Amendment 1 - W91238-10-R-0026.pdf

PDF 144 KB Posted

Attached to
FY11 General Instruction Building at Presidio of Monterey, California
Solicitation number
W91238-10-R-0026
Issued by

About this file

Amendment 1 - W91238-10-R-0026

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY11 General Instruction Building, Presidio of Monterey, California

The purpose of this amendment is to:

1. Clarify the Bidder’s Inquiry Key in Section 00100- the key contains the letter “O” not the number zero.

2. Correct the Subcontracting Plan threshold and the Subcontracting goals in Section 00100 and Section 00111.

3. Include the requirements for the Technical Volume: Factor 5 – Socio-Economic Considerations in Section 00111.

4. Revise the Specifications - Section 01 57 23, Section 22 00 00, Section 22 14 46, Section 25 10 10, and Section 27 10 00.

5. Revise Draw ings (55).

The proposal due date has not been extended.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 35

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Oct-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-10-R-0026

X 9B. DATED (SEE ITEM 11)

07-Oct-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Oct-2010

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET-ROOM 878

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-10-R-0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 2102 07-OCT-2010 Attachment 2 Drawings – Volume 1 of

17 30-SEP-2010

Attachment 3 Drawings – Volume 2 of

49 30-SEP-2010

Attachment 4 Drawings – Volume 3 of

64 30-SEP-2010

Attachment 5 Drawings – Volume 4 of

62 30-SEP-2010

Attachment 6 Drawings – Volume 5 of

58 30-SEP-2010

Attachment 7 Drawings – Volume 6 of

101 30-SEP-2010

Attachment 8 Drawings – Volume 7 of

49 30-SEP-2010

Attachment 9 Davis Bacon Wage Determination

52 10-SEP-2010

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 2102 07-OCT-2010 Attachment 10 Specifications -

Amendment 1

175 21-OCT-2010

Attachment 11 Drawings - Amendment 1 55 21-OCT-2010 Attachment 2 Drawings – Volume 1 of

17 30-SEP-2010

Attachment 3 Drawings – Volume 2 of

49 30-SEP-2010

Attachment 4 Drawings – Volume 3 of

64 30-SEP-2010

Attachment 5 Drawings – Volume 4 of

62 30-SEP-2010

Attachment 6 Drawings – Volume 5 of

58 30-SEP-2010

Attachment 7 Drawings – Volume 6 of

101 30-SEP-2010

Attachment 8 Drawings – Volume 7 of 49 30-SEP-2010

Attachment 9 Davis Bacon Wage

Determination

52 10-SEP-2010

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

SECTION 00100 LOCAL PROVISIONS

SECTION 00100

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

AND EVALUATION CRITERIA FOR AWARD

The following documents must be returned with your quote, bid, or offer.

--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.

--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.

Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.

--The completed Pricing Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and priced sub-line items. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.

--Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section 00600).

--Your Bid Guarantee (e.g., Standard Form 24, “Bid Bond”)

--Any other documents required by the solicitation (see Attachments and/or Section 00111 for competitive RFPs).

INQUIRIES:

Prospective offerors should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fbo.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Number is: W91238-10-R-0026

The Bidder Inquiry Key is: Q4W7YO-O6DCRY

c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Samantha Plank Telephone: (916) 557-5193

E-MAIL:

Samantha.E.Plank@usace.army.mil AND Gregory.L.Tom@usace.army.mil

DIRECTIONS FOR SUBMITTING OFFERS:

Envelopes/packages containing offers must be sealed, marked and addressed as follows:

MARK ENVELOPES/PACKAGES:

Solicitation No.: W91238-10-R-0026 Closing Date: 17 November 2010 Closing Time: 3:00 PM Local Time

ADDRESS ENVELOPES/PACKAGES TO:

Department of the Army U.S. Army Engineer District, Sacramento ATTN: Contracting Division 1325 J Street Sacramento CA 95814-2922

SPECIAL INSTRUCTION PERTAINING TO HAND-CARRIED OFFERS:

Hand-carried offers must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.

Due to security precautions, Offerors may no longer hand-carry their offers directly to Contracting Division. Offers may NOT be turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no longer public parking in the Building.

The contract specialist will be in the Building Lobby 20 minutes prior to the closing time to accept hand-carried offers. After announcing that no further offers will be received, the contract specialist will have the hand-carried offers x-rayed as a security precaution.

