W91238-08-B-0005.pdf
PDF 10 MB Posted
- Solicitation number
- W91238-08-B-0005
About this file
W91238-08-B-0005 Solicitan documents
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08-B-0005-AM09.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM08-CONFORMED.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM07.pdf | ||
| Emerg Levee-Amend 6.pdf | ||
| Emerg Levee Amend 5.pdf | ||
| Emerg Levee Amend 5-Change Pages.pdf | ||
| Emerg Levee Amend 4.pdf | ||
| 08-B-0005-AM3Conformed.pdf | ||
| 08-B-0005-AM3.pdf | ||
| 08-B-0005-Am2.pdf | ||
| 08-B-0005-Am1Conformed.pdf | ||
| 08-B-0005-Am1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS (IFB)
INDEFINITE DELIVERY TYPE - REQUIREMENTS CONTRACT
(Emergency Levee Repairs) Region 1 - Sacramento River, Region 2 - Delta Basin, and Region 3 - San Joaquin River
Sacramento/San Joaquin Rivers & Delta Basin, California
IFB NO. W91238-08-B-0005
SPECIFICATION NO. 1586
US Army Corps of Engineers® Sacramento District
DISTRIBUTION STATEMENT A
Approved for public release; distribution is unlimited
ATTENTION TO OFFERORS:
1. SECURITY REQUIREMENTS
YOUR ATTENTION IS DIRECTED TO THE SECURITY REQUIREMENTS FOR THIS
CONTRACT LOCATED IN SECTION 00800, SPECIAL CONTRACT REQUIREMENTS.
2. FACTS ABOUT THE USE OF INDIVIDUAL SURETIES
The Federal Acquisition Regulation (FAR) permits the use of individual sureties for bid, payment and performance bonds. However, the conditions that must be met are strict, and they may not be waived. Further, the FAR imposes limits with respect to the type of property interest individual sureties may utilize.
Individual sureties have been occasionally and successfully used in accordance with FAR requirements within the Sacramento District, when real property interests have not been provided as the security interest. On at least one occasion, an individual surety was made acceptable when an individual personally known to a bidder provided a business property for the security interest, and legal counsel was engaged to navigate and implement the FAR requirements.
Bidders or proposers considering utilizing individuals or firms providing “brokerage” or “insurance” services to obtain bonds from individual sureties are advised to carefully research their backgrounds. The Government is not responsible for and will not reimburse any bidder for advance payments made to such firms in the event that the bonds are unacceptable to the contracting officer.
The Sacramento District strictly follows the FAR 28.203 “Acceptability of individual sureties.” Frequently, an individual surety’s bid bond raises questions about the real property security interest being offered. Also, individual sureties may use “altered” Standard Form 28 affidavits, which are unacceptable. Documentation containing such flaws will result in rejection of the bonds, and, if it is a bid bond, rejection of the bid.
Some “brokers” apparently represent that “their bonds” are accepted by federal government entities. Yet, be aware that not all federal agencies implement the FAR in a uniform manner. Insufficiencies that go unnoticed by one agency may be perceived as fatal by another. The risk of such results rests with the bidder offering the bid bond.
Know your broker, and ensure that all bonding documents comply with FAR requirements before you submit them. It is important to remember that the contracting officer is vested with a wide degree of discretion and business judgment in determining the acceptability of an individual surety, and the Comptroller General has stated that he will not question such a determination so long as it is reasonable.
So, please make certain that if you intend to use an individual surety you are familiar with the regulations and specific requirements that apply to this form of bonding.
