08-B-0005-AM3.pdf
PDF 564 KB Posted
- Solicitation number
- W91238-08-B-0005
About this file
W91238-08-B-0005 Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08-B-0005-AM09.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM08-CONFORMED.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM07.pdf | ||
| Emerg Levee-Amend 6.pdf | ||
| Emerg Levee Amend 5.pdf | ||
| Emerg Levee Amend 5-Change Pages.pdf | ||
| Emerg Levee Amend 4.pdf | ||
| 08-B-0005-AM3Conformed.pdf | ||
| 08-B-0005-Am2.pdf | ||
| 08-B-0005-Am1Conformed.pdf | ||
| 08-B-0005-Am1.pdf | ||
| W91238-08-B-0005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
PROJECT: EMERGENCY LEVEE REPAIRS, REGION 1 (SACRAMENTO RIVER), REGION 2 (DELTA BASIN), AND REGIONS 3 (SAN JOAQUIN
RIVER): SACRAMENTO/SAN JOAQUIN RIVERS AND DELTA BASIN, CALIFORNIA
See the continuation pages for changes.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 42
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Nov-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-08-B-0005
X 9B. DATED (SEE ITEM 11)
24-Oct-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Nov-2008
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91238-08-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is as follows:
1. The solicitation response date/time of 5 Dec 2008/01:00 in bolck 13A of the SF 1442 remains unchanged.
2. Replace the Pricing Schedule in its entirety, Section 00010.
3. Replace the Technical Specifications in its entirety.
4. Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A as heretofore changed, remains unchanged and in full force and effect.
5. For ease of understanding, a conformed copy of the solicitation incorporating “all” changes will be provided along with this amendment. All bids are to be submitted using this conformed copy of the solicitation.
6. Point of Contact (POC): Carolyn J. Giles, Contract Specialist, Phone (916) 557-5228. Email:
caroyn.j.giles@usace.army.mil.
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
PRICING SCHEDULE
TABLE OF CONTENTS
SECTION TITLE
SOLICITATION, OFFER AND AWARD (STANDARD FORM 1442)
AND PRICING SCHEDULE
00100 INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/
OFFERORS AND EVALUATION CRITERIA FOR AWARD
00600 REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS/OFFERORS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT
1 GENERAL WAGE DETERMINATION
2 PREAWARD SURVEY
3 DRAWINGS AND SKETCHES
TECHNICAL SPECIFICATIONS
(SEE TECHNICAL SPECIFICATIONS' TABLE OF CONTENTS FOR
SPECIFICATION SECTIONS INCLUDED IN THIS SOLICITATION/CONTRACT)
DRAWINGS (SEPARATE PACKAGE) (LIST OF DRAWINGS-SECTION 00700)
NOTE: AS A MINIMUM ANY CONTRACT AWARDED AS A RESULT OF THIS
SOLICITATION SHALL CONSIST OF THE FOLLOWING DOCUMENTS:
STANDARD FORM 1442, SECTIONS 00010, 00700, 00800, TECHNICAL
SPECIFICATIONS AND DRAWINGS, AND ATTACHMENTS AS DESCRIBED IN
CONTRACT DOCUMENT.
SECTION 00600, AS COMPLETED BY AWARDEE, IS INCORPORATED INTO
ANY RESULTANT CONTRACT BY REFERENCE.
SECTION 00100 IS INCLUDED FOR SOLICITATION PURPOSES ONLY. THIS
SECTION WILL BE REMOVED, MAINTAINED IN THE CONTRACT FILE AND
NOT MADE PART OF THE CONTRACT.
AMENDMENTS ARE INCORPORATED INTO THE RESULTANT CONTRACT.
SUBCONTRACTING PLAN (IF REQUIRED) BECOMES AN ATTACHMENT TO AND A
MATERIAL PART OF THE CONTRACT.
