SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
W9123817R0077
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
4 August 2017
PAGE
OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE W91238 8. ADDRESS OFFER TO
SEE ITEM 7 US ARMY CORPS OF ENINGEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814
9. FOR INFORMATION
CALL:
a. NAME
DENNIS D WAGNER II
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
916-557-5195
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Indefinite Delivery/Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) in support of Military Ocean Terminal, Concord (MOTCO) Concord, CA.
Typical efforts include but are not limited to new paving, maintenance/repair paving and underground utilities.
The aggregate not-to-exceed amount f or the IDIQ contract is $47 million dollars over a three (3) year base period and one two
(2) year option period.
This is a Total Small Business Set-aside.
NOTE: this procurement may be delayed, cancelled or revised at any time during the solicitation, evaluation, and/or final award process. The contractor must be registered at System For Award Management (SAM) website.
11. The contractor shall begin performance within 10 calendar days and complete it within 720 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable.
(See 52.211-10 ).
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
12b. CALENDAR DAYS
a. Sealed offers in original and 6 copies to perform the work required are due at the place specified in Item 8 by 02:00 (hour) local time 09/05/2017 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
Section 00 01 10 – Table of Contents
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 671 06-Jul-2017
Attachment 2 Environmental 324 01-Mar-2016
Assessment
Attachment 3 SHPO Consultation 2 05-Jan2017
Attachment 4 ENG Form 3065 2 06-Jun-2017
Requirements
Attachment 5 Task Order Package 275 04-Aug-2017
Section 00 10 00 - Solicitation
AMOUNT
Road/Underground Utility Repair
FFP
Indefinite Delivery Indefinite Quantity (IDIQ) contract will be a Design-Bid-Build
General Construction Multiple Award Task Order Contract
(MATOC) for future paving/underground utilities. This SATOC will support
MOTCO Concord CA. The Period of Performance is thirty-six (36) months; and
Not-To-Exceed amount of $47,000,000.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Road/Underground Utility Repair
FFP
Indefinite Delivery Indefinite Quantity (IDIQ) contract will be a Design-Bid-Build
General Construction Multiple Award Task Order Contract
(MATOC) for future paving/underground utilities. This SATOC will support
MOTCO Concord CA. The Period of Performance is twenty-four (24) months;
and Not-To-Exceed amount of $47,000,000.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
0001 47,000,000 Job
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
1001 N/A N/A N/A N/A
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-6 Unique Entity Identifier OCT 2016
52.211-2 Availability of Specifications, Standards, and Data Item APR 2014
Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST) 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.215-6 Place of Performance OCT 1997
52.217-5 Evaluation Of Options JUL 1990
52.225-10 Notice of Buy American Requirement--Construction MAY 2014
Materials 52.236-28 Preparation of Proposals--Construction OCT 1997
252.225-7031 Secondary Arab Boycott Of Israel JUN 2005
252.236-7006 Cost Limitation JAN 1997
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be DX rated order; x DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations
System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price Single Award Task Order Contract (SATOC) contract resulting from this solicitation.
52.216-12 COST-SHARING CONTRACT--NO FEE (APR 1984)
(a) The Government shall not pay to the Contractor a fee for performing this contract.
(b) After paying 80 percent of the Government's share of the total estimated cost of performance shown in the
Schedule, the Contracting Officer may withhold further payment of allowable cost until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government's interest. This reserve shall not exceed one percent of the Government's share of the total estimated cost shown in the Schedule or , whichever is less.
(End of clause)
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION MATERIALS (MAY
2014) - ALTERNATE I (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American-- Construction Materials Under Trade
Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute or Balance shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph
(b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause
52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
US Army Corps of Engineers
ATTN: Ms. Nikole May
1325 J Street
Sacramento CA 95814-2922
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
See Task Order Package
(c) Participants will meet at--
See Task Order Package
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://farsite.af.mil
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
None
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFAR (48 CFR Chapter Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,
DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)
The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:
http://farsite.hill.af.mil/ http://farsite.hill.af.mil/
Section 00 21 16 - Instructions to Proposers
PROPOSAL INSTRUCTIONS
INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS’ SUBMITTAL INFORMATION FOR
SUPPLIERS (RFQS), BIDDERS (IFBS) AND OFFERORS (RFPS)
A. General Instructions to Offerors:
INQUIRIES:
Prospective offerors should submit any inquiries related to this solicitation in accordance with the following instructions (collect calls will not be accepted):
1. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via
Bidder Inquiry in ProjNet at https://www.projnet.org/projnet. The steps for Bidder Inquiry are as follows:
a. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link.