TABLE OF CONTENTS
COVER SHEET
ATTENTION TO OFFERORS
TABLE OF CONTENTS
SECTION TITLE
00010 SOLICITATION, OFFER AND AWARD (STANDARD FORM 1442)
AND PRICING SCHEDULE
00100 INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/
OFFERORS AND EVALUATION CRITERIA FOR AWARD
00600 REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS/OFFERORS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT
1 GENERAL WAGE DETERMINAION
2 PREAWARD SURVEY
3 SUBCONTRACTING PLAN
TECHNICAL SPECIFICATIONS
(SEE TECHNICAL SPECIFICATIONS' TABLE OF CONTENTS FOR
SPECIFICATION SECTIONS INCLUDED IN THIS SOLICITATION/CONTRACT)
NOTE: AS A MINIMUM ANY CONTRACT AWARDED AS A RESULT OF THIS
SOLICITATION SHALL CONSIST OF THE FOLLOWING DOCUMENTS:
STANDARD FORM 1442, SECTIONS 00010, 00700, 00800, TECHNICAL
SPECIFICATIONS, AND ATTACHMENTS AS DESCRIBED IN
CONTRACT DOCUMENT.
SECTION 00600, AS COMPLETED BY AWARDEE, IS INCORPORATED INTO
ANY RESULTANT CONTRACT BY REFERENCE.
SECTION 00100 IS INCLUDED FOR SOLICITATION PURPOSES ONLY. THIS
SECTION WILL BE REMOVED, MAINTAINED IN THE CONTRACT FILE AND
NOT MADE PART OF THE CONTRACT.
AMENDMENTS ARE INCORPORATED INTO THE RESULTANT CONTRACT.
SUBCONTRACTING PLAN (IF REQUIRED) BECOMES AN ATTACHMENT TO AND A
MATERIAL PART OF THE CONTRACT.
Provide emergency rapid response/ repair of actual or impending levee breaches/failures and resultant f looding events based on the w ork items identif ied in the pricing schedule, for these 3 regions w ithin Sacramento District's Area of Responsibility (1) Sacramento River drainage basin including all rivers/tributaries flow ing into the river north of N38.36838 W 121.52138 (Hood, CA). (2) Delta Region w ith its w estern most boundary on the Sac River at N38.06102 W 122.22616 (I-80 overpass at Carquinez), includes all rivers and tributaries flow ing into region excluding the Sac River north of N38.36838 W121.52138 (Hood, CA) and San Joaquin River South of N37..94802 W121.33722 (w est of I-5 overpass but including the ship channel and port area east of the I-5 overpass. May require barges/cranes. (3). San Joaquin River drainage basin including all rivers and tributaries flow ing into the river south of N37.94802 W121.33722 (w est of the I-5 overpass.
Unrestricted sealed bidding w ill be used. Three (3) IDIQ Requirements contracts w ill be aw arded. Initial contract w ill be for one (1) year, w ith three (3) option years. Option Periods may be exercised early so that any remaining Period's capacity can be made available w hen/if needed to respond to flood f ight activities.
X
CAROLYN J GILES 916-557-5228
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Oct-2008
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________25 Nov 2008 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
W91238
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W91238-08-B-0005 203
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
(AUG 2008)
00600-3
Section 00010 - Solicitation Contract Form
CONTINUATION PAGES 3 AND 4
CONTINUATION OF STANDARD FORM 1442
BLOCK 20D:
(1) IF THE OFFEROR IS A JOINT VENTURE, EACH PARTICIPANT IN THE JOINT VENTURE
MUST COMPLETE THE FOLLOWING:
Company Name Signature Title
Company Name Signature Title
Company Name Signature Title
NOTE: If a corporation is participating as a member of a Joint Venture, the certificate below must also be completed and signed.
CORPORATION AUTHORIZATION TO PARTICIPATE IN JOINT VENTURE CERTIFICATE
I, _______________________, certify that I am the Secretary of the corporation (name) named as a participant in a Joint Venture on this offer; that _____________________, who signed said offer on behalf of the corporation, was (name) then ______________________ of said corporation; that the signature thereto is (title) genuine; that said contract was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing body; and that the corporation is authorized to participate in the Joint Venture on this offer.
(Name of Corporation)
(Secretary)
(2) IF THE OFFEROR IS A PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS BELOW.
SIGNATURES BY ALL PARTNERS HERE SIGNIFY THAT THE INDIVIDUAL WHO SIGNED THE
OFFER IN BLOCK 20B HAS THE AUTHORITY TO BIND THE PARTNERSHIP.
