Plans (Volume 3, Amendment 0003).pdf
PDF 4 MB Posted
- Attached to
- Bluestone Dam Safety Assurance Phase 5 Federal contract opportunity
- Solicitation number
- W9123719B0001
About this file
This document outlines a federal contract opportunity for construction services. The U.S. Army Corps of Engineers Huntington District is soliciting bids for the Bluestone Dam Safety Assurance Phase 5 project located in Hinton, West Virginia. The project involves modifying the primary spillway stilling basin through excavation, demolition, anchor installation, tunneling, and construction of a permanent divider wall. The contract will be awarded as a firm-fixed price contract to the lowest priced responsive and responsible bidder. The estimated value of the contract is between $250,000 and $500,000. Interested parties can access the solicitation documents on www.fbo.gov as of September 16, 2019. Sealed paper bids are due with one original and one copy. A site visit is scheduled for October 4, 2019. The NAICS code for this procurement is 237990.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers.pdf | ||
| W9123719B0001 0004.pdf | ||
| A.03.09 Drawing B-701 (Amendment 0004).pdf | ||
| Plans (Volume 2, Amendment 0003).pdf | ||
| Questions and Answers.pdf | ||
| W9123719B0001 0003.pdf | ||
| Plans (Volume 1, Amendment 0003).pdf | ||
| W9123719B0001_0002.pdf | ||
| Presentation_Slides.pdf | ||
| Preliminary_Materials_and_Concrete_Mixture_Proportioning_Report.pdf | ||
| Sign-In_Sheet.pdf | ||
| W9123719B0001_0001.pdf | ||
| Brand_Name_Justification.pdf | ||
| W9123719B0001.pdf | ||
| Plans_(Volume_2).pdf | ||
| Plans_(Volume_3).pdf | ||
| Directions_for_Pre-Bid_Site_Visit.pdf | ||
| Plans_(Volume_1).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY CORPS
OF ENGINEERS
HUNTINGTON DISTRICT
NEW RIVER
HINTON, WV
BLUESTONE LAKE
BLUESTONE DAM DSA
PHASE 5 (VOLUME 3 OF 3)
INCLUDED: CURRENT RECORD DRAWINGS-CONSTRUCTION
CURRENT RECORD DRAWINGS-CONSTRUCTION
CURRENT RECORD DRAWINGS-CONSTRUCTION
AS-BUILT DRAWINGS PHASE 2B
AS-BUILT DRAWINGS PHASE 2A
AS-BUILT DRAWINGS PHASE 1
AS-BUILT DRAWINGS DRIFT AND DEBRIS
FISCAL YEAR 2019
t
PLANS COFFERDAM I FB
PLANS PHASE 4
PLANS PHASE 3
AS-BUILT DRAWINGS ORIGINAL DAM CONSTRUCTION
LIFTOFF TESTING EQUIPMENT
SUBMITTAL:
SEPTEMBER 2019
AS-BUILT DRAWINGS MAINTENANCE BUILDING (ADDED IN ACCORDANCE
WITH AMENDMENT 0003)
CERTIFIED FINAL DOCUMENTS (FIPO DRAWINGS)-RTA SOLICITATION NO. W9123719B0001
Enclosure No. 10
File details come from the government source that posted it. Updated .