08-B-0005-AM07.pdf
PDF 5 MB Posted
- Solicitation number
- W91238-08-B-0005
About this file
W91238-08-B-0005 Amendment 0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08-B-0005-AM09.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM08-CONFORMED.pdf | ||
| 08-B-0005-AM08.pdf | ||
| Emerg Levee-Amend 6.pdf | ||
| Emerg Levee Amend 5.pdf | ||
| Emerg Levee Amend 5-Change Pages.pdf | ||
| Emerg Levee Amend 4.pdf | ||
| 08-B-0005-AM3Conformed.pdf | ||
| 08-B-0005-AM3.pdf | ||
| 08-B-0005-Am2.pdf | ||
| 08-B-0005-Am1Conformed.pdf | ||
| 08-B-0005-Am1.pdf | ||
| W91238-08-B-0005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT: EMERGENCY LEVEE REPAIRS; REGION 1 (SACRAMENTO RIVER), REGION 2 (DELTA BASIN), AND REGION
3 (JAN JOAQUIN RIVER); SACRAMENTO/SAN JOAQUIN RIVERS AND DELTA BASIN, CALIFORNIA
See continuation pages for changes.
ENCL1: PRICING SCHEDULE
ENCL 2: GENERAL WAGE DETERMINATION: CA20080004, CA20080009
ENCL 3: TECHNICAL SPECIFICATIONS
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
MODIFICATION OF CONTRACTS/ORDER
NO.
E. IMPORTANT: Contractor
15B. CONTRACTOR/OFFEROR
is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
is extended, B.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
2. AMENDMENT/MODIFICATION NO.
6. ISSUED BY
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is required to sign this document and return
15A. NAME AND TITLE OF SIGNER (Type or print)
PAGE OF PAGES 1. CONTRACT ID CODE
5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
7. ADMINISTERED BY (If other than Item 6)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY
16C. DATE SIGNED
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10B. DATED (SEE ITEM 13)
CODE CODE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
is not ex-copies to the issuing office.
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
(Signature of person authorized to sign) (Signature of Contracting Officer)
USAPPC V2.00
10A.
30-105-02
See Item 6USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
CODE
FACILITY CODE
J 1 199
0007 16-January-2009 SPEC. NO. 1586
W91238-08-B-0005
24-Oct-2008
W91238-08-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.222-54 Employment Eligibility Verification. (Jan 2009)
(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item —
(1) Means any item of supply that is—
(i) A commercial item (as defined in paragraph (1) of the definition at 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products. Per 46 CFR 525.1(c)(2), “bulk cargo” means cargo that is loaded and carried in bulk onboard ship without mark or count, in a loose unpackaged form, having homogenous characteristics.
Bulk cargo loaded into intermodal equipment, except LASH or Seabee barges, is subject to mark and count and, therefore, ceases to be bulk cargo.
Employee assigned to the contract means an employee who was hired after November 6, 1986, who is directly performing work, in the United States, under a contract that is required to include the clause prescribed at 22.1803.
An employee is not considered to be directly performing work under a contract if the employee—
(1) Normally performs support work, such as indirect or overhead functions; and
(2) Does not perform any substantial duties applicable to the contract.
Subcontract means any contract, as defined in 2.101, entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.
Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime Contractor or another subcontractor.
United States, as defined in 8 U.S.C. 1101(a)(38), means the 50 States, the District of Columbia, Puerto Rico, Guam, and the U.S. Virgin Islands.
(b) Enrollment and verification requirements. (1) If the Contractor is not enrolled as a Federal Contractor in E- Verify at time of contract award, the Contractor shall—
(i) Enroll. Enroll as a Federal Contractor in the E-Verify program within 30 calendar days of contract award;
(ii) Verify all new employees. Within 90 calendar days of enrollment in the E-Verify program, begin to use E-Verify to initiate verification of employment eligibility of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); and
Amendment 0007
(iii) Verify employees assigned to the contract. For each employee assigned to the contract, initiate verification within 90 calendar days after date of enrollment or within 30 calendar days of the employee's assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).
