Technical Exhibit P - SUBMITTAL REGISTER.PDF

PDF 312 KB Posted

Attached to
Paving IDIQ at JBLM, WA Federal contract opportunity
Solicitation number
W911S825BA012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

About this file

The Submittal Register is a comprehensive document for the LACPO IDIQ (Indefinite Delivery/Indefinite Quantity) contract detailing the extensive documentation and product submittals required across multiple construction and infrastructure disciplines. The register covers preconstruction submittals, product data, shop drawings, test reports, certificates, and closeout documentation for sections including environmental protection, demolition, irrigation, landscaping, lighting, utilities, fencing, concrete work, and drainage systems.

Key submittal categories include preconstruction items like environmental protection plans, employee training records, sustainable material documentation, shop drawings for specific equipment and infrastructure components, test reports verifying material and installation quality, manufacturer certificates, and operational maintenance data. The document is structured to track each submittal's classification (G for general, S for sustainable), required approvals, and specific paragraph references, providing a comprehensive tracking mechanism for the contractor's documentation responsibilities throughout the project lifecycle at Joint Base Lewis-McChord.

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ at JBLM, WA, newest first.
File Type Posted
Conformed Solicitation - W911S825BA012-0006.pdf PDF
Solicitation Amendment W911S825BA012-0006.pdf PDF
Solicitation Amendment W911S825BA012-0005.pdf PDF
Conformed Solicitation - W911S825BA012-0005.pdf PDF
Technical Exhibit E - General Decision WD WA20250001 18 July 2025.pdf PDF
Solicitation Amendment W911S825BA012-0004.pdf PDF
Solicitation Amendment W911S825BA012-0003.pdf PDF
Technical Exhibit A - ELIN Bid Schedule Rev2 (14 July 2025).xlsx XLSX spreadsheet
Solicitation Amendment W911S825BA012-0002.pdf PDF
Technical Exhibit A - ELIN Bid Schedule Rev1 (8 July 2025).xlsx XLSX spreadsheet
Solicitation Amendment W911S825BA012-0001.pdf PDF
Technical Exhibit B - ELIN Descriptions.pdf PDF
Technical Exhibit C - Statement of Work.pdf PDF
Technical Exhibit A - ELIN Bid Schedule.xlsx XLSX spreadsheet
Technical Exhibit K - Division 26 - Electrical.pdf PDF
Technical Exhibit L - Division 31 - Earthwork.pdf PDF
Technical Exhibit Q - WAWF_CEFMS Checklist.pdf PDF
Technical Exhibit E - General Decision Number WD - WA20250001.pdf PDF
Technical Exhibit F- Final Specifications Table of Contents.pdf PDF
Technical Exhibit G - Division 01 - General Requirements.pdf PDF
Technical Exhibit J - Division 10 - Specialties.pdf PDF
Technical Exhibit B - ELIN Descriptions.docx DOCX document
Technical Exhibit H - Division 02 - Existing Conditions.pdf PDF
Technical Exhibit M - Division 32 - Exterior Improvements.pdf PDF
W911S825BA012.pdf PDF
Technical Exhibit C - Statement of Work.docx DOCX document
Technical Exhibit D - Standards Plans Drawings.pdf PDF
Technical Exhibit N - Division 33 - Stormwater Utilities.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 32 PAGES