Offerors who desire to hand-deliver their offers at an earlier time must notify the contract specialist in advance in order to arrange to be met in the Building Lobby by Contracting Division personnel. In the event the contract specialist cannot be reached, please call the main Contracting Division telephone number, (916) 557-5201, in order to request assistance.

Please ensure that all courier and delivery personnel are aware of these procedures.

CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:

In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Section 00111, Preaward Survey). All offerors will complete and return the Preaward Survey as part of the Price/Cost proposal. Failure to submit the Preaward Survey in conjunction with the price proposal will not of itself render the offer unacceptable.

In order to be determined to be responsible a prospective contractor must:

a. Have adequate financial resources to perform the contract or the ability to obtain them.

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.

c. Have a satisfactory performance record. In making the determination of responsibility, the Government Contracting Officer shall consider relevant past performance information. A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history except when there are special standards set forth in the solicitation which applies to all bidders that must be met in order to receive the award. These special standards may be necessary when unusual expertise or specialized facilities are necessary in the performance of the contract; therefore, in order to be determined to be responsible for that particular contract, the offeror must be able to meet those special standards. A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be nonresponsible unless the Contracting Officer determines that the circumstances were beyond the contractor's control or that the contractor has taken appropriate corrective action. Other responsibility considerations by the Contracting Officer will include past efforts by the contractor to apply sufficient tenacity and perseverance to perform acceptably, to meet quality requirements of contracts, and the contractor's past compliance with subcontracting plans (if required) under recent contracts.

d. Have a satisfactory record of integrity and business ethics.

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).

f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Preaward Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in subparagraphs a, e, and f above) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.

The Preaward Survey as a tool used by the Government in determining responsibility of the offeror is submitted as part of the Price/Cost proposal and is separate from the technical proposal's response to the technical evaluation criteria found later in this Section. Some of the information required from the offeror for completion of the Preaward Survey and the technical proposal may be duplicative but it is necessary that the information be provided in full in both places and that the Price/Cost proposal and the Technical proposal be separate documents.

DO NOT state, for example, in the technical proposal, "See Price/Cost proposal for past performance information".

AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTIONS:

a. The internet URL for Corps of Engineers publications is:

http://140.194.76.129/publications/

b. Construction Criteria Base (CCB). The Construction Criteria Base (CCB) system available through the National Institute of Building Sciences includes copies of Corps of Engineers methods and specifications.

Information about the CCB can be obtained from:

http://www.wbdg.org/ccb/ccb.php

c. The Corps of Engineers manual, EM 385-1-1, Safety and Health Requirements Manual, is available on the Internet at the following location:

https://kme.usace.army.mil/CoPs/Contracting/USACE%20Safety%20Manual%20%20EM%2038511%202008/For ms/AllItems.aspx or an alternate URL is http://www.usace.army.mil/CESO/Pages/EM385-1-1,2008NEW!.aspx.

TELEGRAPHIC OFFERS:

TELEGRAPHIC OFFERS ARE NOT ACCEPTABLE.

However, offers may be modified or withdrawn by telegraphic notice. Any telegram to modify an offer sent to this office must be received in the office designated in the solicitation for receipt of offers not later than the exact date and time set for receipt of offers. A telegraphic modification of an offer received in such office by telephone from the receiving telegraph office not later than the exact date and time set for receipt of offers shall be considered.

However, the telephone message shall be confirmed by the telegraph company by sending a copy of the written telegram that formed the basis for the telephone call. The written telegram shall be sealed in an envelope by a proper official and sent to the office designated in the solicitation for receipt of offers. The official shall write on the envelope (1) the date and time of receipt and by whom, and (2) the solicitation number, and shall sign the envelope.

The offeror is responsible to inform the telegraph company of these requirements. No one from this office will be dispatched to the local telegraph office to pick up any telegram for any reason. An offer may be withdrawn by telegraphic notice received at any time prior to contract award.

FACSIMILE BIDS/OFFERS:

Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will not be accepted.

