OUST-AR RANGE PROJECTS FY19
SECTION 02 84 16
PCB BALLASTS, TRANSFORMERS AND HAZARDOUS WASTE LAMP REMOVAL AND RECYLING
PART 1 GENERAL
Buildings (eight) are scheduled for demolition. Electrical fixtures, classed as 'Hazardous Waste Lamps' (HWL) found in these buildings include (but may not be limited to) fluorescent downlight with compact fluorescence, troffers with 2 and 4 lamp fluorescents ranging in length from 2 inches to 8 feet, and exterior mercury light fixtures. These fixtures are to be removed prior to demolition after all asbestos containing materials have been removed. Fixtures are regulated based upon the presence of PCB containing electrical equipment. HWLs are regulated due to the mercury contained in the lamps. All ballasts were assumed PCB ballast without inspection. Lighted exit signs, when found, were assumed to be fluorescent replacements, although some may be incandescent. The Contractor shall verify number and type of HWLs and ballasts to be removed and recycled. Estimated quantities are provided in the Hazardous Building Materials Survey included in Appendix C.
The State of Georgia and the Federal EPA considers unbroken mercury containing lamps as universal waste. Unbroken lamps shall be packed and shipped with applicable Department of Transportation Labeling. They do not need full hazardous materials manifesting. They do require a Universal Waste "Bill of Lading" and a state of Georgia "Universal Waste" (GAU) number. Broken HWL are considered "Hazardous Waste" and RCRA and DOT requirements apply.
Transformers, capacitors, electrical light ballasts, electromagnets, switches, and voltage regulators are considered PCB Articles, subclassed as PCB Equipment. They shall also be removed and recycled or disposed of as required by local, state and federal regulations. All capacitors are assumed to contain PCBs unless a label or chemical analysis states that they do not. PCB ballasts must be disposed of as hazardous wastes and may not be re-sold to subsequent users.
1.1 WORK REQUIREMENTS
The Contractor shall provide all personnel, transportation, services, materials, equipment, technical and management support required to perform the requirements as defined in this specification. The Contractor shall document the results of all recycling efforts.
1.2 DEFINITIONS
1.2.1 Certified Recycling Facility (CRF)
A facility that can validate that recyclable materials received are manufactured into new materials for commercial sale or are reused onsite by the facility.
1.2.2 Georgia EPD
Georgian Environmental Protection Division of the Department of Natural Resources.
1.2.3 Hazardous Materials Transporter
A person engaged in the off-site transportation of waste mercury-containing lamps, or PCB ballasts and transformers by air, rail, highway or water.
1.2.4 PCB Ballasts
Light ballasts weighing less than 50 pounds that may contain polychlorinated biphenyls (PCBs).
1.2.5 Hazardous Waste Lamps (HWL)
Any type of high or low pressure lighting device that is unprocessed, contains mercury and generated light through the discharge of electricity either directly or indirectly through a fluorescing coating. Includes fluorescent lamps, mercury lamps, metal halide lamps and high-pressure sodium lamps.
1.2.6 Waste Mercury-Containing Lamp Transfer Facility
Any transportation-related facility including loading docks, parking areas, storage areas and other similar areas where shipments of waste mercury-containing lamps are held during the normal course of transportation for 10 days or less.
1.3 REFERENCES, PUBLICATIONS AND FORMS
The Contractor shall comply with the issue or version (including all changes and amendments) of Federal, State and local environmental statutes and regulations in effect on the day of issuance of this contract, including the applicable portions of the documents cited in the basic contract. References include but are not limited to the following.
Environmental Protection Agency 40 CFR Parts 260, 261, 264, 265, 268, 270 and 273
Environmental Protection Agency, Resource Conservation and Recovery Act
(RCRA) (40 CFR 266).
Environmental Protection Agency, Disposal of Polychlorinated Biphenyls (PCBs) Federal Register vol. 63 29 June 1998, p. 25283 together with 40
CFR 761.
Hazardous Waste Management System: Modification of the Hazardous Waste Program; Hazardous Waste Lamps, Final Rule Federal Register Vol. 64 No.
128, July 6 1999 Rules and Regulations
Hazardous Waste and Emergency Responder 29 CFR 1926.65
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Spill Prevention and Response Plan; G
Three separately bound copies including the names of workers responsible for handling of PCB articles and HWLs. Submittal shall include the requirements of 29 CFR 1926.65 Emergency Responders and all applicable training and certifications.
SD-07 Certificates
Certification of Approved Recycling or Transfer Facility; G
To be submitted 30 days prior to the removal of recyclable from the site (reference paragraph 3.1.e. 3.1.f) and any time the Contractor changes facilities.
SD-11 Closeout Submittals
PCB Articles and Hazardous Waste Lamps Disposition Report
Three separately bound copies of all logs, invoices, forms, notices, manifests, bills of lading or other shipping documents shall be submitted at the completion of the removal operations specified in this section.
Receipt of Materials at Transfer or Recycling Facility or TSDF
To be submitted no later than 30 days from the date of shipment (reference paragraph 3.1.e. 3.1.f).
PART 2 PRODUCTS
2.1 GOVERNMENT-FURNISHED ITEMS AND SERVICES
The Government shall not provide any materials or services under this specification.
2.2 CONTRACTOR-FURNISHED ITEMS AND SERVICES
The Contractor shall furnish everything required to meet the conditions of this specification.
2.2.1 Equipment, Materials and Tools
The Contractor shall furnish all labor, equipment, materials, supplies, containers, labels, tools, vehicles and supervision necessary to perform the work defined in this specification.
2.2.2 Equipment
All equipment which is used by the Contractor to collect, transfer, transport, containerize and otherwise handle waste mercury-containing lamps, PCB ballasts and transformers shall meet all applicable federal and state requirements. Appropriate and permitted vehicles must be used to collect and transport the recyclable hazardous materials to the appropriate transfer and recycling/reclaim facilities.
2.2.3 Materials
The Contractor shall provide appropriate collection containers for the safe collection and shipment of waste mercury-containing lamps that will accommodate 4 foot and 8 foot tube lengths as well as other sized and shaped lamps, and for the collection and shipment of small PCB ballasts and transformers. Containers provided by the Contractor shall meet the requirements of the receiving certified recycling facility and the Department of Transportation (DOT). The Contractor shall also provide appropriate shipping labels for these containers.
2.2.4 Labeling Collection Containers
Logo decals and descriptive labels (i.e. "Used Mercury-Containing lamps" or "PCB Ballasts") shall initially be placed by the Contractor on all containers used to collect these materials respectively. Used Mercury-containing lamps shall not be considered hazardous waste while intact.
2.2.5 Transportation
The Contractor shall provide permitted transportation for the collection, transfer, removal and transport of waste mercury-containing lamps, PCB ballasts and transformers from the installation to appropriate recycling and reclamation facilities.
2.2.6 Forms and Notifications
It is the responsibility of the Contractor to determine which forms must be completed for compliance with State, Federal, and local requirements complete and submit these forms. Copies of all notification forms shall be included in the PCB ARTICLES AND HAZARDOUS WASTE LAMPS DISPOSITION REPORT.
PART 3 EXECUTION
3.1 SPECIFIC TASKS
a. The Contractor shall perform mercury-containing fluorescent light, HID light and PCB ballast/transformer recycling/disposal. These materials are to be recycled within the United States.
b. The Contractor, along with the Contracting Officer or his designated representative, shall determine a fixed quantity of said materials to be removed from the buildings prior to commencement of work. Broken HWL shall be noted at this time. Estimates provided here are to be verified by the Contractor prior to bid submittal.
c All waste mercury-containing lamps shall be delivered to a certified recycling facility (CRF), which has been approved prior to use by the Contracting Officer or his representative, where they shall be disassembled, reclaimed and prepared for marketing as a raw material in a manner that constitutes recycling as defined in the Resource Conservation and Recovery Act (RCRA) (40 CFR 266).
d. PCB ballasts and transformers shall be delivered to a certified recycling facility (CRF) which has been approved prior to use by the Contracting Officer, where they shall be disassembled. PCB-contaminated liquids shall be incinerated in accordance with 40 CFR 720. All other parts of the ballast shall be reclaimed, reused or prepared for marketing as a raw material in a manner that constitutes recycling as defined in RCRA
(40 CFR 266).
e. The Contractor must submit copies of manifests, bills of lading and other receipts for every shipment transported off-site to a transfer facility or recycling facility. All copies must show name, address and phone number of receiving facility, as well as weight in pounds of materials being received. Receipts must be only for materials removed at the installation under this contract. The Contractor, in accordance with RCRA regulations and the newly adopted State and Federal standards for mercury-containing lamps, must fulfill all applicable transportation and record keeping requirements.
f. The Contractor shall ensure that all mercury-containing lamps, PCB ballasts, and transformers are transported by a permitted hazardous materials transporter directly to a permitted transfer facility or permitted recycling facility, completing proper DOT shipping documentation and obtaining signature of transfer on shipping documentation from the Contracting Officer prior to leaving the site.
g. The Contractor shall take all precautions against breakage of mercury-containing lamps. If any mercury-containing lamps are broken during handling by the Contractor, they are considered to be hazardous waste and handled in accordance RCRA regulation. The Contractor shall be responsible for all costs associated with the cleanup and disposal of hazardous waste generated by the Contractor's employees if intact lamps are broken while being collected and transported.
h. It is the Contractor's responsibility to clean up any pre-existing broken HWL. This material is to be treated, shipped and disposed of as hazardous waste and shall meet all of the requirements (personal protective equipment, hazard posting, site control, emergency responder training, medical clearance to wear a respirator, etc., as stated in OSHA's Hazardous Waste Site and Emergency Responder, 29 CFR 1926.65). Prior to removal activities, the Contractor shall walk the buildings scheduled for demolition with the Contracting Officer to determine the number of broken HWLs. The Contractor shall submit an estimate for the clean-up and disposal costs of broken HWL and will be reimbursed by the Government. All other breakage caused by the removal and handling of the HWLs shall be the Contractor's responsibility and will not be reimbursable, as the Government will not have generated it.
-- End of Section --