UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: Hill AFB, UT - FY16 F-35A Hangar 40/42 Additions and AMU KRSM103013 (P2# 404452) Review: Ph II RFP W91238-16-R-0007 (11 Mar - 2 May 2016) (00001) (sorted by CommentID ) Displaying 66 inquiries.
Id Discipline Sheet Detail Spec
6341494 Construction Management 4.3.1 Preface – Prime Contractor/Key Subcontractor Introduction
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Item B states, "For the purposes of this procurement, a key subcontractor is defined as any subcontractor performing "key" major work elements for which capability information is required to be submitted for evaluation as part of the Offeror's technical proposal. The Government has designated the following major work elements as "key":
- Architect-Engineer Design Firm"
Does this statement limit the contractor to only consider the Architect-Engineer Design firm as it's only Key Subcontractor? Or are we allowed to submit other key subcontractors that are utilized under a Prime Sub Teaming agreement, which is instrumental in the execution of the project and provides extensive past performance experience?
On: Dec 31 2015.
Government Response. . Para 4.3.1 a. says, "For purposes of this procurement, the terms 'key subcontractors' are used to refer only to the prospective subcontractors whose qualifications, experience, and past performance will be evaluated by the Government as part of the source selection process."
As noted in para 4.3.1 b., the government designates key subcontractors, and has only designated the A-E firm as a key subcontractor. As such, the government will only consider those firms designated as key, by the Government, as part of the source selection process. On: Jan 13 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6341630 Contracting Amendment 0001, page 4 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per page 4 of amendment 0001 for W91238-16-R-0007, "DIRECTIONS FOR SUBMITTING OFFERS" instructs us to mark envelopes/packages: Solicitation No. W91238-15-R-0018.
However, page 1 of the solicitation shows that the solicitation number is: W91238-16-R-0007
Please clarify which solicitation number is to be used for marking envelopes/binders...
On: Dec 31 2015.
Government Response. . The solicitation number is W91238-16-R-0007. As such, reference this number on all envelopes and packages. On: Jan 13 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6342741 Electrical 60 line 10.3.19.3 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Looking through the solicitation documents for the above referenced project, there is a reference to 400 HZ, 28 VDC and six 270 VDC aircraft power systems. It looks like these systems will be government furnished and government installed. Can it be confirmed that the need for external aircraft ground power will not be needed on this solicitation and exist?
On: Jan 04 2016.
Government Response. . Section 01 10 10 requires the Contractor to provide the facility power. Section 01 10 10 paragraph 10.3.19.3 specifies: "6 each, 270 volt DC power converters for direct aircraft power shall be purchased and installed within this contract". On: Jan 15 2016
Page 1 of 18ProjNet: Logged In User
5/5/2016https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll...
Current Request Status: Request Closed Information for this report is procurement sensitive.
6346797 Construction Management SF-1442 W91238-16-R-0007 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
SF-1442 Block 13B states that "An offer guarantee" is required. For the Phase One response no values or estimates are required. Please clarify if this provision still applies.
On: Jan 07 2016.
Government Response. . Per section 00 22 10, paragraph 2.4 c., the bid guarantee is part of the price proposal.
Per paragraph 3.3 b., of the same section, the price proposal is to be subitted under Phase II.
This acquisition is currently in phase I. Therefore, offerors shall not submit an offer guarantee for this phase (Phase I). On: Jan 13 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6349465 Contracting 01 45 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Key Personnel Resumes; the RFP requires the CQC Manager to possess a bachelors degree and five years' experience as a quality control manage on construction projects?
Would the government except an experience equivalent in lieu of the degree if the CQC Manager had experience on;
- Experience on an aircraft maintenance hangar construction project.
- Experience on a project installing a high-expansion foam fire suppression system.
- Experience on Corps-of-Engineers-administered aircraft maintenance hangars
On: Jan 10 2016.
Government Response. . An amendment is being written to change the CQC manager requirements to reflect: On-site CQC System Manager – This individual must be a construction person with a minimum of five years' experience in related work (to the instant procurement) with a four-year college degree. See Section 01 45 00 for additional minimum qualifications for this position On: Jan 13 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6438524 Other Insulated Metal Wall Panels Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Good afternoon, Are the Division 7 specifications (Insulated Metal Wall Panels & Metal Roof Panels) performance specifications, or are there Basis-of-Design manufacturers? I ask to determine whether Product Substitution Requests need to be submitted for additional manufacturers to be considered into the specification.
