OSUT_1_03_11_13_00_10_Structural_Concrete_Formwork.pdf
PDF 63 KB Posted
- Attached to
- Armor OSUT 1 Federal contract opportunity
- Solicitation number
- W911SF-19-R-0018
About this file
Structural Concrete
View the file
Other files for this federal contract opportunity
Show all 50
Armor OSUT 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OUST-AR RANGE PROJECTS FY19
SECTION 03 11 13.00 10
STRUCTURAL CONCRETE FORMWORK
05/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ACI INTERNATIONAL (ACI)
ACI 347 (2004) Guide to Formwork for Concrete
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (2004) Basic Hardboard
APA - THE ENGINEERED WOOD ASSOCIATION (APA)
APA PS 1 (1995) Voluntary Product Standard for Construction and Industrial Plywood
ASTM INTERNATIONAL (ASTM)
ASTM C 1074 (2004) Standard Practice for Estimating Concrete Strength by the Maturity Method
ASTM C 1077 (2009b) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation
ASTM C 31/C 31M (2009) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C 39/C 39M (2009) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C 578 (2009e1) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
1.2 SYSTEM DESCRIPTION
The design, engineering, and construction of the formwork is the responsibility of the Contractor. Design formwork in accordance with methodology of ACI 347 for anticipated loads, lateral pressures, and stresses, and capable of withstanding the pressures resulting from placement and vibration of concrete. Comply with the tolerances specified in Section 03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE, paragraph
CONSTRUCTION TOLERANCES. However, for surfaces with an ACI Class A surface designation, limit the allowable deflection for facing material between studs, for studs between walers and walers between bracing to 0.0025 times the span. Design the formwork as a complete system with consideration given to the effects of cementitious materials and mixture additives such as fly ash, cement type, plasticizers, accelerators, retarders, air entrainment, and others. Monitor the adequacy of formwork design and construction prior to and during concrete placement as part of the Contractor's approved Quality Control Plan.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Formwork; G
Drawings showing details of formwork, including dimensions joints, supports, studding and shoring, and sequence of form and shoring removal.
SD-03 Product Data
Design
Design analysis and calculations for form design and methodology used in the design.
Form Materials
Manufacturer's data including literature describing form materials, accessories, and form releasing agents.
Form Releasing Agents
Manufacturer's recommendation on method and rate of application of form releasing agents.
SD-04 Samples
Sample Panels; G
After shop drawings have been reviewed, sample panels for Class A finish with applied architectural treatment shall be built on the project site where directed.
SD-06 Test Reports
Inspection
Field inspection reports for concrete forms and embedded items.
Formwork Not Supporting Weight of Concrete; G.
If forms are to be removed in less than 24 hours on formwork not supporting the weight of concrete, the evaluation and results of the control cylinder tests or maturity instrumentation shall be submitted to and approved before the forms are removed.
SD-07 Certificates
Fiber Voids
Certificates attesting that fiber voids conform to the specified requirements.
1.4 QUALITY ASSURANCE
Sample Panels shall be of sufficient size to contain joints and shall be not less than 6 feet long and 4 feet wide. The panels shall be of typical wall thickness and constructed containing the full allocation of reinforcing steel that will be used in the structure, with the forming system that duplicates in every detail the one that will be used in construction of the structure. Use the same concrete mixture proportion and materials, the same placement techniques and equipment, and the same finishing techniques and timing that are planned for the structure.
Construction of Class A finish will not be permitted until sample panels have been approved. Protect sample panels from construction operations in a manner to protect approved finish, and are not to be removed until all Class A finish concrete has been accepted.
1.5 DELIVERY, STORAGE, AND HANDLING
Store fiber voids above ground level in a dry location. Fiber voids shall be kept dry until installed and overlaid with concrete.
PART 2 PRODUCTS
2.1 FORM MATERIALS
2.1.1 Forms For Class A Finish
Forms for Class A finished surfaces shall be plywood panels conforming to APA PS 1, Grade B-B concrete form panels, Class I or II. Other form materials or liners may be used provided the smoothness and appearance of concrete produced will be equivalent to that produced by the plywood concrete form panels. Forms for round columns shall be the prefabricated seamless type.
