A07.1_6-Atch_5_Acknowledgement_Statement.pdf

PDF 32 KB Posted

Attached to
DB F-35A Hangar 40/42 Additions and AMU
Solicitation number
W91238-16-R-0007
Issued by

About this file

Atch 5_Acknowledgement Statement

View the file

Other files

File Type Posted
C01.14_Award_Announcement_(Synopsis).doc DOC document
Atch_5_Acknowledgement_Statement_05-06-2016.pdf PDF
A07.02_W91238-16-R-0008_Amend.pdf PDF
W91238-16-R-0007-0007_Amend.pdf PDF
A07.6_Bidder_Inquiry_Responses.pdf PDF
Amendment_6_SF30.pdf PDF
Amendment_6.pdf PDF
W9123816R00070005.pdf PDF
Atch_5_Acknowledgement_Statement_03-22-2016.pdf PDF
W91238-16-R-0007-0004_Amend.pdf PDF
Pending_Amendment_4-4-2016.docx DOCX document
Pending_Correction_of_Due_Date.pdf PDF
A07.5_Site_Walk_Sign-In_Sheet_Public_Version_with_Redactions.pdf PDF
W91238-16-R-0007_Phase_2_Potential_Offerors.pdf PDF
Atch_1_SOW_F-35A_Hangar_40_42_Additions_and_AMU.pdf PDF
W91238-16-R-0007-0003_Amend.pdf PDF
Atch_3_Wage_Determination_Building_03-04-2016.pdf PDF
HILL_AFB_DB_RFP_HANGAR_40_42_AMU_JAN_2016_RTA.pdf PDF
Atch_2_Supplemental_Contract_Requirements.pdf PDF
Atch_5_Acknowledgement_Statement.pdf PDF
Atch_4_Wage_Determination_Heavy_01-08-2016.pdf PDF
W91238-16-R-0007-0002.pdf PDF
Attachment_9-01_45_00_(Amend_0002).pdf PDF
Attachment_8-01_33_00_(Amend_0002).pdf PDF
W91238-16-R-0007_Amend_0002.pdf PDF
W1238-16-R-0007_Amend_0001.pdf PDF
2-App1_HILL_AFB_CONSOLIDATED_DB_RFP_FULL_BC2_HANGAR_40_42_AMU_2015_12_21_d.pdf PDF
A07.1_3-Atch_2_Supplemental_Contract_Requirements.pdf PDF
A07.1_1-Atch_1_SOW_F-35A_Hangar_40_42_Additions_and_AMU.pdf PDF
W91238-16-R-0007.pdf PDF
A07.1_2-App_1_Hill_AFB_Final_D-B_RFP_F-35A_Hangar_40 42_Additions_and_AMU.pdf PDF
A07.1_4-Atch_3_Wage_Determination_Building.pdf PDF
A07.1_7-HILL_AFB_FINAL_DB_RFP_HANGAR_40_42_AMU_Drawings_2015_09_18.pdf PDF
A07.1_5-Atch_4_Wage_Determination_Heavy.pdf PDF
Synopsis_(Presolicitation)_F-35A.doc DOC document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 – Acknowledgement Statement F-35A Hangar 40/42 Additions and AMU Hill AFB, UT October 29, 2015

The offeror agrees to perform the work required at the prices specified and in strict accordance with the terms of the contract.

1. Name, Address, and DUNS Number of Contractor

2. Telephone Number

3. Contract No.:

4. Title of Project: F-35A Hangar 40/42 Additions and AMU

5. Name and Title of Person Authorized to Sign Offer:

Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:

6. Signature:

7. Offer Date:

8. Amendments (Number & Date of Acknowledgement):

9. Offers providing less than ___90___ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

10. Period of Performance: __730_____ calendar days

11. (a)-Note that your statement must include your acknowledgment of all amendments; and (b)-This is a Job pricing. Provide price breakout as follows:

CLIN Breakout Schedule

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC.

NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS

AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL

ATTACHMENTS THERETO.

UNIT OF TOTAL

CLIN DESCRIPTION QUANTITY MEASURE PRICE

0001 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation for design of the composite hangars and AMU structure, plus associated site improvements that will house the F-35A Hangar 40/42 and AMU operations at Hill AFB, UT in accordance with all RFP documents, drawings and specifications

0002 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation for construction of the composite hangars and AMU structure, plus associated site improvements that will house the F-35A Hangar 40/42 and AMU operations at Hill AFB, UT in accordance with all RFP documents, drawings and specifications

OPTION 1:

0003 Provide all labor, management, 1 JOB $_______________ equipment and transportation for design of the airfield pavement and subsurface infrastructure from the third pavement joint north of the hangars to the taxi-way at Hill AFB, UT in accordance with all RFP documents, drawings and specifications

0004 Provide all labor, management, 1 JOB $_______________ equipment and transportation for construction of the airfield pavement and subsurface infrastructure from the third pavement joint north of the hangars to the taxi-way at Hill AFB, UT

OPTION 2:

0005 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation for the design of site civil improvements from a point starting 5-feet from the building line to Canberra Drive (all utility installations necessary to make the building functional are included in the Base Bid) at Hill AFB, UT

0006 Provide all labor, management, 1 JOB $_______________ equipment and transportation for the construction of site civil improvements from a point starting 5-feet from the building line to Canberra Drive (all utility installations necessary to make the building functional are included in the Base Bid) at Hill AFB, UT

OPTION 3:

0007 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation to design and construct this project with a Period of Performance of 18 months at Hill AFB, UT

TOTAL PRICE (ITEMS 0001-0007)

END OF CLIN SCHEDULE

1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable".

2. If a modification to a price is submitted which provides for a job adjustment to the total price, the application of the job adjustment to each item in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the job adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule.

3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".

4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

UAI 52.214-5000 ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(5) The successful offeror grants the options listed in the Pricing Schedule to the Government.

The options may be exercised up to 60 calendar days after receipt of notice to proceed (NTP).

(6) Exercise of the option occurs upon mailing of written notice to the Contractor. Exercise will be made by the Contracting Officer. The price for exercise of the option includes all work and effort associated with the scope of that item. The proposed additional time for contract completion will be allowed when the option is exercised.

(7) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

File details come from the government source that posted it. Updated .