Thank you.
On: Mar 17 2016.
Government Response. . Generally, Unified Facility Guide Specifications (UFGS) are performance based.
Per the RFP, the Contractor is responsible for editing the technical specifications and including them in the required design submittals for Government review. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6443565 Specifications Amendment 3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 2 of 18ProjNet: Logged In User
Amendment 3 noted a change to the solicitation required response date/time from 20-Jan-2016 02:00 PM to 10-Apr- 2016 11:00 AM. Please confirm the Phase 2 proposals are due 10-Apr-2016 at 11:00 AM? If confirmed, we request this date be revised because Apr 10 falls on a non-working day, Sunday.
On: Mar 21 2016.
Government Response. . An amendment extended the delivery date to 04-26-2016. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6443625 Civil C-102 Note 2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide a copy of the xeriscape plans for Canberra Drive so they can be matched per note 2 on sheet C-102.
Please clarify if these plans depict the scope of work to be priced under bid option 3.
On: Mar 21 2016.
Government Response. . The landscaping plans will be provided in the forthcoming amendment.
Option 3 is for the design and construction of the project within a period of performance totaling 18 months, as described in Section 01 10 00 page 3 and as indicated on the CLIN schedule. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6443629 Building Design & Engineering General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
After award, will the successful contractor be given the autocad files that were used to create the schematic RFP concept plans so that base information can be used to develop the complete design, or will the contractor need to re-survey the area?
On: Mar 21 2016.
Government Response. . After award, the Contractor will be provided with the CAD files on a CD. Refer to the survey requirement specified in Section 01 33 16 paragraph 4.2. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6443695 Contracting Bid Schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
RFP Section 01 10 00 paragraph "Bid Options Pricing Schedule" lists the following bid options:
Option 1: construct airfield pavement and subsurface infrastructure from the third pavement joint north of the hangars to the taxi-way. Refer to the Civil Drawings located in Section 01 10 10, Attachment A for additional information.
Option 2: Not Used.
Option 3: Design and construct the project within a period of performance totaling 18 months.
However the bid schedule provided in amendment 3, attachment 5 "Acknowledgement Statement", lists the bid options as follows:
Option 1: Design and Construction of the airfield pavement and subsurface infrastructure from the third pavement joint north of the hangars to the taxi-way at Hill AFB, UT.
Option 2: Design and Construction of site civil improvements from a point starting 5-feet from the building line to Canberra Drive (all utility installations necessary to make the building functional are included in the Base Bid) at Hill
AFB, UT.
Option 3: Design and Construct this project with a Period of Performance of 18 months at Hill AFB, UT.
Please clarify the correct bid options.
On: Mar 21 2016.
Page 3 of 18ProjNet: Logged In User
Government Response. . Option two is deleted. An amendment has be issued to ensure the attachments reflect this. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6443746 Contracting SF 1442 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1. The due date for proposals appears to be SUNDAY 10 April. It is recommended that this date be changed to a business day of the week.
2. We request an additional 10 -14 days for bid preparation time beyond 19 April. This project is too complex to offer a good design build proposal in the limited time suggested.
On: Mar 21 2016.
Government Response. . There is an amendment that extended the delivery date to 04-26-2016. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6450443 Contracting General General Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We request a minimum 2 week extension to the bid date. The short duration allowed for technical and price proposal preparation will impact the quality and value of each proposal component. The additional time will allow proper dialogue with key design and subcontract team members in order to provide the best value to the government.
Additionally, added time will ensure the submission of higher quality proposals and minimizes the possibility of disqualification due to error. Due to the technical nature of the facility, additional time is needed for accurate pricing of the unique building features.
On: Mar 25 2016.
Government Response. . There is amendment that extended the delivery date to 04-26-2016. On: Apr 18 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6451187 General Appendix R Appendix R Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Appendix R of the RFP included partial as-built drawings for Bldg. 40, 42, & 89. As-built drawings for the fire suppression water storage tanks and Bldg. 37 were not provided. Please provide, at a minimum, the foundation drawings for the water storage tanks and Bldg. 37 so that an accurate approach and pricing can be provided for protecting those structures during excavation, demolition, and new construction activities.
On: Mar 25 2016.
Government Response. . Refer to Appendix X Hangar 43 Drawings for details on the fire suppression water storage tanks.
The Building 37 drawings will be provide in the forthcoming amendment. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6451232 Structural AD102 01 10 10 - 8.6.6 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing AD102 states that the existing concrete hangar floors are to remain, however spec section 01 10 10 para.