LACPO IDIQ

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey

1.10 GSolid Waste Management Permit

1.5.2 GRegulatory Notifications

1.4.2 GEnvironmental Protection Plan

1.6 GEnvironmental Protection Plan

3.2.1.2 GStormwater Notice of Intent

1.6.4.1Stormwater Pollution Prevention

Plan

1.6.4.6 GDirt and Dust Control Plan

1.5.5 GEmployee Training Records

1.5.5 GEmployee Training Records

3.8.2 GHazardous Materials

1.13.4 G SEPA-Designated

Recovered/Recycled Materials

1.13.5 G SUSDA-Designated Biobased

Products

1.13.1 G SEnergy Star or FEMP-Designated

Products

1.13.2 G SWaterSense-Designated

Products and Services

1.13.8 G SEPEAT-Designated Products

1.13.3 G SLow-Emitting Products and

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 32 PAGES

01 57 19 1.13.5 G SRapidly Renewable Materials

1.13.6 G SRefrigerants and Chemical Fire

Suppressants

1.13.7 G SWood Materials

1.13.9 G SThird-Party Ecolabels

1.13.11 G SSustainable Acquisition Exception

Form (HJB Form 225) SD-03 Product Data

3.8.2 GHazardous Materials

3.8.2 GHazardous Material Inventory

SD-06 Test Reports 3.7.1.1.2Laboratory Analysis 3.2.1.3Construction Inspection Reports

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.5.5 GEmployee Training Records

1.5.5 GEmployee Training Records

1.5.5Erosion and Sediment Control

Inspector 1.4.2.2Environmental Officers, Hazardous Material Technicians, and Hazardous Waste Technicians

1.5.4Environmental Officers, Hazardous Material Technicians, and Hazardous Waste Technicians

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 32 PAGES

01 57 19 1.6.1.2Environmental Officers, Hazardous Material Technicians, and Hazardous Waste Technicians

1.5.5.1Pesticide Applicators 3.13.1Pesticide Applicators 3.5.5Heating and Air Conditioning

Technicians

1.13.2 G SIrrigation System Design, Installation, Maintenance, or Auditing

1.13.7 G SWood Materials

SD-11 Closeout Submittals

3.2.1.4 GStormwater Notice of Termination

3.7.1 GWaste Determination and Profile

Documentation

3.7.3.3.1 GDisposal Documentation for

Hazardous and Regulated Waste GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.3.1 GHazardous Waste/Debris

Management

1.5.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 32 PAGES

01 57 19 1.13.4 G SEPA-Designated Recovered/Recycled Materials

1.13.5 G SUSDA-Designated Biobased

Products

1.13.1 G SEnergy Star or FEMP-Designated

Products

1.13.2 G SWaterSense-Designated

Products and Services

1.13.8 G SEPEAT-Designated Products

1.13.3 G SLow-Emitting Products and

Materials

1.13.5 G SRapidly Renewable Materials

1.13.6 G SRefrigerants and Chemical Fire

Suppressants

1.13.7 G SWood Materials

1.13.9 G SThird-Party Ecolabels

1.13.11 G SSustainable Acquisition Exception

Form (HJB Form 225) 01 74 19 SD-01 Preconstruction Submittals

1.7Construction Waste Management Plan

1.7Construction Waste Management Plan

GJBLM DPW ED Solid Waste and Recycling Program and JBLM

YTC DPW ED.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 32 PAGES

01 74 19 SD-06 Test Reports 1.9.2HJB Form 229

GCOR or PM 1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report 02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

GDeconstruction Plan

1.10Existing Conditions SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.3.3Receipts 3.3.4Receipts

3.5.3 G DPW HJB Form 224

02 82 00 SD-01 Preconstruction Submittals SMastic Removers (Biobased

Content) SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 32 PAGES

02 82 00 3.1.7 GLocal Exhaust Equipment

3.1.7 GPressure Differential Automatic

Recording Instrument

3.1.8 GVacuums

GGlovebags SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2.12.5 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 32 PAGES

02 82 00 1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

2.1 GEncapsulants

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.8 GVacuums

3.1.8 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits and Licenses

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control Records

1.5.8 GProtective Clothing

Decontamination Facility Notification

1.7.1 GRental Equipment

SMastic Removers (Biobased

Content) 02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 32 PAGES

02 83 00 1.5.2.3 GOccupational and Environmental Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.4 GLicenses, Permits and

