OSUT_1_13_12_05_Metal_Angle_Framed_Bleachers.pdf

PDF 57 KB Posted

Attached to
Armor OSUT 1
Solicitation number
W911SF-19-R-0018
Issued by

About this file

Bleachers

View the file

Other files

File Type Posted
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
W911SF19R00180004.pdf PDF
Lafayette_Pool_Oscar_15_Nad_83_Grading_Plan_Sheet_1_Amended_12_July_2019.._.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
44026_Stevon_Booker_Oscar_14_Nad_83_Grading_Plan_.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
W911SF19R00180003.pdf PDF
44026_Stevon_Booker_Oscar_14_Nad_83_Site_Plan_Mod.pdf PDF
Armor_OSUT_1__Questions.pdf PDF
OSUT_1_32_01_19_Field_Molded_Sealants_for_Sealing_Jts_In_Rigid_Pavg.pdf PDF
OSUT_1_08_33_13.00_10_Metal_Rolling_Counter_Doors.pdf PDF
OSUT_1_23_00_00_Air_Supply_Venti_and_Exhaust_Sys.pdf PDF
OSUT_1_01_35_29_Safety_and_Occupational_Health_Requirements.pdf PDF
OSUT_1_06_41_16_00_Laminate_Clad_Architectural_Casework.pdf PDF
OSUT_1_26_41_01_Lightning_Protection_System.pdf PDF
OSUT_1_05_30_00_Steel_Decks.pdf PDF
OSUT_1_09_51_00_Acoustical_Ceilings.pdf PDF
OSUT_1_05_51_00_Metal_Stairs.pdf PDF
OSUT_1_01_78_02_00_10_Closeout_Submittals.pdf PDF
OSUT_1_Latrine_Combined.pdf PDF
OSUT_1_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
OSUT_1_11_42_01_Food_Serving_Tables.pdf PDF
OSUT_1_01_45_01_Quality_Control.pdf PDF
OSUT_1_01_78_23_Operation_an_Maintenace_Data.pdf PDF
OSUT_1_10_14_02_Interior_Signage.pdf PDF
OSUT_1_23_37_13_Diffusers,_Registers,_and_Grills.pdf PDF
OSUT_1_Control_Tower_CMU_Combined.pdf PDF
OSUT_1_07_84_00_Firestopping.pdf PDF
OSUT_1_06_10_00_Rough_Carpentry.pdf PDF
OSUT_1_09_65_00_Resilient_Flooring.pdf PDF
OSUT_1_01_11_0_Summary_of_Work.pdf PDF
OSUT_1_02_84_16_PCB_Trans_Hazard_Waste_Lamp_Removal.pdf PDF
OSUT_1_23_23_00_Refrigerant_Piping.pdf PDF
OSUT_1_07_25_00_Building_Air_Barrier_System.pdf PDF
OSUT_1_C2_Facility_Combined.pdf PDF
OSUT_1_44026_Stevon_Booker_Oscar_14_Nad_83_Site_Plan_Mod.pdf PDF
OSUT_1_09_90_00_Paints_and_Coatings.pdf PDF
OSUT_1_01_42_00_Sources_for_Referencece_Publications.pdf PDF
OSUT_1_12_24_13_Roller_Window_Shades.pdf PDF
OSUT_1_08_91_00_Metal_Wall_Louvers.pdf PDF
OSUT_1_28_31_76_Interior_Fire_Alarm_and_Mass_Notification_Sys.pdf PDF
OSUT_1_23_05_93_Testing,_Adjusting,_and_Balancing_for_HVAC.pdf PDF
OSUT_1_05_50_13_Miscellaneous_Metal_Fabrication.pdf PDF
OSUT_1_01_50_00_Temporary_Construction_Faclities_and_Controls.pdf PDF
OSUT_1_08_11_13_Steel_Doors_and_Frames.pdf PDF
W911SF-19-R-0018-0001,_ARMOR_OSUT_1,_Amend_0001.pdf PDF
OSUT_1_26_28_01_Coordinated_Power_System_Protection.pdf PDF
OSUT_1_32_31_13_High-Security_Chain_Link_Fences.pdf PDF
Show 40 more

Latest 50 of 126 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OUST-AR RANGE PROJECTS FY19

13 12 05-1

SECTION 13 12 05

METAL ANGLE FRAME BLEACHERS

PART 1 - GENERAL

1.1. SECTION INCLUDES

1.1.1. Design and fabrication of angle frame bleachers.

1.02 QUALITY ASSURANCE

1.1.2. Manufacturer Qualifications: Manufacturer must have a minimum of ten years experience in the design and manufacture of bleachers.

1.1.3. Welders must conform to AWS standards.

1.1.4. Source Quality Control: Mill Test Certification.

Codes and Standards: 2012 International Building Code

1.1.5. WARRANTY

1.1.5.1. Warranty shall guarantee bleachers to be free from defect in materials and workmanship for a period of 1 year under normal use.

Warranty period shall begin on date of completion for ojects installed by manufacturer, or its subcontractors, OR warranty period shall begin on date of final delivery on projects installed by others.

1.1.5.2. Anodized finish of plank extrusions shall be covered by 5 year warranty against loss of structural strength or finish deterioration due to exposure to weather conditions or UV rays.

Discoloration of mill finish aluminum due to galvanic reaction not covered.