2.1.2 Forms For Class B Finish
This class of finish shall apply to all surfaces except those specified to receive Class A, Class C, or Class D. Forms for Class B finished surfaces shall be plywood panels conforming to APA PS 1, Grade B-B concrete form panels, Class I or II. Other form materials or liners may be used provided the smoothness and appearance of concrete produced will be equivalent to that produced by the plywood concrete form panels.
2.1.3 Forms For Class C Finish
Forms for Class C finished surfaces shall be shiplap lumber; plywood conforming to APA PS 1, Grade B-B concrete form panels, Class I or II;
tempered concrete form hardboard conforming to AHA A135.4; other approved concrete form material; or steel, except that steel lining on wood sheathing shall not be used.
2.1.4 Forms For Class D Finish
Forms for Class D finished surfaces, except where concrete is placed against earth, shall be wood or steel or other approved concrete form material.
2.1.5 Retain-In-Place Metal Forms
Retain-in-place metal forms for concrete slabs and roofs shall be as specified in Section 05 30 00 STEEL DECKS.
2.1.7 Form Ties
Form ties shall be factory-fabricated metal ties, shall be of the removable or internal disconnecting or snap-off type, and shall be of a design that will not permit form deflection and will not spall concrete upon removal.
Provide solid backing for each tie. Except where removable tie rods are used, ties shall not leave holes in the concrete surface less than 1/4 inch nor more than 1 inch deep and not more than 1 inch in diameter. Terminate the embedded portion of metal ties not less that 2 inches from any concrete surface exposed to water. Removable tie rods shall be not more than 1-1/2 inches in diameter. Plastic snap ties may be used in locations where the surface will not be exposed to view.
Removable tie rods are not to be used in the vault walls that are also exterior walls.
2.1.8 Form Releasing Agents
Form releasing agents shall be commercial formulations that will not bond with, stain or adversely affect concrete surfaces. Agents shall not impair subsequent treatment of concrete surfaces depending upon bond or adhesion nor impede the wetting of surfaces to be cured with water or curing compounds. If special form liners are to be used, the Contractor shall follow the recommendation of the form coating manufacturer.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Formwork
Forms shall be constructed true to the structural design and required alignment. Forms shall be mortar tight, properly aligned and adequately supported to produce concrete surfaces meeting the surface requirements specified in Section 03 31 00.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE and conforming to construction tolerance given in TABLE 1. Continuously monitor the alignment and stability of the forms during all phases to assure the finished product will meet the required surface class specified. Failure of any supporting surface either due to surface texture, deflection or form collapse shall be the responsibility of the Contractor as will the replacement or correction of unsatisfactory surfaces. Where concrete surfaces are to have a Class A or Class B finish, joints in form panels shall be arranged as approved. When forms for continuous surfaces are placed in successive units, care shall be taken to fit the forms over the completed surface to obtain accurate alignment of the surface and to prevent leakage of mortar. Forms shall not be re-used if there is any evidence of defects which would impair the quality of the resulting concrete surface. All surfaces of used forms shall be cleaned of mortar and any other foreign material before reuse. Form ties that are to be completely withdrawn shall be coated with a nonstaining bond breaker.
3.2 CHAMFERING
All exposed joints, edges and external corners shall be chamfered by molding placed in the forms unless the drawings specifically state that chamfering is to be omitted or as otherwise specified. Chamfered joints shall not be permitted where earth or rockfill is placed in contact with concrete surfaces. Chamfered joints shall be terminated twelve inches outside the limit of the earth or rockfill so that the end of the chamfers will be clearly visible.
3.3 COATING
Forms for Class A and Class B finished surfaces shall be coated with a form releasing agent before the form or reinforcement is placed in final position. The coating shall be used as recommended in the manufacturer's printed or written instructions. Forms for Class C and D finished surfaces may be wet with water in lieu of coating immediately before placing concrete, except that in cold weather with probable freezing temperatures, coating shall be mandatory. Surplus coating on form surfaces and coating on reinforcing steel and construction joints shall be removed before placing concrete.
3.4 FORM REMOVAL
Forms shall not be removed without approval. The minimal time required for concrete to reach a strength adequate for removal of formwork without risking the safety of workers or the quality of the concrete depends on a number of factors including, but not limited to, ambient temperature, concrete lift heights, type and amount of concrete admixture, and type and amount of cementitious material in the concrete. It is the responsibility of the Contractor to consider all applicable factors and leave the forms in place until it is safe to remove them. In any case forms shall not be removed unless the minimum compressive strength requirements below are met, except as otherwise directed or specifically authorized. When conditions are such as to justify the requirement, forms will be required to remain in place for a longer period. All removal shall be accomplished in a manner which will prevent damage to the concrete and ensure the complete safety of the structure. Where forms support more than one element, the forms shall not be removed until the form removal criteria are met by all supported elements. Form removal shall be scheduled so that all necessary repairs can be performed as specified in Section 03 31 00.00 10, paragraph 3.11 Repairs. Evidence that concrete has gained sufficient strength to permit removal of forms shall be determined by tests on control cylinders. All control cylinders shall be stored in the structure or as near the structure as possible so they receive the same curing conditions and protection methods as given those portions of the structure they represent. Control cylinders shall be removed from the molds at an age of no more than 24 hours. All control cylinders shall be prepared and tested in accordance with ASTM C 31/C 31M and ASTM C 39/C 39M at the expense of the Contractor by an independent laboratory that complies with ASTM C 1077 and shall be tested within 4 hours after removal from the site.
3.4.1 Formwork Not Supporting Weight of Concrete
Formwork for walls, columns, sides of beams, gravity structures, and other vertical type formwork not supporting the weight of concrete shall not be removed in less than 24 hours after concrete placement is completed. Form removal before 24 hours will be allowed for simple floor slab, sidewalks, and driveways provided the ambient temperature during this period has not fallen below 50 degrees F at any time since placement and evidence from compressive tests on field-cured concrete control cylinders indicates that the concrete has attained a compressive strength of at least 1500 psi.
Control cylinders shall be prepared for each set of forms to be removed before 24 hours. The stability of the concrete shall be evaluated by a structural engineer prior to removal of the forms.
3.4.2 Formwork Supporting Weight of Concrete
Formwork supporting weight of concrete and shoring shall not be removed until structural members have acquired sufficient strength to safely support their own weight and any construction or other superimposed loads to which the supported concrete may be subjected. As a minimum, forms shall be left in place until control concrete test cylinders indicate evidence the concrete has attained at least 80 percent of the compressive strength required for the structure in accordance with the quality and location requirements.
3.5 INSPECTION
Forms and embedded items shall be inspected in sufficient time prior to each concrete placement in order to certify to the Contracting Officer that they are ready to receive concrete. The results of each inspection shall be reported in writing.
TABLE 1
TOLERANCES FOR FORMED SURFACES
1. Variations from the plumb:
a. In the lines and surfaces of columns, piers, walls and in arises
1/4 inch in any 10 feet of length Maximum for entire length -- 1 inch
b. For exposed corner columns, control-joint grooves, and other conspicuous lines
1/4 inch in any 20 feet of length Maximum for entire length -- 1/2 inch
2. Variation for the level or from the grades indicated on the drawings:
TABLE 1
TOLERANCES FOR FORMED SURFACES
a. In slab soffits, ceilings beam soffits, and in arises,measured before removal of supporting shores
1/4 inch in any 10 feet of length 3/8 inch in any bay or in any 20 feet of length Maximum for entire length -- 3/4 inch
b. In exposed lintels, sills, parapets, horizontal grooves, and other conspicuous lines
1/4 inch in any bay or in any 20 feet of length Maximum for entire length -- 1/2 inch
3. Variation of the linear building lines from established position in plan
1/2 inch in any 10 feet 1 inch maximum
4. Variation of distance between walls, columns, partitions
1/4 inch per 10 feet of distance, but not more than 1/2 inch in any one bay, and not more than 1 inch total variation
5. Variation in the sizes and locations of sleeves, floor openings, and wall opening
Minus 1/4 inch, Plus 1/2 inch
6. Variation in cross-sectional dimensions of columns and beams and in the thickness of slabs and walls
Minus 1/4 inch, Plus 1/2 inch
7. Footings:
a. Variation of dimensions in plan Minus 1/2 inch, plus 2 inches when formed or plus 3 inches when placed against unformed excavation
b. Misplacement of eccentricity 2 percent of the footing width in the direction of misplacement but not more than 2 inches
c. Reduction in thickness Minus 5 percent of the specified thickness
8. Variation in steps:
a. In a flight of stairs Riser -- 1/8 inch Tread -- 1/4 inch
TABLE 1
TOLERANCES FOR FORMED SURFACES
b. In consecutive steps Riser -- 1/16 inch Tread -- 1/8 inch
-- End of Section --