Abstract of Offers.pdf
PDF 181 KB Posted
- Attached to
- Bluestone Dam Safety Assurance Phase 5 Federal contract opportunity
- Solicitation number
- W9123719B0001
About this file
This document contains an abstract of offers for a federal construction contract solicitation. The U.S. Army Corps of Engineers Huntington District is soliciting offers for the construction of a modified stilling basin at Bluestone Dam in Hinton, West Virginia as part of the Bluestone Dam Safety Assurance Project Phase 5. Phase 5 involves constructing the modified stilling basin in two halves to allow dam spillway flows to continue during construction. Work will include dewatering, excavation, demolition, anchor installation, tunneling, and construction of a permanent divider wall. The solicitation was issued on September 16, 2019 with bids due on December 6, 2019. The contract will be awarded to the lowest priced responsive and responsible bidder. The estimated value is between $250,000 and $500,000. Five bids were received ranging from $276.7 million to $475.8 million with the government estimate being $319.6 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9123719B0001 0004.pdf | ||
| A.03.09 Drawing B-701 (Amendment 0004).pdf | ||
| Plans (Volume 2, Amendment 0003).pdf | ||
| Plans (Volume 3, Amendment 0003).pdf | ||
| Questions and Answers.pdf | ||
| W9123719B0001 0003.pdf | ||
| Plans (Volume 1, Amendment 0003).pdf | ||
| W9123719B0001_0002.pdf | ||
| Presentation_Slides.pdf | ||
| Preliminary_Materials_and_Concrete_Mixture_Proportioning_Report.pdf | ||
| Sign-In_Sheet.pdf | ||
| W9123719B0001_0001.pdf | ||
| Brand_Name_Justification.pdf | ||
| W9123719B0001.pdf | ||
| Plans_(Volume_2).pdf | ||
| Plans_(Volume_3).pdf | ||
| Directions_for_Pre-Bid_Site_Visit.pdf | ||
| Plans_(Volume_1).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO.
ABSTRACT OF OFFERS
SOLICITATION NO.
ISSUING OFFICE
NO. NAME OF OFFEROR
ACCEP-
TANCE
TIME*
(Days)
BUSI-
NESS
SIZE
L S
SUPPLIES OR SERVICES (General Description)
OPENING DATE PAGE OF PAGES
QUANTITY
UNIT
DELIV-
ERY
TIME**
F.O.B.
POINT
REMARKS
* Indicate by an X a 60-day acceptance.
** Indicate by an X if offer conforms to delivery time specified in solicitation.
I CERTIFY THAT I HAVE OPENED, READ
AND RECORDED ON THIS ABSTRACT
(AND CONTINUATION SHEETS, IF ANY)
ALL OFFERS RECEIVED IN RESPONSE TO
THE SOLICITATION.
TYPED NAME AND TITLE
SIGNATURE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
STANDARD FORM 1409 (REV. 9-88)
Prescribed by GSA-FAR (48 CFR) 53.214
W9123719B0001
USACE, CONTRACTING DIVISION
MATTHEW C. WILSON
502 8TH STREET
HUNTINGTON, WV 25701
Bluestone Dam Safety Assurance, Phase 5
12/06/2019
Brayman Construction
Thalle Construction Co.
Kokosing Industrial, Inc.
Lane-Salimp Bluestone JV
Government Estimate
Matthew C. Wilson, Contracting Officer
$319,592,539.00
$333,675,335.00
$459,999,888.00
$475,804,229.50
$276,726,322.07
9 Dec 2019
| 2019-12-09T09:21:14-0500 | |
| Matthew C. Wilson |