W91238-08-B-0005 Amendment 0008 Conformed set
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08-B-0005-AM09.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM07.pdf | ||
| Emerg Levee-Amend 6.pdf | ||
| Emerg Levee Amend 5.pdf | ||
| Emerg Levee Amend 5-Change Pages.pdf | ||
| Emerg Levee Amend 4.pdf | ||
| 08-B-0005-AM3Conformed.pdf | ||
| 08-B-0005-AM3.pdf | ||
| 08-B-0005-Am2.pdf | ||
| 08-B-0005-Am1Conformed.pdf | ||
| 08-B-0005-Am1.pdf | ||
| W91238-08-B-0005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS (IFB)
INDEFINITE DELIVERY TYPE - REQUIREMENTS CONTRACT
(Emergency Levee Repairs) Region 1 - Sacramento River, Region 2 - Delta Basin, and Region 3 - San Joaquin River
Sacramento/San Joaquin Rivers & Delta Basin, California
IFB NO. W91238-08-B-0005
SPECIFICATION NO. 1586
US Army Corps of Engineers® Sacramento District
DISTRIBUTION STATEMENT A
Approved for public release; distribution is unlimited
ATTENTION TO OFFERORS:
1. SECURITY REQUIREMENTS
YOUR ATTENTION IS DIRECTED TO THE SECURITY REQUIREMENTS FOR THIS
CONTRACT LOCATED IN SECTION 00800, SPECIAL CONTRACT REQUIREMENTS.
2. FACTS ABOUT THE USE OF INDIVIDUAL SURETIES
The Federal Acquisition Regulation (FAR) permits the use of individual sureties for bid, payment and performance bonds. However, the conditions that must be met are strict, and they may not be waived. Further, the FAR imposes limits with respect to the type of property interest individual sureties may utilize.
Individual sureties have been occasionally and successfully used in accordance with FAR requirements within the Sacramento District, when real property interests have not been provided as the security interest. On at least one occasion, an individual surety was made acceptable when an individual personally known to a bidder provided a business property for the security interest, and legal counsel was engaged to navigate and implement the FAR requirements.
Bidders or proposers considering utilizing individuals or firms providing “brokerage” or “insurance” services to obtain bonds from individual sureties are advised to carefully research their backgrounds. The Government is not responsible for and will not reimburse any bidder for advance payments made to such firms in the event that the bonds are unacceptable to the contracting officer.
The Sacramento District strictly follows the FAR 28.203 “Acceptability of individual sureties.” Frequently, an individual surety’s bid bond raises questions about the real property security interest being offered. Also, individual sureties may use “altered” Standard Form 28 affidavits, which are unacceptable. Documentation containing such flaws will result in rejection of the bonds, and, if it is a bid bond, rejection of the bid.
Some “brokers” apparently represent that “their bonds” are accepted by federal government entities. Yet, be aware that not all federal agencies implement the FAR in a uniform manner. Insufficiencies that go unnoticed by one agency may be perceived as fatal by another. The risk of such results rests with the bidder offering the bid bond.
Know your broker, and ensure that all bonding documents comply with FAR requirements before you submit them. It is important to remember that the contracting officer is vested with a wide degree of discretion and business judgment in determining the acceptability of an individual surety, and the Comptroller General has stated that he will not question such a determination so long as it is reasonable.
So, please make certain that if you intend to use an individual surety you are familiar with the regulations and specific requirements that apply to this form of bonding.
W91238-08-B-0005-0008
Provide emergency rapid response/ repair of actual or impending levee breaches/failures and resultant f looding events based on the w ork items identif ied in the pricing schedule, for these 3 regions w ithin Sacramento District's Area of Responsibility (1) Sacramento River drainage basin including all rivers/tributaries flow ing into the river north of N38.36838 W 121.52138 (Hood, CA). (2) Delta Region w ith its w estern most boundary on the Sac River at N38.06102 W 122.22616 (I-80 overpass at Carquinez), includes all rivers and tributaries flow ing into region excluding the Sac River north of N38.36838 W121.52138 (Hood, CA) and San Joaquin River South of N37.94802 W121.33722 (w est of I-5 overpass but including the ship channel and port area east of the I-5 overpass. (3). San Joaquin River drainage basin including all rivers and tributaries flow ing into the river south of N37.94802 W121.33722 (w est of the I-5 overpass). Unrestricted sealed bidding w ill be used.