8.6.6 states "The floor in the hangar shall be designed as rigid aircraft pavement in accordance with UFC 3-260-02 using the latest USACE PCASE design program". Is the intent of the contract for the hangar floor slabs to remain, or design for replacement per 01 10 10?
On: Mar 25 2016.
Page 4 of 18ProjNet: Logged In User
Government Response. . Section 01 10 10 paragraph 5.12.5. Airfield Pavements specifies the airfield pavement requirements. Per paragraph 5.12.5.1, "Airfield pavements include hangar floor and asphalt paved shoulders in addition to hangar access pavements". On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6452355 Structural A-102 01 10 10 - 7.20.5 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The span and coverage area for the overhead crane, per note 3 is unclear on dwg. sheet A-102. Spec. section 01 10 10 7.20.5 calls for a "5-ton capacity overhead crane inside each hangar bay", however sheet A-102 only denotes a single overhead crane in one hangar bay. Please clarify scope for overhead crane and the total hangar bay area to be accessible by the crane(s).
On: Mar 28 2016.
Government Response. . Per Sheet A-102 there are two total 5-ton cranes shown, one each in each hangar bay with coverage across the full widths of each bay to service all 6 F-35A aircraft. See also Sections 3/A-301 and 2/A-302 for additional reference. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6452984 Contracting CLIN Schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The price proposal requires a WBS to be provided. Please define how the bid options are to be incorporated into the WBS or if they are to be excluded from the WBS.
On: Mar 28 2016.
Government Response. . Per the instructions for Tab 4 of the price proposal under para 1.3, of section 00 22 00, "Submit a Work Breakdown Structure of the offeror's proposed contract prices, for each line item in the CLIN Schedule." On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6453046 Structural A-801 through A-804
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The perspective view drawings, sheets A-801 through A-804 show a detailed, conventional structural framing system that uses standard steel framing with open web steel joists, brace frames, etc. RFP section 01 10 10 paragraph 8 "Structural Design", does not restrict the type of building and roof framing to be used. Please confirm if conventional steel framing is required as depicted in the RFP drawings, or if other framing options may be considered.
On: Mar 28 2016.
Government Response. . The RFP drawings are based on conventional steel framing members.
However, this does not preclude the offerors from proposing other systems provided the design and construction complies with applicable UFC criteria as required by the RFP (listed in Appendix G) to be approved by the Contracting Officer On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6454028 Contracting 3.1.2.7, Formatting and Other Restrictions Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
RFP Submission requirements, "3.1.2.7, Formatting and Other Restrictions" in reference to the NAS schedule starts with instructions at paragraphs "c", "d" and "e".
QUESTION: Are there supposed to be subsequent paragraph instructions for "a" and "b"?
On: Mar 29 2016.
Government Response. . Since "a" and "b" are not included, there are not instructions for these letters.
On: Apr 25 2016 Current Request Status: Request Closed
Page 5 of 18ProjNet: Logged In User
6454036 Contracting 3.1.2 Tab 1B - NAS Schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Factor 4, Technical Solution, 3.1.2 Tab 1B – NAS Schedule submission requirements only describe the graphical schedule that shall be submitted. However, the evaluation criteria for the tab states "(b) Proposed schedule and APPROACH that clearly reflect an understanding of the complexity of this project will be evaluated more favorably."
QUESTION: Please confirm that we are to submit a graphical schedule that will be evaluated for our approach, and that the Government is NOT requesting a narrative in addition.
On: Mar 29 2016.
Government Response. . Please submit a technical narrative as required by the paragraphs under 3.1.1 of section 00 22 20 On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6456315 Mechanical 01 10 10 - 9.1.3.11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec 01 10 10 paragraph 9.1.3.11 states that Commissioning will follow UFGS 23 08 00 "Commissioning of HVAC systems". However, the RFP specs also state that the project must comply with DoD High Performance Sustainable Building Requirements, including UFC 1-200-2. Both HPSB and the UFC reference ASHRAE standard 189.1 paragraph 10.3.1.2 for commissioning. That ASHRAE standard requires commissioning of many more building systems then covered by 23 08 00 (domestic hot water, lighting/day-lighting, etc.), as well as commissioning activities not normally included in the UFGS 23 08 00, such as two (2) design reviews, Cx training review and coordination of a Systems Manual.
Do you want Cx per 23 08 00, or do you want it per ASHRAE 189.1 10.3.1.2?