Notifications

1.5.5 GOccupant Protection Plan

1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan GInitial Sample Results

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1 GRespirators

1.6.4 GVacuum Filters

GNegative Air Pressure System

2.1 GMaterials and Equipment

2.1.1 GExpendable Supplies

GLocal Exhaust Equipment GPressure Differential Automatic

Recording Instrument GPressure Differential Log

SD-06 Test Reports GSampling and Analysis

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 32 PAGES

02 83 00 1.5.2.3 GOccupational and Environmental Assessment Data Report

1.5.2.3 GSampling Results

1.5.3 GPressure Differential Recordings

For Local Exhaust System SD-07 Certificates

1.5.1.3 GTesting Laboratory

GThird Party Consultant

Qualifications GOccupant Notification GNotification of the

Commencement of LBP Hazard Abatement

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets 03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.2.2Quality Control Procedures SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data 2.1.1Standard Precast Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 32 PAGES

03 42 13.00 10 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.6Accessories

SD-05 Design Data

2.1.2 GDesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SD-07 Certificates 1.3.2.2Quality Control Procedures

SD-11 Closeout Submittals

2.2.1 SRecycled content for fly ash and

pozzolan

2.2.1 SRecycled content for Ground Iron

Blast-Furnace Slag

2.2.1 SRecycled content for Silica Fume

2.2.1 SRecycled content for Synthetic

Fiber Reinforcement

2.2.1 SRecycled content for steel

10 14 53 SD-03 Product Data 2.1Traffic Sign Posts

FHWA Acceptance Letter 2.4Traffic Sign Retroreflective

Sheeting SD-04 Samples

2.6.2Flexible Posts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 32 PAGES

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

1.6.1 GLED Luminaire Warranty

SD-02 Shop Drawings

1.5.1.1 GLuminaire Drawings

1.5.1.2 GPoles

SD-03 Product Data

2.1 SEnergy Star Label for LED

Luminaire Product

2.1.2 GLuminaire Light Sources

2.1.3 GLuminaire Power Supply Units

(Drivers)

