OSUT_1_1_Spec_Cover_and_Table_of_Contents_FT_Benn.docx

DOCX document 47 KB Posted

Attached to
Armor OSUT 1
Solicitation number
W911SF-19-R-0018
Issued by

About this file

TOC

View the file

Other files

File Type Posted
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
W911SF19R00180004.pdf PDF
Lafayette_Pool_Oscar_15_Nad_83_Grading_Plan_Sheet_1_Amended_12_July_2019.._.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
44026_Stevon_Booker_Oscar_14_Nad_83_Grading_Plan_.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
W911SF19R00180003.pdf PDF
44026_Stevon_Booker_Oscar_14_Nad_83_Site_Plan_Mod.pdf PDF
Armor_OSUT_1__Questions.pdf PDF
OSUT_1_32_01_19_Field_Molded_Sealants_for_Sealing_Jts_In_Rigid_Pavg.pdf PDF
OSUT_1_08_33_13.00_10_Metal_Rolling_Counter_Doors.pdf PDF
OSUT_1_23_00_00_Air_Supply_Venti_and_Exhaust_Sys.pdf PDF
OSUT_1_01_35_29_Safety_and_Occupational_Health_Requirements.pdf PDF
OSUT_1_06_41_16_00_Laminate_Clad_Architectural_Casework.pdf PDF
OSUT_1_26_41_01_Lightning_Protection_System.pdf PDF
OSUT_1_05_30_00_Steel_Decks.pdf PDF
OSUT_1_09_51_00_Acoustical_Ceilings.pdf PDF
OSUT_1_05_51_00_Metal_Stairs.pdf PDF
OSUT_1_01_78_02_00_10_Closeout_Submittals.pdf PDF
OSUT_1_Latrine_Combined.pdf PDF
OSUT_1_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
OSUT_1_11_42_01_Food_Serving_Tables.pdf PDF
OSUT_1_01_45_01_Quality_Control.pdf PDF
OSUT_1_01_78_23_Operation_an_Maintenace_Data.pdf PDF
OSUT_1_10_14_02_Interior_Signage.pdf PDF
OSUT_1_23_37_13_Diffusers,_Registers,_and_Grills.pdf PDF
OSUT_1_Control_Tower_CMU_Combined.pdf PDF
OSUT_1_07_84_00_Firestopping.pdf PDF
OSUT_1_06_10_00_Rough_Carpentry.pdf PDF
OSUT_1_09_65_00_Resilient_Flooring.pdf PDF
OSUT_1_01_11_0_Summary_of_Work.pdf PDF
OSUT_1_02_84_16_PCB_Trans_Hazard_Waste_Lamp_Removal.pdf PDF
OSUT_1_23_23_00_Refrigerant_Piping.pdf PDF
OSUT_1_07_25_00_Building_Air_Barrier_System.pdf PDF
OSUT_1_C2_Facility_Combined.pdf PDF
OSUT_1_44026_Stevon_Booker_Oscar_14_Nad_83_Site_Plan_Mod.pdf PDF
OSUT_1_09_90_00_Paints_and_Coatings.pdf PDF
OSUT_1_01_42_00_Sources_for_Referencece_Publications.pdf PDF
OSUT_1_12_24_13_Roller_Window_Shades.pdf PDF
OSUT_1_08_91_00_Metal_Wall_Louvers.pdf PDF
OSUT_1_28_31_76_Interior_Fire_Alarm_and_Mass_Notification_Sys.pdf PDF
OSUT_1_23_05_93_Testing,_Adjusting,_and_Balancing_for_HVAC.pdf PDF
OSUT_1_05_50_13_Miscellaneous_Metal_Fabrication.pdf PDF
OSUT_1_01_50_00_Temporary_Construction_Faclities_and_Controls.pdf PDF
OSUT_1_08_11_13_Steel_Doors_and_Frames.pdf PDF
W911SF-19-R-0018-0001,_ARMOR_OSUT_1,_Amend_0001.pdf PDF
OSUT_1_26_28_01_Coordinated_Power_System_Protection.pdf PDF
OSUT_1_32_31_13_High-Security_Chain_Link_Fences.pdf PDF
Show 40 more

Latest 50 of 126 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification Date 15 February 2019

ONE UNIT STATION TRAINING – ARMOUR

(OUST-AR)

RANGE PROJECT #1 WARNER, OSCAR 14 &15

Fort Benning, Georgia

Prepared by:

Engineering Division, DPW 6650 Meloy Drive, Building 6 Fort Benning, GA 31905

Specifications Prepared by:

ArchitecturalC. Craig Davis R.A.
DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION

FORT BENNING, GEORGIA

Project #: AROO1

PROJECT TABLE OF CONTENTS DIVISION 01 - GEN ERAL REQUIREMENTS

SUMMARY OF WORK

PROJECT SCHEDULE

01
33
00

SUBMITTAL PROCEDURE

01
35
29

SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01
42
00

SOURCES FOR REFERENCE PUBLICATIONS

01
45
01

QUALITY CONTROL

01
50
00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01
50
61

DUST CONTROL

01
57
20.00
10
ENVIRONMENTAL PROTECTION
01
57
23.00
10
STORM WATER POLLUTION PREVENTION MEASURES
01
62
35

RECYCLED/ RECOVERED MATERIALS

01
74
19

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01
78
02.00
10
CLOSEOUT SUBMITTALS
01
78
23

OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41
00

DEMOLITION

02 84
16

PCB BALLASTS, TRANSFORMERS AND HAZARDOUS WASTE LAMP REMOVAL AND RECYLING

DIVISION 03 - CONCRETE

03
11
13.00
10
STRUCTURAL CONCRETE FORMWORK
03
15
13.00
10
EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS
03
20
01.00
10
CONCRETE REINFORCEMENT
03
31
00.00
10
CAST - IN -PLA CE STRUCTURAL CONCRETE

DIVISION 04 – MASONRY

04 20 00 MASONRY

04 21 13.13 NONBEARING MASONRY VENEER/STEEL STUD WALLS

DIVISION 05 - METALS

05 05
23

WELDING, STRUCTURAL

05 12
00

STRUCTURAL STEEL

05 21
19

OPEN WEB STEEL JOIST FRAMING

05 30
00

STEEL DECKS

05 50
13

MISCELLANEOUS METAL FABRICATIONS

05 51
00

METAL STAIRS

05 52
00

METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

15 FEBUARY 2018

OUST-IN RANGE PROJECTS

Fort Benning, Georgia

PROJECT TABLE OF CONTENTS Page 5

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13BOARD AND BLOCK INSULATION
07 21 16MINERAL FIBER BLANKET INSULATION
07 25 00.00 06BUILDING AIR BARRIER SYSTEM
07 27 26FLUID APPLIED AIR AND MOISTURE BARRIER

07 42 13 METAL WALL PANELS

07 60 00FLASHING AND SHEET METAL
07 61 14.00 20STEEL STANDING SEAM ROOFING
07 84 00FIRESTOPPING
07 92 00JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13STEEL DOORS AND FRAMES
08 33 13METAL ROLLING COUNTER DOORS
08 14 00WOOD DOORS
08 51 13ALUMINUM WINDOWS
08 71 00DOOR HARDWARE
08 81 00GLAZING
08 91 00METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00METAL SUPPORT ASSEMELIES
09 29 00GYPSUM BOARD
09 51 00ACOUSTICAL CEILINGS
09 65 00RESILIENT FLOORING
09 68 00CARPET
09 90 00PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 10 00VISUAL COMMUNICATIOKS SPECIALTIES
10 14 02INTERIOR SIGNAGE

10 22 13 WIRE MESH PARTITIONS

10 44 16 FIRE EXTINGUISHER CABINETS

DIVISION 11 – REFURBISHED EQUIPMENT

11 42 13 FOOD SERVING TABLES

DIVISION 12 - FURNISHINGS

12 24 13
12 48 13.13

ROLLER WINDOW SHADES

ENTRANCE FLOOR MATS

DIVISION 13 – SPECIAL CONSTRUCTION

13 12 05METAL ANGLE FRAMED BLEACHERS
13 34 19METAL BUILDING SYSTEMS

DIVISION 14 - Not Used

DIVISION 21 – Not Used

DIVISION 22 – Not Used

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23
00
00.00
40
GENERAL MECHANICAL PROVISIONS
23
00
00

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23
05
93

TESTING, ADJUSTING, AND BALANCING FOR HVAC

23
07
00

THERMAL INSULATION FOR MECHANICAL SYSTEMS

23
08
00

COMMISSIONING OF HVAC SYSTEMS

23
23
00

REFRIGERANT PIPING

23
34
23

POWER VENTILATORS

23
36
00

AIR TERMINAL UNITS

23
37
13

DIFFUSERS, REGISTERS, AND GRILLS

23
82
02.00
10
UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 25 - Not Used DIVISION 26 - ELECTRICAL

26
00
00

BASIC ELECTRICAL MATERIALS AND METHODS

26
20
00

INTERIOR DISTRIBUTION SYSTEM

26
28
01.00
10
COORDINATED POWER SYSTEM PROTECTION
26
41
01.00
10
LIGHTNING PROTECTION SYSTEM
26
51
00

INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00
EARTHWORK
31 11 00
CLEARING AND GRUBBING
31 23 00
ECAVATION AND FILL
31 31 16
SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 32 11
SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 0119FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIDGID PAVEMENTS
32 05 33LANDSCAPE ESTABLISHMENT
32 11 23AGGREGATE BASE COURSE
32 13 13.06PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES
32 15 00AGGREGATE SURFACE COURSE
32 17 24.00 10PAVEMENT MARKINGS
32 31 13.53HIGH -S ECURITY CHAIN LINK FENCES AND GATES
32 92 19SEEDING

33 40 00 STORM DRAINAGE UTILITIES

- - End of Project Table of Contents - -

SECTION 01 32 01.00 10

image1.png

File details come from the government source that posted it.