08-B-0005-Am1.pdf
PDF 3 MB Posted
- Solicitation number
- W91238-08-B-0005
About this file
W91238-08-B-0005 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08-B-0005-AM09.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM08-CONFORMED.pdf | ||
| 08-B-0005-AM08.pdf | ||
| 08-B-0005-AM07.pdf | ||
| Emerg Levee-Amend 6.pdf | ||
| Emerg Levee Amend 5.pdf | ||
| Emerg Levee Amend 5-Change Pages.pdf | ||
| Emerg Levee Amend 4.pdf | ||
| 08-B-0005-AM3Conformed.pdf | ||
| 08-B-0005-AM3.pdf | ||
| 08-B-0005-Am2.pdf | ||
| 08-B-0005-Am1Conformed.pdf | ||
| W91238-08-B-0005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
PROJECT: EMERGENCY LEVEE REPAIRS; REGION 1 (SACRAMENTO RIVER), REGION 2 (DELTA BASIN), AND REGION 3 (SAN JOAQUIN
RIVER): SACRAMENTO/SAN JOAQUIN RIVERS AND DELTA BASIN, CALIFORNIA
1. The solicitation, IFB, response date and time is hereby changed from 25 Nov 08/ 01:00 PM (PST) to 3 Dec 08/01:00 PM(PST).
2. Point of contact POC): Carolyn J. Giles, Contract Specialist, Phone (916) 557-5228), Email: carolyn.j.giles@usace.army.mil.
3. See the continuation pages for changes.
4. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 60
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Nov-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-08-B-0005
X 9B. DATED (SEE ITEM 11)
24-Oct-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Nov-2008
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91238-08-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The purpose of this amendment is as follows –
A. SECTION 00010 - SOLICITATION CONTRACT FORM
The required performace has changed-
FROM: Provide emergency rapid response/ repair of actual or impending levee breaches/failures and resultant flooding events based on the work items identified in the pricing schedule, for these 3 regions within Sacramento District's Area of Responsibility (1) Sacramento River drainage basin including all rivers/tributaries flowing into the river north of N38.36838 W 121.52138 (Hood, CA). (2) Delta Region with its western most boundary on the Sac River at N38.06102 W 122.22616 (I-80 overpass at Carquinez), includes all rivers and tributaries flowing into region excluding the Sac River north of N38.36838 W121.52138 (Hood, CA) and San Joaquin River South of N37..94802 W121.33722 (west of I-5 overpass but including the ship channel and port area east of the I-5 overpass.
May require barges/cranes. (3). San Joaquin River drainage basin including all rivers and tributaries flowing into the river south of N37.94802 W121.33722 (west of the I-5 overpass. Unrestricted sealed bidding will be used. Three
(3) IDIQ Requirements contracts will be awarded. Initial contract will be for one (1) year, with three (3) option years. Option Periods may be exercised early so that any remaining Period's capacity can be made available when/if needed to respond to flood fight activities.
TO: Provide emergency rapid response/ repair of actual or impending levee breaches/failures and resultant flooding events based on the work items identified in the pricing schedule, for these 3 regions within Sacramento District's Area of Responsibility (1) Sacramento River drainage basin including all rivers/tributaries flowing into the river north of N38.36838 W 121.52138 (Hood, CA). (2) Delta Region with its western most boundary on the Sac River at N38.06102 W 122.22616 (I-80 overpass at Carquinez), includes all rivers and tributaries flowing into region excluding the Sac River north of N38.36838 W121.52138 (Hood, CA) and San Joaquin River South of N37.94802 W121.33722 (west of I-5 overpass but including the ship channel and port area east of the I-5 overpass. (3). San Joaquin River drainage basin including all rivers and tributaries flowing into the river south of N37.94802 W121.33722 (west of the I-5 overpass). Unrestricted sealed bidding will be used. Three (3) IDIQ Requirements contracts will be awarded. Initial contract will be for one (1) year, with three (3) option years. Option Periods may be exercised early so that any remaining Period's capacity can be made available when/if needed to respond to flood fight activities.
B. Add Base and Option Period CLINS for Regions 1, 2, and 3. The CLINs are added for funding purposes.
CLIN 0001 is added as follows:
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 Lump Sum
REGION 1 BASE PERIOD
FFP
SEE PRICING SCHEDULE BELOW
FOB: Destination
ESTIMATED
NET AMT
CLIN 0002 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 Lump
REGION 2 BASE PERIOD
CLIN 0003 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 Lump
REGION 3 BASE PERIOD
CLIN 1001 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 Lump
OPTION REGION 1 OPT 1 PERIOD
SEE THE PRICING SCHEDULE BELOW
CLIN 1002 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 Lump
OPTION REGION 2 OPTION 1 PERIOD
CLIN 1003 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 Lump
OPTION REGION 3 OPTION 1 PERIOD
CLIN 2001 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 Lump
OPTION REGION 1 OPTION 2 PERIOD
CLIN 2002 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 Lump
OPTION REGION 2 OPTION 2 PERIOD
CLIN 2003 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
2003 Lump
OPTION REGION 3 OPTION 2 PERIOD
CLIN 3001 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
3001 Lump
OPTION REGION 1 OPTION 3 PERIOD
CLIN 3002 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
3002 Lump
OPTION REGION 2 OPTION 3 PERIOD
CLIN 3003 is added as follows:
