Plans (Volume 3, Amendment 0003).pdf

PDF 4 MB Posted

Attached to
Bluestone Dam Safety Assurance Phase 5
Solicitation number
W9123719B0001
Issued by

About this file

This document outlines a federal contract opportunity for construction services. The U.S. Army Corps of Engineers Huntington District is soliciting bids for the Bluestone Dam Safety Assurance Phase 5 project located in Hinton, West Virginia. The project involves modifying the primary spillway stilling basin through excavation, demolition, anchor installation, tunneling, and construction of a permanent divider wall. The contract will be awarded as a firm-fixed price contract to the lowest priced responsive and responsible bidder. The estimated value of the contract is between $250,000 and $500,000. Interested parties can access the solicitation documents on www.fbo.gov as of September 16, 2019. Sealed paper bids are due with one original and one copy. A site visit is scheduled for October 4, 2019. The NAICS code for this procurement is 237990.

View the file

Other files

File Type Posted
Abstract of Offers.pdf PDF
A.03.09 Drawing B-701 (Amendment 0004).pdf PDF
W9123719B0001 0004.pdf PDF
Plans (Volume 2, Amendment 0003).pdf PDF
W9123719B0001 0003.pdf PDF
Plans (Volume 1, Amendment 0003).pdf PDF
Questions and Answers.pdf PDF
Preliminary_Materials_and_Concrete_Mixture_Proportioning_Report.pdf PDF
W9123719B0001_0002.pdf PDF
Presentation_Slides.pdf PDF
Sign-In_Sheet.pdf PDF
W9123719B0001_0001.pdf PDF
Plans_(Volume_2).pdf PDF
Brand_Name_Justification.pdf PDF
Plans_(Volume_3).pdf PDF
Plans_(Volume_1).pdf PDF
Directions_for_Pre-Bid_Site_Visit.pdf PDF
W9123719B0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY CORPS

OF ENGINEERS

HUNTINGTON DISTRICT

NEW RIVER

HINTON, WV

BLUESTONE LAKE

BLUESTONE DAM DSA

PHASE 5 (VOLUME 3 OF 3)

INCLUDED: CURRENT RECORD DRAWINGS-CONSTRUCTION

CURRENT RECORD DRAWINGS-CONSTRUCTION

CURRENT RECORD DRAWINGS-CONSTRUCTION

AS-BUILT DRAWINGS PHASE 2B

AS-BUILT DRAWINGS PHASE 2A

AS-BUILT DRAWINGS PHASE 1

AS-BUILT DRAWINGS DRIFT AND DEBRIS

FISCAL YEAR 2019

t

PLANS COFFERDAM I FB

PLANS PHASE 4

PLANS PHASE 3

AS-BUILT DRAWINGS ORIGINAL DAM CONSTRUCTION

LIFTOFF TESTING EQUIPMENT

SUBMITTAL:

SEPTEMBER 2019

AS-BUILT DRAWINGS MAINTENANCE BUILDING (ADDED IN ACCORDANCE

WITH AMENDMENT 0003)

CERTIFIED FINAL DOCUMENTS (FIPO DRAWINGS)-RTA SOLICITATION NO. W9123719B0001

Enclosure No. 10

File details come from the government source that posted it. Updated .