A07.01_-_Task_Order_Package_amend_3_of_4.pdf

PDF 9 MB Posted

Attached to
MOTCO Roads Paving SATOC
Solicitation number
W91238-17-S-0198
Issued by

About this file

TO Package 3 of 4

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

132+61

ACCESS CONTROL POINT #5

(FUTURE)

50 50 0 10 20 30 400-10-20-30-40

G

G

60 60 0 10 20 30 400-10-20-30-40

EG

FG

-30-40

EG

FG

110-90 90 -1

9 - 86+00.00

0 10 20 30 400-10-20-30-40

110-90 90 -1

10 - 88+00.00

0 10 20 30 400-10-20-30-40

110-90100

-30-40

.5

.4

.6

.9

.8

.8

.5

.5

.7

.5

-40 -30 -20 -10 0 10 20 30 40

.5

.9

.9

.2

.1

.8

.9

.7

.9

.7

-40 -30 -20 -10 0 10 20 30 40

.6

-40 -30

75 75 0 10 20 30 400-10-20-30-40

G

G

65 65 0 10 20 30 400-10-20-30-40

EG

FG

-30-40

EG

FG

60-40 40 -6

21 - 116+00.00

0 10 20 30 400-10-20-30-40

-2.0% -2.0%

-3.0:1

-3 .0

:1

60-40 40 -6

22 - 118+00.00

0 10 20 30 400-10-20-30-40

-2.0% -2.0%

60-4050

-30-40

.8

.5

.9

.2

.1

.4

.4

.4

.6

.4

-40 -30 -20 -10 0 10 20 30 40

.3

.7

.0

.1

.9

.5

.8

.4

.6

.4

-40 -30 -20 -10 0 10 20 30 40

.5

-40 -30

50-20 20 -5

0 10 20 30 400-10-20-30-40

EG

FG

3.0:1

-3 .0

:1

60-30 30 -6

0 10 20 30 400-10-20-30-40

EG

FG

-2.0% -2.0% 3.

0:

-3 .0

:1

60-30

-40

EG

FG

.0

.9

.9

.3

.1

.4

.9

.4

.5

.7

.5

-40 -30 -20 -10 0 10 20 30 40

.2

.8

.0

.9

.9

.0

.2

.0

-40 -30 -20 -10 0 10 20 30 40 -40

C-501

TO EXISTING AC PAVEMENT

PULVERIZE AC FOR TRANSITION

OF 2 IN. AT P.O.C.

PULVERIZE TO A DEPTH

P.O.C.

EXIST. AC PAVMENT

EXIST. AC PAVEMENT

EXIST. AC PAVEMENT

NEW AC PAVEMENT

P.O.C.

XIST. AC PAVMENT

AFTER OVERLAY

BEFORE OVERLAY

4 THICK ASPHALTIC CONCRETE

6" THICK AGGREGATE BASE COURSE

6" THICK AGGREGATE SUBBASE

GEOTEXTILE FABRIC

SELECT SUBGRADE

(TOP 6" COMPACTED)

SCALE: NONE

G E

O F

S H

O U

LD

E

R

PLAN

ELEVATION

BACK BRACE DETAILS- STEEL POST

NBURY ROAD, THERE WILL BE A

E BY A SEPARATE

T. PROPER COORDINATION OF

THE NEXT SUBMITTAL.

8. DEMO EXISTING LIGHTNING PROTECTION GROUND WELLS AND

CONNECTION BOXES, TYPICAL.

9. DEMO EXISTING #2/0 AWG BARE COPPER DIRECT BURIED

ON) PROVIDE 4-WAY CONCRETE-ENCASED ELECTRICAL DUCTBANK PER DETAIL 1 ON SHEET E-503.

E ONE #4/0 AWG BARE COPPER WIRE BELOW DUCTBANK. TRANSITION DUCTBANK FROM JOINT

CAL/COMMUNICATIONS CONCRETE-ENCASED DUCTBANK WITH A GRADUAL SWEEP INTO

CAL MANHOLE. MATCH ELECTRICAL PORTION OF JOINT ELECTRICAL/COMMUNICATIONS

NK FOR ELECTRICAL CONFIGURATION OF DUCTS.

13. (OPTION) PROVIDE 4-WAY 15kV PAD-M

SHEET E-501 FOR PAD AND ANCHORING D

14. (OPTION) PROVIDE LIGHTING POLE, FO

5, 6, AND 7 ON SHEET E-501.

T

10. (OPTION) PROVIDE 2-WAY LIGHTING DUCTBANK PER DETAIL 3 ON SHEET E-503. WHERE DUCTBANK PASSES UNDER PAVED AREAS, DUCTBANK SHALL BE CONCRETE ENCASED FOR 5 FEET BEYOND PAVEMENT. WHERE DUCTBANK IS NOT UNDER PAVED AREAS, DUCTBANK MAY BE DIRECT BURIED BUT AREA SURROUNDING DUCTS SHALL BE CONTROLLED LOW-STRENGTH MIX PER DETAIL. PROVIDE FOUR #4 AWG AND ONE #10 AWG

EQUIPMENT GROUND IN ONE DUCT AND PULLROPE IN THE SPARE DUCT.

11. (OPTION) PROVIDE 4-WAY CONCRETE-ENCASED PRIMARY ELECTRICAL DUCTBANK PER DETAIL 4 ON SHEET E-503. PROVIDE THREE 500KCMIL 15kV CABLES IN EACH OF TWO OF THE ELECTRICAL DUCTS AND PROVIDE PULL ROPE IN THE TWO SPARE ELECTRICAL DUCTS. PROVIDE ONE 4/0 AWG BARE COPPER WIRE BELOW THE ELECTRICAL DUCTBANK. ROUTE THE TWO SETS OF FEEDER CABLES FROM THE ELECTRICAL MANHOLE TO THE TWO

MAIN FEEDER POSITIONS ON THE PAD MOUNTED SECTIONALIZING SWITCH.

12. (OPTION) PROVIDE 2-WAY CONCRETE-ENCASED ELECTRICAL DUCTBANK PER DETAIL 4 ON SHEET E-503.

PROVIDE THREE #1 AWG 15kV CABLES IN ONE DUCT AND PROVIDE PULL ROPE IN SPARE DUCT. PROVIDE ONE 4/0 AWG BARE COPPER WIRE BELOW THE ELECTRICAL DUCTBANK. CONNECT TO ONE OF THE TWO AVAILABLE

LATERAL FEEDER SWITCH POSITIONS OF THE NEW PAD MOUNTED SWITCH.

13. (OPTION) PROVIDE 45kVA 4160V DELTA TO 277/480V WYE PAD-MOUNTED TRANSFORMER. SEE DETAILS 2

AND 3 ON SHEET E-501 FOR PAD AND ANCHORING DETAILS.

14. (OPTION) PROVIDE 4-WAY 15kV PAD-MOUNTED SECTIONALIZING SWITCH. SEE DETAILS 2 AND 3 ON SHEET

E-501 FOR PAD AND ANCHORING DETAILS.

ATIONS, AND LIGHTING WORK

ASSEMBLIES ON (E) POLES,

NEW PAVEMENT SHALL BE IN THE

UCTURES SHOWN ALONG THE

HOWN REGARDING EXISTING

11. (OPTION) PROVIDE 2-WAY CONCRETE-ENCASED ELECTRICAL DUCTBANK PER DETAIL 4 ON SHEET E-503. PR DUCTBANK. PROVIDE THREE 500 KCMIL 15kV CABLES AND ONE #2/0 AWG BARE COPPER WIRE IN ONE DUCT IN-LINE RISER POLE BETWEEN EXISTING POLES #1094 AND #1074. STUB UP SPARE DUCT 2 FEET ABOVE GRAD

12. (OPTION) COIL NEW 144 STRAND SMFO CABLES IN MANHOLE. PROVIDE 25' SPARE FOR EACH SMFO CABLE

13. (OPTION) PROVIDE NEW PRIMARY RISER ON EXISTING POLE #1094. SEE DETAIL 1 ON SHEET E-501 FOR DE

14. (OPTION) PROVIDE 2-WAY LIGHTING OR SECONDARY DUCTBANK PER DETAIL 3 ON SHEET E-503. WHERE D SHALL BE CONCRETE ENCASED FOR 5 FEET BEYOND PAVEMENT. WHERE DUCTBANK IS NOT UNDER PAVED AR SURROUNDING DUCTS SHALL BE CONTROLLED LOW STRENGTH MIX PER DETAIL PROVIDE FOUR #4 AWG AND

7. BORE UNDER MORDOH ROAD AND THE RAILROAD TRACKS WEST OF THE ROAD TO PROVIDE CROSSING FOR 2-WAY ELECTRICAL

DUCTBANK. SEE DETAIL A1 ON SHEET E-502.

UON. NEW

NT

GHT POLES,

ORTH OF STA

STRUCTURES

. ANY

INGS AND

REAS,

UCTBANK

S, AF LOT

File details come from the government source that posted it. Updated .