On: Mar 30 2016.
Government Response. . Per 01 10 10, the Contractor shall also take appropriate actions and incorporate features in the design and construction to meet Guiding Principles for Federal Leadership in High Performance and Sustainable Building requirements.
The Contractor is responsible for editing the technical specifications as specified in Section 01 10 10 paragraph 4.5. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6456316 General General Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the Price Proposal Tabs are considered bookmarks on a searchable "pdf" as No hard copy will be submitted, except for the bid guarantee per Amendment 0003; 1.1, 1.2
On: Mar 30 2016.
Government Response. . Per section 00 20 20, para 1.2, for the price volume only, defines "tab" as a bookmark on a searchable PDF document. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6456776 Other N/A N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Tab 1B - NAS Schedule states "a) If the offeror proposes a completion period of lesser duration than the performance period specified in the solicitation, a compliance statement completed by the offeror and duly executed with an original signature by an official authorized to bind the company must be included in the technical proposal. If a contract is awarded to an offeror proposing a completion period of lesser duration than the performance period specified, that shorter performance period will be incorporated into and made a part of the resulting contract. In addition, any assessment of liquidated damages will be based on the shortened performance period accepted by the Government.
Page 6 of 18ProjNet: Logged In User
(b) A compliance statement completed by the offeror and duly executed with an original signature by an official authorized to bind the company must be included in the technical proposal under this tab. Failure to include this signed statement may render an offer which proposes a completion period of lesser duration ineligible for contract award"
However, Tab 1C, Offeror's Statement of Compliance appears to be requesting the same statement of compliance.
Please confirm if this Statement of Compliance shall be submitted under both tabs, and if not, will it be eliminated from Tab 1B? Please confirm the difference, if any, and where it shall be included.
On: Mar 30 2016.
Government Response. . An amendment has been issued that specifies the statement of compliance be included under Tab 1C, but not 1B. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6458884 CAD-BIM Appendix I Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
RFP Appendix I, paragraph 6.2 describes COBie compliance. Does the government desire this service? This will have a 6-figure cost implication to the project.
On: Mar 31 2016.
Government Response. . Section 01 10 00 paragraph Summary of Work specifies the required use of BIM. The BIM requirements are covered in Appendix I. Appendix I indicates in the 'NOTE TO SPECIFIER' that COBie initiatives are Contractor implementation electives; additionally COBie is specified under Section 6 Contractor Electives. The offeror asked if the Government desires this service, and we responded it is not required. Per Appendix I, it is a contractor elective. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459871 Contracting General Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can the government please provide the sign-in sheet for the job walk attendees.
On: Apr 01 2016.
Government Response. . The sign-in sheet is posted to FBO. On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459877 General 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10 Paragraph 5.12.4 Aircraft Apron Parking. Please stipulate the number of aircraft ground wells and tie-downs required in accordance with UFC 3-260-01.
On: Apr 01 2016.
Government Response. . Refer to Appendix A, Sheet C-101 General Note 6, for the number of aircraft ground wells and tie-downs required in accordance with UFC 3-260-01 On: Apr 18 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459881 General 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 7.9.1.8 requires that the SAPF Room (12/13) ceiling is a suspended gypsum board ceiling over entire room. Will lay-in ceiling system be acceptable in order to allow for above ceiling inspection, per
JAFAN 6/9?
On: Apr 01 2016.
Government Response. . Lay-in ceiling system is acceptable as long as it complies with the JAFAN 6/9 requirements as specified in Section 01 10 10 paragraph 7.9.1. On: Apr 18 2016 Current Request Status: Request Closed
Page 7 of 18ProjNet: Logged In User
6459882 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 7.11.6.9 Air Barrier Requirements. Per UFC 3-101-01, design, construct and test the building enclosure with a continuous air barrier to control air leakage. Per UFC 3-101-01, please confirm that hangar bays are required to have air barrier inspections only.
On: Apr 01 2016.
Government Response. . Contractor shall comply with the air barrier requirements per UFC 3-101-01.
Testing of the air barrier in the admin and AMU areas will be required. Inspection-only applies only to the "hangar" part of the building. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459885 Commissioning 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 9.1.3.11 Commissioning. Please clarify definition of "Design Agent's Representative" as used in this paragraph.
On: Apr 01 2016.