Three (3) IDIQ Requirements contracts w ill be aw arded. Initial contract w ill be for one (1) year, w ith three (3) option years. Option Periods may be exercised early so that any remaining Period's capacity can be made available w hen/if needed to respond to flood fight activities.
X
MARSHA R SELLS 916-557-5232
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Oct-2008
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________27 Jan 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
W91238
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W91238-08-B-0005
Section SF 30 - BLOCK 14 CONTINUATION PAGE
PAGE 2 AMENDMENT 0008
SUMMARY OF CHANGES
The purpose of this amendment is as follows:
1. Extend the bid opening date/time in SF 1442, Block 13 (Section 00010) and Local Clause 52.0214-4582 (Section 00100).
2. Changes to Local Clause 52.0214-4581 (Section 00100) changes Point of Contact information.
3. Remove Clause 52.222-54 (Section 00700) due to pending litigation.
4. For ease of understanding, a conformed copy of the solicitation incorporating “all” changes have been provided along with this amendment. All bids are to be submitted using this conformed copy of the solicitation
Section 00010 - Solicitation Contract Form
CONTINUATION PAGES 3 AND 4
CONTINUATION OF STANDARD FORM 1442
BLOCK 20D:
(1) IF THE OFFEROR IS A JOINT VENTURE, EACH PARTICIPANT IN THE JOINT VENTURE
MUST COMPLETE THE FOLLOWING:
Company Name Signature Title
Company Name Signature Title
Company Name Signature Title
NOTE: If a corporation is participating as a member of a Joint Venture, the certificate below must also be completed and signed.
CORPORATION AUTHORIZATION TO PARTICIPATE IN JOINT VENTURE CERTIFICATE
I, _______________________, certify that I am the Secretary of the corporation (name) named as a participant in a Joint Venture on this offer; that _____________________, who signed said offer on behalf of the corporation, was (name) then ______________________ of said corporation; that the signature thereto is (title) genuine; that said contract was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing body; and that the corporation is authorized to participate in the Joint Venture on this offer.
(Name of Corporation)
(Secretary)
(2) IF THE OFFEROR IS A PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS BELOW.
SIGNATURES BY ALL PARTNERS HERE SIGNIFY THAT THE INDIVIDUAL WHO SIGNED THE
OFFER IN BLOCK 20B HAS THE AUTHORITY TO BIND THE PARTNERSHIP.
Name Signature
Name Signature
Name Signature
(3) IF THE OFFEROR IS A CORPORATION, THE OFFER SHALL BE SIGNED IN THE
CORPORATE NAME FOLLOWED BY THE WORD "BY" AND THE SIGNATURE OF THE PERSON
AUTHORIZED TO SIGN THE OFFER IN BLOCK 20B. PROVIDE PROOF THAT THE PERSON
SIGNING FOR THE CORPORATION HAS THE AUTHORITY TO BIND THE CORPORATION BY
COMPLETING THE FOLLOWING CERTIFICATE:
CONTINUATION OF STANDARD FORM 1442
CORPORATION AUTHORIZATION CERTIFICATE
I, ___________________________________, certify that I am the Secretary of the (name) corporation named as offeror in the within offer; that ______________________, (name) who signed said offer on behalf of the corporation, was then
_____________________________________ of said corporation, that the signature (title) thereto is genuine; that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.
(Name of Corporation)
(Secretary)
(4) IF THE OFFEROR IS AN INDIVIDUAL DOING BUSINESS AS A FIRM, THE OFFER SHALL
BE SIGNED BY THAT INDIVIDUAL IN BLOCK 20B FOLLOWED BY THE WORDS "AN INDIVIDUAL
DOING BUSINESS AS _____________________________________ (INSERT NAME OF FIRM).
(5) WHEN AN AGENT SIGNS THE OFFER, PROVIDE PROOF OF THE AGENT'S AUTHORITY TO
BIND THE PRINCIPAL.
TABLE OF CONTENTS
SECTION TITLE
SOLICITATION, OFFER AND AWARD (STANDARD FORM 1442)
AND PRICING SCHEDULE
00100 INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/
OFFERORS AND EVALUATION CRITERIA FOR AWARD
00600 REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS/OFFERORS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT
1 GENERAL WAGE DETERMINATION
2 PREAWARD SURVEY
3 DRAWINGS AND SKETCHES
TECHNICAL SPECIFICATIONS
(SEE TECHNICAL SPECIFICATIONS' TABLE OF CONTENTS FOR
SPECIFICATION SECTIONS INCLUDED IN THIS SOLICITATION/CONTRACT)
DRAWINGS (SEPARATE PACKAGE) (LIST OF DRAWINGS-SECTION 00700)
NOTE: AS A MINIMUM ANY CONTRACT AWARDED AS A RESULT OF THIS
SOLICITATION SHALL CONSIST OF THE FOLLOWING DOCUMENTS:
STANDARD FORM 1442, SECTIONS 00010, 00700, 00800, TECHNICAL
SPECIFICATIONS AND DRAWINGS, AND ATTACHMENTS AS DESCRIBED IN
CONTRACT DOCUMENT.
SECTION 00600, AS COMPLETED BY AWARDEE, IS INCORPORATED INTO
ANY RESULTANT CONTRACT BY REFERENCE.
SECTION 00100 IS INCLUDED FOR SOLICITATION PURPOSES ONLY. THIS
SECTION WILL BE REMOVED, MAINTAINED IN THE CONTRACT FILE AND
NOT MADE PART OF THE CONTRACT.
AMENDMENTS ARE INCORPORATED INTO THE RESULTANT CONTRACT.
SUBCONTRACTING PLAN (IF REQUIRED) BECOMES AN ATTACHMENT TO AND A
MATERIAL PART OF THE CONTRACT.
PRICING SCHEDULE: REGION 1 (SACRAMENTO)
BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
ITEM UNIT OF UNIT
NO. DESCRIPTION QUANTITY MEASURE PRICE TOTAL
PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE
0001 DERRICK STONE 5,000* TON $_______ $____________
0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3,000* TON $_______ $____________
PURCHASE, HAUL & PLACE ROCK FROM LEVEE
0002 TRANSPORT ROCK FROM QUARRY TO SITE
10,000* TON $_______ $____________
0003 MINUS 18” QUARRY ROCK
6,000* TON $_______ $____________
0003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
0004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
0004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
0005 MINUS 6” ROCK 2,000* TON $_______ $____________
0005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
0006 MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
0006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
0007 DRAIN ROCK 2,000* TON $_______ $____________
0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
0008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
0009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
0009AA PLACE 3/4” AGGREGATE BASE
EQUIPMENT
0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
0010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
0010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
00010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
LABOR
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
0011AA FLAGMAN 200* HOUR $_______ $____________
MATERIAL/SUPPLIES
0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
1,000* LF $_______ $____________
SUBTOTAL PROJECTED PRICE $____________
(BASIC CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE
CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF WORK.
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
1001 DERRICK STONE 5,000* TON $_______ $____________
1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
1002 TRANSPORT ROCK FROM QUARRY TO SITE
1003 MINUS 18” QUARRY ROCK
1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
1004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
1004A PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
1005 MINUS 6” ROCK 2,000* TON $_______ $____________
1005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
1006 MINUS 3” FILL MATERIAL
1006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
1007 DRAIN ROCK 2,000* TON $_______ $____________
1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
1008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
1009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
1009AA PLACE 3/4” AGGREGATE BASE
1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
1010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
1010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
1011AA FLAGMAN 200* HOUR $_______ $____________
1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 1: ITEMS 1001 THRU 1012AA)
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
2001 DERRICK STONE 5,000* TON $_______ $____________
2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
2002 TRANSPORT ROCK FROM QUARRY TO SITE
2003 MINUS 18” QUARRY ROCK
2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
2004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
2004A PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
2005 MINUS 6” ROCK 2,000* TON $_______ $____________
2005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
2006 MINUS 3” FILL MATERIAL
2006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
2007 DRAIN ROCK 2,000* TON $_______ $____________
2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
2008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
2009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
2009AA PLACE 3/4” AGGREGATE BASE
2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
2010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
2010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
2011AA FLAGMAN 200* HOUR $_______ $____________
2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 2: ITEMS 2001 THRU 2012AA)
OPTION 3 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
3001 DERRICK STONE 5,000* TON $_______ $____________
3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3002 TRANSPORT ROCK FROM QUARRY TO SITE
3003 MINUS 18” QUARRY ROCK
3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
3004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
3004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
3005 MINUS 6” ROCK 2,000* TON $_______ $____________
3005AA PLACE MINUS 6” ROCK 2,000* TON $_______ $____________
3006 MINUS 3” FILL MATERIAL
3006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
3007 DRAIN ROCK 2,000* TON $_______ $____________
3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
3008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
3009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
3009AA PLACE 3/4” AGGREGATE BASE
3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
3010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
3010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
3011AA FLAGMAN 200* HOUR $_______ $____________
3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 3: ITEMS 3001 THRU 3012AA)
REGION 1 “GRAND PROJECTED TOTAL” $__________________________
(BASE + OPTION PERIODS)
PRICING SCHEDULE: REGION 2 (Delta Region)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
0001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
0003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
0003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
0004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
0004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
0006AA PLACE MINUS 3” FILL MATERIAL
0007 DRAIN ROCK 2,000* TON $_______ $____________
0007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
0008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
0008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
0009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
0009AA PLACE 3/4” AGGREGATE BASE
PURCHASE, HAUL & PLACE ROCK FROM BARGE
0010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
0010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
0010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
0011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
0011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
0011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
0011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
0011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
0011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
0011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
0011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
0011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
0011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
0011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
00012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
0012AA FLAGMAN 200* HOUR $_______ $____________
0013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
0013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(BASIC CONTRACT PERIOD: ITEMS 0001 THRU 0013AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
1001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
1003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
1003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
1004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
1004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
1006AA PLACE MINUS 3” FILL MATERIAL
1007 DRAIN ROCK 2,000* TON $_______ $____________
1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
1008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
1009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
1010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
1010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
1010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
1011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
1011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
1011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
1011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
1011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
1011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
1011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
1011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
1011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
1011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
1012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
1012AA FLAGMAN 200* HOUR $_______ $____________
1013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
1013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 1: ITEMS 1001 THRU 1013AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
2001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
2003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
2003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
2004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
2004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
2006AA PLACE MINUS 3” FILL MATERIAL
2007 DRAIN ROCK 2,000* TON $_______ $____________
2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
2008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
2009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
2010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
2010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
2010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
2011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
2011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
2011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
2011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
2011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
2011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
2011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
2011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
2011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
2011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
2011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
2012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
2012AA FLAGMAN 200* HOUR $_______ $____________
2013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
2013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 2: ITEMS 2001 THRU 2013AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
3001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______ $____________
3003 MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
3003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______ $____________
3004 MINUS 12” PIT RUN ROCK 3,000* TON $_______ $____________
3004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______ $____________
3006AA PLACE MINUS 3” FILL MATERIAL
3007 DRAIN ROCK 2,000* TON $_______ $____________
3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
3008 MINUS 1” FILL MATERIAL 1,000* TON $_______ $____________
3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
3009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
3010 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______ $____________
3010AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
3010AB MOVE BARGE CRANE 100* HOUR $_______ $____________
3011 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
3011AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
3011AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
3011AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
3011AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
3011AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
00011AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
3011AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
3011AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
3011AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
3011AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
3012 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
3012AA FLAGMAN 200* HOUR $_______ $____________
3013 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
3013AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 3: ITEMS 3001 THRU 3013AA)
REGION 2 “GRAND PROJECTED TOTAL” $__________________________
PRICING SCHEDULE: REGION 3(SAN JOAQUIN)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
0001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
0003 MINUS 18” QUARRY ROCK
0003A PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
0004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
0004A PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
0005A PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
0007 DRAIN ROCK 2,000* TON $_______ $____________
0007A PLACE DRAIN ROCK 2,000* TON $_______ $____________
0008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
0008A PLACE MINUS 1” FILL 1,000* TON $_______ $____________
0009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
0009A PLACE 3/4” AGGREGATE BASE
0010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
0010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
0010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
0010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
0010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
0010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
0011AA FLAGMAN 200* HOUR $_______ $____________
0012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(BASE CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
