certificate stating that the firm's financial condition is substantially the same, or, if not the same, state the changes that have taken place. If a Joint Venture, provide this information for each participant in the Joint Venture.

(3) Banking information. Provide letters from banks or other financial institutions with which the contractor conducts business. The letters should contain information about your firm's accounts, loans, lines of credit, etc. The Government is interested in financial stability, timely payments, the length and nature of the relationship between the firm and the financial institution, and the firm's financial ability to perform the contract. The letters should also provide the name and telephone number of the bank representative the Government may contact. If a Joint Venture, provide this information for each Joint Venture participant.

The Government will treat the pre-award survey information submitted by the offeror as proprietary.

3.2.4 EVALUATION OF THE PRICE PROPOSAL

Price to the Government will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed price will be analyzed for reasonableness. It may also be analyzed to determine whether it reflects a clear understanding of the requirements; and is consistent with the offeror’s Technical Proposal. Additionally, all offers will be analyzed for unbalanced pricing.

Information required to be submitted in the Price Proposal volume in addition to the executed SF 1442 with acknowledgement of amendments and the completed pricing schedule will be used to determine the offeror’s eligibility for contract award in accordance with paragraph 2.1 above

Pre-Award Survey

CONSTRUCTION CONTRACTOR DATA DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered Construction Design Consultant

Organization Individual Joint Venture Partnership Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:

Officers:

Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF

(DATE): Present Value ($)

Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION

WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE

(LIST MOST RECENT FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount:

Date:

Description:

Owner:

$ Contract Amount:

Date:

Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING SIGNATURE

See attachment for explanations or detailed description of item(s) reported above.

CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS

List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.

CONTRACT

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

COMPLETE

CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS

List below the principal construction projects your firm has completed within the past six years, including all DoD contracts.

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

SUBLET

CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –

CONSTRUCTION AND/OR TECHNICAL EQUIPMENT

List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.

QUANTITY

DESCRIPTION

CONDITION

YEARS OF

SERVICE

PRESENT

STATUS

4 TECHNICAL PROPOSAL VOLUME

4.1 FORMAT, CONTENTS, AND LIST OF TABS FOR THE TECHNICAL PROPOSAL

Use 8-1/2” x 11” pages for the narrative portions of the proposal. There may be page limits imposed at the tab level. Organize your technical proposal as indicated below. The tabs directly correlate to the technical evaluation factors. Although the Government may use information contained anywhere within the technical proposal in its evaluation of any technical evaluation criteria, the Government is not obligated to search for or to consider information that is not located in the specified location. Number the pages. Do not include information pertaining to your proposed pricing for this project in the technical proposal. Limit your submittals to the information specified; excess information will not be evaluated.

4.2 PREFACE – PRIME CONTRACTOR/KEY SUBCONTRACTOR INTRODUCTION

a. The Offeror is required to propose a specific project team including key subcontractors for evaluation in response to this Request for Proposals. For purposes of this procurement, the terms “key subcontractors” are used to refer only to the prospective subcontractors who will perform 25% or more work on the design and/or construction.

b. Provide a brief introduction narrative. Identify and provide the name, DUNS number, address, point of contact e- mail address, and a brief description of the role and authority of each firm that will be involved in performance of this contract at the prime contractor and key subcontractor level. If the proposed prime contractor is a Joint Venture, describe the relationship, role, and authority (to include management authority) of each firm. (Note: If a proposed firm has branch offices, provide information for each individual branch office that will perform work under the contract with its own workforce.) List the major work elements to be self-performed by the offeror’s in-house work force, the major work elements to be performed by each key subcontractor, and any other major work to be subcontracted to other contractors.

The purpose of this narrative is to provide a brief introduction for information purposes.

