W91238-08-B-0005 Amendment 0009

View the file

Other files

File Type Posted
08-B-0005-AM08.pdf PDF
08-B-0005-AM08-CONFORMED.pdf PDF
08-B-0005-AM08.pdf PDF
08-B-0005-AM07.pdf PDF
Emerg Levee-Amend 6.pdf PDF
Emerg Levee Amend 5.pdf PDF
Emerg Levee Amend 5-Change Pages.pdf PDF
Emerg Levee Amend 4.pdf PDF
08-B-0005-AM3Conformed.pdf PDF
08-B-0005-AM3.pdf PDF
08-B-0005-Am2.pdf PDF
08-B-0005-Am1Conformed.pdf PDF
08-B-0005-Am1.pdf PDF
W91238-08-B-0005.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT: EMERGENCY LEVEE REPAIRS; REGION 1 (SACRAMENTO RIVER), REGION 2 (DELTA BASIN), AND REGION

3 (JAN JOAQUIN RIVER); SACRAMENTO/SAN JOAQUIN RIVERS AND DELTA BASIN, CALIFORNIA

See continuation page for changes to SECTION 00010, PRICING SCHED, SECTION 01 50 02 and SECTION 35 41 00.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

See Item 6USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET-ROOM 878

SACRAMENTO CA 95814-2922

CODE

FACILITY CODE

J 1 37

0009 26-January-2009 SPEC. NO. 1586

W91238-08-B-0005

24-Oct-2008

W91238-08-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 27-Jan-2009 01:00 PM to 12-Feb-2009 01:00 PM.

The following have been added by full text:

AMD 0009 REVISED PRICING SCHED

PRICING SCHEDULE: REGION 1 (SACRAMENTO)

BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

ITEM UNIT OF UNIT

NO. DESCRIPTION QUANTITY MEASURE PRICE TOTAL

PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE

0001 DERRICK STONE 5,000* TON $_______ $____________

0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

0001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

3,000* TON $_______ $____________

PURCHASE, HAUL & PLACE ROCK FROM LEVEE

0002 TRANSPORT ROCK FROM QUARRY TO SITE

10,000* TON $_______ $____________

0003 MINUS 18” QUARRY ROCK

6,000* TON $_______ $____________

0003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

0004 MINUS 12” PIT RUN ROCK

0004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

0005 MINUS 6” ROCK 2,000* TON $_______ $____________

0005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

0006 MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

0006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

0007 DRAIN ROCK 2,000* TON $_______ $____________

0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

0008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

0009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

0009AA PLACE 3/4” AGGREGATE BASE

EQUIPMENT

0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

0010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

0010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

00010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

LABOR

0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

0011AA FLAGMAN 200* HOUR $_______ $____________

MATERIAL/SUPPLIES

0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

0013 CLEARING 5* ACRES $_______ $____________

0014 GRUBBING 5* ACRES $_______ $____________

0015 STRIPPING 5* ACRES $_______ $____________

SUBTOTAL PROJECTED PRICE $____________

(BASIC CONTRACT PERIOD ITEMS 0001 THRU 0015)

*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE

CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF WORK.

PRICING SCHEDULE: REGION 1 (SACRAMENTO)

OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

1001 DERRICK STONE 5,000* TON $_______ $____________

1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

1001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

1002 TRANSPORT ROCK FROM QUARRY TO SITE

1003 MINUS 18” QUARRY ROCK

1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

1004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

1004A PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

1005 MINUS 6” ROCK 2,000* TON $_______ $____________

1005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

1006 MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

1006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

1007 DRAIN ROCK 2,000* TON $_______ $____________

1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

1008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

1009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

1009AA PLACE 3/4” AGGREGATE BASE

1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

1010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

1010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

1011AA FLAGMAN 200* HOUR $_______ $____________

1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

1013 CLEARING 5* ACRES $_______ $____________

1014 GRUBBING 5* ACRES $_______ $____________

1015 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 1: ITEMS 1001 THRU 1015)

OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

2001 DERRICK STONE 5,000* TON $_______ $____________

2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

2001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

2002 TRANSPORT ROCK FROM QUARRY TO SITE

2003 MINUS 18” QUARRY ROCK

2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

2004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

2004A PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

2005 MINUS 6” ROCK 2,000* TON $_______ $____________

2005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

2006 MINUS 3” FILL MATERIAL

2006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

2007 DRAIN ROCK 2,000* TON $_______ $____________

2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

2008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

2009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

2009AA PLACE 3/4” AGGREGATE BASE

2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

2010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

2010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

2011AA FLAGMAN 200* HOUR $_______ $____________

2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

2013 CLEARING 5* ACRES $_______ $____________

2014 GRUBBING 5* ACRES $_______ $____________

2015 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 2: ITEMS 2001 THRU 2015)

OPTION 3 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

3001 DERRICK STONE 5,000* TON $_______ $____________

3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

3001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

3002 TRANSPORT ROCK FROM QUARRY TO SITE

3003 MINUS 18” QUARRY ROCK

3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

3004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

3004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

3005 MINUS 6” ROCK 2,000* TON $_______ $____________

3005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

3006 MINUS 3” FILL MATERIAL

3006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

3007 DRAIN ROCK 2,000* TON $_______ $____________

3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

3008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

3009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

3009AA PLACE 3/4” AGGREGATE BASE

3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

3010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

3010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

3011AA FLAGMAN 200* HOUR $_______ $____________

3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

3013 CLEARING 5* ACRES $_______ $____________

3014 GRUBBING 5* ACRES $_______ $____________

3015 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 3: ITEMS 3001 THRU 3015)

REGION 1 “GRAND PROJECTED TOTAL” $__________________________

(BASE + OPTION PERIODS)

PRICING SCHEDULE: REGION 2 (Delta Region)

BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

0001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

0001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

0003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

0003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

0004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

0004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

0005 MINUS 6” ROCK 2,000* TON $_______ $____________

0005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

0006 MINUS 3” FILL MATERIAL

0006AA PLACE MINUS 3” FILL MATERIAL

0007 DRAIN ROCK 2,000* TON $_______ $____________

0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

0008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

0009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

0009AA PLACE 3/4” AGGREGATE BASE

PURCHASE, HAUL & PLACE ROCK FROM BARGE

0010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

0010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

0010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

0011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

0011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

0011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

0011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

0011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

0011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

0011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

0011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

0011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

0011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

0011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

00012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

0012AA FLAGMAN 200* HOUR $_______ $____________

0013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

0013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

0014 CLEARING 5* ACRES $_______ $____________

0015 GRUBBING 5* ACRES $_______ $____________

0016 STRIPPING 5* ACRES $_______ $____________

(BASIC CONTRACT PERIOD: ITEMS 0001 THRU 0016)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

1001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

1001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

1003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

1003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

1004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

1004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

1007 DRAIN ROCK 2,000* TON $_______ $____________

1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

1008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

1009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

1010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

1010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

1010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

1011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

1011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

1011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

1011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

1011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

1011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

1011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

1011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

1011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

1011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

1012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

1012AA FLAGMAN 200* HOUR $_______ $____________

1013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

1013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

1014 CLEARING 5* ACRES $_______ $____________

1015 GRUBBING 5* ACRES $_______ $____________

1016 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 1: ITEMS 1001 THRU 1016)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

2001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

2001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

2003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

2003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

2004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

2004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

2007 DRAIN ROCK 2,000* TON $_______ $____________

2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

2008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

2009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

2010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

2010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

2010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

2011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

2011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

2011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

2011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

2011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

2011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

2011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

2011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

2011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

2011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

2011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

2012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

2012AA FLAGMAN 200* HOUR $_______ $____________

2013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

2013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

2014 CLEARING 5* ACRES $_______ $____________

2015 GRUBBING 5* ACRES $_______ $____________

2016 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 2: ITEMS 2001 THRU 2016)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

3001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

3001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

3003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

3003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

3004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

3004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

3007 DRAIN ROCK 2,000* TON $_______ $____________

3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

3008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

3009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

3010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

3010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

3010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

3011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

3011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

3011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

3011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

3011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

3011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

00011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

3011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

3011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

3011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

3011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

3012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

3012AA FLAGMAN 200* HOUR $_______ $____________

3013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

3013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

3014 CLEARING 5* ACRES $_______ $____________

3015 GRUBBING 5* ACRES $_______ $____________

3016 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 3: ITEMS 3001 THRU 3016)

REGION 2 “GRAND PROJECTED TOTAL” $__________________________

PRICING SCHEDULE: REGION 3(SAN JOAQUIN)

BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

0001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

0003 MINUS 18” QUARRY ROCK

0003A PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

0004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

0004A PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

0005 MINUS 6” ROCK 2,000* TON $_______ $____________

0005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

0006 MINUS 3” FILL MATERIAL

0005A PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

0007 DRAIN ROCK 2,000* TON $_______ $____________

0007A PLACE DRAIN ROCK 2,000* TON $_______ $____________

0008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

0008A PLACE MINUS 1” FILL 1,000* TON $_______ $____________

0009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

0009A PLACE 3/4” AGGREGATE BASE

0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

0010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

0010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

0010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

0011AA FLAGMAN 200* HOUR $_______ $____________

0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

0013 CLEARING 5* ACRES $_______ $____________

0014 GRUBBING 5* ACRES $_______ $____________

0015 STRIPPING 5* ACRES $_______ $____________

(BASE CONTRACT PERIOD ITEMS 0001 THRU 0015)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

1001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

1003 MINUS 18” QUARRY ROCK

1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

1004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

1004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

2,000* TON $_______ $____________

1007 RAIN ROCK 2,000* TON $_______ $____________

1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

1008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

1009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

1010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

1010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

1011AA FLAGMAN 200* HOUR $_______ $____________

1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

1013 CLEARING 5* ACRES $_______ $____________

1014 GRUBBING 5* ACRES $_______ $____________

1015 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 1: ITEMS 1001 THRU 1015)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

2001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

2003 MINUS 18” QUARRY ROCK

2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

2004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

2004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

2,000* TON $_______ $____________

2007 DRAIN ROCK 2,000* TON $_______ $____________

2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

2008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

2009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

2010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

2010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

2011AA FLAGMAN 200* HOUR $_______ $____________

2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

2013 CLEARING 5* ACRES $_______ $____________

2014 GRUBBING 5* ACRES $_______ $____________

2015 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 2: ITEMS 2001 THRU 2015)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

3001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

3003 MINUS 18” QUARRY ROCK

3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

3004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

3004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

2,000* TON $_______ $____________

3007 DRAIN ROCK 2,000* TON $_______ $____________

3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

3008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

3009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

3010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

3010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

3011AA FLAGMAN 200* HOUR $_______ $____________

3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

CLEARING, GRUBBING AND STRIPPING

3013 CLEARING 5* ACRES $_______ $____________

3014 GRUBBING 5* ACRES $_______ $____________

3015 STRIPPING 5* ACRES $_______ $____________

(OPTION PERIOD 3: ITEMS 3001 THRU 3015)

REGION 3 “GRAND PROJECTED TOTAL” $__________________________

(End of Summary of Changes)

EMERGENCY LEVEE REPAIRS 1586

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 50 02

TEMPORARY CONSTRUCTION FACILITIES

PART 1 GENERAL

1.1 AVAILABILITY AND USE OF UTILITY SERVICES

1.1.1 Sanitation

1.1.2 Utilities

1.2 BULLETIN BOARD AND HARDHAT SIGNS

1.2.1 Bulletin Board

1.2.2 Hard Hat Sign

1.2.3 K-Rail/Jersey Barriers

1.3 PROTECTION AND MAINTENANCE OF TRAFFIC

1.3.1 Roads

1.3.2 Barricades

1.4 CONSTRUCTION AND MAINTENANCE OF HAUL ROADS

1.5 HOUSEKEEPING AND CLEANUP

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

01 50 02 - 1 Amendment 0009

SECTION 01 50 02

TEMPORARY CONSTRUCTION FACILITIES

PART 1 GENERAL

1.1 AVAILABILITY AND USE OF UTILITY SERVICES

1.1.1 Sanitation

The Contractor shall provide and maintain portable field-type sanitary facilities within the construction area.

1.1.2 Utilities

Costs for all utilities (phone, power and water) at the construction area are the responsibility of the contractor.

1.2 BULLETIN BOARD AND HARDHAT SIGNS

1.2.1 Bulletin Board

Immediately upon beginning of work, the Contractor shall display in a conspicuous place accessible to all employees within the construction area the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract and Wage Rate Information poster.

1.2.2 Hard Hat Sign

Prior to commencement or work, the Contractor shall construct and erect 2 hard hat signs at the upstream and downstream limits of the construction area. The signs shall conform to the requirements of the drawings attached at the end of this section.

1.2.3 K-Rail/Jersey Barriers

K-Rail/Jersey Barriers shall be in standard lengths of 20 feet and meet industry specifications for both material and construction. Payment for each unit shall include costs associated with the barrier, delivery, placement, relocation or handling on-site as necessary during the period of the task order and removal from the site.

1.3 PROTECTION AND MAINTENANCE OF TRAFFIC

1.3.1 Roads

The Contractor shall maintain a safe flow of traffic on all affected roads within the construction area. Measures for the protection and diversion of traffic, including the provision of flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the authorities having jurisdiction for that area.

The traveling public shall be protected from damage to person and property.

The Contractor's traffic on roads selected for hauling material to and from the site shall interact as little as possible with public traffic. The Contractor shall investigate the condition and load limits of existing roads and notify the contracting officer of any inadequacies prior to

01 50 02 - 2 commencement of work.

1.3.2 Barricades

The Contractor shall erect and maintain temporary barricades to limit public access to hazardous areas. Such barricades shall be required whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic. Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

1.4 CONSTRUCTION AND MAINTENANCE OF HAUL ROADS

The Contractor's traffic on roads selected for hauling material to and from the site shall interact as little as possible with public traffic. The Contractor shall investigate the condition and load limits of existing roads and notify the contracting officer of any inadequacies prior to commencement of work. Haul roads shall be located and constructed as shown on the site plans and as approved by the contracting officer. Payment for construction and maintenance shall be at the contract unit prices for any materials and effort required under the task order.

1.5 HOUSEKEEPING AND CLEANUP

Pursuant to the requirements of paragraph, CLEANING UP, and paragraph, ACCIDENT PREVENTION, of the CONTRACT CLAUSES, Section 00700 the Contractor shall assign sufficient personnel to insure strict compliance. The Contractor shall keep the construction area and access ways free of debris and obstructions at all times. At least once each day, all areas shall be checked by the Contractor for compliance with the above requirement.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section --

01 50 02 - 3

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 41 00

LEVEE CONSTRUCTION FOR EMERGENCY REPAIR

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Clearing

1.2.2 Grubbing

1.2.3 Stripping

1.2.4 Satisfactory Materials

1.2.5 Unsatisfactory Materials

1.2.6 Excavation

1.2.7 Classification of Soils

1.2.7.1 Cohesionless and Cohesive Materials

1.2.8 Degree of Compaction

1.2.9 Landside Seepage Berm

1.2.9.1 Drain Rock

1.2.9.2 Bedding Material

1.2.10 Minus 18-Inch Quarry Rock

1.2.11 Minus 12-Inch Pit Run Rock

1.2.12 Derrick Stone

1.2.13 Aggregate Base

1.3 SUBMITTALS

1.4 MEASUREMENT AND PAYMENT

1.4.1 Clearing, Grubbing, and Stripping

1.4.1.1 Payment

1.4.1.2 Measurement

1.4.2 Stone, Rock, Filter Sand, Aggregate

1.4.2.1 Payment For Stone, Rock, Filter Sand, Aggregate

1.4.2.2 Measurement of Stone, Rock, Filter Sand, Aggregate

1.4.3 Weighbills and Delivery Tickets

1.5 SYSTEM DESCRIPTION

1.6 GENERAL CONDITIONS

1.6.1 Conduct of the Work

1.6.2 Stockpiling

1.6.3 Drainage Requirements

1.7 REGULATORY REQUIREMENTS

1.8 PROJECT SITE CONDITIONS

1.8.1 Protection of Cultural and Natural Resources

1.8.2 Protection of Man-Made Facilities and Natural Features

PART 2 PRODUCTS

2.1 Drain Rock

2.2 MINUS 18-INCH QUARRY ROCK

2.3 DERRICK STONE

2.4 MINUS 12-INCH PIT RUN ROCK

2.5 MINUS 6-INCH ROCK (Bridging Material)

35 41 00 - 1

2.6 MINUS 3-INCH FILL MATERIAL

2.7 MINUS 1-INCH MATERIAL

2.8 AGGREGATE BASE

PART 3 EXECUTION

3.1 CLEARING

3.2 GRUBBING

3.3 STRIPPING

3.4 DISPOSITION OF CLEARED, GRUBBED, AND STRIPPED MATERIAL

3.5 STOCKPILES

3.6 MAINTENANCE OF WORK

3.6.1 Debris Removal

3.6.2 Surface Drainage of Completed Areas

3.7 PLACEMENT AND SPREADING

3.7.1 General

3.7.1.1 Gradation and Distribution

3.7.2 Equipment Traffic

3.7.3 Placement of Fill Material Near Utilities

3.8 FIELD QUALITY CONTROL

3.8.1 General

3.8.2 Clearing, Grubbing, and Stripping

3.8.2.1 Clearing

3.8.2.2 Grubbing

3.8.2.3 Stripping

3.8.3 Reporting

3.9 LANDSIDE SEEPAGE BERM (OPTIONAL)

3.9.1 Subgrade Preparation

3.9.2 Placement and Compaction of Filter Sand and Drain Rock

3.9.3 Placement of Geotextile and Aggregate Base Course

-- End of Section Table of Contents --

35 41 00 - 2

SECTION 35 41 00

LEVEE CONSTRUCTION FOR EMERGENCY REPAIR

PART 1 GENERAL

Earthwork requirements are included in this section for levee emergency repair.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 2487 (2006) Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D 3740 (2004a; e1 2007) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

ASTM D 698 (2007e1) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CDT)

CDT CM (2001) Construction Manual

1.2 DEFINITIONS

1.2.1 Clearing

Clearing shall consist of the removal and satisfactory disposal of trees, downed timber, snags, slash, brush, garbage, trash, debris, fencing, and other items occurring within the work limits shown on the drawings.

1.2.2 Grubbing

Grubbing shall consist of the removal and satisfactory disposal of stumps, roots larger than 1 inch in diameter, and matted roots from the designated grubbing areas. Grubbing also includes filling of holes from the grubbing operation.

35 41 00 - 3

1.2.3 Stripping

Stripping shall consist of the removal and satisfactory disposal of crops, weeds, grass, and other vegetative materials at the ground surface and topsoil to a depth of 6 inches or as shown on the drawings. Stripping shall also include the limited amount of excavation required to prepare the damaged site for the placement of levee fill or filter sand as shown on the construction drawings.

1.2.4 Satisfactory Materials

Satisfactory materials for levee fill shall consist of materials classified in accordance with ASTM D 2487 as CL, CL-ML, SC, and SM and shall be free from: roots and other organic matter; contamination from hazardous, toxic or radiological substances; trash, debris; and frozen materials. Not all satisfactory materials can be used in levee. Only the satisfactory materials stated above, meeting the additional or modified requirements of paragraph TYPES OF FILL MATERIALS, can be used for levee construction.

1.2.5 Unsatisfactory Materials

Unsatisfactory materials shall not be used in any levee or other required fill. Unsatisfactory materials includes all other materials that are not defined above as satisfactory materials.

Material obtained from stripping shall not be wasted but stockpiled for reuse as topsoil.

1.2.6 Excavation

Excavation shall consist of removal of material to the lines and grades shown on the drawings, or as otherwise directed or approved by the Contracting Officer and as described in paragraph EXCAVATION in PART 3

EXECUTION.

1.2.7 Classification of Soils

Materials used to construct the embankments and for backfills shall be classified in accordance with ASTM D 2487 (Unified Soil Classification System).

1.2.7.1 Cohesionless and Cohesive Materials

Cohesionless materials shall include materials classified in ASTM D 2487 as SW and SP. Cohesive materials include materials classified as SC, ML, CL-ML, and CL. Materials classified as SM will be identified as cohesionless only when the fines are nonplastic

1.2.8 Degree of Compaction

Degree of compaction shall be expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 698, abbreviated hereinafter as percent laboratory maximum density.

1.2.9 Landside Seepage Berm

Landside seepage Berm is constructed at the landside toe of the levee embankment to control the seepage through the levee foundation. The berm is constructed of a layer of drain rock placed on a thin layer of bedding

35 41 00 - 4 material or filter geotextile as directed,and covered by separator geotextile.See Section SECTION 31 05 19 GEOTEXTILE.

1.2.9.1 Drain Rock

Drain rock is the material used in combination with bedding material the landside seepage berm.

1.2.9.2 Bedding Material

The bedding material is a granular material placed on the ground beneath the drain rock as shown on the drawings to prevent piping of the fine soils into the drain rock.

1.2.10 Minus 18-Inch Quarry Rock

Minus 18-inch (200 pounds) quarry rock is the material used beneath the levee fill in order to create a firm foundation for embankment construction in areas where the toe or base of the damaged site is under water.

1.2.11 Minus 12-Inch Pit Run Rock

Minus 12-inch pit run rock will generally be used to choke the flow of water after the initial break has been bridged with larger stone.

1.2.12 Derrick Stone

For placement in relatively fast moving water, derrick stone may be required.

1.2.13 Aggregate Base

Aggregate Base material is a gradded sand and gravel material. The aggregate base shall be used to complete repairs to portions of the haul road and to support truck traffic during work on the site. The material shall also be used for the restoration of the levee patrol road.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Plan of Operations; G

Ten (10) days prior to commencement of haul road construction or levee repair which ever is earlier, the Contractor shall submit for approval a Plan of Operations for accomplishing all levee repair construction and for the location and construction of haul roads. This plan shall include but not be limited to the Contractor's proposed sequence of construction for levee repair items, and methods and types of equipment to be utilized for all embankment and backfill operations, including clearing, grubbing, stripping, excavation, protection of underground and above-ground utilities, transporting, stockpiling, placing, compaction, and

35 41 00 - 5…