UNIT UNIT PRICE ESTIMATED AMOUNT
3003 Lump
OPTION REGION 3 OPTION 3 PERIOD
B. Add Base and Option Period CLINS for Regions 1, 2, and 3. The CLINs are added for funding purposes.
C. Identify all item in the pricing schedule as estimated by the insertion of the asterik(*) symbol for the base and all option periods. The updated Pricing Schedule is included as page number of the amendment.
D. Update the Table of Contents to add Attachments General Wage Determination, PreAward Survey, and Drawings and Sketches.
The following have been added by full text:
PRICING SCHEDULE
TABLE OF CONTENTS
SECTION TITLE
SOLICITATION, OFFER AND AWARD (STANDARD FORM 1442)
AND PRICING SCHEDULE
00100 INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/
OFFERORS AND EVALUATION CRITERIA FOR AWARD
00600 REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS/OFFERORS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT
1 GENERAL WAGE DETERMINATION
2 PREAWARD SURVEY
3 DRAWINGS AND SKETCHES
TECHNICAL SPECIFICATIONS
(SEE TECHNICAL SPECIFICATIONS' TABLE OF CONTENTS FOR
SPECIFICATION SECTIONS INCLUDED IN THIS SOLICITATION/CONTRACT)
DRAWINGS (SEPARATE PACKAGE) (LIST OF DRAWINGS-SECTION 00700)
NOTE: AS A MINIMUM ANY CONTRACT AWARDED AS A RESULT OF THIS
SOLICITATION SHALL CONSIST OF THE FOLLOWING DOCUMENTS:
STANDARD FORM 1442, SECTIONS 00010, 00700, 00800, TECHNICAL
SPECIFICATIONS AND DRAWINGS, AND ATTACHMENTS AS DESCRIBED IN
CONTRACT DOCUMENT.
SECTION 00600, AS COMPLETED BY AWARDEE, IS INCORPORATED INTO
ANY RESULTANT CONTRACT BY REFERENCE.
SECTION 00100 IS INCLUDED FOR SOLICITATION PURPOSES ONLY. THIS
SECTION WILL BE REMOVED, MAINTAINED IN THE CONTRACT FILE AND
NOT MADE PART OF THE CONTRACT.
AMENDMENTS ARE INCORPORATED INTO THE RESULTANT CONTRACT.
SUBCONTRACTING PLAN (IF REQUIRED) BECOMES AN ATTACHMENT TO AND A
MATERIAL PART OF THE CONTRACT.
PRICING SCHEDULE : REGION 1 (SACRAMENTO)
BASE SCHEDULE (365 CALENDAR DAYS FROM CONTRACT AWARD)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE
ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE
PURCHASE, HAUL & PLACE DERRICK STONE FROM LEVEE
0001 DERRICK STONE
MATERIAL) 5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
0001AC PLACE DERRICK STONE
USING 80d DRAGLINE, OR EQUAL 3,000* TON $_______
PURCHASE, HAUL & PLACE ROCK FROM LEVEE
0002 TRANSPORT ROCK FROM
QUARRY TO SITE 10,000* TON $_______
0003 MINUS 18” QUARRY
ROCK 6,000* TON $_______
0003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
0004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
0004AA PLACE 12” PIT
RUN ROCK 6,000* TON $_______
0005 MINUS 3” FILL
MATERIAL 2,000* TON $_______
0005AA PLACE MINUS 3”
FILL MATERIAL 2,000* TON $_______
0006 DRAIN ROCK 2,000* TON $_______
0006AA PLACE DRAIN ROCK
2,000* TON $_______
0007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
0007AA PLACE MINUS 1”
FILL 1,000* TON $_______
0008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
0008AA PLACE MINUS 1 1/2”
AGGREGATE BASE 3,000* TON $_______
EQUIPMENT
0010 CAT 966F, OR EQUAL 500* HOUR $_______
0010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
0010AB CAT D-6, OR EQUAL 80* HOUR $_______
0010AC CAT D-8, OR EQUAL 80* HOUR $_______
0010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
0010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
0010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
0010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
0010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80* HOUR $_______
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______
0010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
0010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
0010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
0010AM PORTABLE TOILET EACH* LS $_______
LABOR
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
0011AA FLAGMAN 200* HOUR $_______
MATERIAL/SUPPLIES
0012 GEOTEXTILE FABRIC 15,000* SY $_______
0012AA 4FT ORANGE SAFETY FENCE
W/U-SHAPED STAKES 1,000* LF $_______
SUBTOTAL PROJECTED PRICE $_______________
(BASE CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
*THESE ARE YEARLY PROJECTED ESTIMATED QUANTITIES. FIRM/ACTUAL QUANTITIES WILL BE
CITED IN THE INDIVIDUAL TASK ORDERS. ALSO SEE SECTION 01-11-00, SUMMARY OF WORK.