2.3.3 GLighting Contactor

2.3.2 GTime Switch

2.3.4 GLighting Control Relay Panel

2.3.5 GMotion Sensor

2.3.1 GPhotocell

GConcrete Poles GAluminum Poles

2.4.1 GSteel Poles

2.5Brackets

2.2 GObstruction Marker Luminaires

SD-04 Samples

2.1 GLED, Luminaires

SD-05 Design Data

1.5.3 GDesign Data for Luminaires

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 32 PAGES

26 56 00 SD-06 Test Reports

1.5.4 GLED Luminaire - IES LM-79 Test

Report

1.5.5 GLED Light Source - IES LM-80

Test Report 3.2Operating Test

SD-07 Certificates

1.6.1 GLuminaire Useful Life Certificate

SD-08 Manufacturer’s Instructions Concrete Poles Fiberglass Poles

SD-10 Operation and Maintenance Data

1.6.2Electronic Ballast Warranty 1.7Operational Service

26 56 13.00 40 SD-02 Shop Drawings

1.3.2 GPoles

1.3.2 GInstallation Details

SD-03 Product Data

1.3.1 GLocal/Regional Materials

1.3.2 GSteel Poles

1.3.2 GBrackets

1.3.2 GAnchorage Systems

SD-05 Design Data

2.2.1 GLighting Standards

1.5.1.1 GSoil Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 32 PAGES

26 56 13.00 40 GSeismic Design Data

1.3.2 GManufacturer's Catalog Data

1.5.4 GManufacturer's Color Charts and

Chips

1.3.2 GSafety Data Sheets

SD-07 Certificates

1.3.1 GSustainable Acquisition

SD-08 Manufacturer’s Instructions

1.3.2 GFoundation Requirements

2.1 GMounting Details

SD-10 Operation and Maintenance Data

1.3.1 GOperational Service

SD-11 Closeout Submittals

1.3.2 GWarranty

3.3.1 GRecord Drawings

26 56 19.00 40 SD-01 Preconstruction Submittals

1.2 GMaterial, Equipment, and Fixture

Lists

1.2 GEquipment and Performance

Data SD-02 Shop Drawings

2.2 GStreet-Lighting Luminaires

3.1 GInstallation Drawings

SD-03 Product Data

2.1 GStreet-Lighting Fixtures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 32 PAGES

26 56 19.00 40 2.2 GStreet-Lighting Luminaires SD-06 Test Reports

3.2.1Operational Tests SD-07 Certificates

1.2Lighting-Distribution Certificates SD-11 Closeout Submittals

3.3Warranty 26 56 20 SD-01 Preconstruction Submittals

1.6.5 GProtection plan

3.18.2 GTraining

SD-02 Shop Drawings

2.1 GLighting and visual navigation

aids GWave-off system GLanding signal officer (LSO) control panel

2.3.1 GApproach Lighting Frangible

Towers

2.13 GWind Cone Indicator Assembly

Connection

3.18.4 GPosted instructions

SD-03 Product Data GSimulated carrier deck lighting system

2.2.1 GPilot relay panel

2.2.2 GControl transfer panel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 32 PAGES

26 56 20 2.2.4 GAirfield lighting control and monitoring system

2.3 GApproach lighting systems

2.3.2.3 GType L-823

2.3.4.1 GPrecision approach path indicator

system 2.3.4.2Chase helicopter approach path indicator system

2.4.1 GRunway edge lights

2.4.2 GRunway threshold and end lights

2.4.3 GRunway centerline lights, tailhook

operations

2.4.4 GRunway centerline lights, non-tailhook operations

2.4.5 GRunway touchdown zone lights, tailhook operations

2.5.1 GTaxiway edge lights

2.5.2 GTaxiway centerline lights

2.5.7 GRunway hold position lights

2.6.3 GGuidance signs

2.6.4 GRunway distance remaining signs

2.6.5 GArresting gear markers

2.10 GObstruction lighting

GWheels-up system GWave-off system

2.11 GLight bases

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 32 PAGES

26 56 20 2.13 GWind direction indicator

2.14.1 GAirfield rotating beacon

2.14.2Helipad/heliport beacon

2.14.3 GAirfield identification/code beacon

2.17 GIsolation transformers

2.17.1 GEncapsulated isolation

transformers

2.17.2 GIsolation transformers for

frangible towers

2.20 GConstant current regulators

3.11 GConstant current regulators

3.16.7 GConstant current regulators

2.21 GCircuit selector switch

2.22.1.6 GControl cable

2.22.2.7 GFrangible couplings

2.22.6 GType P-605

2.22.6 GType P-606

1.6.2 GMaterials and equipment

SD-06 Test Reports

3.15 GVisual inspection

3.15.1 GVisual inspection

3.16 GPhotometric testing

3.16.1 GAirfield guidance signs

3.16.4 GAirfield guidance signs

3.16.1 GDischarge-type flashing light

equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 32 PAGES

26 56 20 3.16.5 GDischarge-type flashing light equipment

3.16.1 GPAPIs

3.16.6 GPAPIs

3.15.5 GProgress testing for series

lighting circuits

3.15.4 GCounterpoise system test and

inspection

3.15.2 GOperating test

3.15.3 GDistribution conductors, 600-volt

class

3.15.6 GElectrical acceptance tests

3.15.7 GLow-voltage continuity tests

3.15.8 GHigh-voltage insulation resistance

tests

2.20 GConstant current regulators

3.11 GConstant current regulators

3.16.7 GConstant current regulators

SD-07 Certificates

1.6.3 GQualifications of contractor

1.6.4 GQualifications of photometric

tester

2.23.1 GSpecial tools

3.18.2 GSpecial tools

3.1.5 G4-Jack positioning jig

3.1.5.1 GElevated light level

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 32 PAGES

26 56 20 3.2.3.2 GCrimping tool 3.2.3.3Cable penciler

3.19.1 GList of parts

SD-08 Manufacturer’s Instructions

3.18.4 GPosted instructions

SD-10 Operation and Maintenance Data

2.20 GConstant current regulators

3.11 GConstant current regulators

3.16.7 GConstant current regulators

2.14.1 GAirfield rotating beacon

2.3 GApproach lighting systems

GWave-off system

3.19.2 GMaintenance and repair

instructions 3.19.3Posted operations and maintenance instructions SD-11 Closeout Submittals

3.18.3As-built drawings 32 01 19 SD-03 Product Data

3.1.2.3 GManufacturer's

Recommendations

3.1Equipment SD-04 Samples

1.4.1 GMaterials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 32 PAGES

32 01 19 1.4.1 GCertified Copies of the Test Reports

32 01 19.61 SD-03 Product Data 2.1Sealants 3.5.2Manufacturer's

Recommendations SD-04 Samples

2.1Sealants 2.3.1Blocking Media/Backup Materials 3.3.4.1Backer Rod 2.3.2Bond Breaking Tapes

SD-06 Test Reports 2.1Sealants

SD-07 Certificates 3.1Equipment List

SD-08 Manufacturer’s Instructions 2.1Sealants

32 05 33 SD-01 Preconstruction Submittals Integrated Pest Management Plan; G

SD-07 Certificates 3.5.1Maintenance Inspection Report

3.5.2 GPlant Quantities

SD-11 Closeout Submittals 3.5.3Tree Staking and Guying

Removal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 32 PAGES

32 11 20 SD-03 Product Data

1.5 GPlant, Equipment, and Tools

1.1.3Waybills and Delivery Tickets

SD-06 Test Reports

2.2.1 GInitial Tests

3.13.1 GIn-Place Tests

32 11 23 SD-03 Product Data

1.5 GPlant, Equipment, and Tools

1.1.3Waybills and Delivery Tickets

SD-06 Test Reports

2.3.1 GInitial Tests

3.13.1 GIn-Place Tests

32 13 14.13 SD-03 Product Data

2.1.7 GDiamond Grinding Plan

2.9.1 GDowels

2.9.2 GDowel Bar Assemblies

2.11Equipment

3.1.2 GProposed Techniques

SD-05 Design Data

2.13.2 GPreliminary Proposed

Proportioning

2.13.2 GProportioning Studies

SD-06 Test Reports

1.4.1 GBatch Plant Manufacturer's

Inspection Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 32 PAGES

32 13 14.13 1.4.1 GSlipform Paver Manufacturer's Inspection Report

2.1.4.1 GSampling and Testing

2.1.7 GDiamond Grinding of PCC

Surfaces

2.11.2.3 GMixer Performance (Uniformity)

Testing

3.9.1 GRepair Recommendations Plan

SD-07 Certificates

1.4.1 GContractor Quality Control Staff

1.4.3Laboratory Accreditation and

Validation

1.4.3.3 GCommercial Laboratory

2.11NRMCA Certificate of

Conformance 32 13 73.19 SD-03 Product Data

2.1Equipment 3.1.1Manufacturer's Instructions

SD-04 Samples

2.2 GCompression Seals

SD-06 Test Reports

2.1.3 GTest Requirements

32 31 13 SD-02 Shop Drawings 2.1Fence Assembly 3.2.2.1Location of Gate, Corner, End, and Pull Posts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 32 PAGES

32 31 13 2.1Gate Assembly 2.2.13Gate Hardware and Accessories Part 3Erection/Installation Drawings

SD-03 Product Data 2.1Fence Assembly 2.1Gate Assembly 2.2.13Gate Hardware and Accessories 2.3.1Zinc Coating