PRICING SCHEDULE: REGION 1 (SACRAMENTO)
BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE
PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE
0001 DERRICK STONE (MATERIAL)
5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3,000* TON $_______
PURCHASE, HAUL & PLACE ROCK FROM LEVEE
0002 TRANSPORT ROCK FROM QUARRY TO SITE
10,000* TON $_______
0003 MINUS 18” QUARRY ROCK
6,000* TON $_______
0003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
0004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
0004AA PLACE 12” PIT RUN ROCK
0005 MINUS 3” FILL MATERIAL
2,000* TON $_______
0005AA PLACE MINUS 3” FILL MATERIAL
0006 DRAIN ROCK 2,000* TON $_______
0006AA PLACE DRAIN ROCK 2,000* TON $_______
0007 MINUS 1” FILL MATERIAL
1,000* TON $_______
0007AA PLACE MINUS 1” FILL 1,000* TON $_______
0008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
0008AA PLACE MINUS 1 1/2” AGGREGATE BASE
EQUIPMENT
0010 CAT 966F, OR EQUAL 500* HOUR $_______
0010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
0010AB CAT D-6, OR EQUAL 80* HOUR $_______
0010AC CAT D-8, OR EQUAL 80* HOUR $_______
0010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
00010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______
0010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______
LABOR
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
0011AA FLAGMAN 200* HOUR $_______
MATERIAL/SUPPLIES
0012 GEOTEXTILE FABRIC 15,000* SY $_______
0012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
1,000* LF $_______
SUBTOTAL PROJECTED PRICE $_______________
(BASIC CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE
CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF WORK.
PRICING SCHEDULE : REGION 1 (SACRAMENTO)
OPTION 1 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
1001 DERRICK STONE (MATERIAL)
5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
1002 TRANSPORT ROCK FROM QUARRY TO SITE
1003 MINUS 18” QUARRY ROCK
1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
1004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
1004A PLACE 12” PIT RUN ROCK
1005 MINUS 3” FILL MATERIAL
1005AA PLACE MINUS 3” FILL MATERIAL
1006 DRAIN ROCK 2,000* TON $_______
1006AA PLACE DRAIN ROCK 2,000* TON $_______
1007 MINUS 1” FILL MATERIAL
1,000* TON $_______
1007AA PLACE MINUS 1” FILL 1,000* TON $_______
1008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
1008AA PLACE MINUS 1 1/2” AGGREGATE BASE
1010 CAT 966F, OR EQUAL 500* HOUR $_______
1010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
1010AB CAT D-6, OR EQUAL 80* HOUR $_______
1010AC CAT D-8, OR EQUAL 80* HOUR $_______
1010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
1010AI LIGHT PLANT, 5 KW 50* DAILY $_______
1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______
1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
1011AA FLAGMAN 200* HOUR $_______
1012 GEOTEXTILE FABRIC 15,000* SY $_______
1012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(BASIC CONTRACT PERIOD ITEMS 0001 THRU 00012AA)
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
2001 DERRICK STONE (MATERIAL)
5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
2002 TRANSPORT ROCK FROM QUARRY TO SITE
2003 MINUS 18” QUARRY ROCK
2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
2004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
2004A PLACE 12” PIT RUN ROCK
2005 MINUS 3” FILL MATERIAL
2005AA PLACE MINUS 3” FILL MATERIAL
2006 DRAIN ROCK 2,000* TON $_______
2006AA PLACE DRAIN ROCK 2,000* TON $_______
2007 MINUS 1” FILL MATERIAL
1,000* TON $_______
2007AA PLACE MINUS 1” FILL 1,000* TON $_______
2008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
2008AA PLACE MINUS 1 1/2” AGGREGATE BASE
2010 CAT 966F, OR EQUAL 500* HOUR $_______
2010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
2010AB CAT D-6, OR EQUAL 80* HOUR $_______
2010AC CAT D-8, OR EQUAL 80* HOUR $_______
2010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
2010AI LIGHT PLANT, 5 KW 50* DAILY $_______
2010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______
2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
2011AA FLAGMAN 200* HOUR $_______
2012 GEOTEXTILE FABRIC 15,000* SY $_______
2012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(BASIC CONTRACT PERIOD ITEMS 0001 THRU 00012AA)
OPTION 3 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
3001 DERRICK STONE (MATERIAL)
5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3002 TRANSPORT ROCK FROM QUARRY TO SITE