OPTION 1 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
1001 DERRICK STONE
MATERIAL) 5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
1001AC PLACE DERRICK STONE
1002 TRANSPORT ROCK FROM
1003 MINUS 18” QUARRY
1003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
1004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
1004AA PLACE 12” PIT
1005 MINUS 3” FILL
1005AA PLACE MINUS 3”
1006 DRAIN ROCK 2,000* TON $_______
1006AA PLACE DRAIN ROCK
2,000* TON $_______
1007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
1007AA PLACE MINUS 1”
FILL 1,000* TON $_______
1008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
1008AA PLACE MINUS 1 1/2”
10010 CAT 966F, OR EQUAL 500* HOUR $_______
10010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
10010AB CAT D-6, OR EQUAL 80* HOUR $_______
10010AC CAT D-8, OR EQUAL 80* HOUR $_______
10010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
10010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
10010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
10010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
10010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80* HOUR $_______
10010AI LIGHT PLANT, 5 KW 50* DAILY $_______
10010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
10010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
10010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
10010AM PORTABLE TOILET EACH* LS $_______
1011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
1011AA FLAGMAN 200* HOUR $_______
1012 GEOTEXTILE FABRIC 15,000* SY $_______
1012AA 4FT ORANGE SAFETY FENCE
(OPTION 1 PERIOD ITEMS 1001 THRU 1012AA)
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
2001 DERRICK STONE
(MATERIAL) 5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
2001AC PLACE DERRICK STONE
2002 TRANSPORT ROCK FROM
2003 MINUS 18” QUARRY
2003A PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
2004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
2004A PLACE 12” PIT
2005 MINUS 3” FILL
2005A PLACE MINUS 3”
2006 DRAIN ROCK 2,000* TON $_______
2006A PLACE DRAIN ROCK
2,000* TON $_______
2007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
2007A PLACE MINUS 1”
FILL 1,000* TON $_______
2008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
2008A PLACE MINUS 1 1/2”
20010 CAT 966F, OR EQUAL 500* HOUR $_______
20010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
20010AB CAT D-6, OR EQUAL 80* HOUR $_______
20010AC CAT D-8, OR EQUAL 80* HOUR $_______
20010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
20010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
20010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
20010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
20010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80* HOUR $_______
20010AI LIGHT PLANT, 5 KW 50* DAILY $_______
20010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
20010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
20010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
20010AM PORTABLE TOILET EACH* LS $_______
20011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
20011AA FLAGMAN 200* HOUR $_______
20012 GEOTEXTILE FABRIC 15,000* SY $_______
20012AA 4FT ORANGE SAFETY FENCE
(OPTION 2 PERIOD ITEMS 2001 THRU 2012AA)
OPTION 3 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
3001 DERRICK STONE
(MATERIAL) 5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
3001AC PLACE DERRICK STONE
3002 TRANSPORT ROCK FROM
3003 MINUS 18” QUARRY
3003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
3004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
3004AA PLACE 12” PIT
3005 MINUS 3” FILL
3005AA PLACE MINUS 3”
3006 DRAIN ROCK 2,000* TON $_______
3006AA PLACE DRAIN ROCK
2,000* TON $_______
3007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
3007AA PLACE MINUS 1”
FILL 1,000* TON $_______
3008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
3008AA PLACE MINUS 1 1/2”
30010 CAT 966F, OR EQUAL 500* HOUR $_______
30010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
30010AB CAT D-6, OR EQUAL 80* HOUR $_______
30010AC CAT D-8, OR EQUAL 80* HOUR $_______
30010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
30010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
30010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
30010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
30010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80* HOUR $_______
30010AI LIGHT PLANT, 5 KW 50* DAILY $_______
30010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
30010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
30010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
30010AM PORTABLE TOILET EACH* LS $_______
3011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
3011AA FLAGMAN 200* HOUR $_______
3012 GEOTEXTILE FABRIC 15,000* SY $_______
3012AA 4FT ORANGE SAFETY FENCE
(OPTION 3 PERIOD ITEMS 3001 THRU 3012AA)
PRICING SCHEDULE : REGION 2 (Delta Region)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE
(MATERIAL) 5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
0001AC PLACE DERRICK STONE
QUARRY TO SITE 6,000* TON $_______
ROCK 3,000* TON $_______
0003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
0004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
RUN ROCK 3,000* TON $_______
2,000* TON $_______
0007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
0007AA PLACE MINUS 1”
FILL 1,000* TON $_______
0008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
PURCHASE, HAUL & PLACE ROCK FROM BARGE
0009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
0009AA MINUS 18inch QUARRY ROCK PLACED
FROM BARGE 10,000* TON $_______
0009AB MOVE BARGE CRANE 100* HOUR $_______
0010 CAT 966F, OR EQUAL 500* HOUR $_______
0010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
0010AB CAT D-6, OR EQUAL 80* HOUR $_______
0010AC CAT D-8, OR EQUAL 80* HOUR $_______
0010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
0010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
0010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
0010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
0010AH POWER BROOM, 5-8 foot broom width, Capable of wet sweep 80* HOUR $_______
0010AI LIGHT PLANT, 5 KW 50* DAILY $_______
0010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
0010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
0010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
0010AM PORTABLE TOILET EACH* LS $_______
0011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
0011AA FLAGMAN 200* HOUR $_______
0012 GEOTEXTILE FABRIC 15,000* SY $_______
0012AA 4FT ORANGE SAFETY FENCE
BASE CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
1001AC PLACE DERRICK STONE
1003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
1004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
2,000* TON $_______
1007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
1007AA PLACE MINUS 1”
FILL 1,000* TON $_______
1008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
1009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
1009AA MINUS 18inch QUARRY ROCK PLACED
1009AB MOVE BARGE CRANE 100* HOUR $_______
1010 CAT 966F, OR EQUAL 500* HOUR $_______
1010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
1010AB CAT D-6, OR EQUAL 80* HOUR $_______
1010AC CAT D-8, OR EQUAL 80* HOUR $_______
1010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
1010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
1010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
1010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
1010AH POWER BROOM, 5-8 foot broom width, 1010AI LIGHT PLANT, 5 KW 50* DAILY $_______
1010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
1010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
1010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
1010AM PORTABLE TOILET EACH* LS $_______
(DELTA REGION OPTION 1 PERIOD ITEMS 1001 THRU 1012AA)
OPTION 2 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
2001AC PLACE DERRICK STONE
2003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
2004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
2004AA PLACE 12” PIT
2005AA PLACE MINUS 3”
2006AA PLACE DRAIN ROCK
2,000* TON $_______
2007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
2007AA PLACE MINUS 1”
FILL 1,000* TON $_______
2008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
2008AA PLACE MINUS 1 1/2”
2009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
2009AA MINUS 18inch QUARRY ROCK PLACED
2009AB MOVE BARGE CRANE 100* HOUR $_______
2010 CAT 966F, OR EQUAL 500* HOUR $_______
2010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
2010AB CAT D-6, OR EQUAL 80* HOUR $_______
2010AC CAT D-8, OR EQUAL 80* HOUR $_______
2010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
2010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
2010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
2010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
2010AH POWER BROOM, 5-8 foot broom width, 2010AI LIGHT PLANT, 5 KW 50* DAILY $_______
2010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
2010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
2010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
2010AM PORTABLE TOILET EACH* LS $_______
2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
2011AA FLAGMAN 200* HOUR $_______
2012 GEOTEXTILE FABRIC 15,000* SY $_______
2012AA 4FT ORANGE SAFETY FENCE
(DELTA REGION OPTION 2 PERIOD ITEMS 2001 THRU 2012AA)
OPTION 3 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
3001AC PLACE DERRICK STONE
3003AA PLACE MINUS 18”
QUARRY ROCK 3,000* TON $_______
3004 MINUS 12” PIT RUN
ROCK 3,000* TON $_______
2,000* TON $_______
3007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
3007AA PLACE MINUS 1”
FILL 1,000* TON $_______
3008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
3009 MOBILIZATION/DEMOBILIZATION
OF BARGE CRANE 1* LS $_______
3009AA MINUS 18inch QUARRY ROCK PLACED
3009AB MOVE BARGE CRANE 100* HOUR $_______
3010 CAT 966F, OR EQUAL 500* HOUR $_______
3010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
3010AB CAT D-6, OR EQUAL 80* HOUR $_______
3010AC CAT D-8, OR EQUAL 80* HOUR $_______
3010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
3010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
3010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
3010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
3010AH POWER BROOM, 5-8 foot broom width, 3010AI LIGHT PLANT, 5 KW 50* DAILY $_______
3010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
3010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
3010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
3010AM PORTABLE TOILET EACH* LS $_______
(DELTA REGION OPTION 3 PERIOD ITEMS 3001 THRU 3012AA)
PRICING SCHEDULE : REGION 3(SAN JOAQUIN)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE
(MATERIAL) 5,000* TON $_______
0001AA HAUL DERRICK STONE 5,000* TON $_______
0001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
0001AC PLACE DERRICK STONE
0003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
0004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
2,000* TON $_______
0007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
0007AA PLACE MINUS 1”
FILL 1,000* TON $_______
0008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
00010 CAT 966F, OR EQUAL 500* HOUR $_______
00010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
00010AB CAT D-6, OR EQUAL 80* HOUR $_______
00010AC CAT D-8, OR EQUAL 80* HOUR $_______
00010AD EXCAVATOR, CAT 235
OR EQUAL 80 HOUR $_______
00010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80 HOUR $_______
00010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80 HOUR $_______
00010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80 HOUR $_______
00010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80 HOUR $_______
00010AI LIGHT PLANT, 5 KW 50* DAILY $_______
00010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
00010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
00010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
00010AM PORTABLE TOILET EACH* LS $_______
00011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
00011AA FLAGMAN 200* HOUR $_______
00012 GEOTEXTILE FABRIC 15,000* SY $_______
00012AA 4FT ORANGE SAFETY FENCE
(BASE CONTRACT PERIOD ITEMS 0001 THRU 0012AA)
OPTION 1 - (365 CALENDAR DAYS FROM EXERCISE OF OPTION 1)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
1001AA HAUL DERRICK STONE 5,000* TON $_______
1001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
1001AC PLACE DERRICK STONE
1003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
1004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
2,000* TON $_______
1007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
1007AA PLACE MINUS 1”
FILL 1,000* TON $_______
1008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
1010 CAT 966F, OR EQUAL 500* HOUR $_______
1010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
1010AB CAT D-6, OR EQUAL 80* HOUR $_______
1010AC CAT D-8, OR EQUAL 80* HOUR $_______
1010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
1010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
1010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
1010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
1010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80* HOUR $_______
1010AI LIGHT PLANT, 5 KW 50* DAILY $_______
1010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
1010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
1010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
10010AM PORTABLE TOILET EACH* LS $_______
(SAN JOAQUIN OPTION 1 PERIOD ITEMS 1001 THRU 1012AA)
OPTION 2 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 2)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
2001AA HAUL DERRICK STONE 5,000* TON $_______
2001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
2001AC PLACE DERRICK STONE
2003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
2004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
2004AA PLACE 12” PIT
2005AA PLACE MINUS 3”
2006AA PLACE DRAIN ROCK
2,000* TON $_______
2007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
2007AA PLACE MINUS 1”
FILL 1,000* TON $_______
2008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
2008AA PLACE MINUS 1 1/2”
2010 CAT 966F, OR EQUAL 500* HOUR $_______
2010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
2010AB CAT D-6, OR EQUAL 80* HOUR $_______
2010AC CAT D-8, OR EQUAL 80* HOUR $_______
2010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
2010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
2010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
2010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
2010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80* HOUR $_______
2010AI LIGHT PLANT, 5 KW 50* DAILY $_______
2010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
2010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
2010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
2010AM PORTABLE TOILET EACH* LS $_______
2011 SURVEY CREW W/EQUIPMENT 1* DAILY $_______
2011AA FLAGMAN 200* HOUR $_______
2012 GEOTEXTILE FABRIC 15,000* SY $_______
2012AA 4FT ORANGE SAFETY FENCE
(SAN JOAQUIN OPTION 2 PERIOD ITEMS 2001 THRU 2012AA)
OPTION 3 -(365 CALENDAR DAYS FROM EXERCISE OF OPTION 3)
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. OPTIONS MAY BE EXERCISED
SOLELY AT THE DISCRETION OF THE GOVERNMENT.
LINE
(MATERIAL) 5,000* TON $_______
3001AA HAUL DERRICK STONE 5,000* TON $_______
3001AB PLACE DERRICK STONE
FROM LEVEE 5,000* TON $_______
3001AC PLACE DERRICK STONE
3003AA PLACE MINUS 18”
QUARRY ROCK
FROM LEVEE 6,000* TON $_______
3004 MINUS 12” PIT RUN
ROCK 6,000* TON $_______
2,000* TON $_______
3007 MINUS 1” FILL
MATERIAL 1,000* TON $_______
3007AA PLACE MINUS 1”
FILL 1,000* TON $_______
3008 MINUS 1 1/2”
AGGREGATE BAS 3,000* TON $_______
3010 CAT 966F, OR EQUAL 500* HOUR $_______
3010AA 10-WHEELED DUMP TRUCK 600* HOUR $_______
3010AB CAT D-6, OR EQUAL 80* HOUR $_______
3010AC CAT D-8, OR EQUAL 80* HOUR $_______
3010AD EXCAVATOR, CAT 235
OR EQUAL 80* HOUR $_______
3010AE COMPACTOR, SMOOTH DRUM,
8-10 TON, VIBRATORY 80* HOUR $_______
3010AF COMPACTOR, SHEEPSFOOT,
CAT 825 OR EQUAL 80* HOUR $_______
3010AG WATER TRUCK, 3000-4000
GALLON CAPACITY 80* HOUR $_______
3010AH POWER BROOM, 5-8 FOOT BROOM WIDTH,
CAPABLE OF WET SWEEP 80* HOUR $_______
3010AI LIGHT PLANT, 5 KW 50* DAILY $_______
3010AJ PORTABLE TRAFFIC WARNING
SIGN, W/GENERATOR EACH* DAILY $_______
3010AK TRAFFIC CONTROL SIGNAGE EACH* DAILY $_______
3010AL K-RAIL/JERSEY BARRIER EACH* DAILY $_______
3010AM PORTABLE TOILET EACH* LS $_______
(SAN JOAQUIN OPTION 3 PERIOD ITEMS 3001 THRU 3012AA)
1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may be cause for rejection of bids.
2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.
3. The bidder/offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for award.
7. Notwithstanding any other provisions of this solicitation, the award will be made to the lowest responsible and responsive bidder(s) for either REGION 1, REGION 2, or REGION 3 whichever is in the best interest of the Government. Bidders may submit prices on a single Region only or any combination of Regions.
8. Davis-Bacon Act Wage Determinations for Option Periods
a. Upon exercise of an option to extend the term of the contract, the most current Davis-Bacon Act wage determination(s) from the same schedule(s) as the wage determination(s) incorporated into the original contract will be incorporated into the modified contract.
b. In accordance with FAR 52.222-30, Davis-Bacon Act—Price Adjustment (None or Separately Specified Pricing Method), provided in full text in Section 00700, no adjustments in contract price will be made as a result of incorporation of the new wage determination(s). The solicitation provides the opportunity to bid or propose separate prices for each option period. The option prices may include an amount to cover estimated increases.
c. For indefinite delivery type contracts, the wage determination incorporated into the contract at the exercise of the option will be incorporated into task orders issued during that option period. The wage determination will be effective for the complete period of performance of those task orders without further revision.
10. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
11. The quantities on the pricing schedule are the yearly projected amounts for each contract line item. These projected quantities are for bidding purposes only. They are not estimated quantities. Therefore, the “Variation in Estimated Quantities” clause does not apply to these line items.
12. The unit prices for the contract line item numbers (CLINs) on the Pricing Schedule are firm, fixed prices. These firm, fixed unit prices will govern regardless of quantities ordered under any subsequent task order(s).
13. The “Subtotal Projected Price” for the base period will be the “Bid Price” for purposes of determining the amount of the bid guarantee.
14. The “Grand Total Projected Price” will be used only for the purpose of determining the low bidder in accordance with FAR 52.217-5.
E. Revise the Bid Opening Date, from 25 Nov 2008 to 5 Dec 2008. The time remains unchanged. See SECTION 00100, Clause 52.0214-4582 below:
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.0214-4582 DIRECTIONS FOR SUBMITTING BIDS (MAR 2003)
Envelopes containing bids must be sealed, marked and addressed as follows:
MARK ENVELOPES:
Solicitation No. W91238-08-B-0005 Bid Opening Date: 5 Dec 2008 Bid Opening Time: 1:00 PM Local Time
ADDRESS ENVELOPES TO:
Department of the Army U.S. Army Engineer District, Sacramento ATTN: Contracting Division 1325 J Street Sacramento CA 95814-2922
SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:
Hand-carried bids must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.
Due to security precautions, all Corps of Engineers visitors are now required to sign-in, leave a Photo-ID (such as a drivers license), and get a Visitor’s Pass at the Security Desk in the Building Lobby. Bidders may no longer hand-carry their bids directly to Contracting Division. Bids may NOT be either turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no longer public parking in the Building.
The Bid Opening Officer will be in the Building Lobby 20 minutes prior to the scheduled bid opening time to accept sealed bids. After announcing that no further bids will be received, the Bid Opening Officer will take the hand-carried bids and have them x-rayed as a security precaution. After the bids have been x-rayed, the bidders waiting in the Building Lobby will then be escorted as a group to the Bid Opening Room, where the bids will be publicly opened and read.
Bidders who desire to hand-deliver their bids at an earlier time must notify the contract specialist in advance to arrange to be met in the Building Lobby by Contracting Division personnel. In the event the contract specialist cannot be reached, please call the main Contracting Division telephone number, (916) 557-5201, in order to request assistance.
Please ensure that all courier and delivery personnel are aware of these procedures.
F. Add DFARS Clause 252.232-7003 (Electronic Submission of Payment Requests and Receiving Reports) and
DFARS 252.246-7000 (Material Inspection and Receiving Reports) under Section 00700, Contract Clauses.
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(MAR 2008)
(a) Definitions. As used in this clause--
(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when--
(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;
(2) DoD is unable to receive a payment request or provide acceptance in electronic form;
(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment; or
(4) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
(End of clause)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
(End of clause)
G. Delete Clause 52.2011.4853 (Alternate Structured Approach to Weighted Guidline Method for Construction Contracts.
H. The Summary of Work and Wage Determinations are hereby replaced in their entirety by the attached Summary of Work and Wage Determinations.
I. The Drawings and Sketches are hereby added as Attachment 3 to the solicititation, IFB.
J. Change the Subcontrating Goals/Percentages from TBD to actual data in Section 00800 documents below -
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
SAMPLE SUBCONTRACTING PLAN
- S A M P L E -
SUBCONTRACTING PLAN
SUBCONTRACTING PLAN SUBMITTED IN ACCORDANCE WITH PUBLIC LAW 95-507 (THE
FOLLOWING FORMAT IS ESTABLISHED IN ACCORDANCE WITH FAR 52.219-9(d)(1) THROUGH (d)(11)
AND INCLUDES THE REQUIRED STATUTORY ELEMENTS AS DESCRIBED IN FAR 19.704. IT ALSO
INCLUDES ADDITIONAL REQUIREMENTS OF THE DFARS 219.704 AND AFARS 5119.704.
EVALUATION OF THE SUBCONTRACTING PLAN BY THE GOVERNMENT WILL BE AS PRESCRIBED
IN FAR 19.705 (AND ITS SUPPLEMENTS).
DO NOT JUST ADDRESS THE FOLLOWING ISSUES IN SHORT; FOLLOW THE GUIDANCE OF FAR
52.219-9 IN ITS ENTIRETY. FOR EXAMPLE, PARAGRAPH 11 BELOW ASKS FOR A DISCUSSION OF RECORDS; THE PLAN SHOULD ADDRESS ALL RECORDS AS DESCRIBED IN FAR 52.219-9(d)(11)(i) THROUGH (vi).
IN ACCORDANCE WITH FAR 19.704 IF THE CONTRACT CONTAINS OPTIONS, THE CUMULATIVE
VALUE OF THE BASIC CONTRACT AND ALL OPTIONS IS CONSIDERED IN DETERMINING WHETHER
A SUBCONTRACTING PLAN IS NECESSARY. ONCE IT HAS BEEN DECIDED IF A PLAN IS
NECESSARY, THE SUBCONTRACTING PLAN SHALL CONTAIN SEPARATE PARTS, ONE FOR THE
BASIC CONTRACT AND ONE FOR EACH OPTION. IN OTHER WORDS, IT IS NECESSARY TO ADDRESS
PLANNED SUBCONTRACTING DOLLARS AND PERCENTAGES OF TOTAL TO BE AWARDED TO SMALL,
SMALL DISADVANTAGED, HUBZONE SMALL, WOMEN-OWNED SMALL, VETERAN-OWNED SMALL,
SERVICE-DISABLED VETERAN-OWNED SMALL, HISPANIC SERVICING INSTITUTIONS AND TRIBAL
COUNCIL UNIVERSITIES, HBCU/MIs, AND QUALIFIED NONPROFIT AGENCIES FOR THE BLIND AND
OTHER SEVERELY DISABLED SEPARATELY FOR THE BASIC CONTRACT PERIOD AND EACH OPTION
YEAR. THEREFORE, PARAGRAPHS 1 AND 2 BELOW MUST BE PREPARED SEPARATELY FOR THE BASE YEAR AND EACH OPTION YEAR. ALL OTHER PARTS OF THE SUBCONTRACTING PLAN ONLY NEED TO
BE ADDRESSED ONCE.
IF THE SUBCONTRACTING PLAN'S PROPOSED SUBCONTRACTING GOALS DO NOT MEET THE
CORPS OF ENGINEERS' SUBCONTRACTING GOALS, THE SUBCONTRACTING PLAN MUST BE
SUBMITTED WITH A FULL EXPLANATION OF THE REASONS FOR THE LESSER GOALS
ESTABLISHED BY THE PLAN. A SMALL DISADVANTAGED BUSINESS GOAL OF LESS THAN FIVE
PERCENT MUST BE APPROVED TWO LEVELS ABOVE THE CONTRACTING OFFICER (DFARS 219.705- 4).
PROJECT TITLE: _________________________________________________
RFP/IFB NO.: ________________ CONTRACT NO.: _________________
CONTRACTOR NAME: _______________________________________________
DIVISION: ______________________________________________________
INDIVIDUAL COMPLETING THIS PLAN: _______________________________
TELEPHONE NO.: _________________________________________________
1. Goals, expressed in terms of percentages of total planned subcontracting dollars, for the use of small businesses, small disadvantaged businesses, HUBZone small businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses as subcontractors. The offeror shall include all subcontracts that contribute to contract performance and may include a proportionate share of products and services that are normally allocated as indirect costs.
Corps of Engineers Subcontracting Percentage Goals:
Small Businesses 70.0%
Small, Disadvantaged Businesses 6.2%
Women-Owned Small Businesses 7.0%
HUBZone Small Business 9.8%
Veteran-Owned Small Business 3.0%
Service Disabled Veteran Owned Small Business 0.9%
*Service-disabled veteran-owned small business concerns meet the definition of veteran-owned small business concerns, and offerors may also include them within the subcontracting plan goal for veteran-owned small business concerns.
2. Statement of: (i) total dollars planned to be subcontracted, (ii) total dollars planned to be subcontracted to small business; (iii) total dollars planned to be subcontracted to hubzone small business;(iv) total dollars planned to be subcontracted to small disadvantaged business; (v) total dollars planned to be subcontracted to women-owned small business;(vi) total dollars planned to be subcontracted to veteran-owned small business; (vii) total dollars planned to be subcontracted to service-disabled veteran-owned small business; (viii) total dollars planned to be subcontracted to Hispanic Servicing Institutions and Tribal Council Universities; (ix) total dollars planned to be subcontracted to Historically Black Colleges/Universities and/or Minority Institutions; and (x) total dollars planned to be subcontracted to Qualified Nonprofit Agencies for the Blind and Severely Disabled.
Total Cost of Prime Contract: $________
Total Dollars to be Subcontracted $________ _______%*
To Small Business $________ _______%**
To HUBZone Small Business $________ _______%**
To Small Disadvantaged Business $________ _______%**
To Women-Owned Small Business $________ _______%**
To Veteran-owned Small Business $________ _______%**
To Service-Disabled Veteran-owned
Small Business $________ _______%**
To Hispanic Servicing Institutions And Tribal Council Universities $________ _______%**
To Historically Black Colleges/ Universities/Minority
Institutions $________ _______%**
To Qualified Nonprofit Agencies for the Blind and Other Severely Disabled $________ _______%**
NOTES:
* Calculate percentage of Total Dollars to be Subcontracted to Total Cost of Prime Contract ** Calculate subcontracted dollars to each group to Total Dollars to be Subcontracted, NOT TO Total Cost of Prime Contract.
PLANNED SUBCONTRACTING INCLUDES ALL PLANNED EXPENDITURES. TOTAL
ESTIMATED COST TO SUBCONTRACTORS AND GOALS MUST BE ESTABLISHED EVEN IF THE
CONTRACT IS OF THE INDEFINITE-DELIVERY TYPE.
SUBCONTRACTS AWARDED TO SMALL DISADVANTAGED BUSINESSES, HUBZONE SMALL
BUSINESSES, WOMEN-OWNED SMALL BUSINESSES, VETERAN-OWNED SMALL BUSINESSES,
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES, HISPANIC SERVICING INSTITUTIONS, AND TRIBAL COUNCIL UNIVERSITIES, HBCU/MIs, AND QUALIFIED NONPROFIT AGENCIES FOR THE
BLIND AND OTHER SEVERELY DISABLED COUNT TOWARD THE OVERALL SMALL BUSINESS
GOAL. HBCU/MIs ARE COUNTED AS A SUBSET OF THE SMALL DISADVANTAGED GOAL. THE
CORPS OF ENGINEERS HAS NOT BEEN ASSIGNED A SET GOAL FOR HUBZONE SMALL BUSINESS,
HISPANIC SERVICING INSTITUTION AND TRIBAL COUNCIL UNIVERSITIES, HBCU/MIs OR
QUALIFIED NONPROFIT AGENCIES FOR THE BLIND AND OTHER SEVERELY DISABLED.
IN ACCORDANCE WITH DFARS 219.703, QUALIFIED NONPROFIT AGENCIES FOR THE BLIND AND
OTHER SEVERELY DISABLED THAT HAVE BEEN APPROVED BY THE COMMITTEE FOR PURCHASE
FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED UNDER THE JAVITS-WAGNER-O'DAY (41
U.S.C. 46-48) ARE ELIGIBLE TO PARTICIPATE IN THE PROGRAM AS A RESULT OF 10 U.S.C. 2410d
AND SECTION 9077 OF PUB. L. 102-396 AND SIMILAR SECTIONS IN SUBSEQUENT DEFENSE
APPROPRIATIONS ACTS. UNDER THIS AUTHORITY SUBCONTRACTS AWARDED TO SUCH ENTITIES
MAY BE COUNTED TOWARD THE PRIME CONTRACTOR’S SMALL BUSINESS SUBCONTRACTING
GOAL.
3. A description of the principal types of supplies and services to be subcontracted and an identification of the types planned for subcontracting to (i) small business concerns, (ii) small disadvantaged business concerns, (iii) HUBZone small business concerns, (iv) women-owned small business concerns, (v) veteran-owned small business concerns
(vi) service-disabled veteran-owned small business concerns, (vii) Hispanic Servicing Institutions, and Tribal Council Universities, (viii) HBCUs and MIs, (ix) qualified nonprofit agencies for the blind and other severely disabled.
4. A statement of the method used in developing the proposed subcontracting goals for small business concerns, small disadvantaged business concerns, HUBZone small business concerns, women-owned small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, Hispanic Servicing Institutions and Tribal Council Universities, HBCUs and MIs, and qualified nonprofit agencies for the blind and other severely disabled.
5. A description of the method used to identify potential sources for solicitation purposes to assure small, small disadvantaged, HUBZone small, women-owned small, veteran-owned small, service-disabled…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .