Attachment_13,_TE12-IDS_PerformanceVerificationTest_(PVT).pdf
PDF 1 MB Posted
- Solicitation number
- W911S8-19-R-0002
About this file
Attachment 13, TE12 - IDS Performance Verification Test (PVT)
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Start with the IDS system in the ARMED mode, testers inside the alarmed area and all doors and windows with BMS installed closed:
2. Open the RTU: receive TAMPER alarm Y/N NA
3. Move tamper switches to maintenance position: TAMPER return Y/N NA
4. Disconnect the communication line (RJ45 or copper): COMM FAIL alarm Y/N NA
5. Reconnect the communication line: COMM FAIL return Y/N NA
6. Turn off AC: AC FAIL alarm Y/N NA
7. Turn on AC: AC & COMMS return Y/N NA
8. Test S-fault & short (in sequence): remove and replace each active jumper Y/N NA
9. Open door(s) with BMS: INTRUSION alarm Y/N NA
10. Close door(s): INTRUSION return Y/N NA
11. Trigger motion sensor(s): INTRUSION alarm Y/N NA
12. Stand still: INTRUSION return Y/N NA
13. Place RTU into the UNARMED mode Y/N NA
14. Activate BMS tamper switch(all in sequence): TAMPER alarm Y/N NA
15. Return BMS tamper switch (all in sequence): TAMPER return Y/N NA
16. Activate PIMS tamper switch (all in sequence): TAMPER alarm Y/N NA
17. Return PIMS tamper switch (all in sequence): TAMPER return Y/N NA
18. Close RTU: TAMPER alarm & TAMPER return Y/N NA
19. Close facility and FORCE CLOSE the IDS: verify alarmed status Y/N NA
20. Reenter facility & input DURESS PIN: DURESS OPEN alarm Y/N NA
21. Reenter proper PIN: DURESS return Y/N NA
22. Activate duress switch(s) (all in sequence): DURESS alarm Y/N NA
23. Reset duress switch(s): DURESS return Y/N NA
24. Test Glass Break sensor(s) (all in sequence): INTRUSION alarm Y/N NA
25. Wait: INTRUSION return Y/N NA
26. Test fence sensor(s) (all in sequence): INTRUSION alarm Y/N NA
27. Wait: INTRUSION return Y/N NA
28. Test proximity sensor(s) (all in sequence): INTRUSION alarm Y/N NA
29. Wait: INTRUSION return Y/N NA
W911S8-19-R-0002 Attachment 13, TE12, ICIDS Performance Verification Test (PVT)
30. Test vibration sensor(s): INTRUSION alarm Y/N NA
31. Wait: INTRUSION return Y/N NA
32. Conducted IDS training for the building manager/POC Y/N NA
Name: Position: Date: .
Name: Position: Date: .
Name: Position: Date: .
33. Verify graphic map for each alarm point (provide accurate map) Y/N NA
34. Comments: _____________________________________________________________________________
By signing this form, you are attesting to the accuracy of the information contained in items 1 through 32 either by personal observation or by report of subordinate employee that personally observed the PVT.
Primary PSI:_________________________\___________________________Date:_____________
PRINT NAME SIGNATURE
USACE
PM/PE/QA:_________________________\___________________________Date:_____________
Prime Contractor
QA:_________________________\___________________________Date:_____________
Sub-contractor QA:_________________________\___________________________Date:_____________
W911S8-19-R-0002 Attachment 13, TE12, ICIDS Performance Verification Test (PVT)