TE_16_MSW_Reports_from_Contractor.docx
DOCX document 17 KB Posted
- Solicitation number
- W911SG-17-R-0037
About this file
Technical Exhibit 16- MSW Reports from Contractor
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit 16 MSW Reports from Contractor
The Contractor shall provide the Government the reports on weekly basis every Friday that contain the following. Comment by Myers, Michael D CIV USA AMC: State when reports are to be delivered, listed Friday above.
What about reports for damaged bins and other report details required above???
· Load Weights
· Load Locations (GPS Coordinates) of Dumpsters and Roll Offs
· Routes
· Vehicle and Driver ID
· Solid Waste Hauled and Delivered to Landfill in TX and NM (Landfill Weight Tickets with date and time)
· Conduct quarterly visual storm water runoff observations. Comment by Myers, Michael D CIV USA AMC: Add to report detail of TE 16
· Coordinate annual employee training programs.
· Conduct onsite preventive maintenance inspections.
· Update material inventories.
· Attend SWPPP meetings within DPW as they occur.
***Monthly Employee status Report
· Equipment Name, part #, NSN
· Vehicle/Truck Plate Number and serial number
· Truck scale readings (weights) per truck and facility/location
· Truck scale/GPS calibrations (if manufactured required) for accuracy
· Track waste diversion rates
· Equipment quantity received, issued, on hand
· Number of trips to the transfer station by truck
· Unit of Measure
· Weight of each truck
· Vehicle maintenance/repair logs
There is a “Zero Tolerance” for the Contractor to turn in late reports. . The COR will notify the KO and list it in the monthly COR report.
File details come from the government source that posted it. Updated .