1001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
1003 MINUS 18” QUARRY ROCK
1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
1004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
1004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
1006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
1007 RAIN ROCK 2,000* TON $_______ $____________
1007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
1008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
1008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
1009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
1010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
1010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
1010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
1010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
1010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
1010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
1011AA FLAGMAN 200* HOUR $_______ $____________
1012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 1: ITEMS 1001 THRU 1012AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
2001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
2003 MINUS 18” QUARRY ROCK
2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
2004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
2004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
2006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
2007 DRAIN ROCK 2,000* TON $_______ $____________
2007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
2008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
2008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
2009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
2010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
2010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
2010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
2010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
2010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
2010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
2011AA FLAGMAN 200* HOUR $_______ $____________
2012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 2: ITEMS 2001 THRU 2012AA)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
3001AA HAUL DERRICK STONE 5,000* TON $_______ $____________
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______ $____________
3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3003 MINUS 18” QUARRY ROCK
3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______ $____________
3004 MINUS 12” PIT RUN ROCK
6,000* TON $_______ $____________
3004AA PLACE 12” PIT RUN ROCK
6,000* TON $_______ $____________
3006AA PLACE MINUS 3” FILL MATERIAL
2,000* TON $_______ $____________
3007 DRAIN ROCK 2,000* TON $_______ $____________
3007AA PLACE DRAIN ROCK 2,000* TON $_______ $____________
3008 MINUS 1” FILL MATERIAL
1,000* TON $_______ $____________
3008AA PLACE MINUS 1” FILL 1,000* TON $_______ $____________
3009 3/4” AGGREGATE BASE
3,000* TON $_______ $____________
3010 CAT 966F, OR EQUAL 500* HOUR $_______ $____________
3010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______ $____________
3010AB CAT D-6, OR EQUAL 80* HOUR $_______ $____________
3010AC CAT D-8, OR EQUAL 80* HOUR $_______ $____________
3010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______ $____________
3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______ $____________
3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______ $____________
3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______ $____________
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______ $____________
3010AI LIGHT PLANT, 5 KW 50* DAILY $_______ $____________
3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______ $____________
3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______ $____________
3011AA FLAGMAN 200* HOUR $_______ $____________
3012 GEOTEXTILE FABRIC 15,000* SY $_______ $____________
3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 3: ITEMS 3001 THRU 3012AA)
REGION 3 “GRAND PROJECTED TOTAL” $__________________________
Section 00100 - Bidding Schedule/Instructions to Bidders
LOCAL CLAUSES
SECTION 00100
INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/OFFERORS
AND EVALUATION CRITERIA FOR AWARD
52.204-4005 SUBMITTAL INFORMATION FOR SUPPLIERS (RFQS), BIDDERS (IFBS) AND
OFFERORS (RFPS) (SEP 2004)
The following documents must be returned with your quote, bid, or offer.
--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.
--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.
Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.
--The completed Pricing Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and priced sub-line items. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.
--Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section 00600).
--Your Bid Guarantee (e.g., Standard Form 24, “Bid Bond”)
52.0214-4581 INQUIRIES (NOV 2007)
Prospective bidders should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):
a. For information related to amendments, and the dates set for bid opening, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
http://www.fedbizopps.gov/� https://www.projnet.org/projnet�
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.
4. The Solicitation Number is : W91238-08-B-0005
The Bidder Inquiry Key is: A8AKGV-YRXQAQ
c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to the bid opening date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
f. The point of contact for this solicitation is:
Contract Specialist: Marsha Sells (POC 10 Jan 2009 through award) Telephone: (916) 557-5232
FAX: (916) 557-5278
E-MAIL: Marsha.R.Sells@usace.army.mil and Carolyn.E.Mallory@usace.army.mil
52.0214-4582 DIRECTIONS FOR SUBMITTING BIDS (MAR 2003)
Envelopes containing bids must be sealed, marked and addressed as follows:
MARK ENVELOPES:
Solicitation No. W91238-08-B-0005 Bid Opening Date: 27 Jan 2009 Bid Opening Time: 1:00 PM Local Time
ADDRESS ENVELOPES TO:
Department of the Army U.S. Army Engineer District, Sacramento ATTN: Contracting Division 1325 J Street Sacramento CA 95814-2922
SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:
Hand-carried bids must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.
Due to security precautions, all Corps of Engineers visitors are now required to sign-in, leave a Photo-ID (such as a drivers license), and get a Visitor’s Pass at the Security Desk in the Building Lobby. Bidders may no longer hand-carry their bids directly to Contracting Division. Bids may NOT be either turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no longer public parking in the Building.
mailto:Marsha.R.Sells@usace.army.mil�
The Bid Opening Officer will be in the Building Lobby 20 minutes prior to the scheduled bid opening time to accept sealed bids. After announcing that no further bids will be received, the Bid Opening Officer will take the hand-carried bids and have them x-rayed as a security precaution. After the bids have been x-rayed, the bidders waiting in the Building Lobby will then be escorted as a group to the Bid Opening Room, where the bids will be publicly opened and read.
Bidders who desire to hand-deliver their bids at an earlier time must notify the contract specialist in advance to arrange to be met in the Building Lobby by Contracting Division personnel.