Government Response. . The "Design Agent's Representative" as used in Section 01 10 10 paragraph
9.1.3.11 Commissioning refers to the Commissioning Agent if applicable to contractor's team. This was reflected in Amendment 0006. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459886 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 11.1.2.7 Means of Egress: This paragraph Refers to UFC 4-211-02, Section 3-2.1.5 for means of egress requirements. UFC 4-211-02 is applicable to Aircraft Corrosion Control and Paint Facilities, not aircraft maintenance hangars. Please clarify to what, if any, degree UFC 4-211-02 is applicable to the Hangars 40/42 project.
On: Apr 01 2016.
Government Response. . Section 01 10 10 paragraph 11.1.2.7 noted references UFC 4-211-01, dated 9 Oct, "Aircraft Maintenance Hangars"; not UFC 4-211-02,"Corrosion Control and Paint Hangars", which does not apply to this project. On: Apr 29 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459887 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 11.1.2.7 Means of Egress: NFPA 101 40.6.2.2 stipulates that the maximum allowable distance between exit doors on exterior hangar walls is 150 feet. The SOW states that the requirements of "...NFPA 101 apply to hangar bay egress, except as modified. Exit doors are not required in hangar door(s). Where hangar doors exceed 150 ft., an exit shall be provided within 20 ft. of each end of the hangar door. Personnel doors may be provided through the hangar door; however these doors will not be counted as one of the required exits." Please confirm and clarify the authorization to deviate from the NFPA 101 Life Safety Code Requirements.
On: Apr 01 2016.
Government Response. . The Contractor is to provide means of egress as specified in Section 01 10 10 paragraph 11.1.2.7 and as shown on sheet G-101. There is no authorization to deviate from the NFPA 101 Life Safety Code Requirements. On: Apr 29 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459889 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 8 of 18ProjNet: Logged In User
Section 01 10 10, Paragraph 11.1.2.7 Means of Egress: On previous hangars at HAFB the users expressed a specific need for a personnel door and a cable access hatch in the center panel of hangar doors, in order to meet operational requirements. Please confirm whether or not a personnel, exit, or other type door is required in the center panel of each hangar door.
On: Apr 01 2016.
Government Response. . The HAFB users did not request personnel doors within the hangar doors or a cable access hatch in the center panel of the hangar doors during reviews for this project. The offerors should prepare their proposal per the requirements specified in the RFP. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459890 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 11.2.7.9 Draft Curtains. Provide draft curtains surrounding each sprinkler system in accordance with ETL 02-15 and UFC 4-211- 01. The proposed hangar areas only slightly exceed the maximum area for which draft curtains are required (15,000 SF). Please confirm that draft curtains will be required.
On: Apr 01 2016.
Government Response. . Draft curtains are required as specified in Section 01 10 10 paragraph
11.2.7.9. On: Apr 29 2016
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459891 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 7.11.1 Exterior Masonry Walls (Drawing 2/A-310) The Government drawings do not show or indicate any insulation on the inside faces of the masonry walls. Please confirm that the exterior masonry wall assembly must meet the R-19 thermal resistance value in order to meet the energy code requirements.
On: Apr 01 2016.
Government Response. . The exterior walls shall be designed to comply with the High Performance and Sustainable Buildings (HPSB) requirements as specified in Section 01 10 10 paragraph 4.5.3. The contractor is to confirm the required thermal resistance value in their complete design. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459892 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 7.11.5.8 Is it acceptable to install a single-ply SBS membrane roof in lieu of the Base-standard modified polymer two-ply SBS system?
On: Apr 01 2016.
Government Response. . It is not acceptable to install a single-ply SBS membrane roof in lieu of the Base-standard modified polymer two-ply SBS system. The Contractor shall comply with the requirements detailed in Section 01 10 10 paragraph 7.11.5.8. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459894 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 7.11.1 Exterior Masonry Walls. Please confirm that exterior, exposed masonry walls require both masonry units and mortar to be manufactured with an integral water repellant, and that these walls are also required to be sealed with an impregnating sealer after construction.
On: Apr 01 2016.
Government Response. . Designer of Record has the authority to detail accordingly in compliance with RFP criteria. Per Section 01 10 10 paragraph 1.6: "The conceptual design drawings provided do not indicate all necessary design and construction requirements; while the written components, including
Page 9 of 18ProjNet: Logged In User specifications and attachments, of the RFP describes technical performance and system requirements. The Contractor is responsible for the complete Project design, shall retain all responsibilities and be recognized as the Designer of Record." On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459895 LEED 01 10 10
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 4.5.3 Sustainable (LEED) Design. Per this paragraph "The Contractor is not required to design the project to meet US Green Building Council (USGBC) certification. However, compliance with sustainable design procedures is required. LEED®-NC is a commercial Green Building Rating Tool developed by USGBC."
Paragraph 1.3 - LEED Certification: "The current F-35A Hangar 40/42 Additions and AMU project is not required to be LEED Certified. However, compliance with applicable Air Force sustainable design principles is expected as defined further within this RFP." The statements in the two above mentioned paragraphs appear to be in conflict with one another. Please clarify.
On: Apr 01 2016.
Government Response. . Based on the referenced paragraph and 4.5.4, while the contractor is not required to obtain LEED certification, the contractor is required to comply with HPSB criteria. On: Apr 29 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459897 LEED 01 10 10
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 4.5.3 Sustainable (LEED) Design. While this project is not required to obtain LEED certification, it is required to be designed and constructed to meet a LEED Silver and other sustainability requirements. The tracking and documentation associated with a LEED certification are very substantial and costly, but will not add value if the project is not registered for LEED certification. Please confirm that the Contractor is to design and construct the Work to meet the stipulated sustainability requirements, but that tracking and documentation associated with LEED Silver certification is NOT required.
On: Apr 01 2016.
Government Response. . The tracking and documentation associated with registering this project for USGBC LEED Silver certification is not required; however, this project shall fully comply with the sustainable design requirements as specified in Section 01 10 10 paragraph 4.5.3. The Contractor shall fully incorporate the Federal Leadership in High Performance and Sustainable Buildings (HPSB) requirements in design and construction and shall pursue LEED credits to otherwise attain a LEED Silver Certification, and shall demonstrate this by compliance of a point scoring LEED checklist for each design/construction feature of work in meeting the Silver LEED total point requirement. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459901 Electrical CD102 Demolition Note #2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet CD102, Demolition Note #2, specifies the relocation of an existing stadium pole and lights. Is alternative lighting required while this pole and lights are out of service for relocation?
On: Apr 01 2016.
Government Response. . No alternative lighting shall be required during the relocation of this light pole during construction activities where non-occupancy of building is realized as long as illumination of existing adjacent facilities is not affected by reduced lighting. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459902 Electrical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 10 of 18ProjNet: Logged In User
Section 01 10 10, Paragraph 10.3.19.2 lists the requirement for a J42018 connector for the powering of support equipment. Will these connectors be provided and installed by the government or provided and installed by the electrical contractor?
On: Apr 01 2016.
Government Response. . The Contractor is required to provide and install the connector as required in Section 01 10 10 paragraph 10.3.19.2. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459903 Electrical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph, 10.3.19.4 lists a requirement for static ground receptacles. Can the existing static ground receptacles be re-used? How many new static ground receptacles are required? Where are the new static ground receptacles to be located?
On: Apr 01 2016.
Government Response. . The Contractor must locate the receptacle locations and quantities per criteria in the RFP, as specified in Section 01 10 10 paragraph 10.3.19.4.
There is nothing in the specifications prohibiting the reuse of existing receptacles should they be deemed reusable by the DOR and Contracting Officer. On: Apr 29 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459906 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 9.2.19.1.4 "Air drawn from adjacent spaces into the restrooms shall not be through door louvers; instead, lined transfer duct (duct jumper) shall be used for noise attenuation..." Base standards do not allow the use of lined duct. Please confirm that manufactured and listed sound attenuators are required to meet this acoustic isolation requirement.
On: Apr 01 2016.
Government Response. . The Contractor/Designer of Record has the authority to detail accordingly in compliance with RFP criteria. Per Section 01 10 10 paragraph 1.6: The conceptual design drawings provided do not indicate all necessary design and construction requirements; while the written components, including specifications and attachments, of the RFP describes technical performance and system requirements. The Contractor is responsible for the complete Project design, shall retain all responsibilities and be recognized as the Designer of Record. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459907 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 8.3.4 states the frost depth shall be 73 inches; however, section 8.6.2 states the minimum frost depth to be 36 inches. Please clarify the correct frost depth requirement.
On: Apr 01 2016.
Government Response. . The frost depth for Hill AFB is 36 inches. The forthcoming amendment will clarify Section 01 10 10 paragraph 8.3.4. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459908 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 8.4.4.1 requires steel deck for both roof and composite floor deck to be 18 gauge minimum. Please confirm that lighter gauges are not acceptable.
On: Apr 01 2016.
Page 11 of 18ProjNet: Logged In User
Government Response. . Lighter gauges may be acceptable depending on the Contractor's/DOR's framing design solution. The Contractor/Designer of Record has the authority to detail accordingly in compliance with RFP criteria pending ultimate approval by the Contracting Officer. Per Section 01 10 10 paragraph 1.6: The Contractor is responsible for the complete Project design, shall retain all responsibilities and be recognized as the Designer of Record. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459910 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 8.4.5.2 states all CMU walls shall be solid grouted. Please confirm that ALL CMU walls will be required to be solid grouted.
On: Apr 01 2016.
Government Response. . Designer of Record has the authority to detail accordingly in compliance with RFP criteria pending ultimate approval by the Contracting Officer. Per Section 01 10 10 paragraph 1.6: The conceptual design drawings provided do not indicate all necessary design and construction requirements; while the written components, including specifications and attachments, of the RFP describes technical performance and system requirements. The Contractor is responsible for the complete Project design, shall retain all responsibilities and be recognized as the Designer of Record. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459912 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 8.6.9 states foundation stem walls shall be 12 inches thick minimum. Will 12 inch wide stem walls be required beneath 8 inch CMU walls when structurally adequate to support those walls?
On: Apr 01 2016.
Government Response. . The Contractor / Designer of Record has the authority to detail accordingly in compliance with RFP criteria pending ultimate approval by the Contracting Officer. Per Section 01 10 10 paragraph 1.6: The conceptual design drawings provided do not indicate all necessary design and construction requirements; while the written components, including specifications and attachments, of the RFP describes technical performance and system requirements. The Contractor is responsible for the complete Project design, shall retain all responsibilities and be recognized as the Designer of Record. On:
Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459914 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 11.14.4.3.2: Please confirm that the existing water storage tanks and fire pumps in Building 43 are sufficient to supply the necessary flows and pressures for the new criteria high expansion foam system equipment (Appendix S).
On: Apr 01 2016.
Government Response. . The Government confirms the pumps at Building 43 are sufficient to supply the necessary flows and pressures for the new criteria high expansion foam system equipment. On: Apr 25 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459916 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 11.3.1 requires a graphical annunciator to be provided. Please verify how many graphical annunciators will be required and in what locations. Also, what graphical information will be required to be displayed.
On: Apr 01 2016.
Page 12 of 18ProjNet: Logged In User
Government Response. . The Contractor / Designer of Record has the authority to detail accordingly in compliance with RFP criteria pending ultimate approval by the Contracting Officer. Per Section 01 10 10 paragraph 1.6: The conceptual design drawings provided do not indicate all necessary design and construction requirements; while the written components, including specifications and attachments, of the RFP describes technical performance and system requirements. The Contractor is responsible for the complete Project design, shall retain all responsibilities and be recognized as the Designer of Record. The Contractor is to verify the quantity and location of graphical annunciators., and to determine the graphical information to be displayed. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459917 Architectural Amendment 0001 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Amendment #1 documents include the Hill Air Force Base Design Standard dated 19 Mar 2014. A newer design guide has been released dated 3 Sep 2015. Should the newer design guide be used for this project?
On: Apr 01 2016.
Government Response. . The latest design guide should be used for the project. The forthcoming amendment will replace Appendix L with the April 2016 version of the Base Facility Design Guide. On: Apr 29 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459919 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 5.12.4 Aircraft Apron Parking: Please confirm quantity and layout of ground wells and tie-down requirements for the new concrete apron.
On: Apr 01 2016.
Government Response. . Refer to General Note 6 on sheet C-101 for the quantity of ground wells and tie downs. Contractor shall provide ground wells and tie down IAW UFC 03-260-01. The Contractor / Designer of Record has the authority to detail accordingly in compliance with RFP criteria pending ultimate approval by the Contracting Officer. Per Section 01 10 10 paragraph 1.6: The Contractor is responsible for the complete Project design, shall retain all responsibilities and be recognized as the Designer of Record.
On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459922 Architectural 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 10 10, Paragraph 11.2.5 (and paragraph 5.7): Please confirm that the existing high pressure fire line needs to remain operational during construction of Hangars 40/42. What, if any, provisions have been made for ready connection of this project to the existing high pressure fire line (valves and/or flanges, etc.)? Is the installation of the new high pressure fire line to be within the Hangar 40/42 project boundary and scope of work?
On: Apr 01 2016.
