OUST-AR RANGE PROJECTS FY19
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 665 (2006) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C 930 (2005) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D 3833/D 3833M (1996; R 2006) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM D 4397 (2009) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM E 136 (2009a) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C
ASTM E 84 (2009c) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E 96/E 96M (2005) Standard Test Methods for Water Vapor Transmission of Materials
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 211 (2010) Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
NFPA 31 (2006; Errata 2006; Errata 2007) Installation of Oil Burning Equipment
NFPA 54 (2008) National Fuel Gas Code
NFPA 70 (2008; AMD 1 2008) National Electrical Code - 2008 Edition
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T803 OM (2006) Puncture Test of Container Board
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data; G
Blanket insulation
Sill sealer insulation
Vapor retarder
Pressure sensitive tape
Accessories
SD-08 Manufacturer's Instructions
Insulation
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.3.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.4 SAFETY PRECAUTIONS
1.4.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134.
1.4.2 Smoking
Do not smoke during installation of blanket thermal insulation.
1.4.3 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C 930.
PART 2 PRODUCTS
2.1 BLANKET INSULATION
ASTM C 665, Type II, blankets with non-reflecting coverings and Class A, membrane-faced surface with a flame spread of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E 84.
2.1.1 Thermal Resistance Value (R-VALUE)
As indicated on drawings.
2.1.2 Recycled Materials
Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:
Rock Wool: 75 percent slag Fiberglass: 20 to 25 percent glass cullet
2.1.3 Prohibited Materials
Do not provide asbestos-containing materials.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
3.3 INSTALLATION
3.3.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.3.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.3.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions.
Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.
3.3.1.3 Installation at Bridging and Cross Bracing
Butt insulation at bridging.
-- End of Section --