08-B-0005-Am2.pdf
PDF 221 KB Posted
- Solicitation number
- W91238-08-B-0005
About this file
W91238-08-B-0005 Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08-B-0005-AM09.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM08-CONFORMED.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM07.pdf | ||
| Emerg Levee-Amend 6.pdf | ||
| Emerg Levee Amend 5.pdf | ||
| Emerg Levee Amend 5-Change Pages.pdf | ||
| Emerg Levee Amend 4.pdf | ||
| 08-B-0005-AM3Conformed.pdf | ||
| 08-B-0005-AM3.pdf | ||
| 08-B-0005-Am1Conformed.pdf | ||
| 08-B-0005-Am1.pdf | ||
| W91238-08-B-0005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT: EMERGENCY lEVEE REPAIRS, REGION 1 (SACRAMENTO RIVER), REGION 2 (DELTA BASIN), AND REGION 3 (SAN JOAQUIN
RIVER): SACRAMENTO/SAN JOAQUIN RIVERS AND DELTA BASIN, CALIFORNIA
See the continuation pages for changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Nov-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-08-B-0005
X 9B. DATED (SEE ITEM 11)
24-Oct-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
2. AMENDMENT/MODIFICATION NO.
10A. MOD. OF CONTRACT/ORDER NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Nov-2008
CODE
4. REQUISITION/PURCHASE REQ. NO.
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
See Item 6
CODE FACILITY CODE
EMAIL:TEL:
W91238-08-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is as follows:
1. The solicitation response day in block 13A of the SF 1442 is hereby changed from 3 Dec 2008 to 5 Dec 2008/01:00 (PST). The response date of 5 Dec 2008 is now the same as the bid opening date in Local Clause 52.0214-4582, Directions for Submitting Bids (MAR 03).
2. Add a place to insert the "Grand Total Projected Price" at the end of Region 3, Option Period 3 Pricing Schedule.
3. Point of Contact (POC): Carolyn J. Giles, Contract Specialist, Phone (916) 557-5228, Email:
carolyn.j.giles@usace.army.mil.
4. SF 1442, page 1 with a response date of 5 Dec 2008 and Region 3, Option Period 3 Pricing Schedule are hereby provided as replacement pages.
5. Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A as heretofore changed, remains unchanged and in full force and effect.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 03-Dec-2008 01:00 PM to 05-Dec-2008 01:00 PM.
PAGE OF PAGES 1. SOLlCrTATlOO NO. 2. lYPE OF SOLlCrTATION 3. DATE ISSUBJ SOLICITATION, OFFER, ~ SEALBJBID (IFB) 24-OCt-2008AND AWARD
W91238-08-B-0005-0002 10F 203(CDnstructiDn, AlteratiDn, Dr Repair) DNEGOTIATID (RFP)
1M PORTANT - The "offer" section on the reverse must be fully com pleted by offeror.
4. OONTRACT NO. 5. REQUISITIOI\VPURO-lASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7) CODE I7.ISSUffiBY OODE IW91238
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION See Item 7
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
TEL: FAX: TEL: FAX:
A. NAIvE B. TELEPI<>NE NO. (Include area cDde) (NO COLLECT CALLS)
CALL:
9. FOR INFORM<\TION
CAROLYN J GILES 916-557-5228
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
1O. lHE GOVERNM:NT REQUIRES PERFORM<\NCE OF lHE WORK DESCRfBBJ IN THESE DOCUIvENTS (Title, identifying nD., date):
A"ovide errergency rapid response/ repair of actual or il'll>ending levee breaches/failures and resultant flooding events based on the work item:; identified in the pricing schedule, for these 3 regions within Sacrarrento [)strict's Area of Responsibility (1) Sacrarrento River drainage basin including all rivers/tributaries flow ing into the river north of N38.36838 W 121.52138 (Hood, CA). (2) Delta Region with its western rrost boundary on the Sac River at N38.061 02 W 122.22616 (1-80 overpass at Carquinez), includes all rivers and tributaries flow ing into region excluding the Sac River north of N38.36838 W121.52138 (Hood, CA) and San Joaquin River South of N37.94802 W121.33722 (west of 1-5 overpass but including the ship channel and port area east of the 1-5 overpass. (3). San Joaquin River drainage basin including all rivers and tributaries flow ing into the river south of N37.94802 W121.33722 (west of the 1-5 overpass). Unrestricted sealed bidding w ill be used.
Three (3) IDIQ Requirerrents contracts w ill be awarded. Initial contract w ill be for one (1) year, with three (3) option years. Option Periods rray be exercised early so that any rerraining Period's capacity can be rrade available w hen/if needed to respond to flood fight activities.
10 36511. The Contractor shall begin perforrrance within calendar days and cOl'll>lete it within calendar days after receiving
Daward, 0 notice to proceed. This perforrrance period is 0 rrandatory, Dnegotiable. (See FAR 52.211-10 .)
12B. CALENDAR DAYS 12 A. lHE OONTRACTOR M.JST FURNISH ANY RECURS) PERFORfv\A.NCE AND PAYM:NT BONDS?
(If 'YES," indicate v,;thin hDwmany calendar days after award in Item 128.)
100 yES DNO
13. AOOITlONAL SOLImATION REQUIREIvENTS:
01:00 PM
local tirre (date). If this is a sealed bid solicitation, offers rrus t be publicly opened at that tirre. Sealed envelopes containing offers
A. Sealed offers in original and 2 copies to perform the work required are due at the place specified in Item 8 by (hDur) 05 Dec 2008 shall be rrarked to show the offeror's narre and address, the solicitation nuntJer, and the date and tirre offers are due.
B. An offer guarantee 0 is, Dis not required.
C. All offers are subject to the (1) work requirerrents, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Governrrent acceptance after the date offers are due w ill not be considered and w ill be rejected.
1442-101
PrescribOO by GSA
FAR (48 CFR) 53236-1(e)
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)
PRICING SCHEDULE: REGION 3(SAN JOAQUIN)
OPTION 3 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAYBE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE
PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE
3001 DERRICK STONE
(MATERIAL) 5,000* TON $
300lAA HAUL DERRICK STONE 5,000* TON $
300lAB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $
300lAC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL 3,000* TON $
PURCHASE, HAUL & PLACE ROCK FROM LEVEE
3002 TRANSPORT ROCK FROM
QUARRY TO SITE 10,000* TON $
3003 MINUS 18" QUARRY
ROCK 6,000* TON $--
3003AA PLACE MINUS 18"
QUARRY ROCK
FROM LEVEE 6,000* TON $--
3004 MINUS 12" PIT RUN
ROCK 6,000* TON $--
3004AA PLACE 12" PIT
RUN ROCK 6,000* TON $--
3005 MINUS 3" FILL
MATERIAL 2,000* TON $--
Amendment 0002
VV91238-08-B-0005
Page 46 0[203
3005AA PLACE MINUS 3"
FILL MATERIAL 2,000* TON $
3006 DRAIN ROCK 2,000* TON $
3006AA PLACE DRAIN ROCK
2,000* TON $
3007 MINUS 1" FILL
MATERIAL 1,000* TON $
3007AA PLACE MINUS 1"
FILL 1,000* TON $
3008 MINUS 1 1/2"
AGGREGATE BAS 3,000* TON $
3008AA PLACE MINUS 1 112"
AGGREGATE BASE 3,000* TON $
EQUIPMENT
3010 CAT 966F, OR EQUAL 500* HOUR $
3010AA lO-VVHEELED DUMP TRUCK 600* HOUR $
3010AB CAT D-6, OR EQUAL 80* HOUR $
3010AC CAT D-8, OR EQUAL 80* HOUR $
3010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $
3010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $
3010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $
3010AG VVATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $
3010AH POVVER BROOM, 5-8 FOOT BROOM VVIDTH,
CAPABLE OF VVET SVVEEP 80* HOUR $
3010AI LIGHT PLANT, 5 KVV 50* DAILY $
3010AJ PORTABLE TRAFFIC VVARNING
SIGN, VV/GENERATOR EACH* DAILY $
3010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $
Page 470[203
3010AL K-RAIL/JERSEY BARRIER EACH* DAILY $
3010AM PORTABLE TOILET EACH* LS $
LABOR
3011 SURVEY CREW W/EQUIPMENT 1* DAILY $
3011AA FLAGMAN 200* HOUR $
MATERIAL/SUPPLIES
3012 GEOTEXTILE FABRIC 15,000* SY $
3012AA 4FT ORANGE SAFETY FENCE
W/U-SHAPED STAKES 1,000* LF $
SUBTOTAL PROJECTED PRICE $ _
(SAN JOAQUIN OPTION 3 PERIOD ITEMS 3001 THRU 3012AA)
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE
CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF WORK.
GRANDTOTALPROJECTEDPRICES __
1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may be cause for rejection of bids.
2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.
3. The bidder/offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for award.
7. Notwithstanding any other provisions of this solicitation, the award will be made to the lowest responsible and responsive bidder(s) for either REGION 1, REGION 2, or REGION 3 whichever is in the best interest of the Government. Bidders may submit prices on a single Region only or any combination of Regions.
8. Davis-Bacon Act Wage Determinations for Option Periods
a. Upon exercise of an option to extend the term of the contract, the most current Davis-Bacon Act wage determination(s) from the same schedule(s) as the wage determination(s) incorporated into the original contract will be incorporated into the modified contract.
b. In accordance with FAR 52.222-30, Davis-Bacon Act-Price Adjustment (None or Separately Specified Pricing Method), provided in full text in Section 00700, no adjustments in contract price will be made as a result of incorporation of the new wage determination(s). The solicitation provides the opportunity to bid or propose separate prices for each option period. The option prices may include an amount to cover estimated increases.
c. For indefinite delivery type contracts, the wage determination incorporated into the contract at the exercise of the option will be incorporated into task orders issued during that option period. The wage determination will be effective for the complete period of performance of those task orders without further revision.
10. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension ofunit prices will be corrected;
(4) Apparent errors in addition oflump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
11. The quantities on the pricing schedule are the yearly estimated amounts for each contract line item. These projected quantities are for bidding purposes only.
VV91 238-08-B-0005
12. The unit prices for the contract line item numbers (eLINs) on the Pricing Schedule are firm, fixed prices. These firm, fixed unit prices will govern regardless of quantities ordered under any subsequent task order(s).
13. The "Subtotal Projected Price" for the base period will be the "Bid Price" for purposes of determining the amount of the bid guarantee.
14. The "Grand Total Projected Price" will be used only for the purpose of determining the low bidder in accordance with FAR 52.217-5.