Name Signature
Name Signature
Name Signature
(3) IF THE OFFEROR IS A CORPORATION, THE OFFER SHALL BE SIGNED IN THE
CORPORATE NAME FOLLOWED BY THE WORD "BY" AND THE SIGNATURE OF THE PERSON
AUTHORIZED TO SIGN THE OFFER IN BLOCK 20B. PROVIDE PROOF THAT THE PERSON
SIGNING FOR THE CORPORATION HAS THE AUTHORITY TO BIND THE CORPORATION BY
COMPLETING THE FOLLOWING CERTIFICATE:
00600-4
CONTINUATION OF STANDARD FORM 1442
CORPORATION AUTHORIZATION CERTIFICATE
I, ___________________________________, certify that I am the Secretary of the (name) corporation named as offeror in the within offer; that ______________________, (name) who signed said offer on behalf of the corporation, was then
_____________________________________ of said corporation, that the signature (title) thereto is genuine; that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.
(Name of Corporation)
(Secretary)
(4) IF THE OFFEROR IS AN INDIVIDUAL DOING BUSINESS AS A FIRM, THE OFFER SHALL
BE SIGNED BY THAT INDIVIDUAL IN BLOCK 20B FOLLOWED BY THE WORDS "AN INDIVIDUAL
DOING BUSINESS AS _____________________________________ (INSERT NAME OF FIRM).
(5) WHEN AN AGENT SIGNS THE OFFER, PROVIDE PROOF OF THE AGENT'S AUTHORITY TO
BIND THE PRINCIPAL.
00600-5
TABLE OF CONTENTS
SECTION TITLE
00010 SOLICITATION, OFFER AND AWARD (STANDARD FORM 1442)
AND PRICING SCHEDULE
00100 INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/
OFFERORS AND EVALUATION CRITERIA FOR AWARD
00600 REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS/OFFERORS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
TECHNICAL SPECIFICATIONS
(SEE TECHNICAL SPECIFICATIONS' TABLE OF CONTENTS FOR
SPECIFICATION SECTIONS INCLUDED IN THIS SOLICITATION/CONTRACT)
DRAWINGS (SEPARATE PACKAGE) (LIST OF DRAWINGS-SECTION 00700)
NOTE: AS A MINIMUM ANY CONTRACT AWARDED AS A RESULT OF THIS
SOLICITATION SHALL CONSIST OF THE FOLLOWING DOCUMENTS:
STANDARD FORM 1442, SECTIONS 00010, 00700, 00800, TECHNICAL
SPECIFICATIONS AND DRAWINGS, AND ATTACHMENTS AS DESCRIBED IN
CONTRACT DOCUMENT.
SECTION 00600, AS COMPLETED BY AWARDEE, IS INCORPORATED INTO
ANY RESULTANT CONTRACT BY REFERENCE.
SECTION 00100 IS INCLUDED FOR SOLICITATION PURPOSES ONLY. THIS
SECTION WILL BE REMOVED, MAINTAINED IN THE CONTRACT FILE AND
NOT MADE PART OF THE CONTRACT.
AMENDMENTS ARE INCORPORATED INTO THE RESULTANT CONTRACT.
SUBCONTRACTING PLAN (IF REQUIRED) BECOMES AN ATTACHMENT TO AND A
MATERIAL PART OF THE CONTRACT.
00600-6
PRICING SCHEDULE
PRICING SCHEDULE : REGION 1 (SACRAMENTO)
BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE
ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE
PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE
0001 DERRICK STONE
(MATERIAL) 5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
0001AC PLACE DERRICK STONE
USING 80d DRAGLINE, OR EQUAL 3,000* TON $_______
PURCHASE, HAUL & PLACE ROCK FROM LEVEE
0002 TRANSPORT ROCK FROM
QUARRY TO SITE 10,000* TON $_______
0003 MINUS 18” QUARRY
ROCK 6,000* TON $_______
0003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
0004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
0004AA PLACE 12” PIT
RUN ROCK 6,000* TON $_______
0005 MINUS 3” FILL
MATERIAL 2,000* TON $_______
0005AA PLACE MINUS 3”
FILL MATERIAL 2,000* TON $_______
0006 DRAIN ROCK 2,000* TON $_______
0006AA PLACE DRAIN ROCK
2,000* TON $_______
00600-7
0007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
0007AA PLACE MINUS 1”
FILL 1,000* TON $_______
0008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
0008AA PLACE MINUS 1 1/2”
AGGREGATE BASE 3,000* TON $_______
EQUIPMENT
0010 CAT 966F, OR EQUAL 500* HOUR $_______
0010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
0010AB CAT D-6, OR EQUAL 80* HOUR $_______
0010AC CAT D-8, OR EQUAL 80* HOUR $_______
0010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
0010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
0010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
0010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______
0010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
0010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
0010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
0010AM PORTABLE TOILET EACH LS $_______
LABOR
0011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
0011AA FLAGMAN 200* HOUR $_______
MATERIAL/SUPPLIES
00600-8
0012 GEOTEXTILE FABRIC 15,000* SY $_______
0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
1,000* LF $_______
SUBTOTAL PROJECTED PRICE $_______________
(BASE CONTRACT PERIOD ITEMS 0001 THRU 00012AA)
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL
BE CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF
WORK.
00600-9
PRICING SCHEDULE : REGION 1 (SACRAMENTO)
OPTION 1 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
1001 DERRICK STONE
(MATERIAL) 5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
1001AC PLACE DERRICK STONE
1002 TRANSPORT ROCK FROM
1003 MINUS 18” QUARRY
1003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
1004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
1004AA PLACE 12” PIT
1005 MINUS 3” FILL
1005AA PLACE MINUS 3”
1006 DRAIN ROCK 2,000* TON $_______
1006AA PLACE DRAIN ROCK
00600-10
2,000* TON $_______
1007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
1007AA PLACE MINUS 1”
FILL 1,000* TON $_______
1008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
1008AA PLACE MINUS 1 1/2”
10010 CAT 966F, OR EQUAL 500* HOUR $_______
10010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
10010AB CAT D-6, OR EQUAL 80* HOUR $_______
10010AC CAT D-8, OR EQUAL 80* HOUR $_______
10010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
10010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
10010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
10010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
10010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
10010AI LIGHT PLANT, 5 KW 50* DAILY $_______
10010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
10010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
10010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
10010AM PORTABLE TOILET EACH LS $_______
1011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
1011AA FLAGMAN 200* HOUR $_______
00600-11
1012 GEOTEXTILE FABRIC 15,000* SY $_______
1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION 1 PERIOD ITEMS 1001 THRU 10012AA)
00600-12
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
2001 DERRICK STONE
(MATERIAL) 5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
2001AC PLACE DERRICK STONE
2002 TRANSPORT ROCK FROM
2003 MINUS 18” QUARRY
2003A PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
2004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
2004A PLACE 12” PIT
2005 MINUS 3” FILL
2005A PLACE MINUS 3”
2006 DRAIN ROCK 2,000* TON $_______
2006A PLACE DRAIN ROCK
00600-13
2,000* TON $_______
2007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
2007A PLACE MINUS 1”
FILL 1,000* TON $_______
2008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
2008A PLACE MINUS 1 1/2”
20010 CAT 966F, OR EQUAL 500* HOUR $_______
20010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
20010AB CAT D-6, OR EQUAL 80* HOUR $_______
20010AC CAT D-8, OR EQUAL 80* HOUR $_______
20010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
20010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
20010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
20010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
20010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
20010AI LIGHT PLANT, 5 KW 50* DAILY $_______
20010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
20010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
20010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
20010AM PORTABLE TOILET EACH LS $_______
20011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
20011AA FLAGMAN 200* HOUR $_______
00600-14
20012 GEOTEXTILE FABRIC 15,000* SY $_______
20012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION 2 PERIOD ITEMS 2001 THRU 20012AA)
00600-15
OPTION 3 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
3001 DERRICK STONE
(MATERIAL) 5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
3001AC PLACE DERRICK STONE
3002 TRANSPORT ROCK FROM
3003 MINUS 18” QUARRY
3003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
3004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
3004AA PLACE 12” PIT
3005 MINUS 3” FILL
3005AA PLACE MINUS 3”
3006 DRAIN ROCK 2,000* TON $_______
3006AA PLACE DRAIN ROCK
00600-16
2,000* TON $_______
3007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
3007AA PLACE MINUS 1”
FILL 1,000* TON $_______
3008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
3008AA PLACE MINUS 1 1/2”
30010 CAT 966F, OR EQUAL 500* HOUR $_______
30010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
30010AB CAT D-6, OR EQUAL 80* HOUR $_______
30010AC CAT D-8, OR EQUAL 80* HOUR $_______
30010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
30010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
30010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
30010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
30010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
30010AI LIGHT PLANT, 5 KW 50* DAILY $_______
30010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
30010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
30010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
30010AM PORTABLE TOILET EACH LS $_______
3011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
3011AA FLAGMAN 200* HOUR $_______
00600-17
3012 GEOTEXTILE FABRIC 15,000* SY $_______
3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION 3 PERIOD ITEMS 3001 THRU 30012AA)
00600-18
PRICING SCHEDULE : REGION 2 (Delta Region)
BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE
(MATERIAL) 5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
0001AC PLACE DERRICK STONE
QUARRY TO SITE 6,000* TON $_______
ROCK 3,000* TON $_______
0003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
0004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
RUN ROCK 3,000* TON $_______
00600-19
0007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
0007AA PLACE MINUS 1”
FILL 1,000* TON $_______
0008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
PURCHASE, HAUL & PLACE ROCK FROM BARGE
0009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1 LS $_______
0009AA MINUS 18inch QUARRY ROCK PLACED FROM BARGE
10,000* TON $_______
0009AB MOVE BARGE CRANE 100 HOUR $_______
0010 CAT 966F, OR EQUAL 500* HOUR $_______
0010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
0010AB CAT D-6, OR EQUAL 80* HOUR $_______
0010AC CAT D-8, OR EQUAL 80* HOUR $_______
0010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
0010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
0010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
0010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
0010AH POWER BROOM, 5-8 foot broom width, Capable of wet sweep 80 HOUR $_______
0010AI LIGHT PLANT, 5 KW 50 DAILY $_______
0010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH DAILY $_______
0010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
0010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
0010AM PORTABLE TOILET EACH LS $_______
00600-20
0011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
0011AA FLAGMAN 200* HOUR $_______
0012 GEOTEXTILE FABRIC 15,000* SY $_______
0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
BASE CONTRACT PERIOD ITEMS 0001 THRU 00012AA)
00600-21
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
1001AC PLACE DERRICK STONE
1003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
1004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
00600-22
1007 MINUS 1” FILL
1007AA PLACE MINUS 1”
FILL 1,000* TON $_______
1008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
1009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1 LS $_______
1009AA MINUS 18inch QUARRY ROCK PLACED FROM BARGE
1009AB MOVE BARGE CRANE 100 HOUR $_______
1010 CAT 966F, OR EQUAL 500* HOUR $_______
1010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
1010AB CAT D-6, OR EQUAL 80* HOUR $_______
1010AC CAT D-8, OR EQUAL 80* HOUR $_______
1010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
1010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
1010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
1010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
1010AH POWER BROOM, 5-8 foot broom width, Capable of wet sweep 80 HOUR $_______
1010AI LIGHT PLANT, 5 KW 50 DAILY $_______
1010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH DAILY $_______
1010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
1010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
1010AM PORTABLE TOILET EACH LS $_______
00600-23
(DELTA REGION OPTION 1 PERIOD ITEMS 1001 THRU 10012AA)
00600-24
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
2001AC PLACE DERRICK STONE
2003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
2004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
2004AA PLACE 12” PIT
2005AA PLACE MINUS 3”
2006AA PLACE DRAIN ROCK
00600-25
2007 MINUS 1” FILL
2007AA PLACE MINUS 1”
FILL 1,000* TON $_______
2008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
2008AA PLACE MINUS 1 1/2”
2009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1 LS $_______
2009AA MINUS 18inch QUARRY ROCK PLACED FROM BARGE
2009AB MOVE BARGE CRANE 100 HOUR $_______
2010 CAT 966F, OR EQUAL 500* HOUR $_______
2010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
2010AB CAT D-6, OR EQUAL 80* HOUR $_______
2010AC CAT D-8, OR EQUAL 80* HOUR $_______
2010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
2010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
2010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
2010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
2010AH POWER BROOM, 5-8 foot broom width, Capable of wet sweep 80 HOUR $_______
2010AI LIGHT PLANT, 5 KW 50 DAILY $_______
2010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH DAILY $_______
2010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
2010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
2010AM PORTABLE TOILET EACH LS $_______
00600-26
2011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
2011AA FLAGMAN 200* HOUR $_______
2012 GEOTEXTILE FABRIC 15,000* SY $_______
2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(DELTA REGION OPTION 2 PERIOD ITEMS 2001 THRU 20012AA)
00600-27
OPTION 3 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
3001AC PLACE DERRICK STONE
3003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
3004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
00600-28
3007 MINUS 1” FILL
3007AA PLACE MINUS 1”
FILL 1,000* TON $_______
3008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
3009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1 LS $_______
3009AA MINUS 18inch QUARRY ROCK PLACED FROM BARGE
3009AB MOVE BARGE CRANE 100 HOUR $_______
3010 CAT 966F, OR EQUAL 500* HOUR $_______
3010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
3010AB CAT D-6, OR EQUAL 80* HOUR $_______
3010AC CAT D-8, OR EQUAL 80* HOUR $_______
3010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
3010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
3010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
3010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
3010AH POWER BROOM, 5-8 foot broom width, Capable of wet sweep 80 HOUR $_______
3010AI LIGHT PLANT, 5 KW 50 DAILY $_______
3010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH DAILY $_______
3010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
3010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
3010AM PORTABLE TOILET EACH LS $_______
00600-29
(DELTA REGION OPTION 3 PERIOD ITEMS 3001 THRU 30012AA)
00600-30
PRICING SCHEDULE : REGION 3(SAN JOAQUIN)
BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE
(MATERIAL) 5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
0001AC PLACE DERRICK STONE
0003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
0004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
00600-31
0007 MINUS 1” FILL
0007AA PLACE MINUS 1”
FILL 1,000* TON $_______
0008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
00010 CAT 966F, OR EQUAL 500* HOUR $_______
00010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
00010AB CAT D-6, OR EQUAL 80* HOUR $_______
00010AC CAT D-8, OR EQUAL 80* HOUR $_______
00010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
00010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
00010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
00010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
00010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
00010AI LIGHT PLANT, 5 KW 50* DAILY $_______
00010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
00010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
00010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
00010AM PORTABLE TOILET EACH LS $_______
00011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
00011AA FLAGMAN 200* HOUR $_______
00600-32
00012 GEOTEXTILE FABRIC 15,000* SY $_______
00012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(BASE CONTRACT PERIOD ITEMS 0001 THRU 00012AA)
00600-33
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
1001AC PLACE DERRICK STONE
1003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
1004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
00600-34
2,000* TON $_______
1007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
1007AA PLACE MINUS 1”
FILL 1,000* TON $_______
1008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
1010 CAT 966F, OR EQUAL 500* HOUR $_______
1010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
1010AB CAT D-6, OR EQUAL 80* HOUR $_______
1010AC CAT D-8, OR EQUAL 80* HOUR $_______
1010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
1010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
1010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
1010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
1010AI LIGHT PLANT, 5 KW 50* DAILY $_______
1010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
1010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
1010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
10010AM PORTABLE TOILET EACH LS $_______
00600-35
(SAN JOAQUIN OPTION 1 PERIOD ITEMS 1001 THRU 10012AA)
00600-36
OPTION 2 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
2001AC PLACE DERRICK STONE
2003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
2004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
2004AA PLACE 12” PIT
2005AA PLACE MINUS 3”
2006AA PLACE DRAIN ROCK
00600-37
2,000* TON $_______
2007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
2007AA PLACE MINUS 1”
FILL 1,000* TON $_______
2008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
2008AA PLACE MINUS 1 1/2”
2010 CAT 966F, OR EQUAL 500* HOUR $_______
2010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
2010AB CAT D-6, OR EQUAL 80* HOUR $_______
2010AC CAT D-8, OR EQUAL 80* HOUR $_______
2010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
2010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
2010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
2010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
2010AI LIGHT PLANT, 5 KW 50* DAILY $_______
2010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
2010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
2010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
2010AM PORTABLE TOILET EACH LS $_______
2011 SURVEY CREW W/EQUIPMENT 1 DAILY $_______
2011AA FLAGMAN 200* HOUR $_______
00600-38
2012 GEOTEXTILE FABRIC 15,000* SY $_______
2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(SAN JOAQUIN OPTION 2 PERIOD ITEMS 2001 THRU 20012AA)
00600-39
OPTION 3 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET
FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE
EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
3001AC PLACE DERRICK STONE
3003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
3004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
00600-40
2,000* TON $_______
3007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
3007AA PLACE MINUS 1”
FILL 1,000* TON $_______
3008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
3010 CAT 966F, OR EQUAL 500* HOUR $_______
3010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
3010AB CAT D-6, OR EQUAL 80* HOUR $_______
3010AC CAT D-8, OR EQUAL 80* HOUR $_______
3010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
3010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
3010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
3010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
3010AI LIGHT PLANT, 5 KW 50* DAILY $_______
3010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
3010AK TRAFFIC CONTROL SIGNAGE EACH DAILY $_______
3010AL K-RAIL/JERSEY BARRIER EACH DAILY $_______
3010AM PORTABLE TOILET EACH LS $_______
00600-41
(SAN JOAQUIN OPTION 3 PERIOD ITEMS 3001 THRU 30012AA)
00600-42
1. Prices must be submitted on all individual items of this Pricing Schedule.
Failure to do so may be cause for rejection of bids.
2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.
3. The bidder/offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for award.
7. Notwithstanding any other provisions of this solicitation, the award will be made to the lowest responsible and responsive bidder(s) for either REGION 1, REGION 2, or REGION 3 whichever is in the best interest of the Government.
Bidders may submit prices on a single Region only or any combination of Regions.
8. Davis-Bacon Act Wage Determinations for Option Periods
a. Upon exercise of an option to extend the term of the contract, the most current Davis-Bacon Act wage determination(s) from the same schedule(s) as the wage determination(s) incorporated into the original contract will be incorporated into the modified contract.
b. In accordance with FAR 52.222-30, Davis-Bacon Act—Price Adjustment (None or Separately Specified Pricing Method), provided in full text in Section 00700, no adjustments in contract price will be made as a result of incorporation of the new wage determination(s). The solicitation provides the opportunity to bid or propose separate prices for each option period. The option prices may include an amount to cover estimated increases.
c. For indefinite delivery type contracts, the wage determination incorporated into the contract at the exercise of the option will be incorporated into task orders issued during that option period. The wage determination will be effective for the complete period of performance of those task orders without further revision.
10. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
00600-43
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
1. The quantities on the pricing schedule are the yearly projected amounts for each contract line item. These projected quantities are for bidding purposes only. They are not estimated quantities. Therefore, the “Variation in Estimated Quantities” clause does not apply to these line items.
12. The unit prices for the contract line item numbers (CLINs) on the Pricing Schedule are firm, fixed prices. These firm, fixed unit prices will govern regardless of quantities ordered under any subsequent task order(s).
13. The “Subtotal Projected Price” for the base period will be the “Bid Price” for purposes of determining the amount of the bid guarantee.
14. The “Grand Total Projected Price” will be used only for the purpose of determining the low bidder in accordance with FAR 52.217-5.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
DELIVERY WILL BE ESTABLISHED WITH EACH TASK ORDER.
00600-44
Section 00100 - Bidding Schedule/Instructions to Bidders
LOCAL CLAUSES
SECTION 00100
INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/OFFERORS
AND EVALUATION CRITERIA FOR AWARD
52.204-4005 SUBMITTAL INFORMATION FOR SUPPLIERS (RFQS), BIDDERS (IFBS) AND
OFFERORS (RFPS) (SEP 2004)
The following documents must be returned with your quote, bid, or offer.
--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.
--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.
Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.
--The completed Pricing Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and priced sub-line items. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.
--Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section 00600).
--Your Bid Guarantee (e.g., Standard Form 24, “Bid Bond”)
52.0214-4581 INQUIRIES (NOV 2007)
Prospective bidders should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):
a. For information related to amendments, and the dates set for bid opening, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
00600-45
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.
4. The Solicitation Number is : W91238-08-B-0005
The Bidder Inquiry Key is: A8AKGV-YRXQAQ
c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to the bid opening date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
f. The point of contact for this solicitation is:
Contract Specialist: Carolyn J. Giles Telephone: (916) 557-5228
FAX: (916) 557-5278.
E-MAIL: Carolyn.J.Giles@usace.army.mil and Carolyn.E.Mallory@usace.army.mil
52.0214-4582 DIRECTIONS FOR SUBMITTING BIDS (MAR 2003)
Envelopes containing bids must be sealed, marked and addressed as follows:
MARK ENVELOPES:
Solicitation No. W91238-08-B-0005 Bid Opening Date: 25 Nov 2008 Bid Opening Time: 1:00 PM Local Time
ADDRESS ENVELOPES TO:
Department of the Army U.S. Army Engineer District, Sacramento ATTN: Contracting Division 1325 J Street Sacramento CA 95814-2922
SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:
Hand-carried bids must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.
Due to security precautions, all Corps of Engineers visitors are now required to sign-in, leave a Photo-ID (such as a drivers license), and get a Visitor’s Pass at the Security Desk in the Building Lobby. Bidders may no longer hand-carry their bids directly to Contracting Division. Bids may NOT be either turned-in at the Security Desk or left unattended elsewhere in the Lobby.
00600-46
Additionally, you are advised that there is no longer public parking in the Building.
The Bid Opening Officer will be in the Building Lobby 20 minutes prior to the scheduled bid opening time to accept sealed bids. After announcing that no further bids will be received, the Bid Opening Officer will take the hand-carried bids and have them x-rayed as a security precaution. After the bids have been x-rayed, the bidders waiting in the Building Lobby will then be escorted as a group to the Bid Opening Room, where the bids will be publicly opened and read.
Bidders who desire to hand-deliver their bids at an earlier time must notify the contract specialist in advance to arrange to be met in the Building Lobby by Contracting Division personnel. In the event the contract specialist cannot be reached, please call the main Contracting Division telephone number,
(916) 557-5201, in order to request assistance.
Please ensure that all courier and delivery personnel are aware of these procedures.
52.0209-4501 CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY (MAR 2002)
In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Attachments, Preaward Survey). The Preaward Survey is attached to the solicitation for information purposes only. It will be required from only the low bidder. After the Bid Opening, the Government will request this information from the low bidder if the low bidder has not had a contract with the Sacramento District within the last twelve months and the Government will set a due date for its submission. The Preaward Survey is not required as part of the bid package.
In order to be determined to be responsible a prospective contractor must:
a. Have adequate financial resources to perform the contract or the ability to obtain them.
b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
c. Have a satisfactory performance record. In making the determination of responsibility, the Government Contracting Officer shall consider relevant past performance information. A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history except when there are special standards set forth in the solicitation which applies to all bidders that must be met in order to receive the award. These special standards may be necessary when unusual expertise or specialized facilities are necessary in the performance of the contract; therefore, in order to be determined to be responsible for that particular contract, the offeror must be able to meet those special standards.
A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be nonresponsible unless the Contracting Officer determines that the circumstances were beyond the contractor's control or that the contractor has taken appropriate corrective action. Other responsibility considerations by the Contracting Officer will include past efforts by the contractor to apply sufficient tenacity and perseverance to perform acceptably, to meet quality requirements of contracts, 00600-47 and the contractor's past compliance with subcontracting plans (if required) under recent contracts.
d. Have a satisfactory record of integrity and business ethics.
e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.
g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Preaward Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in subparagraphs a, e, and f above) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.
52.0211-4805 AVAILABILITY…
This is the start of the file's text. The full file is on GovTribe.