Government Response. . Refer to Section 01 10 10 paragraph 5.14.4.3.2 and Appendix A Sheet C-103 for fire service requirements. Contractor shall be responsible for coordinating all impairments associated with high pressure line with the Base Fire Chief and Contracting Office. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459927 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011010.9.2.2: SOW indicates that Trane Trace 700, Energy Pro, or eQuest shall be utilized for HVAC load calculations. Will the government also allow Sefaira for evaluating whole building energy performance?
On: Apr 01 2016.
Page 13 of 18ProjNet: Logged In User
Government Response. . Sefaira is not an acceptable software for HVAC load calculations. The Contractor shall comply with Section 01 10 10 paragraph 9.2.2. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459930 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011010.9.2.19.1.1: SOW indicates that the AHU systems for the first and second floor office areas will provide both heating and cooling comfort throughout the year. The description implies that these units should be semi
– custom packaged rooftop units with VAV capability with DX cooling. According to BFDS section 7.12.3, new buildings shall exceed ASHRAE/IESNA Standard 90.1 by 30% if cost effective. Per ASHRAE/IESNA standard 90.1, the baseline system and proposed system are the same system (VAV system with reheat). It is highly unlikely that 30% savings can be achieved with the AHU system described in the statement of work. Is it the government's intention that the contractor is to design and install the (baseline) system as described in the RFP, rather than upgraded systems meeting enhanced energy performance requirements as stipulated elsewhere in the SOW?
On: Apr 01 2016.
Government Response. . The Government's intent is for the Contractor to comply with High Performance and Sustainable Buildings (HPSB) criteria to the extent achievable as determined by the DOR and approved by the Contracting Officer mutually discussed during the design charrette. On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459931 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011010.9.2.19.1.1: Is direct evaporative cooling acceptable in lieu of DX cooling as described in SOW 9.2.19.1.1?
On: Apr 01 2016.
Government Response. . Units shall be DX cooling as specified in Section 01 10 10 paragraph
9.2.19.1.1. On: Apr 25 2016
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459932 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011010.9.2.19.1.1: Is indirect evaporative cooling (IDEC) acceptable in lieu of DX cooling as described in
SOW 9.2.19.1.1?
On: Apr 01 2016.
Government Response. . Indirect evaporative cooling is not acceptable in lieu of direct expansion (DX) cooling. Contractor shall provide DX cooling as specified in Section 01 10 10 paragraph 9.2.19.1.1. On:
May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459933 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011010.9.2.19.1.1: Are VRF systems acceptable in lieu of the semi-custom AHU approach described in SOW 9.2.19.1.1?
On: Apr 01 2016.
Government Response. . VRF units are acceptable so long as all ventilation rate requirements are met IAW criteria and requirements specified in the RFP. On: Apr 25 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459934 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 14 of 18ProjNet: Logged In User
Section 011010.9.2.2: SOW indicates that the cooling load shall include a 10% safety factor. Providing this safety factor adversely effects the energy efficiency of the cooling system(s), and hence the ability of the systems to achieve stipulated efficiencies. Is it the government's intention that we provide this safety factor in lieu of energy performance?
On: Apr 01 2016.
Government Response. . The 10% safety factor is required by the UFC and as specified in Section 01 10 10 paragraph 9.2.2. The Contractor must comply with the criteria and requirements specified in the RFP.
On: May 04 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459936 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011010.9.2.2: SOW indicates that the heating load shall include a 30% pick-up factor, plus a 10% safety factor. Providing this safety factor adversely effects the energy efficiency of the heating system(s). Is it the government's intention that the contractor provide this safety factor in lieu of meeting energy performance requirements?
On: Apr 01 2016.
Government Response. . The pickup factor and safety factor are required by the UFC. The Contractor must comply with the criteria and requirements as specified in the RFP and Section 01 10 10 paragraph
9.2.2. On: Apr 25 2016
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6459938 Mechanical 01 10 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011010.9.3.5: SOW indicates that the trench drains will be connected to the existing industrial waste line.
Will these new industrial waste line connections be classified as laterals?
On: Apr 01 2016.
Government Response. . Per Section 01 10 10, paragraph 9.3.5, "Within expanded Hanger areas.
provide trench drains with sufficient laterals aeration and easy cleanout of oil or other residue." On: May 04 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6501838 Architectural 011010.11.1.2.7 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Previous Inquiry #6459886 – UFC 4-211-01N, as provided on the WBDG site, does not include paragraph #3-2.1.5, nor…