3003 MINUS 18” QUARRY ROCK
3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
3004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
3004AA PLACE 12” PIT RUN ROCK
3005 MINUS 3” FILL MATERIAL
3005AA PLACE MINUS 3” FILL MATERIAL
3006 DRAIN ROCK 2,000* TON $_______
3006AA PLACE DRAIN ROCK 2,000* TON $_______
3007 MINUS 1” FILL MATERIAL
1,000* TON $_______
3007AA PLACE MINUS 1” FILL 1,000* TON $_______
3008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
3008AA PLACE MINUS 1 1/2” AGGREGATE BASE
3010 CAT 966F, OR EQUAL 500* HOUR $_______
3010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
3010AB CAT D-6, OR EQUAL 80* HOUR $_______
3010AC CAT D-8, OR EQUAL 80* HOUR $_______
3010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
3010AI LIGHT PLANT, 5 KW 50* DAILY $_______
3010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______
3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
3011AA FLAGMAN 200* HOUR $_______
3012 GEOTEXTILE FABRIC 15,000* SY $_______
3012AA 4FT ORANGE SAFETY FENCE W/U-SHAPED STAKES
(OPTION PERIOD 3 ITEMS 3001 THRU 3012AA)
REGION 1 “GRAND PROJECTED TOTAL” (BASE + OPTION PERIODS) PRICE-
PRICING SCHEDULE : REGION 2 (Delta Region)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
0001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______
0003 MINUS 18” QUARRY ROCK
3,000* TON $_______
0003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______
0004 MINUS 12” PIT RUN ROCK 3,000* TON $_______
0004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______
0005AA PLACE MINUS 3” FILL MATERIAL
0006AA PLACE DRAIN ROCK 2,000* TON $_______
0007 MINUS 1” FILL MATERIAL 1,000* TON $_______
0007AA PLACE MINUS 1” FILL 1,000* TON $_______
0008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
0008AA PLACE MINUS 1 1/2” AGGREGATE BASE
PURCHASE, HAUL & PLACE ROCK FROM BARGE
0009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
0009AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
0009AB MOVE BARGE CRANE 100* HOUR $_______
0010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
0010AB CAT D-6, OR EQUAL 80* HOUR $_______
0010AC CAT D-8, OR EQUAL 80* HOUR $_______
0010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
0010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
00011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
BASIC CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
1001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______
1003 MINUS 18” QUARRY ROCK
3,000* TON $_______
1003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______
1004 MINUS 12” PIT RUN ROCK 3,000* TON $_______
1004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______
1005AA PLACE MINUS 3” FILL MATERIAL
1006 DRAIN ROCK 2,000* TON $_______
1006AA PLACE DRAIN ROCK 2,000* TON $_______
1007 MINUS 1” FILL MATERIAL 1,000* TON $_______
1007AA PLACE MINUS 1” FILL 1,000* TON $_______
1008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
1009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
1009AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
1009AB MOVE BARGE CRANE 100* HOUR $_______
1010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
1010AB CAT D-6, OR EQUAL 80* HOUR $_______
1010AC CAT D-8, OR EQUAL 80* HOUR $_______
1010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
1010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______
(DELTA REGION OPTION 1 PERIOD ITEMS 1001 THRU 1012AA)
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
2001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______
2003 MINUS 18” QUARRY ROCK
3,000* TON $_______
2003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______
2004 MINUS 12” PIT RUN ROCK 3,000* TON $_______
2004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______
2005AA PLACE MINUS 3” FILL MATERIAL
2006AA PLACE DRAIN ROCK 2,000* TON $_______
2007 MINUS 1” FILL MATERIAL 1,000* TON $_______
2007AA PLACE MINUS 1” FILL 1,000* TON $_______
2008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
2009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
2009AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
2009AB MOVE BARGE CRANE 100* HOUR $_______
2010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
2010AB CAT D-6, OR EQUAL 80* HOUR $_______
2010AC CAT D-8, OR EQUAL 80* HOUR $_______
2010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
(DELTA REGION OPTION 2 PERIOD ITEMS 2001 THRU 2012AA)
OPTION 3 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
3001AC PLACE DERRICK STONE USING 80d DRAGLINE OR EQUAL
6,000* TON $_______
3003 MINUS 18” QUARRY ROCK
3,000* TON $_______
3003AA PLACE MINUS 18” QUARRY ROCK
3,000* TON $_______
3004 MINUS 12” PIT RUN ROCK 3,000* TON $_______
3004AA PLACE 12” PIT RUN ROCK 3,000* TON $_______
3005AA PLACE MINUS 3” FILL MATERIAL
3006AA PLACE DRAIN ROCK 2,000* TON $_______
3007 MINUS 1” FILL MATERIAL 1,000* TON $_______
3007AA PLACE MINUS 1” FILL 1,000* TON $_______
3008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
3009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
3009AA MINUS 18” QUARRY ROCK PLACED FROM BARGE
3009AB MOVE BARGE CRANE 100* HOUR $_______
3010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
3010AB CAT D-6, OR EQUAL 80* HOUR $_______
3010AC CAT D-8, OR EQUAL 80* HOUR $_______
3010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
00010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
(DELTA REGION OPTION 3 PERIOD ITEMS 3001 THRU 3012AA)
REGION 2 “GRAND PROJECTED TOTAL” (BASE + OPTION PERIODS) PRICE-
PRICING SCHEDULE : REGION 3(SAN JOAQUIN)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
0001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
0003 MINUS 18” QUARRY ROCK
0003A PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
0004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
0004A PLACE 12” PIT RUN ROCK
0005A PLACE MINUS 3” FILL MATERIAL
0006A PLACE DRAIN ROCK 2,000* TON $_______
0007 MINUS 1” FILL MATERIAL
1,000* TON $_______
0007A PLACE MINUS 1” FILL 1,000* TON $_______
0008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
0008A PLACE MINUS 1 1/2” AGGREGATE BASE
0010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
0010AB CAT D-6, OR EQUAL 80* HOUR $_______
0010AC CAT D-8, OR EQUAL 80* HOUR $_______
0010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
0010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
0010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
0010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
(BASE CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
1001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
1003 MINUS 18” QUARRY ROCK
1003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
1004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
1004AA PLACE 12” PIT RUN ROCK
1005AA PLACE MINUS 3” FILL MATERIAL
1006 RAIN ROCK 2,000* TON $_______
1006AA PLACE DRAIN ROCK 2,000* TON $_______
1007 MINUS 1” FILL MATERIAL
1,000* TON $_______
1007AA PLACE MINUS 1” FILL 1,000* TON $_______
1008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
1010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
1010AB CAT D-6, OR EQUAL 80* HOUR $_______
1010AC CAT D-8, OR EQUAL 80* HOUR $_______
1010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
1010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
1010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
1010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
00010AJ K-RAIL/JERSEY BARRIER EACH* DAILY $_______
(SAN JOAQUIN OPTION 1 PERIOD ITEMS 1001 THRU 1012AA)
OPTION 2 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
2001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
2003 MINUS 18” QUARRY ROCK
2003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
2004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
2004AA PLACE 12” PIT RUN ROCK
2005AA PLACE MINUS 3” FILL MATERIAL
2006AA PLACE DRAIN ROCK 2,000* TON $_______
2007 MINUS 1” FILL MATERIAL
1,000* TON $_______
2007AA PLACE MINUS 1” FILL 1,000* TON $_______
2008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
2010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
2010AB CAT D-6, OR EQUAL 80* HOUR $_______
2010AC CAT D-8, OR EQUAL 80* HOUR $_______
2010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
2010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
2010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
2010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
(SAN JOAQUIN OPTION 2 PERIOD ITEMS 2001 THRU 2012AA)
OPTION 3 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
OPTIONS MAY BE EXERCISED SOLELY AT THE DISCRETION OF THE GOVERNMENT.
ITEMS OF EQUIPMENT, MATERIAL AND/OR SERVICES NOT LISTED IN THE PRICING SCHEDULE
AND NECESSARY FOR EXECUTION OF AN INDIVIDUAL TASK ORDER WILL BE ADDED AND
NEGOTIATED UNDER THAT TASK ORDER; THE VALUE OF THE ADDED EQUIPMENT, MATERIAL
AND/OR SERVICES SHALL NOT EXCEED 10 PERCENT OF THE VALUE OF THAT TASK ORDER.