PREPARATION OF SUBCONTRACTING PLAN:

(a) See FAR 52.219-9, Section 00700, of this solicitation. Located in Section 00111 of this solicitation is a sample Subcontracting Plan which will aid the Contractor in preparing a Subcontracting Plan in accordance with FAR 52.219-9(d)(1) through (d)(11). Subcontracting Plans will be developed considering only the subcontracts actually to be awarded. Subcontracting Plans are required from other than small businesses if the contract price is over $1.5 million; they are not required from small business firms regardless of the contract price.

(b) The sample Subcontracting Plan is attached to this solicitation for information purposes. Review of the Subcontracting Plan by the Government will be in accordance with FAR 19.705-4. For Invitation for Bids a Subcontracting Plan will be required only from the low bidder if the low bidder is a large business and the low bid is over $1.5 million. The Subcontracting Plan is not required from the low bidder until after the Bid Opening; it is not required as part of the bid package. After the Bid Opening, if the selected bidder fails to submit an acceptable plan within the time prescribed by the Contracting Officer, the bidder will be ineligible for award. For Request for Proposals, a Subcontracting Plan is required with submission of the price proposal package.

(c) A Subcontracting Plan which proposes goals less than the recommended goals below must contain support, in writing, for the lesser goals and discuss the Contractor's good faith effort to meet the recommended floors.

(d) In accordance with FAR 19.704 if the contract contains options, the cumulative value of the basic contract and all options is considered in determining whether a subcontracting plan is necessary. If a plan is necessary, the subcontracting plan shall contain separate parts, one for the basic contract period and one for each option period. It is necessary to address planned subcontracting dollars and percentages of total to be awarded to small businesses, small disadvantaged businesses, HUBZone small businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran- owned small businesses, Hispanic Servicing Institutions and Tribal Council Universities, HBCU/MIs, and qualified nonprofit agencies for the blind and other severely disabled for the basic contract period and each option period. All other parts of the subcontracting plan only need to be addressed once.

(e) Subcontracts awarded to HUBZone small businesses, small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, Hispanic Servicing Institutions and Tribal Council Universities, HBCU/MIs, and qualified nonprofit agencies for the blind and other severely disabled count toward the overall small business goal. HBCU/MIs are counted as a subset of the small disadvantaged business goal. The Corps of Engineers has not been assigned separate goals for qualified nonprofit agencies for the blind and other severely disabled, HBCU/MIs, Hispanic Servicing Institutions and Tribal Council Universities, or for HUBZone small business concerns.

(f) Qualified nonprofit agencies for the blind and other severely disabled, that have been approved by the Committee for Purchase from People Who Are Blind or Severely Disabled under the Javits-Wagner-O’Day Act (41 U.S.C. 46-48), are eligible to participate in the program as a result of 10 U.S.C. 2410d and Section 9077 of Pub. L.

102-396 and similar sections in subsequent Defense appropriations acts. Under this authority, subcontracts awarded to such entities may be counted toward the prime contractor’s small business subcontracting goal.

(g) Contact Ms. Michelle Stratton (916)557-7641, Deputy for Small Business, with questions on the Subcontracting Plan requirements and further instructions on submission of Electronic Subcontracting Reporting System (eSRS) as required by FAR 52.219-9.

(h) The accepted Subcontracting Plan will be incorporated into and made a material part of the contract.

(i) The Corps of Engineers highly encourages all bidders/offerors to meet the recommended subcontracting goals as follows:

Small Businesses 70.0%

Small Disadvantaged Businesses 6.2%

Women-Owned Small Businesses 7.0%

HUBZone Small Business 9.8%

Veteran-Owned Small Business 3.5%

Service Disabled Veteran Owned Small Business 2.0%

The goals are calculated as a percentage of the TOTAL SUBCONTRACTING DOLLARS, NOT THE TOTAL

CONTRACT AMOUNT.

PERFORMANCE AND PAYMENT BONDS:

The bidder/offeror whose bid/offer is accepted will, within the time established in the contract, furnish performance and payment bonds in accordance with FAR 52.228-15 located in Section 00700.

INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS:

Bidders/offerors utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28 (Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the bid itself (see clause titled "Pledges of Assets," FAR 52.228-11).

Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate. If this is an IFB, failure to provide pledges of acceptable assets, with the bid, in the specified form, accompanied by a properly executed SF 24 and SF 28, will render the bidder nonresponsible and thus ineligible for award. If this is an RFP, failure to provide required documentation described herein may cause the offeror to be deemed "unacceptable".

