About this file

W91238-08-B-0005 Amendment 0007

View the file

Other files

File Type Posted
08-B-0005-AM09.pdf PDF
08-B-0005-AM08.pdf PDF
08-B-0005-AM08-CONFORMED.pdf PDF
08-B-0005-AM08.pdf PDF
Emerg Levee-Amend 6.pdf PDF
Emerg Levee Amend 5.pdf PDF
Emerg Levee Amend 5-Change Pages.pdf PDF
Emerg Levee Amend 4.pdf PDF
08-B-0005-AM3Conformed.pdf PDF
08-B-0005-AM3.pdf PDF
08-B-0005-Am2.pdf PDF
08-B-0005-Am1Conformed.pdf PDF
08-B-0005-Am1.pdf PDF
W91238-08-B-0005.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT: EMERGENCY LEVEE REPAIRS; REGION 1 (SACRAMENTO RIVER), REGION 2 (DELTA BASIN), AND REGION

3 (JAN JOAQUIN RIVER); SACRAMENTO/SAN JOAQUIN RIVERS AND DELTA BASIN, CALIFORNIA

See continuation pages for changes.

ENCL1: PRICING SCHEDULE

ENCL 2: GENERAL WAGE DETERMINATION: CA20080004, CA20080009

ENCL 3: TECHNICAL SPECIFICATIONS

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

See Item 6USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET-ROOM 878

SACRAMENTO CA 95814-2922

CODE

FACILITY CODE

J 1 199

0007 16-January-2009 SPEC. NO. 1586

W91238-08-B-0005

24-Oct-2008

W91238-08-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

52.222-54 Employment Eligibility Verification. (Jan 2009)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item —

(1) Means any item of supply that is—

(i) A commercial item (as defined in paragraph (1) of the definition at 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products. Per 46 CFR 525.1(c)(2), “bulk cargo” means cargo that is loaded and carried in bulk onboard ship without mark or count, in a loose unpackaged form, having homogenous characteristics.

Bulk cargo loaded into intermodal equipment, except LASH or Seabee barges, is subject to mark and count and, therefore, ceases to be bulk cargo.

Employee assigned to the contract means an employee who was hired after November 6, 1986, who is directly performing work, in the United States, under a contract that is required to include the clause prescribed at 22.1803.

An employee is not considered to be directly performing work under a contract if the employee—

(1) Normally performs support work, such as indirect or overhead functions; and

(2) Does not perform any substantial duties applicable to the contract.

Subcontract means any contract, as defined in 2.101, entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime Contractor or another subcontractor.

United States, as defined in 8 U.S.C. 1101(a)(38), means the 50 States, the District of Columbia, Puerto Rico, Guam, and the U.S. Virgin Islands.

(b) Enrollment and verification requirements. (1) If the Contractor is not enrolled as a Federal Contractor in E- Verify at time of contract award, the Contractor shall—

(i) Enroll. Enroll as a Federal Contractor in the E-Verify program within 30 calendar days of contract award;

(ii) Verify all new employees. Within 90 calendar days of enrollment in the E-Verify program, begin to use E-Verify to initiate verification of employment eligibility of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); and

Amendment 0007

(iii) Verify employees assigned to the contract. For each employee assigned to the contract, initiate verification within 90 calendar days after date of enrollment or within 30 calendar days of the employee's assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(2) If the Contractor is enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall use E-Verify to initiate verification of employment eligibility of—

(i) All new employees. (A) Enrolled 90 calendar days or more. The Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(B) Enrolled less than 90 calendar days. Within 90 calendar days after enrollment as a Federal Contractor in E- Verify, the Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(ii) Employees assigned to the contract. For each employee assigned to the contract, the Contractor shall initiate verification within 90 calendar days after date of contract award or within 30 days after assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(3) If the Contractor is an institution of higher education (as defined at 20 U.S.C. 1001(a)); a State or local government or the government of a Federally recognized Indian tribe; or a surety performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond, the Contractor may choose to verify only employees assigned to the contract, whether existing employees or new hires. The Contractor shall follow the applicable verification requirements at (b)(1) or (b)(2), respectively, except that any requirement for verification of new employees applies only to new employees assigned to the contract.