LINE
5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE FROM LEVEE
5,000* TON $_______
3001AC PLACE DERRICK STONE USING 80d DRAGLINE, OR EQUAL
3003 MINUS 18” QUARRY ROCK
3003AA PLACE MINUS 18” QUARRY ROCK FROM LEVEE
6,000* TON $_______
3004 MINUS 12” PIT RUN ROCK
6,000* TON $_______
3004AA PLACE 12” PIT RUN ROCK
3005AA PLACE MINUS 3” FILL MATERIAL
3006AA PLACE DRAIN ROCK 2,000* TON $_______
3007 MINUS 1” FILL MATERIAL
1,000* TON $_______
3007AA PLACE MINUS 1” FILL 1,000* TON $_______
3008 MINUS 1 1/2” AGGREGATE BASE
3,000* TON $_______
3010AA 10-WHEELED DUMP TRUCK
600* HOUR $_______
3010AB CAT D-6, OR EQUAL 80* HOUR $_______
3010AC CAT D-8, OR EQUAL 80* HOUR $_______
3010AD EXCAVATOR, CAT 235 OR EQUAL
80* HOUR $_______
3010AE COMPACTOR, SMOOTH DRUM, 8-10 TON, VIBRATORY
80* HOUR $_______
3010AF COMPACTOR, SHEEPSFOOT, CAT 825 OR EQUAL
80* HOUR $_______
3010AG WATER TRUCK, 3000-4000 GALLON CAPACITY
80* HOUR $_______
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH, CAPABLE OF WET SWEEP
80* HOUR $_______
(SAN JOAQUIN OPTION 3 PERIOD ITEMS 3001 THRU 3012AA)
REGION 3 “GRAND PROJECTED TOTAL” (BASE + OPTION PERIODS) PRICE-
1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may be cause for rejection of bids.
2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.
3. The bidder/offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for award.
7. Notwithstanding any other provisions of this solicitation, the award will be made to the lowest responsible and responsive bidder(s) for either REGION 1, REGION 2, or REGION 3 whichever is in the best interest of the Government. Bidders may submit prices on a single Region only or any combination of Regions.
8. Davis-Bacon Act Wage Determinations for Option Periods
a. Upon exercise of an option to extend the term of the contract, the most current Davis-Bacon Act wage determination(s) from the same schedule(s) as the wage determination(s) incorporated into the original contract will be incorporated into the modified contract.
b. In accordance with FAR 52.222-30, Davis-Bacon Act—Price Adjustment (None or Separately Specified Pricing Method), provided in full text in Section 00700, no adjustments in contract price will be made as a result of incorporation of the new wage determination(s). The solicitation provides the opportunity to bid or propose separate prices for each option period. The option prices may include an amount to cover estimated increases.
c. For indefinite delivery type contracts, the wage determination incorporated into the contract at the exercise of the option will be incorporated into task orders issued during that option period. The wage determination will be effective for the complete period of performance of those task orders without further revision.
10. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
11. The quantities on the pricing schedule are estimated yearly projected amounts for each contract line item. These projected quantities are for bidding purposes only. They are estimated quantities. The “Variation in Estimated Quantities” clause does apply to these line items.
12. The unit prices for the contract line item numbers (CLINs) on the Pricing Schedule are firm, fixed prices. These firm, fixed unit prices will govern regardless of quantities ordered under any subsequent task order(s).
13. The “Subtotal Projected Price” for the base period for each Region will be the “Bid Price” for purposes of determining the amount of the bid guarantee.
14. The “Grand Total Projected Price” for each Region will be used only for the purpose of determining the low bidder in accordance with FAR 52.217-5.
(End of Summary of Changes)
A M
S U
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
E M
E R
G E
N C
Y L
E V
E E
R E
P A
IR
S
S D
-0
P ro du ct
D at a G
G eo sy nt he tic
2.
M an uf ac tu rin g Q ua lit y C on tro l S am pl in g an d
Te st in g
S D
-0
S am pl es
3.
Q ua lit y
A ss ur an ce S am pl es a nd Te st s
S D
-0
C er tif ic at es
2.
1.
G
G eo te xt ile
S
D -0
P ro du ct D at a
G R ip ra p G
Fi lte r M at er ia l G
B ed di ng
M at er ia l S
D -0
Te st R ep or ts 2.
4.
G G ra da tio n
Te st
G E va lu at io n Te st in g of
S to ne B ed di ng M at er ia l
S D
-0
C er tif ic at es
S to ne W ei gh
S ca le C er tif ic at io n
C er tif ie d W ei gh t S ca le T ic ke ts
S
D -0
P re co ns tru ct io n S ub m itt al s G
P la n of
O pe ra tio ns S
D -0
Te st R ep or ts Q ua lit y C on tro l T es t R es ul ts
Te st
D at a S um m ar ie s;
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
A M
EMERGENCY LEVEE REPAIRS 1586
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 02
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 AVAILABILITY AND USE OF UTILITY SERVICES
1.1.1 Sanitation
1.1.2 Utilities
1.2 BULLETIN BOARD AND HARDHAT SIGNS
1.2.1 Bulletin Board
1.2.2 Hard Hat Sign
1.2.3 K-Rail/Jersey Barriers
1.3 PROTECTION AND MAINTENANCE OF TRAFFIC
1.3.1 Roads
1.3.2 Barricades
1.4 HOUSEKEEPING AND CLEANUP
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
01 50 02 - 1 Amendment 0003
SECTION 01 50 02
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 AVAILABILITY AND USE OF UTILITY SERVICES
1.1.1 Sanitation
The Contractor shall provide and maintain portable field-type sanitary facilities within the construction area.
1.1.2 Utilities
Costs for all utilities (phone, power and water) at the construction area are the responsibility of the contractor.
1.2 BULLETIN BOARD AND HARDHAT SIGNS
1.2.1 Bulletin Board
Immediately upon beginning of work, the Contractor shall display in a conspicuous place accessible to all employees within the construction area the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract and Wage Rate Information poster.
1.2.2 Hard Hat Sign
Prior to commencement or work, the Contractor shall construct and erect 2 hard hat signs at the upstream and downstream limits of the construction area. The signs shall conform to the requirements of the drawings attached at the end of this section.
1.2.3 K-Rail/Jersey Barriers
K-Rail/Jersey Barriers shall be in standard lengths of 20 feet and meet industry specifications for both material and construction. Payment for each unit shall include costs associated with the barrier, delivery, placement, relocation or handling on-site as necessary during the period of the task order and removal from the site.
1.3 PROTECTION AND MAINTENANCE OF TRAFFIC
1.3.1 Roads
The Contractor shall maintain a safe flow of traffic on all affected roads within the construction area. Measures for the protection and diversion of traffic, including the provision of flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the authorities having jurisdiction for that area.
The traveling public shall be protected from damage to person and property.
The Contractor's traffic on roads selected for hauling material to and from the site shall interact as little as possible with public traffic. The Contractor shall investigate the condition and load limits of existing roads and notify the contracting officer of any inadequacies prior to
01 50 02 - 2 commencement of work.
1.3.2 Barricades
The Contractor shall erect and maintain temporary barricades to limit public access to hazardous areas. Such barricades shall be required whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic. Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
1.4 HOUSEKEEPING AND CLEANUP
Pursuant to the requirements of paragraph, CLEANING UP, and paragraph, ACCIDENT PREVENTION, of the CONTRACT CLAUSES, Section 00700 the Contractor shall assign sufficient personnel to insure strict compliance. The Contractor shall keep the construction area and access ways free of debris and obstructions at all times. At least once each day, all areas shall be checked by the Contractor for compliance with the above requirement.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
01 50 02 - 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 05
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 TEMPORARY ELECTRIC WIRING
1.3 EXISTING UTILITIES
1.4 GENERAL SAFETY REQUIREMENTS
1.5 PERMITS
1.6 EQUIPMENT DATA FORM
1.7 PAYMENT
1.8 NON CONTRACT WORK
1.9 DAMAGE TO EXISTING ROADS
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
01 50 05 - 1
SECTION 01 50 05
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2003) Safety -- Safety and Health Requirements
U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT (CESPK)
CESPK FORM 450 (1992) Contractor Equipment Data Sheet
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1904.5 Determination of work-relatedness
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1926 Safety and Health Regulations for Construction
1.2 TEMPORARY ELECTRIC WIRING
a. Temporary Power and Lighting
The Contractor shall provide construction power facilities in accordance with the safety requirements of the National Electrical Code NFPA No. 70 and the SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1. All work shall be accomplished by skilled electrical tradesmen in a workmanlike manner, as approved by the Contracting Officer.
b. Construction Equipment
In addition to the requirements of EM 385-1-1, SAFETY AND HEALTH REQUIREMENTS, all temporary wiring conductors used for operation of construction tools and equipment shall be either Type TW or THW contained in metal raceways or multi-conductor cord. Temporary wiring shall be secured above the ground or along the ground in a workmanlike manner and shall not present an obstacle to persons or subject to damage by vehicles or equipment.
c. Circuit Protection
In addition to requirements in EM 385-1-1 and the National Electrical Code, all 15 and 20-ampere receptacle outlets used for obtaining power during construction shall have ground fault circuit interrupters (GFCI) for personnel protection. The Contracting Officer may allow an exception to this requirement for circuits for circuits operating at other than 60 Hertz
01 50 05 - 2 normal(in both cases an assured grounding program as described in the National Electrical Code may be permitted). The assured grounding program will not be permitted as a substitute for usage of GFCI'S except as described above. All generator-powered 15- and 20-ampere, 60 Hertz receptacle outlets shall have GFCI'S, and shall be properly grounded. A testing means shall be provided which will impose a measured fault of 5 milliampere, plus or minus 1 milliampere, and result in tripping the GFCI unit.
1.3 EXISTING UTILITIES
Care shall be taken to preserve and protect pole lines, signs, pipelines and existing improvements form damage during construction operations. The Contractor shall verify the location of any buried utilities within the work area. The Contractor shall assume full responsibility for reimbursing the owners for any damage to their properties, utilities, or improvements, or interference with their services caused through his operations. Should such damage be found to have been caused without the Contractor's fault or negligence an equitable adjustment in the amount due under the contract will be made under the applicable CONTRACT CLAUSES, Section 00700.
1.4 GENERAL SAFETY REQUIREMENTS
a. General
The Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, (see Contract Clauses, Section 00700, ACCIDENT PREVENTION) and the Occupational Safety and Health Act (OSHA) Standards for Construction 29 CFR 1926; General Industry Standards 29 CFR 1910; and the National Fire Protection Association Codes are applicable to this contract. In case of conflict the most stringent requirement of the standards is applicable.
b. Contractor's superintendent
The Contractor's superintendent shall take an active role in enforcing the safety requirements by participation in safety conferences, job hazard analysis, tool box meetings, walk-through inspections, correction of violations, etc.
c. Job Hazard Analysis
The Contractor shall perform and submit a job hazard analysis of the effort associated with an emergency levee repair prior to the pre-construction meeting (Section 01 45 04, paragraph 3.3). The analysis shall include major or high risk hazards, as well as commonly recurring deficiencies that might possibly be encountered for that operation, and shall identify proposed methods and techniques of accomplishing each phase in a safe manner. The Prime Contractor's superintendent shall take active participation in the Job Hazard Analysis, including the subcontractors' work. Prior to start of actual work a meeting shall be held with Prime Contractor, Government, and affected subcontractor to review the Job Hazard Analysis. In addition, job site meetings shall be held to indoctrinate foreman and workers on details of this analysis.
d. Violations
If recurring violations and/or gross violation indicate that the safety performance is unsatisfactory, corrective action shall be taken as directed, and at the discretion of the Contracting Officer the retention or
01 50 05 - 3 some part thereof will be withheld from the progress payment until corrective action has been completed.
e. Fire Prevention
Twenty-four hours notice shall be given to the Contracting Officer prior to conducting any hazardous operation. Cutting or welding will be permitted only in areas that are or have been made fire safe. Where possible, all combustibles shall be located at least 35 feet horizontally from the work site. Where such location is impracticable, combustibles shall be protected with fire blankets and/or protective welding screens to prevent slag from running out of the work area. Edges of covers at the floor shall be tight to prevent sparks from going under them. This precaution is also important at overlaps where several covers are used to protect a large pile. Other fire prevention precautions shall be in accordance with the latest National Fire Codes.
f. Recordkeeping/Reporting Requirements
On all contract operations, the Prime Contractor shall be responsible for recording and reporting all accident exposure and experience incident work.
(This includes exposure and experience of the prime contractor and his/her sub-contractor(s)). As a minimum these records shall include exposure work-hours and a log of occupational injuries and illnesses. (OSHA Form 200 or state equivalent as prescribed by 29 CFR 1904.5) Reference EM 385-1-1, 01.D.04.
g. Accident Reporting
In addition to the requirements for reporting accidents in accordance with EM 385-1-1, Section 1, the Prime Contractor will submit at the 50% point and 100% of project completion, a written summary of worker's compensation claims filed by workers on the project. The report will include all subcontractors. The main report covering the Prime Contractor claims will be certified as "correct and true" by the Contractor's compensation insurance carrier. The same certification will be required for subcontractor reports.
1.5 PERMITS
General
Reference is made to the article of the contract entitled "Permits and Responsibilities," which obligates the Contractor to obtain all required licenses and permits for acquisition and/or transport of equipment and material to and from the project site and for maintenance and operation of that equipment in execution of the project scope of work..
1.6 EQUIPMENT DATA FORM
In conjunction with paragraph, 52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE, in Section 00800, the Contractor shall furnish CESPK FORM 450 for all necessary equipment to perform work requiring adjustment of contract price and shall submit these forms with the modification proposals. A sample form is at the end of this section.
1.7 PAYMENT
No separate payment will be made for the work covered under this section
01 50 05 - 4 and all costs in connection therewith will be considered a subsidiary obligation of the Contractor
1.8 NON CONTRACT WORK
The Contractor and/or his subcontractors shall not perform any work or erect any structure for third parties, landowners or otherwise, within the limits of the rights-of-way without prior approval of the Contracting Officer.
1.9 DAMAGE TO EXISTING ROADS
The Contractor shall preserve and protect all existing private and public roads. At the completion of work and prior to the Contractor leaving the project, he shall restore to pre-project conditions all such roads. Repairs shall include replacement of base rock and/or surface treatment as required.
Prior to de-mobilization, the contractor and Government shall conduct a joint inspection of all access routes to identify the condition of the routes. The contractor shall then submit for approval a plan for restoration of those routes to pre-construction conditions.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
01 50 05 - 5
DIVISION 31 - EARTHWORK
SECTION 31 05 19
GEOTEXTILE
PART 1 GENERAL
1.1 REFERENCES
1.2 MEASUREMENT
1.3 PAYMENT
1.4 SUBMITTALS
1.5 DELIVERY, STORAGE AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.5.3 Handling
PART 2 PRODUCTS
2.1 RAW MATERIALS
2.1.1 Geotextile
2.1.2 Thread
2.2 MANUFACTURING QUALITY CONTROL SAMPLING AND TESTING
PART 3 EXECUTION
3.1 QUALITY ASSURANCE SAMPLES AND TESTS
3.1.1 Quality Assurance Samples
3.1.2 Quality Assurance Tests
3.2 INSTALLATION
3.2.1 Subgrade Preparation
3.2.2 Placement
3.3 SEAMS
3.3.1 Overlap Seams
3.3.2 Sewn Seams
3.4 PROTECTION
3.5 REPAIRS
3.6 PENETRATIONS
3.7 COVERING
-- End of Section Table of Contents --
31 05 19 - 1
SECTION 31 05 19
GEOTEXTILE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 4354 (1999) Sampling of Geosynthetics for Testing
ASTM D 4355 (2002) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus
ASTM D 4439 (2004) Geosynthetics
ASTM D 4533 (2004) Trapezoid Tearing Strength of Geotextiles
ASTM D 4632 (1991; R 2003) Grab Breaking Load and Elongation of Geotextiles
ASTM D 4716 (2004) Determining the (in-plane) Flow Rate per Unit Width and Hydraulic Transmissivity of a Geosynthetic Using a Constant Head.
ASTM D 4751 (2004) Determining Apparent Opening Size of a Geotextile
ASTM D 4759 (2002) Determining the Specification Conformance of Geosynthetics
ASTM D 4833 (2000e1) Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products
ASTM D 4873 (2002) Identification, Storage, and Handling of Geosynthetic Rolls and Samples
1.2 MEASUREMENT
No separate measurement for payment will be made for geotextile. Unit of measure shall be square yards of material placed.
1.3 PAYMENT
No separate payment will be made for geotextile.