BID GUARANTEE FORM AND AMOUNT:

The offeror shall furnish a separate bid guarantee in accordance with the solicitation provision titled "Bid Guarantee", FAR 52.228-1. In accordance with FAR 28.101-2 the bid guarantee amount shall be at least 20 percent of the "bid price" but shall not exceed $3 million. When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated. If there are option line items on the Pricing Schedule (Section 00010), the term "bid price" is hereby defined as the total bid not to include any amount for line items designated as "options". In bids/proposals that contain "additives", the "bid price" is defined as the total of all bid items including additive line items. FAR 28.106-1 states that a Standard Form (SF) 24 shall be used for the bid bond. In accordance with FAR 28.202(a)(1), corporate sureties utilized must appear on the list contained in the Department of Treasury Circular 570 titled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies."

ACCEPTANCE OF OFFERS:

A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

SECTION 00111 PRICE VOLUME

4 PRICE PROPOSAL VOLUME.

4.1 NUMBER OF SETS OF THE PRICE PROPOSAL.

Submit the original (no copies) of the price proposal volume.

4.2 FORMAT, CONTENTS, AND LIST OF TABS FOR THE PRICE PROPOSAL.

Use only 8-1/2” x 11” pages. There are no page limits for the price proposal; however, limit responses to required information. Excess information will not be evaluated. Organize your price proposal as indicated below. If a tab is not applicable to your proposal, omit that tab but do not renumber the subsequent tabs.

PRICE PROPOSAL VOLUME

TAB CONTENTS OF THE PRICE PROPOSAL

1 Proposal Cover Sheet

2 SF 1442; Acknowledgement of Amendments; Joint Venture Agreement

3 Pricing Schedule

4 Work Breakdown Structure

5 Representations, Certifications, and Other Statements of Offerors

6 Bid Guarantee

7 Pre-Award Survey Information

8 Subcontracting Plan

4.3 DETAILED SUBMISSION REQUIREMENTS FOR THE PRICE PROPOSAL.

Tab 1 of the Price Proposal: Proposal Cover Sheet.

The proposal cover sheet is required by FAR 52.215-1 (c)(2). This provision, titled “Instructions to Offerors – Competitive Acquisition” is provided in full text in Section 00 21 00. The format and content for the proposal cover sheet follows:

PROPOSAL COVER SHEET

1. Solicitation Number:

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available):

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the Solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

(End of Proposal Cover Sheet)

Tab 2 of the Price Proposal: SF 1442; Acknowledgement of Amendments; Joint Venture Agreement.

The Standard Form (SF) 1442 with continuation pages must be completed by the offeror and duly executed with an original signature by the official(s) identified in the proposal cover sheet as authorized to bind the offeror in accordance with FAR 4.102, which includes specific instructions pertaining to individuals, partnerships, corporations, Joint Venture participants, and agents. Include the offeror’s DUNS number in block 14 of the SF 1442, along with the offeror’s address. All amendments must be acknowledged in accordance with the instructions on the Standard Form 30, Amendment. If the offeror is a Joint Venture (JV), include a copy of the JV agreement and indicate its status. (Note: Please use a document protector in lieu of punching holes in the original SF 1442.)

Tab 3 of the Price Proposal: Pricing Schedule.

Submit the completed Pricing Schedule (Section 00010) with the offeror’s proposed contract prices inserted in the appropriate spaces. Prices must be proposed for all contract line items. Unit prices must be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off the extended prices to the nearest dollar.

Check your pricing submission very carefully for mathematical and clerical errors prior to submission. Any qualification of pricing may render the proposal unacceptable and therefore not eligible for award. (Note: Please use document protectors in lieu of punching holes in the completed “original” pricing schedule.)

Tab 4 of the Price Proposal: Work Breakdown Structure.

Submit a Work Breakdown Structure of the offeror’s proposed base schedule contract prices using the format below, in accordance with UFC 03-700-02A.