Select agency as USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click continue. Fill in all required information and click Add User.
b. From this page you may view all bidder inquiries or add an inquiry.
c. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.
d. The Solicitation Number is: W91238-17-R-0077
e. The Bidder Inquiry Key is: 3D383R-ZCW5K3
2. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:
In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Attachments, Pre-award Survey). All offerors will complete and return the Pre-award
Survey as part of the Price/Cost proposal. Failure to submit the Pre-award Survey in conjunction with the price proposal will not of itself render the offer unacceptable.
In order to be determined to be responsible a prospective contractor must:
1. Have adequate financial resources to perform the contract or the ability to obtain them.
2. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
3. Have a satisfactory performance record. In making the determination of responsibility, the Government
Contracting Officer shall consider relevant past performance information. A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history except when there are special standards set forth in the solicitation which applies to all bidders that must be met in order to receive the award. These special standards may be necessary when unusual expertise or specialized facilities are necessary in the performance of the contract; therefore, in order to be determined to http://www.projnet.org/projnet http://www.projnet.org/projnet http://www.projnet.org/projnet be responsible for that particular contract, the offeror must be able to meet those special standards. A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be nonresponsible unless the Contracting Officer determines that the circumstances were beyond the contractor's control or that the contractor has taken appropriate corrective action. Other responsibility considerations by the Contracting Officer will include past efforts by the contractor to apply sufficient tenacity and perseverance to perform acceptably, to meet quality requirements of contracts, and the contractor's past compliance with subcontracting plans (if required) under recent contracts.
4. Have a satisfactory record of integrity and business ethics.
5. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
6. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.
7. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Pre-award Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in subparagraphs a, e, and f above) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.
The Pre-award Survey as a tool used by the Government in determining responsibility of the offeror is submitted as part of the Price/Cost proposal and is separate from the technical proposal's response to the technical evaluation criteria found later in this section. Some of the information required from the offeror for completion of the Pre-award Survey and the technical proposal may be duplicative but it is necessary that the information be provided in full in both places and that the Price/Cost proposal and the Technical proposal be separate documents. DO NOT state, for example, in the technical proposal, "See Price/Cost proposal for past performance information".
AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTIONS:
1. The internet URL for Corps of Engineers publications is: http://140.194.76.129/publications/
2. Construction Criteria Base (CCB). The Construction Criteria Base (CCB) system available through the
National Institute of Building Sciences includes copies of Corps of Engineers methods and specifications.
Information about the CCB can be obtained from:
http://www.wbdg.org/ccb/ccb.php
PERFORMANCE AND PAYMENT BONDS:
1. The bidder/offeror whose bid/offer is accepted will, within the time established in the contract, furnish performance and payment bonds in accordance with FAR 52.228-15.
INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS:
1. Bidders/offerors utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28
(Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an http://140.194.76.129/publications/ http://www.wbdg.org/ccb/ccb.php individual surety, and include these with the SF 24 (Bid Bond), and the bid itself (see clause titled "Pledges of
Assets," FAR 52.228-11).
2. Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate. If this is an IFB, failure to provide pledges of acceptable assets, with the bid, in the specified form, accompanied by a properly executed SF 24 and SF 28, will render the bidder non-responsible and thus ineligible for award. If this is an RFP, failure to provide required documentation described herein may cause the offeror to be deemed "unacceptable".
BID GUARANTEE FORM AND AMOUNT:
1. The offeror shall furnish a separate bid guarantee in accordance with the solicitation provision titled "Bid
Guarantee", FAR 52.228-1. In accordance with FAR 28.101-2 the bid guarantee amount shall be at least 20 percent of the "bid price" but shall not exceed $3 million. When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated. If there are option line items on the CLIN Schedule, the term "bid price" is hereby defined as the total bid not to include any amount for line items designated as "options".
2. In bids/proposals that contain "additives", the "bid price" is defined as the total of all bid items including additive line items. FAR 28.106- 1 states that a Standard Form (SF) 24 shall be used for the bid bond. In accordance with FAR 28.202(a)(1), corporate sureties utilized must appear on the list contained in the
Department of Treasury Circular 570 titled "Companies Holding Certificates of Authority as Acceptable
Sureties on Federal Bonds and Acceptable Reinsuring Companies."
ACCEPTANCE OF OFFERS:
1. A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION:
1. It is a requirement that any and all contractors that intend to do business with the government must be registered in the System for Award Management (SAM) database. No contract may be awarded by the government to any contractor who is not registered in SAM. If your company is not registered in SAM, you must register in order to be eligible for any government award.
2. The following link provides access to the SAM website: https://www.sam.gov/portal/public/SAM/
3. If you have difficulties with or questions regarding the SAM registration, the following link has been set up by the Defense Logistics Agency (DLA) to assist contractors registering for CAGE codes for enrollment and navigation within SAM: https://www.logisticsinformationservice.dla.mil/CAGETier3/
B. Instructions for Preparation of Non-Price (Technical) Volume:
The following instructions explain the documents which must be included in your technical proposal; see Section C for instructions describing contents of pricing volume. Provide the original and six (6) copies of the technical volume.
The technical volume shall be divided into 9 sections, tabbed as sections A through I, as follows:
TAB A: PROPOSAL COVER SHEET
http://www.sam.gov/portal/public/SAM/ http://www.logisticsinformationservice.dla.mil/CAGETier3/ http://www.logisticsinformationservice.dla.mil/CAGETier3/ http://www.logisticsinformationservice.dla.mil/CAGETier3/
1. The proposal cover sheet is required by FAR 52.215-1 (c)(2). This provision, titled “Instructions to Offerors –
Competitive Acquisition” is provided in full text in Section 00 21 00.
2. Show the Solicitation Number
3. Show the name, address, DUNS number, and telephone and email of the offeror.
4. Include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the Solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.
5. Provide names, titles, email addresses, and telephone number of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation.
6. Provide the name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
7. Acknowledgment that the offeror is registered in the System for Award Management database, and that his/her registration is current IAW FAR Clause 52.204-99 System for Award Management Registration, (AUG 2012)
(Deviation).
TAB B: PROPOSED CONTRACT
1. The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.
TAB C: SOLICITATION AMENDMENTS (IF ANY)
1. Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.
2. Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.
TAB D: REPS and CERTS
1. Your completed Representations, Certifications, and Other Statements of Biders/Offerors. The offeror must have electronically completed the annual representations and certifications on the “System for Award
Management” (SAM) website in accordance with FAR 52.204-8. The offeror is responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes at least annually to ensure that they are kept current, accurate and complete. In addition, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in Section 00 45 00 of the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA
Representations and Certifications and Section 00 45 00
TAB E: BID BOND
1. Your Bid Guarantee Standard Form 24, “Bid Bond.” All offerors must submit a bid guarantee, (e.g., Standard Form 24, Bid Bond) which complies with the requirements of FAR 28.101 Bid Guarantees, and any
Defense and Army supplements thereto.
TAB F: EXPERIENCE AND CAPABILITY
1. Preface – Prime Contractor/Key Subcontractor Introduction
a. Provide a brief introduction narrative. Identify and provide the name, DUNS number, address, point of contact e-mail address, and a brief description of the role and authority of each firm that will be involved in performance of this contract at the prime contractor and key subcontractor level. If the proposed prime contractor is a Joint Venture, describe the relationship, role, and authority (to include management authority) of each firm. (Note: If a proposed firm has branch offices, provide information for each individual branch office that will perform work under the contract with its own workforce.)
List the major work elements to be self-performed by the offeror’s in-house work force, the major work elements to be performed by each key subcontractor, and any other major work to be subcontracted to other contractors.
b. The Offeror is required to propose a specific project team including key subcontractors for evaluation in response to this Request for Proposals. For purposes of this procurement, the term “key subcontractors” is used to refer only to the prospective subcontractors whose qualifications, experience, and past performance will be evaluated by the Government as part of the source selection process; see subparagraph “c,” below. For reasons of efficiency, not all subcontractors critical to successful contract performance need be included in this group. In order to streamline the proposal submission and evaluation process, please limit your submission to the information specifically requested. Information pertaining to other subcontractors not designated as “key” will be considered excess and may not be evaluated.
c. For the purposes of this procurement, a key subcontractor is defined as any subcontractor performing
“key” work elements for which capability information is required to be submitted for evaluation as part of the Offeror’s technical proposal. The Government has designated the following major work elements as “key”:
- Paving
- Utility Manhole Installation/Ductbank Installation
The Offeror shall identify any subcontractor it plans to employ to perform paving work, utility manhole installation work, or ductbank installation work as a “key” subcontractor and shall include in its proposal the required information about these subcontractors.
d. The Offeror’s attention is directed to the clause in Section 00 72 00 titled “Personnel, Subcontractors and Outside Associates or Consultants.” In accordance with this clause, any post-award changes to the key personnel and/or key subcontractors in the accepted proposal will require Contracting Officer approval.
e.. Formatting: The submission is limited to two (2) 8-1/2”x11” pages for narrative. The JV Agreement, if applicable, is not included in the two page limitation.
TAB G – EXPERIENCE AND CAPABILITY
1. General
a. The information provided under this tab will be used to evaluate the experience and capability of the offeror and proposed key subcontractors.
b. The Government is interested in selecting a contractor with the ability to demonstrate their experience and capability to reduce performance risk associated with successful completion of the project.
2. Prime Contractor/Key Subcontractor Example Projects Demonstrating Experience and Capability.
a. The offeror shall, if possible, submit “example projects” per paragraph b. (1) below, that demonstrate the prime’s and key subcontractors’ experience and capability which the Government may evaluate to determine their likely success in performing the subject contract.
b. The offeror must explain how the work performed in the example projects is relevant to this project and how it shows the contractor’s or key subcontractors’ understanding of the work requirements and approach necessary to successfully complete this project as well as the project’s risks. Submit the following information:
(1) At least three (3), but not more than five (5) example projects for the Prime contractor exceeding
$500K, and at least two (2), but not more than three (3), example projects for each Key
Subcontractor. The collective projects must demonstrate the following characteristics of the prime contractor and/or key subcontractor(s):
A. Prime Contractor Experience
i. At least one (1) Prime contractor project submitted shall have a construction dollar value of at least $5,000,000 and have been substantially completed within five (5) years from the date of proposal submission
B. Paving Contractor Experience
i. Roadway Paving
ii. Full Depth Construction Road Paving including existing grade preparation and/or existing road removal and installation of sub-base, base, and paving
iii. At least one (1) paving project with a construction dollar value of at least
$5,000,000
iv. At least one paving project substantially completed within the last five (5) years from the date of proposal submission
C. Utility Contractor Experience
i. Utility Manhole Installation/Ductbank Installation
ii. Experience with cast-in-place underground ductbank
c. Do not submit construction projects that are not substantially complete. (For this purpose, “substantially complete” means that only punch list items remain for project acceptance or that the majority of the elements of the project have been turned over to the customer for beneficial occupancy.)
d. Provide a Summary Matrix that indicates which submitted example project(s) demonstrates which experience and/or capability. The example provided is not mandatory; develop and provide your own matrix that best explains your proposal.
Example Matrix
PRIME SUB
CAPABILITY/EXAMPLE PROJECT #1 #2 #3 #4 #5 #6 #7 #8 #9
At least one (1) Prime contractor project submitted shall have a construction dollar value of at least $5,000,000 and h a v e b e e n completed within five (5) years from the date of proposal submission
X
Roadway Paving X X
Full Depth Construction Road Paving including existing grade preparation and/or existing road removal and installation of sub-base, base, and paving
At least one (1) paving project submitted shall have a construction dollar value of at least $5,000,000 X X
At least one paving project submitted shall have been completed within the last five (5) years from the date of proposal submission
Utility Manhole Installation/Ductbank Installation X X
Experience with cast-in-place underground ductbank X X X X X
e. Formatting and Other Restrictions.
(1) ) Start the information for each example project on a new page.
(2) ) Use the “Project Information Form” below to submit the example projects. Use of an alternate format could result in a lower rating if all of the specified information is not provided. (Note: Do not submit a group of related jobs as one project unless all of the work was done under the same contract, or for indefinite delivery contracts, under one task order.) Example projects are limited to 25 pages 8-1/2" x
11" total, for all projects. Each side of the paper will be counted as one page.
(3) The Summary Matrix is limited to one (1) 8-1/2”x11” page in addition to the 25 identified above.
PROJECT INFORMATION FORM
1. Example Project Number: Start with “1” for the first of all submitted projects and number consecutively.
2. Provide the name of Contractor(s)/Key Subcontractor (s) for which the example project is submitted to demonstrate experience and capability.
3. Contract Number and Awarded Prime Contractor Name: Provide contract number and the name of the contractor awarded the contract.
4. Title and Location: Title and location of project or contract.
5. Month and Year Project Work Commenced and Month and Year Project was Completed. Include original completion date and actual completion date and a succinct description of any changes in these two dates.
6. Project Owner: Project and contract owner or user, such as a government agency or installation, an institution, or corporation or private individual.
7. Point of Contact Name: Provide project owner’s name or appropriate point of contract for the organization that contracted the construction .
8. Point of Contact Telephone Number and email
9. Description of the Project: Provide contract type, dollar amount (original contract amount and final dollar value (include an explanation for the difference)), physical size, project complexities and a brief description of prime contractor’s effort. If the firm (prime/key subcontractor) performed as a subcontractor, describe the work effort pertaining to the subcontracted effort, not the prime contract requirement. Clearly describe how the example project is relevant to this project.
TAB H – PAST PERFORMANCE
1. General.
a. The information provided under this tab will be used to evaluate the past performance record of the offeror and proposed key subcontractors. Information other than that supplied by the offeror under this tab may be utilized by the Government in its evaluation of past performance.
2. Prime Contractor/Key Subcontractor Example Projects Past Performance.
a. Offerors shall provide past performance information on each of the example projects submitted underTab G, Experience and Capability. Past performance information shall include any evaluations contained in the Government’s Past Performance Information Retrieval System (PPIRS), Federal
Awardee Performance and Integrity Information System (FAPIIS), Construction Contractor Appraisal
Support System (CCASS), as well as any other questionnaires or performance evaluations previously completed.
b. The Past Performance Questionnaire is provided below for the offeror or its team members to submit to the client for each project the offeror includes in its proposal forTab G, Experience and Capability. Include completed Past Performance Questionnaires with your proposal and ensure that correct phone numbers and email addresses are provided for the client’s point of contact. If the offeror is unable to obtain a completed
PPQ from a client for a project beforethe date the offeror intends to submit its proposal, the offeror shall complete and submit with the proposal the first page of the PPQ, including contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure prompt submittal of the balance of the questionnaires via the offeror or directly by those third parties to the Government’s point of contact, Mr. Bryan Glover. Mr. Glover may be reached by email at
Bryan.Glover@usace.army.mil; please copy Nikole May at Nikole.V.May@usace.army.mil. Please include the solicitation number in the subject line of any email sent. All submissions are due by the proposal closing date and any past performance information delivered to the Government by a client after the closing date will not be considered.
c. Offerors are invited to include any performance recognition documents received within the last five (5) years, such as awards, award fee announcements or determinations, customer letters of commendation, or any other form of performance recognition. It is preferred that performance recognition documents be provided for the example projects; performance recognition documents from other than example projects will be considered less relevant.
d. While the Government may consider past performance information from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
e. Formatting and Other Restrictions
(1) Start the information for each example project on a new page. There is no page limitation for this submission.
(2) Sample Past Performance Questionnaire follows:
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) mailto:Nikole.V.May@usace.army.mil
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE
OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY
DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO
SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE.
PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND
ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
CLIENT’S EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the
Contractor successfully performed a significant event that was a benefit to the
Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the
Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
Form PPQ-0 (9/30/11)
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR
EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance
E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff
(including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
Form PPQ-0 (9/30/11)
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E
VG
S
M
U
N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes
No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes:
following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations
(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
Form PPQ-0
3. Key Subcontractor Authorization Letters.
a. Submit a letter of authorization from each proposed key subcontractor that authorizes the Government to discuss the key subcontractor’s past performance record with the prime contractor in conjunction with the Government’s evaluation of the offeror’s technical proposal.
b. Formatting and Other Restrictions: Each letter should be furnished on the business concern’s letterhead and signed by an authorized representative of the concern. There is not a page limitation for this submission.
TAB I – TECHNICAL APPROACH
1. Technical Narrative
a. The Offeror shall provide a technical narrative that details its proposed approach to project construction, explaining its strategy and means to successfully complete the project’s Statement of Work requirements. The narrative shall demonstrate the capabilities and resources of the offeror and its proposed key subcontractors in planning and executing the subject project in accordance with the requirements of the RFP, and shall demonstrate the offeror’s knowledge of quality control procedures applicable to a road improvement and re-pavement effort.
b. Formatting and Other Restrictions. The narrative is limited to ten (10) 8-1/2” x 11” pages
2. Network Analysis Schedule.
a. Provide NAS Project Schedule or GANTT chart (not a Pert Chart), broken down to the “Feature of Work” level including any optional work, that graphically illustrates the proposed integration, scheduling and phasing of the major features of work on the critical and near-critical path for this project in a logical and achievable sequence, including final close-out.
b. Clearly indicate the following…