(4) Option to verify employment eligibility of all employees. The Contractor may elect to verify all existing employees hired after November 6, 1986, rather than just those employees assigned to the contract. The Contractor shall initiate verification for each existing employee working in the United States who was hired after November 6, 1986, within 180 calendar days of—

(i) Enrollment in the E-Verify program; or

(ii) Notification to E-Verify Operations of the Contractor's decision to exercise this option, using the contact information provided in the E-Verify program Memorandum of Understanding (MOU).

(5) The Contractor shall comply, for the period of performance of this contract, with the requirements of the E- Verify program MOU.

(i) The Department of Homeland Security (DHS) or the Social Security Administration (SSA) may terminate the Contractor's MOU and deny access to the E-Verify system in accordance with the terms of the MOU. In such case, the Contractor will be referred to a suspension or debarment official.

(ii) During the period between termination of the MOU and a decision by the suspension or debarment official whether to suspend or debar, the Contractor is excused from its obligations under paragraph (b) of this clause. If the suspension or debarment official determines not to suspend or debar the Contractor, then the Contractor must reenroll in E-Verify.

(c) Web site. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.

(d) Individuals previously verified. The Contractor is not required by this clause to perform additional employment verification using E-Verify for any employee—

(1) Whose employment eligibility was previously verified by the Contractor through the E-Verify program;

(2) Who has been granted and holds an active U.S. Government security clearance for access to confidential, secret, or top secret information in accordance with the National Industrial Security Program Operating Manual; or

(3) Who has undergone a completed background investigation and been issued credentials pursuant to Homeland Security Presidential Directive (HSPD)–12, Policy for a Common Identification Standard for Federal Employees and Contractors.

(e) Subcontracts. The Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for identification of the parties), in each subcontract that—

(1) Is for —(i) Commercial or noncommercial services (except for commercial services that are part of the purchase of a COTS item (or an item that would be a COTS item, but for minor modifications), performed by the COTS provider, and are normally provided for that COTS item); or

(ii) Construction;

(2) Has a value of more than $3,000; and

(3) Includes work performed in the United States.

(End of clause)

(End of Summary of Changes)

PRICING SCHEDULE: REGION 1 (SACRAMENTO)

BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

ITEM UNIT OF UNIT

NO. DESCRIPTION QUANTITY MEASURE PRICE TOTAL

PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE

0001 DERRICK STONE 5,000* TON $_______ $____________

0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

0001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

3,000* TON $_______ $____________

PURCHASE, HAUL & PLACE ROCK FROM LEVEE

0002 TRANSPORT ROCK FROM QUARRY TO SITE

10,000* TON $_______ $____________

0003 MINUS 18” QUARRY ROCK

6,000* TON $_______ $____________

0003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

0004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

0004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

0005 MINUS 6” ROCK 2,000* TON $_______ $____________

0005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

0006 MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

0006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

0007 DRAIN ROCK 2,000* TON $_______ $____________

0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

0008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

0009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

0009AA PLACE 3/4” AGGREGATE BASE

EQUIPMENT

0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

0010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

0010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

00010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

LABOR

0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

0011AA FLAGMAN 200* HOUR $_______ $____________

MATERIAL/SUPPLIES

0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

1,000* LF $_______ $____________

SUBTOTAL PROJECTED PRICE $____________

(BASIC CONTRACT PERIOD ITEMS 0001 THRU 0012AA)

*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE

CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF WORK.

OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

1001 DERRICK STONE 5,000* TON $_______ $____________

1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

1001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

1002 TRANSPORT ROCK FROM QUARRY TO SITE

1003 MINUS 18” QUARRY ROCK

1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

1004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

1004A PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

1005 MINUS 6” ROCK 2,000* TON $_______ $____________

1005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

1006 MINUS 3” FILL MATERIAL

1006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

1007 DRAIN ROCK 2,000* TON $_______ $____________

1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

1008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

1009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

1009AA PLACE 3/4” AGGREGATE BASE

1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

1010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

1010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

1011AA FLAGMAN 200* HOUR $_______ $____________

1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 1: ITEMS 1001 THRU 1012AA)

OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

2001 DERRICK STONE 5,000* TON $_______ $____________

2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

2001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

2002 TRANSPORT ROCK FROM QUARRY TO SITE

2003 MINUS 18” QUARRY ROCK

2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

2004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

2004A PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

2005 MINUS 6” ROCK 2,000* TON $_______ $____________

2005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

2006 MINUS 3” FILL MATERIAL

2006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

2007 DRAIN ROCK 2,000* TON $_______ $____________

2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

2008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

2009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

2009AA PLACE 3/4” AGGREGATE BASE

2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

2010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

2010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

2011AA FLAGMAN 200* HOUR $_______ $____________

2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 2: ITEMS 2001 THRU 2012AA)

OPTION 3 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

3001 DERRICK STONE 5,000* TON $_______ $____________

3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

3001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

3002 TRANSPORT ROCK FROM QUARRY TO SITE

3003 MINUS 18” QUARRY ROCK

3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

3004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

3004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

3005 MINUS 6” ROCK 2,000* TON $_______ $____________

3005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________

3006 MINUS 3” FILL MATERIAL

3006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

3007 DRAIN ROCK 2,000* TON $_______ $____________

3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

3008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

3009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

3009AA PLACE 3/4” AGGREGATE BASE

3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

3010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

3010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

3011AA FLAGMAN 200* HOUR $_______ $____________

3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 3: ITEMS 3001 THRU 3012AA)

REGION 1 “GRAND PROJECTED TOTAL” $__________________________

(BASE + OPTION PERIODS)

PRICING SCHEDULE: REGION 2 (Delta Region)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

0001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

0001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

0003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

0003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

0004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

0004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

0006AA PLACE MINUS 3” FILL MATERIAL

0007 DRAIN ROCK 2,000* TON $_______ $____________

0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

0008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

0009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

0009AA PLACE 3/4” AGGREGATE BASE

PURCHASE, HAUL & PLACE ROCK FROM BARGE

0010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

0010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

0010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

0011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

0011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

0011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

0011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

0011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

0011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

0011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

0011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

0011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

0011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

0011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

00012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

0012AA FLAGMAN 200* HOUR $_______ $____________

0013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

0013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(BASIC CONTRACT PERIOD: ITEMS 0001 THRU 0013AA)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

1001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

1001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

1003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

1003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

1004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

1004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

1006AA PLACE MINUS 3” FILL MATERIAL

1007 DRAIN ROCK 2,000* TON $_______ $____________

1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

1008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

1009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

1010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

1010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

1010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

1011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

1011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

1011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

1011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

1011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

1011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

1011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

1011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

1011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

1011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

1012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

1012AA FLAGMAN 200* HOUR $_______ $____________

1013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

1013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 1: ITEMS 1001 THRU 1013AA)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

2001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

2001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

2003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

2003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

2004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

2004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

2006AA PLACE MINUS 3” FILL MATERIAL

2007 DRAIN ROCK 2,000* TON $_______ $____________

2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

2008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

2009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

2010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

2010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

2010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

2011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

2011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

2011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

2011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

2011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

2011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

2011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

2011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

2011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

2011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

2011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

2012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

2012AA FLAGMAN 200* HOUR $_______ $____________

2013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

2013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 2: ITEMS 2001 THRU 2013AA)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

3001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

3001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL

6,000* TON $_______ $____________

3003 MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

3003AA PLACE MINUS 18” QUARRY ROCK

3,000* TON $_______ $____________

3004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________

3004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________

3006AA PLACE MINUS 3” FILL MATERIAL

3007 DRAIN ROCK 2,000* TON $_______ $____________

3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

3008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________

3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

3009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

3010 MOBILIZATION/DEMOBILIZATION

OF BARGE CRANE 1* LS $_______ $____________

3010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE

3010AB MOVE BARGE CRANE 100* HOUR $_______ $____________

3011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

3011AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

3011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

3011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

3011AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

3011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

00011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

3011AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

3011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

3011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

3011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

3012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

3012AA FLAGMAN 200* HOUR $_______ $____________

3013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

3013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 3: ITEMS 3001 THRU 3013AA)

REGION 2 “GRAND PROJECTED TOTAL” $__________________________

*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE

PRICING SCHEDULE: REGION 3(SAN JOAQUIN)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

0001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

0003 MINUS 18” QUARRY ROCK

0003A PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

0004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

0004A PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

0005A PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

0007 DRAIN ROCK 2,000* TON $_______ $____________

0007A PLACE DRAIN ROCK 2,000* TON $_______ $____________

0008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

0008A PLACE MINUS 1” FILL 1,000* TON $_______ $____________

0009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

0009A PLACE 3/4” AGGREGATE BASE

0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

0010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

0010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

0010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

0011AA FLAGMAN 200* HOUR $_______ $____________

0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(BASE CONTRACT PERIOD ITEMS 0001 THRU 0012AA)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

1001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

1003 MINUS 18” QUARRY ROCK

1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

1004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

1004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

1006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

1007 RAIN ROCK 2,000* TON $_______ $____________

1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

1008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

1009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

1010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

1010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

1011AA FLAGMAN 200* HOUR $_______ $____________

1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 1: ITEMS 1001 THRU 1012AA)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

2001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

2003 MINUS 18” QUARRY ROCK

2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

2004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

2004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

2006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

2007 DRAIN ROCK 2,000* TON $_______ $____________

2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

2008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

2009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

2010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

2010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

2011AA FLAGMAN 200* HOUR $_______ $____________

2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 2: ITEMS 2001 THRU 2012AA)

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.

ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE

AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND

NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL

AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.

LINE

3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________

3001AB PLACE DERRICK STONE FROM LEVEE

5,000* TON $_______ $____________

3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL

3003 MINUS 18” QUARRY ROCK

3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE

6,000* TON $_______ $____________

3004 MINUS 12” PIT RUN ROCK

6,000* TON $_______ $____________

3004AA PLACE 12” PIT RUN ROCK

6,000* TON $_______ $____________

3006AA PLACE MINUS 3” FILL MATERIAL

2,000* TON $_______ $____________

3007 DRAIN ROCK 2,000* TON $_______ $____________

3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________

3008 MINUS 1” FILL MATERIAL

1,000* TON $_______ $____________

3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________

3009 3/4” AGGREGATE BASE

3,000* TON $_______ $____________

3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________

3010AA 10-WHEELED DUMP TRUCK

600* HOUR $_______ $____________

3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________

3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________

3010AD EXCAVATOR, CAT 235 OR EQUAL

80* HOUR $_______ $____________

3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY

80* HOUR $_______ $____________

3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL

80* HOUR $_______ $____________

3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY

80* HOUR $_______ $____________

3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP

80* HOUR $_______ $____________

3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________

3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________

3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________

3011AA FLAGMAN 200* HOUR $_______ $____________

3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________

3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES

(OPTION PERIOD 3: ITEMS 3001 THRU 3012AA)

REGION 3 “GRAND PROJECTED TOTAL” $__________________________

*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE

GENERAL DECISION: CA20080004 01/16/2009 CA4

Date: January 16, 2009 General Decision Number: CA20080004 01/16/2009

Superseded General Decision Number: CA20070004

State: California

Construction Types: Heavy (Heavy and Dredging) and Highway

Counties: Del Norte, Humboldt, Lake and Mendocino Counties in California.

DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling);

AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 02/29/2008 3 03/07/2008 4 06/20/2008 5 07/04/2008 6 07/11/2008 7 08/01/2008 8 08/15/2008 9 08/29/2008 10 09/12/2008 11 10/03/2008 12 12/05/2008 13 01/02/2009 14 01/16/2009

* ASBE0016-005 01/01/2009

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems)

(1) Mendocino County.......$ 47.73 15.21

(2) Del Norte, Humboldt, Lake Counties...............$ 39.08 15.21

* ASBE0016-006 01/01/2009

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 29.60 5.40

BRCA0003-001 08/01/2008

Rates Fringes

MARBLE FINISHER..................$ 28.02 12.12

BRCA0003-003 08/01/2008

Rates Fringes

MARBLE MASON.....................$ 39.22 18.58

BRCA0003-006 07/01/2008

Rates Fringes

BRICKLAYER.......................$ 37.98 17.32

SPECIALTY PAY:

(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.

(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.

(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.

BRCA0003-008 07/01/2008

Rates Fringes

TERRAZZO FINISHER................$ 28.81 10.61

TERRAZZO WORKER/SETTER...........$ 38.18 17.67

BRCA0003-013 04/01/2007

Rates Fringes

TILE FINISHER

Del Norte & Humboldt Counties....................$ 20.25 9.78 Lake & Mendocino Counties...$ 19.74 9.26

TILE LAYER

Del Norte & Humboldt Counties....................$ 36.47 11.01 Lake & Mendocino Counties...$ 33.31 10.96

CARP0034-001 07/01/2008

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 33.90 23.03 Diver standby...............$ 38.29 23.03 Diver Tender................$ 37.29 23.03 Diver wet...................$ 76.58 23.03 Manifold Operator (mixed gas)........................$ 42.29 23.03 Manifold Operator (Standby).$ 37.29 23.03

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 01/01/2009

Rates Fringes

Piledriver.......................$ 33.90 23.03

CARP0035-006 01/01/2009

Rates Fringes

CARPENTER

(1) Carpenter...............$ 27.52 19.73

(2) Hardwood floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw

Filer.......................$ 27.67 19.73

(3) Bridge Builder..........$ 34.75 19.73

(4) Millwright..............$ 30.02 19.95

ELEC0551-001 06/01/2008

LAKE AND MENDOCINO COUNTIES

Rates Fringes

Electricians:

Electrician.................$ 42.33 3%+12.68

TUNNEL WORK: Add $0.50 per hour.

ELEC0551-002 06/01/2008

DEL NORTE AND HUMBOLDT COUNTIES

Rates Fringes

Electricians:....................$ 42.33 3%+12.68

TUNNEL WORK: Add $0.50 per hour.

ELEC1245-002 06/01/2008

HUMBOLDT, LAKE AND MENDOCINO COUNTIES

Rates Fringes

LINE CONSTRUCTION

(1) Lineman; Cable splicer..$ 43.07 12.57

(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 34.40 11.53

(3) Groundman...............$ 26.31 11.29

(4) Powderman...............$ 38.46 11.69

HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day

ENGI0003-018 06/30/2008

"AREA 1" WAGE RATES ARE LISTED BELOW

"AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1

RATES.

SEE AREA DEFINITIONS BELOW

Rates Fringes

POWER EQUIPMENT OPERATOR

(AREA 1:)

GROUP 1.....................$ 36.77 20.89

GROUP 2.....................$ 35.24 20.89

GROUP 3.....................$ 33.76 20.89

GROUP 4.....................$ 32.38 20.89

GROUP 5.....................$ 31.11 20.89

GROUP 6.....................$ 29.79 20.89

GROUP 7.....................$ 28.65 20.89

GROUP 8.....................$ 27.51 20.89

GROUP 8-A...................$ 27.30 20.89

POWER EQUIPMENT OPERATOR

(Cranes and Attachments -

AREA 1:)

GROUP 1

Cranes.....................$ 37.65 20.89 Oiler......................$ 28.39 20.89 Truck crane oiler..........$ 30.68 20.89

GROUP 2

Cranes.....................$ 35.89 20.89 Oiler......................$ 28.18 20.89 Truck crane oiler..........$ 30.42 20.89

GROUP 3

Cranes.....................$ 34.14 20.89 Hydraulic..................$ 29.79 20.89 Oiler......................$ 27.90 20.89 Truck Crane Oiler..........$ 30.18 20.89

POWER EQUIPMENT OPERATOR

(Piledriving - AREA 1:)

GROUP 1

Lifting devices............$ 37.99 20.89 Oiler......................$ 28.73 20.89 Truck crane oiler..........$ 31.01 20.89

GROUP 2

Lifting devices............$ 36.17 20.89 Oiler......................$ 28.46 20.89 Truck Crane Oiler..........$ 30.76 20.89

GROUP 3

Lifting devices............$ 34.49 20.89 Oiler......................$ 28.24 20.89 Truck Crane Oiler..........$ 30.47 20.89

GROUP 4.....................$ 32.72 20.89

GROUP 5.....................$ 30.08 20.89

GROUP 6.....................$ 27.85 20.89

POWER EQUIPMENT OPERATOR

(Steel Erection - AREA 1:)

GROUP 1

Cranes.....................$ 38.62 20.89 Oiler......................$ 29.07 20.89 Truck Crane Oiler..........$ 31.30 20.89

GROUP 2

Cranes.....................$ 36.85 20.89 Oiler......................$ 28.80 20.89 Truck Crane Oiler..........$ 31.08 20.89

GROUP 3

Cranes.....................$ 35.37 20.89 Hydraulic..................$ 30.42 20.89 Oiler......................$ 28.58 20.89 Truck Crane Oiler..........$ 30.81 20.89

GROUP 4.....................$ 33.35 20.89

GROUP 5.....................$ 32.05 20.89

POWER EQUIPMENT OPERATOR

(Tunnel and Underground Work

- AREA 1:)

SHAFTS, STOPES, RAISES:

GROUP 1....................$ 32.87 20.89

GROUP 1-A..................$ 35.34 20.89

GROUP 2....................$ 31.61 20.89

GROUP 3....................$ 30.28 20.89

GROUP 4....................$ 29.14 20.89

GROUP 5....................$ 28.00 20.89

UNDERGROUND:

GROUP 1....................$ 32.77 20.89

GROUP 1-A.........