This document is a Solicitation Amendment for a paving contract at Joint Base Lewis-McChord, Washington, specifically Amendment 0003 dated 14 July 2025. The amendment makes four key revisions to the original solicitation: 1) incorporating formulas for calculating total aggregate cost for each ELIN (Equipment Line Item Number), 2) adding a note to the bottom of Technical Exhibit A - ELIN Bid Schedule, 3) revising CLIN 0001 Description, and 4) changing CLIN 0001's cost constraint to "EST" (Estimated). Contractors are required to use the updated "Technical Exhibit A - ELIN Bid Schedule Rev2 (14 July 2025)" when submitting proposals and must include acknowledgement of this amendment in their proposal submission. The contract involves paving work, including furnishing labor, equipment, materials, transportation, and supervision for roadway and airfield paving projects, with all associated pricing to include transportation, equipment, labor, materials, supervision, profit, and performance & payment bonds.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
Amendment 0003 revises the following:
1. Revision of Technical Exhibit A to incorporate formulas for calculating total aggregate cost for each ELIN; When submitting your proposal, ensure that you use the ELIN Bid Scheduled titled "Technical Exhibit A - ELIN Bid Schedule Rev2 (14 July 2025)".
2. Add note to the bottom of Technical Exhibit A - ELIN Bid Schedule Rev2 (14 July 2025)
3. Revise CLIN 0001 Description
4. Revise CLIN 0001 to reflect "EST" for Cost Constraint
Acknowledgement of receipt of Amendment 0003 shall be included in your proposal submission
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO CHANGED
BY
Description
Paving - Contractor shall furnish all labor, equipment, materials, transportation, and supervision in the performance of paving and incidental related work in accordance with the attached Statement of Work. Joint Base Lewis-McChord Contract Line Item Number 0001 is the summation of total prices from the Bid Schedule (Technical Exhibit 1). CLIN pricing shall include all transportation, equipment, labor, materials, supervision, profit, performance & payment bonds. PSC: Z2LB
Paving - Contractor shall furnish all labor, equipment, materials, transportation, and supervision in the performance of paving and incidental related work in accordance with the attached Statement of Work.
Technical Exhibit A - ELIN Bid CLIN Schedule pricing shall include all transportation, equipment, labor, materials supervision, profit, and performance & payment bonds.
PSC: Z2LB
Cost Constraints Estimated
W911S825BA0120003
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0003 |
| EffDate: 14 JUL 2025 |
| ReqNo: |
| ProjNo: PANMCC-24-P-0000 024098 |
| IssCode: W911S8 |
| AdmCode: |
| IssuedBy: W6QM MICC-JB LEWIS-MC CHORD |
DIRECTORATE OF CONTRACTING, BLDG 2015 4TH ST BOX 339500 MS 19
JOINT BASE LEWIS MCCH, WA 98433-9500
UNITED STATES
KRISTEN CARTER, EMAIL: KRISTEN.D.CARTER6.CIV@ARMY.MIL TELEPHONE: 520-714-8391
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911S825BA012 |
| SolDate: 24 JUN 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: SEE SCHEDULE |
| ContNameTitle: |
| CoNameTitle: ANGELA K, CHAPLINSKI |
| ContDate: |
| CODate: 14 JUL 2025 |