Atch_7_-_Government_Furnished_Property.pdf

PDF 13 KB Posted

Attached to
Building and Grounds Maintenance and Recreation Area Services
Solicitation number
W911WN-17-T-3007
Issued by

About this file

Atch 7 - Gov't Furnished Property

View the file

Other files

File Type Posted
Current_Subcontractors.pdf PDF
Vacation_Eligibility_Certification_W911WN-17-T-3007.pdf PDF
W911WN-17-T-30007-0001_Conformed_Version.pdf PDF
SCA_WD_15-5794_R3_Yough_Somerset_05082017.pdf PDF
Pre-Quote_Sign-in.pdf PDF
Amd_-0001_Exhibit_B_-_Maintenance_of_Landscaped_Areas.pdf PDF
Amd_-0001_Exhibit_A_-_Grass_Mowing.pdf PDF
Exhibit_F_-1-_Proposed_Booth_hours.xlsx XLSX spreadsheet
W911WN-17-T-3007-0001_Price_Schedule-Youghiogheny.xls XLS spreadsheet
W911WN-17-T-3007-0001.pdf PDF
W911WN-17-T-3007_Price_Schedule-Youghiogheny.xls XLS spreadsheet
SCA_WD_15-4278_R1_Yough_Garrett_Co..docx DOCX document
Exhibit_I_-2-_Detail__1_Float_Line_End_Anchor.pdf PDF
Atch_2_-_Accident_Prevention_Plan.pdf PDF
W911WN-17-T-3007.pdf PDF
Exhibit_I_-5-_Location_of_bouys.pdf PDF
Exhibit_B_-_Maintenance_of_Landscaped_Areas.pdf PDF
Exhibit_I_-6-_Mill_Run_Beach_Map.pdf PDF
Atch_1_-_Sample_Quality_Control_Plan.pdf PDF
Exhibit_E_-_Raw_Sewage_and_Sludge_Removal.pdf PDF
Exhibit_I_-3-_Detail__2_Ball_Float.pdf PDF
Exhibit_I_-4-_Detail__3_Depth_Gage_Anchor.pdf PDF
Exhibit_A_-1-_Mowing_Maps.pdf PDF
SCA_WD_15-4235_R3_Yough_Fayette_Co.docx DOCX document
Atch_3_-_Activity_Hazard_Analysis.xlsx XLSX spreadsheet
Atch_6_-_Pesticide_Application_Record.pdf PDF
Atch_5_-_Contract_Discrepancy_Report.pdf PDF
Exhibit_J_-_Boundary_Marking.pdf PDF
Exhibit_I_-_Maintenance_of_Navigation_Aids.pdf PDF
Exhibit_D_-_Solid_Waste_Removal.pdf PDF
Exhibit_H_-_Drift,_Debris_and_Trash_Removal.pdf PDF
Exhibit_I_-7-_Spillway_Beach_Map.pdf PDF
Atch_4_-_ENG_Form_3394.pdf PDF
Exhibit_C_-2-_Cleaning_Schedule.pdf PDF
SCA_WD_15-5794_R2_Yough_Somerset_Co.docx DOCX document
Exhibit_G_-_Wildlife_Management.pdf PDF
Exhibit_A_-_Grass_Mowing.pdf PDF
Exhibit_C_-_Cleaning_Services.pdf PDF
Exhibit_K-_2017_Youghiogheny_River_Lake_Map.pdf PDF
Exhibit_I_-1-_Bowline_with_a_Half_Hitch.pdf PDF
Exhibit_C_-3-_Table_of_light_bulbs.pdf PDF
Exhibit_F_-_Recreation_Area_Services.pdf PDF
Exhibit_C_-1-_Map_of_Campgrounds_restrooms_and_showers.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7

GOVERNMENT-FURNISHED FACILITIES AND EQUIPMENT

GENERAL

This attachment includes additional information for Government-furnished equipment and facilities.

An overall map of the project is located in Exhibit K.

Facilities:

Space will be provided at the project for a Contractor office and for storage of equipment at the Somerfield North Recreation Area garage. This area is located along Route 40 about midway on the lake. There are sewage facilities available in the public restroom in the area during the recreation season. Electric and telephone service is available, but power and telephone shall be the Contractor's responsibility. No other utilities are available. The building is unheated. The Contractor shall be responsible for connection of all utilities. Equipment will not be stored outside the building at this site.

Space will be provided in the Outflow Field for storage of equipment. A small (less than 16 ft in any one direction) Contractor-owned tool shed or trailer may be placed in this area at a specific location to be designated by the COR. Water, sewage, and electric are not available at this location. This area is reasonably secure in that the gates to the area are locked, at night. However, the area is open to the public in the outflow fishing area and the group campsites are close by.

The utility closet in the Resource Manager’s Office basement will be available for storage of cleaning equipment and includes a small utility sink.

Where available, the Government will furnish electric and water to perform the specified work. At remote locations, the Contractor shall supply his own utilities.

Property:

Keys will be issued to the contractor at the beginning of the contract as needed. The contractor will then be responsible for issuing keys to his/her employees, tracking them, and for recovering them as employees are laid-off or terminated. All keys will be turned back in to the Government at the end of the contract or as requested by the COR. If keys are lost or not turned back in, the Contractor may be held liable for the cost of rekeying the project.

The Government will furnish telephones and communication systems, for official use only, at each campground entrance station. The contractor will also be responsible for all issued property. An example property list for the campground booths is attached. This list may not be all-inclusive and is subject to change.

OUTFLOW BOOTH PROPERTY

(EXAMPLE)

NRRS Computer, Peripherals, & Communications Equipment:

CPU UPS Battery Backup Monitor Cash Drawer Report Printer Surge Protector Receipt Printer Component Covers Keyboard NRRS Satellite Dish w. Modem & Cables Credit Card Swipe Booth Radio Mouse w. Pad Telephone w. Jack & Cables Adding Machine

Tools:

Broom Sledge Hammer Toilet Plunger Dustpan Garden Hose Desk Brush Shovel Flashlight Rake Hedge Clippers Lantern Ladder Toolbox w. Hammer & Miscellaneous Screwdrivers (7)

Miscellaneous Equipment & Furniture:

Desk Chairs (2) Folding Table Floor Fan Air Conditioning Unit Heater Clock Waste cans (3) Safe Throw Bag 1st Aid Kit, HURL Kit, CPR Mask, Sharps Container

Signature Booth Attendant Date

Issuing COE Employee Date

RECEIVED: ________________________ _________

COE Employee Date

File details come from the government source that posted it. Updated .