OSUT_1_23_37_13_Diffusers,_Registers,_and_Grills.pdf
PDF 52 KB Posted
- Attached to
- Armor OSUT 1 Federal contract opportunity
- Solicitation number
- W911SF-19-R-0018
About this file
Diffusers
View the file
Other files for this federal contract opportunity
Show all 50
Armor OSUT 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OUST-AR RANGE PROJECT FY19
SECTION 23 37 13
DIFFUSERS, REGISTERS, AND GRILLS
08/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 113 (2009) Method of Testing for Room Air Diffusion (Repeatable Method of Testing Steady - State Air Diffusion Performance in Occupied Zones of Building Spaces)
ASHRAE EQUIP IP HDBK (2004) Handbook, HVAC Systems and Equipment (IP Edition)
ASHRAE EQUIP SI HDBK (2004) Handbook, HVAC Systems and Equipment (SI Edition)
ASHRAE FUN IP (2009) Fundamentals Handbook, I-P Edition
ASHRAE FUN SI (2009) Fundamentals Handbook, SI Edition
1.2 GENERAL REQUIREMENTS
Section 23 00 00 AIR SUPPLY, DISTRIBUTION, AND EXHAUST SYSTEMS applies to work specified in this section.
1.3 PERFORMANCE REQUIREMENTS
Certify air diffusion devices s having been tested and rated in accordance with ASHRAE EQUIP IP HDBK, Chapter 17; ASHRAE FUN IP, Chapter 31, and ASHRAE 113, where such certification is required.
Submit Equipment and Performance Data for air-diffusion devices consisting of sound data in terms of Noise Criteria (NC) index for the capacity range of the device.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submit the following in accordance with this section.
Material, Equipment, and Fixture Lists Records of Existing Conditions
SD-02 Shop Drawings
Submit Fabrication Drawings for air-diffusion devices in accordance with this section.
Submit Installation Drawings for air-diffusion devices in accordance with the paragraph entitled, "Installation," of this section.
SD-03 Product Data
Submit Equipment and Performance Data for air-diffusion devices in accordance with paragraph entitled, "Performance Requirements," of this section.
SD-04 Samples
Submit Manufacturer's Standard Color Chart in accordance with this section.
SD-10 Operation and Maintenance Data
Provide operation and maintenance manuals consistent with manufacturer's standard brochures, schematics, printed instructions, general operating procedures and safety precautions.
Provide manuals for the following air-diffusion devices:
Type TS Supply Troffer Type TSR Combination Supply and Return Troffer
PART 2 PRODUCTS
2.1 AIR-DIFFUSION DEVICE CONSTRUCTION
Preclude flutter, rattle, or vibration on air-diffusion device construction and mounting. Refer to Section 23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT for vibration isolation considerations. Modify devices and provide accessories necessary for mounting in indicated surface construction.
Select color from Manufacturer's Standard Color Chart which indicate the manufacturer's standard color selections and finishes for air-diffusion devices.
Match color with architectural background.
Provide color as indicated on drawings.
Provide supply diffusers with combination damper and equalizing grid.
Ensure dampers are extracting-splitter type, except as otherwise indicated.
Ensure air-diffusion device volume and pattern adjustments can be made from the face of the device. Make volume adjustments by removable key.
Provide gaskets for supply-terminal air devices mounted in finished surfaces.
Include within the Material, Equipment, and Fixture Lists the manufacturer's style or catalog numbers, specification and drawing reference numbers, warranty information, and fabrication site information.
Submit Records of Existing Conditions consisting of the results of Contractor's survey of work area conditions and features of existing structures and facilities within and adjacent to the jobsite. Commencement of work constitutes acceptance of existing conditions.
Submit Fabrication Drawings for air-diffusion devices consisting of fabrication and assembly details to be performed in the factory.
2.2 TYPES OF AIR-DIFFUSION DEVICES
2.2.4 Type DRE
Provide type DRE supply diffuser, round with three expanding cones to provide discharge air paths, minimally, two-position adjustable for horizontal or vertical discharge.
2.2.6 Type DP Series
Provide type DP series return diffuser with a square, perforated, hinged, face plate with opposed blade volume control, white baked enamel exterior finish, and black matte finish on exposed-to-view interior surface.
2.2.10 Type GS
Provide type GS supply and return grille double deflection type with adjustable face bars parallel to short dimension and adjustable rear bars parallel to long dimension.
Provide a baked enamel finish.
Provide aluminum construction.
PART 3 EXECUTION
3.1 INSTALLATION
Install equipment as indicated and specified and in accordance with manufacturer's recommendations.
Submit installation Drawings for air-diffusion devices. Indicate on drawings overall physical features, dimensions, ratings, service requirements, and equipment weights.
-- End of Section --
File details come from the government source that posted it.