01 SUBSTRUCTURE 12 ELECTRICAL SYSTEMS

02 SUPERSTRUCTURE 13 EQUIPMENT

03 EXTERIOR CLOSURE 14 FURNISHINGS

04 ROOFING 15 SPECIAL CONSTRUCTION

05 INTERIOR CONSTRUCTION 16 SELECTIVE BUILDING DEMOLITION

06 INTERIOR FINISHES 17 SITE PREPARATION

07 CONVEYING SYSTEMS 18 SITE IMPROVEMENTS

08 PLUMBING 19 SITE CIVIL/MECHANICAL UTILITIES

09 HVAC M2 20 SITE ELECTRICAL UTILITIES

10 FIRE PROTECTION SYSTEMS 21 DESIGN

11 ELECTRIC POWER AND LIGHTING

Tab 5 of the Price Proposal: Representations, Certifications, and Other Statements of Offerors.

The offeror must have electronically completed the annual representations and certifications on the “Online Representations and Certifications Application” (ORCA) website in accordance with FAR 52.204-8 (provided in full text in Section 00600. The offeror is responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in Section 00600 of the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications and Section 00600.

Tab 6 of the Price Proposal: Bid Guarantee.

All offerors must submit a bid guarantee, (e.g., Standard Form 24, Bid Bond) which complies with the requirements of FAR 52.228-1 and FAR 28.101 Bid Guarantees, and any Defense and Army supplements thereto.

Tab 7 of the Price Proposal: Pre-Award Survey Information.

a. The contracting officer is required to make an affirmative pre-award determination of the prospective contractor’s responsibility in accordance with the mandatory requirements of Part 9 of the Federal Acquisition Regulation (FAR) and its supplements. The contracting officer must have sufficient information available to determine that a prospective contractor meets these minimum standards. Therefore, the offeror is requested to provide the pre-award survey information described below with its price proposal:

(1) The completed Construction Contractor Data Form with Supplemental Schedules A-C (see format which follows). If the offeror is a large multi-segmented business concerns, the data provided on the supplemental schedules may be limited to information that directly pertains to the specific segment of the business concern (i.e., the division, group, unit, etc.) proposed to perform work under the prospective contract with its own work force. If the offer is being submitted by a Joint Venture, submit a separate form for each Joint Venture participant. The offeror may submit pre-award survey information in another format, provided that the information furnished is substantially the same as that which would be furnished on the Construction Contractor Data Form and its supplemental schedules.

(2) Current financial statements. If the financial statement is more than 60 days old, submit a certificate stating that the firm's financial condition is substantially the same, or, if not the same, state the changes that have taken place. If a Joint Venture, provide this information for each participant in the Joint Venture.

(3) Banking information. Provide letters from banks or other financial institutions with which the contractor conducts business. The letters should contain information about your firm's accounts, loans, lines of credit, etc. The Government is interested in financial stability, timely payments, the length and nature of the relationship between the firm and the financial institution, and the firm's financial ability to perform the contract. The letters should also provide the name and telephone number of the bank representative the Government may contact. If a Joint Venture, provide this information for each Joint Venture participant.

b. The Government will treat the pre-award survey information submitted by the offeror as proprietary.

(Tab 7 of the Price Proposal: Pre-Award Survey Information)

CONSTRUCTION CONTRACTOR DATA DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered Construction Design Consultant

Organization Individual Joint Venture Partnership Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:

Officers:

Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF

(DATE): Present Value ($)

Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION

WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE (LIST

MOST RECENT FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount:

Date:

Description:

Owner:

$ Contract Amount:

Date:

Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING

SIGNATURE

See attachment for explanations or detailed description of item(s) reported above.

CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS

List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.

CONTRACT

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

COMPLETE

CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS

List below the principal construction projects your firm has completed within the past six years, including all DoD contracts with a total value exceeding $20,000,000.00___.

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

SUBLET

CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –

CONSTRUCTION AND/OR TECHNICAL EQUIPMENT

List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.

QUANTITY

DESCRIPTION

CONDITION

YEARS OF

SERVICE

PRESENT

STATUS

Tab 8 of the Price Proposal: Subcontracting Plan.

a. All offerors submitting offers with a total value (including all options) exceeding $1,500,000 that are not small businesses are required to submit a subcontracting plan. The plan must be prepared in accordance with Public Law 95-507 and the following instructions and format, which conform to FAR 52.219-9(d)(1) through (d)(11) and include the required statutory elements as described in FAR 19.704 and the additional requirements of DFARS

219.704 and AFARS 5119.704. Evaluation of the subcontracting plan by the Government will be as prescribed in FAR 19.705 (and its supplements).