PVC Coating Aluminum Alloy Coating

2.2.1Fabric 2.2.8Stretcher Bars 2.3.3Concrete

SD-04 Samples 2.2.1Fabric

Posts Braces

2.2.2Line Posts 2.2.4Sleeves 2.2.5Top Rail

Bottom Rail 2.3.2Tension Wire 2.2.8Stretcher Bars 2.2.11Gate Posts 2.2.13Gate Hardware and Accessories 2.2.16Padlocks

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 32 PAGES

32 31 13 2.2.15Wire Ties SD-07 Certificates

1.3.1Certificates of Compliance SD-08 Manufacturer’s Instructions

2.1Fence Assembly 2.1Gate Assembly 2.1Hardware Assembly 2.1Accessories

SD-11 Closeout Submittals 3.3Recycled Material Content

; S 32 84 24 SD-02 Shop Drawings

Irrigation Sprinkler System (WaterSense); S

SD-03 Product Data 2.1Piping Materials

WARNING: Text in tags exceeds the maximum length of 300 characters

2.2Heads 2.3.6Backflow Preventers 2.5Automatic Controller 2.5.2Controller Enclosure 2.1.4Solvent Cement 2.6.1Control Wiring 2.1.7Drip Irrigation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 32 PAGES

32 84 24 2.4.4.2Water Hammer Arresters 2.4.2Water Meter 2.4.5.1Rain Shut-Off Device 2.4.5.2Freeze Shut-Off Device 2.4.5.3Soil Moisture Sensor 2.4.1Tapping Tee 3.1.7.3Valve Boxes and Lids 2.4.3Drip Head Accessories

SD-05 Design Data 1.4System Pressure Calculations 1.4Irrigation Requirements

SD-06 Test Reports 1.8.1Tests 2.3.6Backflow Preventers 3.2.1Pressure Test 3.2.2Operation Test

SD-07 Certificates 2.3.6Backflow Preventers

SD-08 Manufacturer’s Instructions 2.5Automatic Controller 2.2Heads 2.1Piping Materials 2.3.6Backflow Preventers 2.3Valves 2.1.4Solvent Cement 2.6.1Control Wiring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 32 PAGES

32 84 24 2.1.7Drip Irrigation 2.4.4.2Water Hammer Arresters 2.4.2Water Meter 2.4.5.1Rain Shut-Off Device 2.4.5.2Freeze Shut-Off Device 2.4.5.3Soil Moisture Sensor

SD-10 Operation and Maintenance Data

2.1 GPiping Materials

2.2 GHeads

2.3.6 GBackflow Preventers

2.3 GValves

2.5 GAutomatic Controller

2.1.7 GDrip Irrigation

2.4.4.2 GWater Hammer Arresters

2.4.2 GWater Meter

2.4.5.1 GRain Shut-Off Device

2.4.5.2 GFreeze Shut-Off Device

2.4.5.3 GSoil Moisture Sensor

SD-11 Closeout Submittals Controller Charts (WaterSense);

S Irrigation Spray Heads (WaterSense); S

32 92 19 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 32 PAGES

32 92 19 WARNING: Text in tags exceeds the maximum length of 300 characters

2.4Fertilizer SD-06 Test Reports

2.2.3Topsoil Composition Tests SD-07 Certificates

2.1Seed SD-08 Manufacturer’s Instructions

2.7Erosion Control Materials 32 93 00 SD-01 Preconstruction Submittals

1.4.3State Landscape Contractor's License

1.6Time Restrictions and Planting Conditions

SD-03 Product Data WARNING: Text in tags exceeds the maximum length of 300 characters

2.3.8Composted Derivatives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 32 PAGES

32 93 00 Organic Mulch Materials (Biobased Content); S Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.

Hydraulic Mulch (Recycled Content); G,S

Hose; S Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.

2.9.1.2Ground Stakes

2.7 GWeed Control Fabric

2.13 GRoot Control Barrier

2.9.1Staking Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 32 PAGES

32 93 00 Edging; S Submit documentation certifying products are from salvaged/recovered lumber sources and indicating percentage of salvaged/recovered content per unit of product.

2.9.7Metal Anchors

1.4.4 GPhotographs

SD-04 Samples

2.8 GMulch

SD-06 Test Reports 2.2.4Topsoil Composition Tests 1.4.5Percolation Test

SD-07 Certificates Nursery Certifications Indicate names of plants in accordance with the LHBH, including type, quality, and size.

SD-10 Operation and Maintenance Data

1.9Plastic Identification 33 11 00 SD-01 Preconstruction Submittals

3.1.1Connections

- G

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 32 PAGES

33 11 00 2.1.1Pipe, Fittings, Joints and Couplings

2.1.1.4.3.1Ball And Socket Joint 2.1.2Valves 2.1.2.8Valve Boxes 2.1.4.1Fire Hydrants 2.2.1Pipe Restraint 2.2.3Tapping Sleeves 2.2.9.1Corporation Stops

Backflow Preventer 2.1.1.5Railroad Crossing Casing Pipe

Precast Concrete Thrust Blocks 3.2.4Disinfection Procedures

SD-06 Test Reports 3.3.1.4Backflow Preventer Tests

- G 3.3.1.3Bacteriological Samples

Post-Construction Fusion Report Leakage Test - G Hydrostatic Test - G

SD-07 Certificates 2.1.1Pipe, Fittings, Joints and

Couplings Lining and Coating

2.1.1.1.1Lining 2.1.1.2.1.3Lining for Fittings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 32 PAGES

33 11 00 2.1.2Valves 2.1.4.1Fire Hydrants

Backflow Prevention Training Certificate

Backflow Tester Fusion Technician Qualifications Turbine Type Meters Propeller Type Meters Displacement Type Meters Compound Type Meters Fire Service Type Meters

2.1.5Backflow Certificate SD-08 Manufacturer’s Instructions

2.1.1.1Ductile Iron Piping 2.1.1.2.1.1PVC Piping 2.1.1.2.1.2PVCO Piping 2.1.1.2.3Polyethylene (PE) Pipe

Fiberglass Pipe, Fittings, Joints And Joint Materials

Concrete Pressure Pipe Prestressed Concrete Pressure Pipe

Reinforced Concrete Cylinder Pipe

2.1.1.2.2PVC Piping For Service Lines 2.1.1.3Copper Pipe For Service Lines

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 32 PAGES

33 30 00 SD-01 Preconstruction Submittals

1.3.1 GContractor's License

SD-02 Shop Drawings

3.1.1 GInstallation Drawings

SD-03 Product Data 2.2.7Precast Concrete Manholes 2.2.11Frames, Covers, and Gratings 2.2.1Gravity Pipe 2.2.2Pressure Pipe

GPrecast Concrete Septic Tanks SD-06 Test Reports

3.3.1.1.2.1GPrecast Concrete Sewer Manhole Test

GHydrostatic Sewer Test

3.3.1.1.1 GInfiltration Tests And Exfiltration

Tests GNegative Air Pressure Test

3.3.1.1.3 GLow-Pressure Air Tests

3.3.1.2 GTests For Pressure Lines

3.3.1.3Deflection Testing

GConcrete Pipe Test SD-07 Certificates

2.2.5Portland Cement Gaskets

33 40 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 32 PAGES

33 40 00 Preconstruction Registration Form for Underground Injection Control Well

SD-04 Samples 2.1Pipe for Culverts and Storm

Drains SD-07 Certificates

2.1.8Resin Certification 2.1.9Resin Certification 2.4.8.1Oil Resistant Gasket 3.9.1.1Leakage Test

Hydrostatic Test on Watertight Joints

3.9.1.2Determination of Density 2.4.7Frame and Cover for Gratings 3.9.2.1.3Post-Installation Inspection

Report 3.3Placing Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .