OSUT_1_07_27_26_Fluid_Applied_Air_and_Moisture_Barrier.pdf

PDF 40 KB Posted

Attached to
Armor OSUT 1
Solicitation number
W911SF-19-R-0018
Issued by

About this file

Fluid Applied Air Barrier

View the file

Other files

File Type Posted
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
W911SF19R00180004.pdf PDF
Lafayette_Pool_Oscar_15_Nad_83_Grading_Plan_Sheet_1_Amended_12_July_2019.._.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
44026_Stevon_Booker_Oscar_14_Nad_83_Grading_Plan_.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
W911SF19R00180003.pdf PDF
44026_Stevon_Booker_Oscar_14_Nad_83_Site_Plan_Mod.pdf PDF
Armor_OSUT_1__Questions.pdf PDF
OSUT_1_32_01_19_Field_Molded_Sealants_for_Sealing_Jts_In_Rigid_Pavg.pdf PDF
OSUT_1_08_33_13.00_10_Metal_Rolling_Counter_Doors.pdf PDF
OSUT_1_23_00_00_Air_Supply_Venti_and_Exhaust_Sys.pdf PDF
OSUT_1_01_35_29_Safety_and_Occupational_Health_Requirements.pdf PDF
OSUT_1_06_41_16_00_Laminate_Clad_Architectural_Casework.pdf PDF
OSUT_1_26_41_01_Lightning_Protection_System.pdf PDF
OSUT_1_05_30_00_Steel_Decks.pdf PDF
OSUT_1_09_51_00_Acoustical_Ceilings.pdf PDF
OSUT_1_05_51_00_Metal_Stairs.pdf PDF
OSUT_1_01_78_02_00_10_Closeout_Submittals.pdf PDF
OSUT_1_Latrine_Combined.pdf PDF
OSUT_1_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
OSUT_1_11_42_01_Food_Serving_Tables.pdf PDF
OSUT_1_01_45_01_Quality_Control.pdf PDF
OSUT_1_01_78_23_Operation_an_Maintenace_Data.pdf PDF
OSUT_1_10_14_02_Interior_Signage.pdf PDF
OSUT_1_23_37_13_Diffusers,_Registers,_and_Grills.pdf PDF
OSUT_1_Control_Tower_CMU_Combined.pdf PDF
OSUT_1_07_84_00_Firestopping.pdf PDF
OSUT_1_06_10_00_Rough_Carpentry.pdf PDF
OSUT_1_09_65_00_Resilient_Flooring.pdf PDF
OSUT_1_01_11_0_Summary_of_Work.pdf PDF
OSUT_1_02_84_16_PCB_Trans_Hazard_Waste_Lamp_Removal.pdf PDF
OSUT_1_23_23_00_Refrigerant_Piping.pdf PDF
OSUT_1_07_25_00_Building_Air_Barrier_System.pdf PDF
OSUT_1_C2_Facility_Combined.pdf PDF
OSUT_1_44026_Stevon_Booker_Oscar_14_Nad_83_Site_Plan_Mod.pdf PDF
OSUT_1_09_90_00_Paints_and_Coatings.pdf PDF
OSUT_1_01_42_00_Sources_for_Referencece_Publications.pdf PDF
OSUT_1_12_24_13_Roller_Window_Shades.pdf PDF
OSUT_1_08_91_00_Metal_Wall_Louvers.pdf PDF
OSUT_1_28_31_76_Interior_Fire_Alarm_and_Mass_Notification_Sys.pdf PDF
OSUT_1_23_05_93_Testing,_Adjusting,_and_Balancing_for_HVAC.pdf PDF
OSUT_1_05_50_13_Miscellaneous_Metal_Fabrication.pdf PDF
OSUT_1_01_50_00_Temporary_Construction_Faclities_and_Controls.pdf PDF
OSUT_1_08_11_13_Steel_Doors_and_Frames.pdf PDF
W911SF-19-R-0018-0001,_ARMOR_OSUT_1,_Amend_0001.pdf PDF
OSUT_1_26_28_01_Coordinated_Power_System_Protection.pdf PDF
OSUT_1_32_31_13_High-Security_Chain_Link_Fences.pdf PDF
Show 40 more

Latest 50 of 126 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OUST-AR RANGE PROJECTS FY19

SECTION 07 27 26

FLUID APPLIED AIR AND MOISTURE BARRIER

PART 1 GENERAL

1.1 DEFINITIONS

Fluid-applied air and water-resistive barrier that stops air and water leakage in cavity wall and masonry veneer construction.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 2369 (2007) Volatile Content of Coatings

ASTM E 2357 Standard Test Method for Determining Air Leakage of Air Barrier Assemblies

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-04 Samples

Samples; G

1.8 PROJECT CONDITIONS

1.8.1 Environmental Requirements

Surface and ambient temperatures should be 40 degrees F. and rising and below 100 degrees F. during application and drying period.

PART 2 PRODUCTS

2.1 MATERIALS

A. Spray Wrap: Ready-mixed, flexible, acrylic coating to be applied to sheathing or CMU backup.

a. Total Solids: 74 percent per ASTM D 2369.

b. VOC CONTENT: <100 g/L. Complies with all known national, state and district AIM VOC regulations.

c. FLASH POINT: >200° F (> 93° C)

d. FREEZE POINT: 32° F (0° C)

B. Tape: Self-adhering, glass fiber, fabric tape for use fill to reinforce rough openings, inside and outside corners and sheathing joints.

a. Size: 4.25-in or 9.5-in wide self-adhesive, flexible, symmetrical, interlaced glass fiber fabric, with alkaline resistant coating.

C. Joint Fabric: Non-woven reinforcement fabric for use on sheathing joints, inside or outside corners and rough openings.

Size: 4.00-in or 6.00-in wide

D. Transition Membrane: Self-adhering water-resistive air barrier material works as a secondary seal for sealant joints or as an air barrier connection material which bridges dissimilar materials.

Size: 6 or 9 inch.

E. PERFORMANCE REQUIREMENTS

1. Air Leakage of Air Barrier Assemblies: Less than 0.04 dfm/ft2@1.57 psf per ASTM E 2357.

2. Surface Burning Characteristics per ASTM E 84.

PART 3 EXECUTION

3.2 PREPARATION

Surfaces should be clean, dry and in good repair before application.

Prepare surfaces according to manufacturer's written instructions.

Protect people, vehicles, property, plants and all surfaces not designated to receive treatment from the product splash and wind drift.

Test a small area of each surface to confirm suitability and desired results before starting overall application.

Prime according to manufacturer's instructions, if recommended.

3.4 INSTALLATION

1. Liberally apply Spray Wrap by spray or roller to all vertical and horizontal sheathing joints.

2. Embed Joint Fabric in the wet Spray Wrap.

3. Apply Spray Wrap over the Joint Fabric. Spot over-driven fasteners and surface defects with Fill or paintable caulk. Let dry.

4. Spray or roller apply Spray Wrap to the entire surface - including areas covered by Joint Fabric and Spray Wrap - to a uniform wet mil thickness of 10 mils. Let dry. This is just enough for the wet film to hide the black ink on the sheathing, which will show slightly after drying.

3.7 ADJUSTING AND CLEANING

Clean tools and equipment with water immediately after use. Dried material must be removed mechanically.

-- End of Section --