Directions_for_Pre-Bid_Site_Visit.pdf
PDF 310 KB Posted
- Attached to
- Bluestone Dam Safety Assurance Phase 5 Federal contract opportunity
- Solicitation number
- W9123719B0001
About this file
This document provides details for a federal construction contract solicitation and related pre-bid site visit. The U.S. Army Corps of Engineers Huntington District is seeking a firm-fixed price contract for construction of a modified stilling basin at Bluestone Dam in Hinton, West Virginia as part of Phase 5 of the Bluestone Dam Safety Assurance Project. Work will include dewatering, excavation, demolition, anchor installation, tunneling, and construction of a permanent divider wall. An organized pre-bid site visit is scheduled for October 4, 2019. Bids are due by September 16, 2019 and must be submitted as one sealed paper original and one sealed paper copy. The contract will be awarded to the lowest priced responsive and responsible bidder. The estimated value is between $250,000 and $500,000. The NAICS code is 237990. The solicitation and any updates can be found at www.fbo.gov under solicitation number W9123719B0001.
NOTE: This file is provided for information purposes only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers.pdf | ||
| W9123719B0001 0004.pdf | ||
| A.03.09 Drawing B-701 (Amendment 0004).pdf | ||
| Plans (Volume 2, Amendment 0003).pdf | ||
| Questions and Answers.pdf | ||
| Plans (Volume 3, Amendment 0003).pdf | ||
| W9123719B0001 0003.pdf | ||
| Plans (Volume 1, Amendment 0003).pdf | ||
| Presentation_Slides.pdf | ||
| W9123719B0001_0002.pdf | ||
| Preliminary_Materials_and_Concrete_Mixture_Proportioning_Report.pdf | ||
| Sign-In_Sheet.pdf | ||
| W9123719B0001_0001.pdf | ||
| Plans_(Volume_3).pdf | ||
| Brand_Name_Justification.pdf | ||
| W9123719B0001.pdf | ||
| Plans_(Volume_2).pdf | ||
| Plans_(Volume_1).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
From I-64, take exit 139 (Sandstone/Hinton) to Route 20 S and continue approximately 12.5 miles. Turn left onto WV-3 E, then turn right onto Greenbrier Drive. Turn right onto Miller Avenue and continue to the maintenance building.
From I-77, take exit 14 (Athens Road) to Route 20 N and continue approximately 24 miles. Turn right onto WV-3 E, then turn right onto Greenbrier Drive. Turn right onto Miller Avenue and continue to the maintenance building.
File details come from the government source that posted it. Updated .