1.1.6. ENGINEERING

1.1.6.1. Engineering certifications and calculations by a Registered Professional Engineer will be provided upon request, for a fee.

PART 2 – PRODUCTS

2.1. DESIGN

2.1.1. Applicable Codes:

INTERNATIONAL BUILDING CODE (IBC), 2012 EDITION

2.1.2. Design Loads:

13 12 05-2

2.1.2.1. Live Loads: Uniform loading - Structure = 100 psf Uniform loading Seat and Foot plank = 120 plf

2.1.2.2. Sway Loads: Perpendicular to seats = 10 plf Parallel to seats = 24 plf

2.1.2.3. Guardrail Loads: Uniform vertical load = 100 plf

Uniform horizontal load = 50 plf Concentrated horizontal load = 200 pounds

2.1.2.4. Wind Loads: Basic design wind speed = 100 mph (exposure “B”)

2.1.2.4.1. Bleacher must be anchored to foundation to meet wind loads.

2.2. ANGLE FRAME BLEACHERS

2.2.1. Quantity – as shown on drawings

2.2.2. Size: Shall consist of number of units shown/indicated units 10 rows high x length shown but not less than 48’-0” to 55’-0” long.

2.2.3. Net seating capacity per unit 250 to 280 excluding aisles, based on 18" per seat).

2.2.4. Framework: Prefabricated aluminum angle or galvanized steel angle at max. 6' spacing joined by means of aluminum angle cross bracing.

2.2.5. Shop connections: Welded to meet AWS standards and local code requirements.

2.2.6. Joint Sleeve Assembly: Internal splices, where required shall be two per joint, and shall penetrate the joint a minimum of 8 in each direction and be riveted at one end only to allow for contraction and expansion.

2.2.7. Rise and Depth Dimensions: 8” vertical rise and 24” tread depth, Seat height is 17” above its respective tread. (Except low rise & 3 row models)

2.2.8. Seats: Nominal 2” x 10” anodized aluminum with anodized end caps.

2.2.9. Treads: Nominal one (1) or optional two (2) 2” x 10” mill finish aluminum with anodized end caps on rows 2 and up.

2.2.10. Risers: Nominal 2” x 10” mill finish aluminum with end caps on top row. Nominal 1” x 6” mill finish aluminum with end caps on all other rows.

2.2.11. Aisles: Aisle footboards shall be of aluminum alloy 6063-T6 and be of mill finish with contrasting aisle markings. Three aisle stiffener angles shall be used to strengthen the aisle step.

13 12 05-3

There shall be aisle(s)as indicated and width shown but not less than 42 inches.

2.2.12. Aisle Handrail: Anodized aluminum pipe with intermediate rail.

2.2.13. Guardrail: Rails shall be anodized aluminum tube with end plugs and elbows where required. All Rails shall be secured to support with galvanized fasteners. Top rails at sides, rear and front shall be 42” above the leading edge of seat or walking surfaces. Rear rail support members shall be aluminum channel, side and front rail support s shall be aluminum angle.

2.2.13.1. Chainlink System: Fencing shall consist of 9 gauge, 2” mesh galvanized chainlink fabric, heavy duty tension bands, tension bars, brace bands, combo rail endcaps, and wire ties.

2.2.13.2. Vertical Picket System: Aluminum pipe and bar anodized after fabrication & attached to supports with galvanized fasteners.

2.3. MATERIALS / FINISHES

2.3.1. Framework:

2.3.1.1. Aluminum: Structural fabrication with aluminum alloy 6061-T6 mill finish. Each frame shall be unit-welded, using metal inert gas method, under guidelines by the American Welding Society.

Galvanized Steel: ASTM A36/A & A529/A after fabrication all steel is hot dipped galvanized to ASTM A 123 specifications.

All cross bracing and horizontal bracing shall be aluminum angle 6061-T6 mill finish.

2.3.1.2. Extruded Aluminum:

2.3.1.2.1. Seat planks: Aluminum alloy 6063-T6, clear anodized 204R1, AA-M10C22A31, Class II with a wall thickness nominally .078" for impact and deformation resistance.

2.3.1.2.2. Tread and Riser Planks: Aluminum alloy 6063-T6, mill finis with a wall thickness nominally .078” for impact and deformation resistance. 3. Guardrail Pipe: 1-5/8 OD schedule 40 aluminum alloy 6105-T5, clear anodized 204R1, AA-M10C22A31, Class II.

2.3.1.2.3. Handrail Pipe: 1-5/8 OD schedule 40 aluminum alloy 6105- T1, clear anodized 204R1, AA-M10C22A31, Class II.

2.3.1.3. Accessories:

2.3.1.3.1. Channel End Caps: Aluminum alloy 6063-T6, clear anodized 204R1, AA-M10C22A31, Class II.

13 12 05-4

2.3.1.3.2. Hardware: Bolts and Nuts shall be hot dipped galvanized.

2.3.1.3.3. Hold Down Clip Assembly: Aluminum alloy 6063-T6 mill finish.

2.3.1.3.4. Joint Sleeve Assembly: Aluminum alloy 6061-T6, mill finish.

PART 3 – EXECUTION

3.1. MATERIALS / FINISHES

3.1.1. INSTALLATION

3.1.1.1. Install bleacher unit in accordance with manufacturer written instructions, shop drawings, and the 2012 International Building Code.