(2) If the Contractor is enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall use E-Verify to initiate verification of employment eligibility of—
(i) All new employees. (A) Enrolled 90 calendar days or more. The Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or
(B) Enrolled less than 90 calendar days. Within 90 calendar days after enrollment as a Federal Contractor in E- Verify, the Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or
(ii) Employees assigned to the contract. For each employee assigned to the contract, the Contractor shall initiate verification within 90 calendar days after date of contract award or within 30 days after assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).
(3) If the Contractor is an institution of higher education (as defined at 20 U.S.C. 1001(a)); a State or local government or the government of a Federally recognized Indian tribe; or a surety performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond, the Contractor may choose to verify only employees assigned to the contract, whether existing employees or new hires. The Contractor shall follow the applicable verification requirements at (b)(1) or (b)(2), respectively, except that any requirement for verification of new employees applies only to new employees assigned to the contract.
(4) Option to verify employment eligibility of all employees. The Contractor may elect to verify all existing employees hired after November 6, 1986, rather than just those employees assigned to the contract. The Contractor shall initiate verification for each existing employee working in the United States who was hired after November 6, 1986, within 180 calendar days of—
(i) Enrollment in the E-Verify program; or
(ii) Notification to E-Verify Operations of the Contractor's decision to exercise this option, using the contact information provided in the E-Verify program Memorandum of Understanding (MOU).
(5) The Contractor shall comply, for the period of performance of this contract, with the requirements of the E- Verify program MOU.
(i) The Department of Homeland Security (DHS) or the Social Security Administration (SSA) may terminate the Contractor's MOU and deny access to the E-Verify system in accordance with the terms of the MOU. In such case, the Contractor will be referred to a suspension or debarment official.
(ii) During the period between termination of the MOU and a decision by the suspension or debarment official whether to suspend or debar, the Contractor is excused from its obligations under paragraph (b) of this clause. If the suspension or debarment official determines not to suspend or debar the Contractor, then the Contractor must reenroll in E-Verify.
(c) Web site. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.
(d) Individuals previously verified. The Contractor is not required by this clause to perform additional employment verification using E-Verify for any employee—
(1) Whose employment eligibility was previously verified by the Contractor through the E-Verify program;
(2) Who has been granted and holds an active U.S. Government security clearance for access to confidential, secret, or top secret information in accordance with the National Industrial Security Program Operating Manual; or
(3) Who has undergone a completed background investigation and been issued credentials pursuant to Homeland Security Presidential Directive (HSPD)–12, Policy for a Common Identification Standard for Federal Employees and Contractors.
(e) Subcontracts. The Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for identification of the parties), in each subcontract that—
(1) Is for —(i) Commercial or noncommercial services (except for commercial services that are part of the purchase of a COTS item (or an item that would be a COTS item, but for minor modifications), performed by the COTS provider, and are normally provided for that COTS item); or
(ii) Construction;
(2) Has a value of more than $3,000; and
(3) Includes work performed in the United States.
(End of clause)
(End of Summary of Changes)
PRICING SCHEDULE: REGION 1 (SACRAMENTO)
BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
ITEM UNIT OF UNIT
NO. DESCRIPTION QUANTITY MEASURE PRICE TOTAL
PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE
0001 DERRICK STONE 5,000* TON $_______ $____________
0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3,000* TON $_______ $____________
PURCHASE, HAUL & PLACE ROCK FROM LEVEE
0002 TRANSPORT ROCK FROM QUARRY TO SITE
10,000* TON $_______ $____________
0003 MINUS 18” QUARRY ROCK
6,000* TON $_______ $____________
0003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
0004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
0004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
0005 MINUS 6” ROCK 2,000* TON $_______ $____________
0005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
0006 MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
0006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
0007 DRAIN ROCK 2,000* TON $_______ $____________
0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
0008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
0009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
0009AA PLACE 3/4” AGGREGATE BASE
EQUIPMENT
0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
0010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
0010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
00010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
LABOR
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
0011AA FLAGMAN 200* HOUR $_______ $____________
MATERIAL/SUPPLIES
0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
1,000* LF $_______ $____________
SUBTOTAL PROJECTED PRICE $____________
(BASIC CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE
CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF WORK.
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
1001 DERRICK STONE 5,000* TON $_______ $____________
1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
1002 TRANSPORT ROCK FROM QUARRY TO SITE
1003 MINUS 18” QUARRY ROCK
1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
1004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
1004A PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
1005 MINUS 6” ROCK 2,000* TON $_______ $____________
1005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
1006 MINUS 3” FILL MATERIAL
1006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
1007 DRAIN ROCK 2,000* TON $_______ $____________
1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
1008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
1009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
1009AA PLACE 3/4” AGGREGATE BASE
1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
1010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
1010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
1011AA FLAGMAN 200* HOUR $_______ $____________
1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 1: ITEMS 1001 THRU 1012AA)
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
2001 DERRICK STONE 5,000* TON $_______ $____________
2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
2002 TRANSPORT ROCK FROM QUARRY TO SITE
2003 MINUS 18” QUARRY ROCK
2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
2004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
2004A PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
2005 MINUS 6” ROCK 2,000* TON $_______ $____________
2005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
2006 MINUS 3” FILL MATERIAL
2006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
2007 DRAIN ROCK 2,000* TON $_______ $____________
2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
2008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
2009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
2009AA PLACE 3/4” AGGREGATE BASE
2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
2010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
2010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
2011AA FLAGMAN 200* HOUR $_______ $____________
2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 2: ITEMS 2001 THRU 2012AA)
OPTION 3 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
3001 DERRICK STONE 5,000* TON $_______ $____________
3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3002 TRANSPORT ROCK FROM QUARRY TO SITE
3003 MINUS 18” QUARRY ROCK
3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
3004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
3004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
3005 MINUS 6” ROCK 2,000* TON $_______ $____________
3005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
3006 MINUS 3” FILL MATERIAL
3006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
3007 DRAIN ROCK 2,000* TON $_______ $____________
3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
3008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
3009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
3009AA PLACE 3/4” AGGREGATE BASE
3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
3010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
3010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
3011AA FLAGMAN 200* HOUR $_______ $____________
3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 3: ITEMS 3001 THRU 3012AA)
REGION 1 “GRAND PROJECTED TOTAL” $__________________________
(BASE + OPTION PERIODS)
PRICING SCHEDULE: REGION 2 (Delta Region)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
0001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
0003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
0003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
0004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
0004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
0006AA PLACE MINUS 3” FILL MATERIAL
0007 DRAIN ROCK 2,000* TON $_______ $____________
0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
0008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
0009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
0009AA PLACE 3/4” AGGREGATE BASE
PURCHASE, HAUL & PLACE ROCK FROM BARGE
0010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
0010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
0010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
0011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
0011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
0011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
0011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
0011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
0011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
0011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
0011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
0011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
0011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
0011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
00012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
0012AA FLAGMAN 200* HOUR $_______ $____________
0013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
0013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(BASIC CONTRACT PERIOD: ITEMS 0001 THRU 0013AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
1001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
1003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
1003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
1004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
1004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
1006AA PLACE MINUS 3” FILL MATERIAL
1007 DRAIN ROCK 2,000* TON $_______ $____________
1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
1008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
1009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
1010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
1010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
1010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
1011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
1011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
1011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
1011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
1011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
1011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
1011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
1011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
1011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
1011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
1012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
1012AA FLAGMAN 200* HOUR $_______ $____________
1013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
1013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 1: ITEMS 1001 THRU 1013AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
2001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
2003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
2003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
2004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
2004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
2006AA PLACE MINUS 3” FILL MATERIAL
2007 DRAIN ROCK 2,000* TON $_______ $____________
2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
2008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
2009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
2010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
2010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
2010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
2011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
2011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
2011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
2011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
2011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
2011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
2011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
2011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
2011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