b. Do not just address the following issues in short; follow the guidance of FAR 52.219-9 in its entirety. For example, paragraph 11 below asks for a discussion of records; the plan should address all records as described in FAR 52.219-9(d)(11)(i) through (vi).

c. In accordance with FAR 19.704 if the contract contains options, the cumulative value of the basic contract and all options is considered in determining whether a subcontracting plan is necessary. Once it has been decided if a plan is necessary, the subcontracting plan shall contain separate parts, one for the basic contract and one for each option.

d. In other words, it is necessary to address planned subcontracting dollars and percentages of total to be awarded to small, small disadvantaged, HUBZone small, women-owned small, veteran-owned small, service-disabled veteran-owned small, Hispanic servicing institutions and tribal council universities, HBCU/MIs, and qualified nonprofit agencies for the blind and other severely disabled separately for the basic contract period and each option period or option item. Therefore, paragraphs 1 and 2 below must be prepared separately for the base period and each option period/item. All other parts of the subcontracting plan only need to be addressed once.

e. If the subcontracting plan's proposed subcontracting goals do not meet the Corps of Engineers' subcontracting goals, the subcontracting plan must be submitted with a full explanation of the reasons for the lesser goals established by the plan. A small disadvantaged business goal of less than five percent must be approved one level above the contracting officer (DFARS 219.705-4).

(Tab 8 of the Price Proposal: Subcontracting Plan)

SAMPLE SUBCONTRACTING PLAN

PROJECT TITLE:

RFP/IFB NUMBER:

CONTRACT NUMBER:

CONTRACTOR NAME:

DIVISION:

INDIVIDUAL COMPLETING THIS PLAN:

TELEPHONE NUMBER:

FAX NUMBER:

EMAIL ADDRESS:

1. Goals, expressed in terms of percentages of total planned subcontracting dollars, for the use of small businesses, small disadvantaged businesses, HUBZone small businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses as subcontractors. The offeror shall include all subcontracts that contribute to contract performance and may include a proportionate share of products and services that are normally allocated as indirect costs.

Corps of Engineers Subcontracting Percentage Goals: Goals

Small Business _______% 70.0%

Small Disadvantaged Business _______% 6.2%

Women-Owned Small Business _______% 7.0%

HUBZone Small Business _______% 9.8%

Veteran-Owned Small Business _______% 3.5%

Service-Disabled Veteran-Owned Small Business _______% 2.0%

2. Statement of: (i) total dollars planned to be subcontracted; (ii) total dollars planned to be subcontracted to small business; (iii) total dollars planned to be subcontracted to veteran-owned small business; (iv) total dollars planned to be subcontracted to HUBZone small business; (v) total dollars planned to be subcontracted to small disadvantaged business; and (vi) total dollars planned to be subcontracted to women-owned small business.

(Tab 8 of the Price Proposal: Subcontracting Plan, Con’t.)

Total Cost of Prime Contract: $____________

Total Dollars to be Subcontracted $____________ _______%*

To Small Business $____________ _______%**

To Small Disadvantaged Business $____________ _______%**

To Women-Owned Small Business $____________ _______%**

To HUBZone Small Business $____________ _______%**

To Service-Disabled Veteran-owned Small Business $____________ _______%**

NOTES:

* Calculate percentage of Total Dollars to be Subcontracted to Total Cost of Prime Contract ** Calculate subcontracted dollars to each group to Total Dollars to be Subcontracted, NOT TO Total Cost of Prime Contract.

(Notes: Planned subcontracting includes all planned expenditures. Total estimated cost to subcontractors and goals must be established even if the contract is of the indefinite-delivery type.

a. Subcontracts awarded to small disadvantaged businesses, HUBZone small businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, Hispanic servicing institutions, and tribal council universities, HBCU/MIs, and qualified nonprofit agencies for the blind and other severely disabled count toward the overall small business goal.

HBCU/MIs are counted as a subset of the small disadvantaged goal. The Corps of Engineers has not been assigned a set goal for, Hispanic servicing institution and tribal council universities, HBCU/MIs or qualified nonprofit agencies for the blind and other severely disabled.

b. In accordance with DFARS 219.703, qualified nonprofit agencies for the blind and other severely disabled that have been approved by the Committee for Purchase from People Who are Blind or Severely Disabled under the Javits-Wagner-O'Day (41 U.S.C. 46-48) are eligible to participate in the program as a result of 10 U.S.C. 2410d and section 9077 of Pub. L. 102-396 and similar sections in subsequent Defense Appropriations Acts. Under this authority subcontracts awarded to such entities may be counted toward the prime contractor’s small business subcontracting goal.)

3. A description of the principal types of supplies and services to be subcontracted and an identification of the types planned for subcontracting to (i) small business concerns, (ii) small disadvantaged business concerns, (iii) HUBZone small business concerns, (iv) women-owned small business concerns, (v) veteran-owned small business concerns (vi) service-disabled veteran-owned small business concerns,

(vii) Hispanic Servicing Institutions, and Tribal Council Universities, (viii) HBCUs and MIs, (ix) qualified nonprofit agencies for the blind and other severely disabled.

4. A statement of the method used in developing the proposed subcontracting goals for small business concerns, small disadvantaged business concerns, HUBZone small business concerns, women-owned small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, Hispanic Servicing Institutions and Tribal Council Universities, HBCUs and MIs, and qualified nonprofit agencies for the blind and other severely disabled.

5. A description of the method used to identify potential sources for solicitation purposes to assure small, small disadvantaged, HUBZone small, women-owned small, veteran-owned small, service-disabled veteran-owned small, Hispanic Servicing Institutions and Tribal Council Universities, HBCU and MI, and qualified nonprofit agencies for the blind and other severely disabled participation (e.g., existing company source lists, the Procurement Marketing and Access Network (PRO-Net) of the Small Business Administration (SBA), the list of certified small disadvantaged business concerns of the SBA, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce, or small, veteran-owned small, HUBZone small, small disadvantaged, women-owned small business, and service-disabled veteran-owned trade associations).

6. A statement as to whether or not the offeror included indirect costs in establishing the subcontracting goals, and if so, a description of the method used to determine the proportionate share of indirect costs to be incurred with: (i) small business concerns, (ii) small disadvantaged business concerns, (iii) HUBZone small business concerns, (iv) women-owned small business concerns, (v) veteran-owned small business concerns, (vi) service-disabled veteran-owned small business concerns, (vii) Hispanic Servicing Institutions and Tribal Council Universities, (viii) HBCUs and MIs, and (ix) qualified nonprofit agencies for the blind and other severely disabled.

7. The name of the individual employed by the offeror who will administer the offeror's subcontracting program and a description of the duties of the individual.

Name: ______________________________________________________

Title and Telephone Number: ____________________________________

Address: ____________________________________________________

City, State and Zip Code: _______________________________________

Duties (Attachment may be used):

8. Describe the efforts the offeror will make to assure that small business concerns, small disadvantaged business concerns, HUBZone small business concerns, women-owned small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small, business concerns, Hispanic Servicing Institutions and Tribal Council Universities, HBCUs and MIs), and qualified nonprofit agencies for the blind and other severely disabled will have an equitable opportunity to complete for subcontractors under this contract.

9. I do herewith assure that this concern will include the clause at FAR 52.219-8 entitled "Utilization of Small Business Concerns" in all subcontracts which offer further subcontracting opportunities and will require all subcontractors (except small business concerns) who receive subcontracts in excess of $500,000 ($1,500,000 for construction of any public facility) to adopt a plan similar to the plan agreed to by this concern and in consonance with the FAR clause 52.219-9.

10. I also assure that this concern will (i) cooperate in any studies or surveys as may be required, (ii) submit periodic reports in order to allow the Government to determine the extent of compliance by the offeror with the subcontracting plan, and (iii) submit Standard Form (SF) 294, Subcontracting Report for Individual Contracts, and SF 295, Summary Subcontract Report, in accordance with the instructions of the forms, and (iv) ensure that the subcontractors under this contract agree to submit the required SF 294s and 295s. I assure that this concern will submit an SF 295 on Corps of Engineers projects only.

The SF 295 shall be completed and distributed in accordance with the Corps of Engineers supplemental instructions. I will not report Corps of Engineers projects through any other agency unless authorized by the Contracting Officer.