However, if applicable, the government reserves the right to consider information contained therein throughout the evaluation of the other factors.

c. In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this RFP, the prime contractor must have completed at least two of the total number of projects submitted for Factor 4 for consideration in response to the past performance requirements of this RRP. Factor 1, Experience and Capability. Past performance reviews submitted for Factor 4 must be for the same projects submitted for Factor 1. If information about a subcontractor is submitted and considered during the evaluation, the expectation is that this subcontractor will perform this work. Before utilizing another subcontractor for this work, the Government must consent.

d. An Offeror that relies upon the performance history of a member or members of a proposed contractor team arrangement will be expected to maintain that arrangement during performance of any contract awarded to that Offeror under this RFP. As a part of their proposal, the Offeror must provide a contractor team agreement signed by all parties, identifying the legal name(s) of all entities and describing the nature of each entity’s relationship (teaming/partnering, joint venture, etc.) and its role on this project. A letter of commitment may be used to demonstrate this arangement. Past Performance information of other than the Offeror will not be considered without the teaming arrangements. In the case of joint ventures, at least one project will be submitted from each member to demonstrate past experience. (Team agreement information will not count in the page limitation).

e. An AE Firm may be on more than one contractor's team however a teaming arrangements must be provided with the solicitation and that team will be required for the duration of the project.

An IDIQ contract may be used however task order(s) shall be submitted in lieu of the complete IDIQ. Task orders may be combined as a "single project" if the projects were the same (ie: AE completed the 35% design for project X and completed the 100% design for project X).

The submission is limited to two (2) 8-1/2”x11” pages for narrative. The Technical Proposal is to be submitted in one hard “original” and five (5) copies. In addition, submit one complete copy of the technical proposal on Compact Disk (CD).

4.3 TECHNICAL EVALUATION FACTORS

The Government will evaluate each offeror’s technical proposal based on how well the proposal addresses each of the evaluation factors listed below.

They are listed here in descending order of importance:

- Factor 1: Experience and Capability

- Factor 2: Technical Approach

- Factor 3: Project Schedule

- Factor 4: Past Performance

4.4 FACTOR 1 – EXPERIENCE AND CAPABILITY

Prime Contractor/Key Subcontractor: Provide descriptions of up to four (4) projects substantially complete or completed by the Prime Contractor/Key Subcontractor, within the last ten (10) years, which demonstrate experience and capability similar to this project. Projects are considered substantially complete if only punch list items remain for project acceptance or that the majority of the project elements have been turned over to customer for beneficial occupancy.

Examples projects can either be commercial or institutional.

AE Design Firm: Offerors shall provide descriptions of up to two (2) projects designed by the AE Firm, within the last ten (10) years, which demonstrate experience and capability similar to this project. The listed design firm must be used on the project. No deviations will be permitted unless approved by the Contracting Officer. Identification of more than one (1) design firm will result in an evaluation based on the least qualified firm. Indicate any previous working relationship with the Prime Contractor.

Projects considered similar in experience and capability would include, but not limited to the following:

a) Experience with designing and constructing electrical primary and emergency back-up power infrastructure;

b) Experience with designing, constructing, and commissioning upgrades to existing electrical infrastructure that will result in a reliable primary and back-up power distribution system configured in a 2N+2 power and control arrangement;

c) Experience with design, construction, and installation of commissioned electrical systems including medium voltage transformers and switchgear, 480V Main Distribution Panels (MDP), Motor Control Centers (MCC), Programmable Logic Controllers (PLC), Supervisory Control and Data Acquisition (SCADA), automated generator control systems, control/monitoring consoles, emergency generators, Automatic Transfer Switch (ATS), and associated electrical systems.

d) Other types of projects may be submitted however the offeror must explain the similarity of those projects to the project that is being solicited in this RFP.

*For all name brand products/processes listed above, offerors may quote using a similar products. Use of alternate products is contingent upon Government approval.

Information should include project name, location, and owner’s name, point of contact, telephone number, and email address.

There is a limit of six (6), single-sided pages for this Narrative using a minimum font of 11.

Start each project on a new page. Page size shall be 8.5 x 11 inches with a minimum margin size of one-half inch on all sides. Any information provided beyond this limit will not be reviewed or evaluated by the Source Selection Evaluation Board.

Evaluation Criteria:

The Offeror will be rated on an adjectival rating basis. Offers demonstrating experience with the following may be rated more favorably:

-Familiarity with the Allen Bradley (A-B) PLC, access workstations, power source switching control and SPM-A/2301A Woodward genset controllers; and -Experience with design, construction, and commissioning of i) Woodward system in a combination of Eastgen3400 and LS-5 (circuit breaker control and protection module) or ii) PLC-Woodward structure by replacing with new PLCs and modern Woodward modules.

-Familiarity with security requirements for PAVE PAWS and capability of providing the full time security for all personnel working.

-Prime contractor and Architect-Engineer designer teaming experience on similar design-build projects.

-Corps of Engineers and Beale AFB construction projects.

*Experience within the last ten years will be considered more favorable than older experience.

4.5 FACTOR 2 – TECHNICAL APPROACH

Provide a narrative that describes the offeror’s Design-Build team and intended technical approach to executing the design-build contract per the detailed requirements herein. Clearly, but concisely describe the offeror’s Design-Build team, and how members of the team will work collaboratively to ensure timely, quality completion of the project. The Technical Approach Narrative shall address all of the following:

Organization: Describe the firms that compose the offeror’s Design-Build team, their resources and how their resources will be utilized, their roles and responsibilities, and any contractual arrangements that have been established. Present a matrix of responsibilities for each firm in executing the key design and construction activities for each major feature of the project.

Describe the proposed management structure for the Design-Build team explaining how the design and construction process will be managed and the authorities and the delegations of authority within the Design-Build team.

Collaborative Approach for Design-Build: Describe interactions and communications within the Design-Build team and with the Corps of Engineers during the design. Describe the role of the construction team members during design. Describe the role and interaction of the design team with the construction team during construction, addressing, at a minimum, design during construction, including control and approval of revisions to the accepted design; requests for information; shop drawing and submittal reviews and approvals; progress meetings; site visits, if any; contract completion, closeout, as-built and completion documentation.

Technical Design Consideration: Describe the technical considerations and approach of the two basic design configurations to be considered - Woodward centric design vs. the PLC centric design. Explain which design methodology the Design-Build team will be utilizing and how the proposed design system is a better value to the Government than the other design methodology.

“Better-value” to the Government shall be demonstrated through the Contractor’s concise explanation and/or discussion of their proposed design configuration, which may include attributes of better reliability, maintainability, durability, adaptability, advanced technology, quality, sustainability, life cycle costs, and performance while meeting the requirement. The contractor’s explanation shall be based upon facts and supposition, and must be convincing by comparison through contrasting of the 2 design configurations to the Government that one design configuration is of benefit over the other.

Quality Control: Describe the Design-Build team’s quality control approach, corporate systems and capabilities to maintain quality control of the design and construction. Describe the proposed quality control organization, including the proposed staffing plan. Provide specific information on how you will manage design quality control, track design evolution and changes during design to meet the schedule and to facilitate Government reviews. Provide information on how you will handle internal and external requests for information, shop drawings, submittal reviews, progress meetings, site visits, contract completion, closeout, as-built, and completion documentation. In addition to the required designer-of-record roles specified within the RFP for maintaining integrity of the design, describe any other DOR involvement in the quality control process, if any. There is no need to submit a quality control plan as the successful offeror will provide that after award. Describe the offeror’s system to control and track revisions to the design.

There is a limit of the eight (8), single-sided pages for this Narrative using a minimum font of 11.

Page size shall be 8.5 x 11 inches with a minimum margin size of one-half inch on all sides. Any information provided beyond this limit will not be reviewed or evaluated by the Source Selection Evaluation Board.

Evaluation Criteria:

The offeror will be rated on an adjectival basis. The Government will evaluate the offeror’s ability to assess capabilities and understanding of the requirements of this contract as well as clearly demonstrating the ability to effectively manage the designers, consultants, and subcontractors on the team. Additionally, the Government will evaluation the offeror’s ability to coordinate all of the work throughout the design and construction phases and an understanding of the phasing of the work.

-The greater the proposal demonstrates the ability to lower/minimize the risk of unsuccessful performance, the greater the rating.

There is a limit of eight (8), single-sided pages for this Narrative using a minimum font of 11.

Page size shall be 8.5 x 11 inches with a minimum margin size of one-half inch on all sides. Any information provided beyond this limit will not be reviewed or evaluated by the Source Selection Evaluation Board.

4.6 FACTOR 3 – PROJECT SCHEDULE

The offeror shall develop a proposed construction schedule (i.e., GANTT (NOT a Pert Chart that graphically illustrates the proposed integration, scheduling, and phasing of the major features on the critical and near-critical path for this project, including final close-out and/or commissioning.

The importance of the construction schedule should be highlighted by certain critical project factors: obtaining all necessary approvals on schedule and pre-work plans, project climate, weather sensitive work, and phasing constraints.

The proposed schedule must indicate the starting and completion times of all major elements of work beginning with the notice to proceed. The schedule shall be as realistic as possible, demonstrating the offeror’s ability to propose a schedule that identifies all major elements of work for this project, meets the Government’s requirements, and is obtainable. For the purposes of the proposal submittal, assume a Notice to Proceed (NTP) date of 15 April 2018. The Contractor’s schedule shall show phasing of the work (i.e. identify the 5 phases of work specified in the Statement of Work {Attachment 1}).

Describe the offeror’s schedule control capabilities and any systems the offeror will use to plan design and construction activities. Explain how the schedule will be used to manage design and construction. Discuss internal procedures for handling delays to minimize time growth. Include any consideration of fast-tracking design and construction. Discuss how prime plans to streamline construction, manage labor and any other resource constraints to reduce cost and achieve timely project completion.

The narrative shall be limited to 2 (two) 8.5”x11” pages while physical schedule must be on 11”x17” paper.

Evaluation Criteria:

The offeror will be rated on an adjectival rating. The Government will evaluate the offeror’s ability to schedule and integrate the design and/or major work elements, construction and close out activities. The Government will evaluate the offeror’s approach to the scheduling /phasing of the major activities appears reasonable, realistic, and achievable which will include appropriate consideration of recognizable constraints including material and equipment lead times and the impacts on construction activities of adverse weather typical for the construction site. Proposed schedule and approach that clearly reflect an understanding of the complexity of this project will be evaluated more favorably.

ADJECTIVAL RATINGS

This rating scale will be used in conjunction with Factors 1-3.

ADJECTIVE DEFINITION AND CRITERIA

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable

Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

Risk Definitions

Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

4.7 FACTOR 4 – PAST PERFORMANCE

The Offeror shall submit past performance information on the projects submitted in Factor 1, Experience and Capability. The Offeror shall provide completed performance evaluations for the submitted projects that demonstrate the Offeror’s performance on recent and relevant electronic system upgrade projects. The Offeror shall provide formal performance evaluation if they are available.

Formal performance evaluations are those that are similar to the Department of Defense Performance Evaluation (Construction) Form DD2626.

In addition to formal evaluations or if a formal evaluation is unavailable, the Offeror shall obtain the information using the Past Performance Questionnaire included at the end of this section. The Past Performance Questionnaire included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for this factor. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal.

Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also include performance recognition documents received in the last ten (10) years such as awards, award fee determinations, customer letters of recommendation, and any other forms of performance recognition received for the projects submitted in Factor 1.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

Evaluation Criteria: The evaluation of past performance will focus on two elements: the recency and relevance of the Offeror’s past performance information:

Recency is a measure of time that has elapsed since the past performance referenced occurred. It is expressed as a time period during which past performance references are considered relevant.

Relevancy is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.

Quality of Products or Services. The third aspect of the past performance evaluation is to establish the overall quality. The past performance evaluation conducted in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts. Requirements for considering history of small business utilization are outlined at FAR 15.304(c)(3)(ii) and DFARS 215.305(a)(2). The Past Performance Evaluation Team will review all past performance information collected and determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment (see paragraph 3.1.3.3). A separate quality assessment rating is not required; rather, the past performance confidence assessment rating is based on the offeror’s overall record of recency, relevancy, and quality of performance.

Overall past performance will be rated in terms of how likely there is a performance risk to the Government, that is, the confidence performance rating the greater the expectation that the Offeror will successfully confidence assessment rating. If an offeror has no record of relevant past performance, or if the information on the offeror’s past performance is not available, the offer must state that fact. The offeror may be rated as unknown confidence/neutral.

Past performance in Federal Government work may be rated more favorably than work outside the Federal Government. Additionally, work for the US Army Corps of Engineers or Beale AFB work may be rated more favorably over work with other Federal Government agencies.

Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Confidence Assessment - Performance confidence is the confidence associated with an Offeror's likelihood of success in performing the solicitation's requirements as indicated by that Offeror's record of current or past performance. Performance Confidence Assessment:

In conducting a performance confidence assessment, each Offeror shall be assigned one of the ratings in accordance with the table below. See Reference FAR 15.305(2) for information on assigning an unknown/neutral confidence rating.

Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

There is no page limit for this section. Portion should be on 8.5”x11” paper.

Past Performance Questionnaire

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task…