2011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
2011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
2012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
2012AA FLAGMAN 200* HOUR $_______ $____________
2013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
2013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 2: ITEMS 2001 THRU 2013AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
3001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
3003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
3003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
3004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
3004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
3006AA PLACE MINUS 3” FILL MATERIAL
3007 DRAIN ROCK 2,000* TON $_______ $____________
3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
3008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
3009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
3010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
3010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
3010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
3011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
3011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
3011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
3011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
3011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
3011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
00011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
3011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
3011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
3011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
3011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
3012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
3012AA FLAGMAN 200* HOUR $_______ $____________
3013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
3013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 3: ITEMS 3001 THRU 3013AA)
REGION 2 “GRAND PROJECTED TOTAL” $__________________________
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE
PRICING SCHEDULE: REGION 3(SAN JOAQUIN)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
0003 MINUS 18” QUARRY ROCK
0003A PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
0004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
0004A PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
0005A PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
0007 DRAIN ROCK 2,000* TON $_______ $____________
0007A PLACE DRAIN ROCK 2,000* TON $_______ $____________
0008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
0008A PLACE MINUS 1” FILL 1,000* TON $_______ $____________
0009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
0009A PLACE 3/4” AGGREGATE BASE
0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
0010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
0010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
0010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
0011AA FLAGMAN 200* HOUR $_______ $____________
0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(BASE CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
1003 MINUS 18” QUARRY ROCK
1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
1004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
1004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
1006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
1007 RAIN ROCK 2,000* TON $_______ $____________
1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
1008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
1009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
1010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
1010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
1011AA FLAGMAN 200* HOUR $_______ $____________
1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 1: ITEMS 1001 THRU 1012AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
2003 MINUS 18” QUARRY ROCK
2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
2004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
2004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
2006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
2007 DRAIN ROCK 2,000* TON $_______ $____________
2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
2008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
2009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
2010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
2010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
2011AA FLAGMAN 200* HOUR $_______ $____________
2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 2: ITEMS 2001 THRU 2012AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3003 MINUS 18” QUARRY ROCK
3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
3004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
3004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
3006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
3007 DRAIN ROCK 2,000* TON $_______ $____________
3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
3008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
3009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
3010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
3010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
3011AA FLAGMAN 200* HOUR $_______ $____________
3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 3: ITEMS 3001 THRU 3012AA)
REGION 3 “GRAND PROJECTED TOTAL” $__________________________
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE
GENERAL DECISION: CA20080004 01/16/2009 CA4
Date: January 16, 2009 General Decision Number: CA20080004 01/16/2009
Superseded General Decision Number: CA20070004
State: California
Construction Types: Heavy (Heavy and Dredging) and Highway
Counties: Del Norte, Humboldt, Lake and Mendocino Counties in California.
DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling);
AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 02/29/2008 3 03/07/2008 4 06/20/2008 5 07/04/2008 6 07/11/2008 7 08/01/2008 8 08/15/2008 9 08/29/2008 10 09/12/2008 11 10/03/2008 12 12/05/2008 13 01/02/2009 14 01/16/2009
* ASBE0016-005 01/01/2009
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems)
(1) Mendocino County.......$ 47.73 15.21
(2) Del Norte, Humboldt, Lake Counties...............$ 39.08 15.21
* ASBE0016-006 01/01/2009
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 29.60 5.40
BRCA0003-001 08/01/2008
Rates Fringes
MARBLE FINISHER..................$ 28.02 12.12
BRCA0003-003 08/01/2008
Rates Fringes
MARBLE MASON.....................$ 39.22 18.58
BRCA0003-006 07/01/2008
Rates Fringes
BRICKLAYER.......................$ 37.98 17.32
SPECIALTY PAY:
(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.
(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.
(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.
BRCA0003-008 07/01/2008
Rates Fringes
TERRAZZO FINISHER................$ 28.81 10.61
TERRAZZO WORKER/SETTER...........$ 38.18 17.67
BRCA0003-013 04/01/2007
Rates Fringes
TILE FINISHER
Del Norte & Humboldt Counties....................$ 20.25 9.78 Lake & Mendocino Counties...$ 19.74 9.26
TILE LAYER
Del Norte & Humboldt Counties....................$ 36.47 11.01 Lake & Mendocino Counties...$ 33.31 10.96
CARP0034-001 07/01/2008
Rates Fringes
Diver Assistant Tender, ROV Tender/Technician...........$ 33.90 23.03 Diver standby...............$ 38.29 23.03 Diver Tender................$ 37.29 23.03 Diver wet...................$ 76.58 23.03 Manifold Operator (mixed gas)........................$ 42.29 23.03 Manifold Operator (Standby).$ 37.29 23.03
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 01/01/2009
Rates Fringes
Piledriver.......................$ 33.90 23.03
CARP0035-006 01/01/2009
Rates Fringes
CARPENTER
(1) Carpenter...............$ 27.52 19.73
(2) Hardwood floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw
Filer.......................$ 27.67 19.73
(3) Bridge Builder..........$ 34.75 19.73
(4) Millwright..............$ 30.02 19.95
ELEC0551-001 06/01/2008
LAKE AND MENDOCINO COUNTIES
Rates Fringes
Electricians:
Electrician.................$ 42.33 3%+12.68
TUNNEL WORK: Add $0.50 per hour.
ELEC0551-002 06/01/2008
DEL NORTE AND HUMBOLDT COUNTIES
Rates Fringes
Electricians:....................$ 42.33 3%+12.68
TUNNEL WORK: Add $0.50 per hour.
ELEC1245-002 06/01/2008
HUMBOLDT, LAKE AND MENDOCINO COUNTIES
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 43.07 12.57
(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 34.40 11.53
(3) Groundman...............$ 26.31 11.29
(4) Powderman...............$ 38.46 11.69
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ENGI0003-018 06/30/2008
"AREA 1" WAGE RATES ARE LISTED BELOW
"AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DEFINITIONS BELOW
Rates Fringes
POWER EQUIPMENT OPERATOR
(AREA 1:)
GROUP 1.....................$ 36.77 20.89
GROUP 2.....................$ 35.24 20.89
GROUP 3.....................$ 33.76 20.89
GROUP 4.....................$ 32.38 20.89
GROUP 5.....................$ 31.11 20.89
GROUP 6.....................$ 29.79 20.89
GROUP 7.....................$ 28.65 20.89
GROUP 8.....................$ 27.51 20.89
GROUP 8-A...................$ 27.30 20.89
POWER EQUIPMENT OPERATOR
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 37.65 20.89 Oiler......................$ 28.39 20.89 Truck crane oiler..........$ 30.68 20.89
GROUP 2
Cranes.....................$ 35.89 20.89 Oiler......................$ 28.18 20.89 Truck crane oiler..........$ 30.42 20.89
GROUP 3
Cranes.....................$ 34.14 20.89 Hydraulic..................$ 29.79 20.89 Oiler......................$ 27.90 20.89 Truck Crane Oiler..........$ 30.18 20.89
POWER EQUIPMENT OPERATOR
(Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 37.99 20.89 Oiler......................$ 28.73 20.89 Truck crane oiler..........$ 31.01 20.89
GROUP 2
Lifting devices............$ 36.17 20.89 Oiler......................$ 28.46 20.89 Truck Crane Oiler..........$ 30.76 20.89
GROUP 3
Lifting devices............$ 34.49 20.89 Oiler......................$ 28.24 20.89 Truck Crane Oiler..........$ 30.47 20.89
GROUP 4.....................$ 32.72 20.89
GROUP 5.....................$ 30.08 20.89
GROUP 6.....................$ 27.85 20.89
POWER EQUIPMENT OPERATOR
(Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 38.62 20.89 Oiler......................$ 29.07 20.89 Truck Crane Oiler..........$ 31.30 20.89
GROUP 2
Cranes.....................$ 36.85 20.89 Oiler......................$ 28.80 20.89 Truck Crane Oiler..........$ 31.08 20.89
GROUP 3
Cranes.....................$ 35.37 20.89 Hydraulic..................$ 30.42 20.89 Oiler......................$ 28.58 20.89 Truck Crane Oiler..........$ 30.81 20.89
GROUP 4.....................$ 33.35 20.89
GROUP 5.....................$ 32.05 20.89
POWER EQUIPMENT OPERATOR
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 32.87 20.89
GROUP 1-A..................$ 35.34 20.89
GROUP 2....................$ 31.61 20.89
GROUP 3....................$ 30.28 20.89
GROUP 4....................$ 29.14 20.89
GROUP 5....................$ 28.00 20.89
UNDERGROUND:
GROUP 1....................$ 32.77 20.89
GROUP 1-A.........
This is the start of the file's text. The full file is on GovTribe.