11. Provide a description of the types of records the offeror will maintain to demonstrate procedures which have been adopted to comply with the requirements and goals set forth in the plan, including the establishment of source lists; and a description of its efforts to locate small business, small disadvantaged business, HUBZone small business, women-owned small business, veteran-owned small business, service-disabled veteran-owned small business, Hispanic Servicing Institutions and Tribal Council Universities, HBCUs and MIs, and qualified nonprofit agencies for the blind and other severely disabled.

The records shall include at least the following (on a plant-wide or company-wide basis, unless otherwise indicated):

a. Source lists (e.g., PASS), guides, and other data that identify small business, small disadvantaged business, HUBZone small business, women-owned small business, veteran-owned small business, service-disabled veteran-owned small business, Hispanic Servicing Institutions and Tribal Council Universities, HBCUs and MIs), and qualified nonprofit agencies for the blind and other severely disabled.

b. Organizations contacted in an attempt to locate sources that are small business, small disadvantaged business, HUBZone small business, women-owned small business, veteran-owned small business, service-disabled veteran-owned small business, Hispanic Servicing Institutions and Tribal Council Universities, HBCUs and MIs), and qualified nonprofit agencies for the blind and other severely disabled.

c. Records on each subcontract solicitation resulting in an award of more than $100,000, indicating (1) whether small business concerns were solicited and if not, why not; (2) whether veteran-owned small business concerns were solicited and if not, why not; (3) whether HUBZone small business concerns were solicited and if not, why not; (4) whether small disadvantaged business concerns were solicited and if not, why not; (5) whether women-owned small business concerns were solicited and if not, why not; (6) whether service-disabled veteran-owned small business concerns were solicited and if not, why not; (7) whether Hispanic Servicing Institutions and Tribal Council Universities concerns were solicited and if not, why not; (8) whether HBCUs and MIs were solicited and if not, why not; (9) whether qualified nonprofit agencies for the blind and other severely disabled were solicited and if not, why not; and (8) if applicable, the reason award was not made to a small business concern.

d. Records of any outreach efforts to contact (1) trade associations, (2) business development organizations, and (3) conferences and trade fairs to locate small business, small disadvantaged business, HUBZone small business, women-owned small business, veteran-owned small business, service-disabled veteran-owned small business, Hispanic Servicing Institutions and Tribal Council Universities, HBCUs and MIs, and qualified nonprofit agencies for the blind and other severely disabled sources.

e. Records of internal guidance and encouragement provided to buyers through (1) workshops, seminars, training, etc., and (2) monitoring performance to evaluate compliance with the programs' requirements.

f. On a contract-by-contract basis, records to support award data submitted by the offeror to the Government, including the name, address, and business size of each subcontractor. Contractors having company or division-wide annual plans need not comply with this requirement.

12. Discuss the extent to which the offeror has historically been successful in complying with the requirements of the clauses at FAR 52.219-8, Utilization of Small Business Concerns, and 52.219-9, Small Business Subcontracting Plan, in establishing realistic yet challenging goals and show evidence of ability to achieve the goals. Information addressing past performance on DoD contracts evidencing achievement of established subcontracting goals will be in the form of Standard Forms 294 and 295 (attach these to this plan). Offerors who have had no prior Department of Defense contracts from which to assess past performance will not be penalized. Those who have had prior DoD contracts must provide the SF 294s and 295s on past DoD contracts.

(Signature)

(Title of Corporate Officer)

(End of Sample Subcontracting Plan)

SECTION 00111 TECHNICAL VOLUME

Tab 3 of the Technical Proposal: Factor 3 – Past Performance.

1. General.

a. The information provided under this tab will be used in conjunction with the evaluation of the relevant past performance record of the offeror and proposed key subcontractors. Information other than that supplied by the offeror under this tab may be utilized by the Government in its evaluation of past performance.

b. The more similarities an example project has with the prospective contract, the greater the degree of relevancy.

The Source Selection Authority shall determine the relevance of similar past performance information.

2. Prime Contractor/Key Subcontractor Past Performance.

a. Offerors are to provide past performance evaluation information on the example projects submitted under the Experience and Capability factor (e.g. Construction Contractor Appraisal Support System (CCASS), questionnaire, similar performance evaluation, or other performance evaluations completed previously).

b. If an official written performance rating or evaluation is not available for the prime or a proposed key subcontractor, then send a copy of the completed* example “Project Information Form” to the reference along with a past performance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .