Attachment_13,_TE12-IDS_PerformanceVerificationTest_(PVT).pdf

PDF 1 MB Posted

Attached to
INTEGRATED COMMERCIAL INTRUSION DETECTION SYSTEM II AND IV (ICIDS II and ICIDS IV)
Solicitation number
W911S8-19-R-0002
Issued by

About this file

Attachment 13, TE12 - IDS Performance Verification Test (PVT)

View the file

Other files

File Type Posted
Attachment_28,_Amendment_02,_W911S8-19-R-0002_Solicitation_A.pdf PDF
Questions_and_Response_14_Nov_18.pdf PDF
Attachment_24,_W91S8-19-R-0002_BlankPricingWorksheet_(CLIN_schedule).xlsx XLSX spreadsheet
Questions_and_Response_9_Nov_18.pdf PDF
Attachment_27,_Amendment_01,_W911S8-19-R-0002_Solicitation_A.pdf PDF
Attachment_26,_W91S8-19-R-0002_Historical_ICIDS_M&R.xlsx XLSX spreadsheet
Attachment_25,_W91S8-19-R-0002_LoadedLaborRateTable.xls XLS spreadsheet
Attachment_23,_W911S8-19-R-0002_Solicitatioin_A.pdf PDF
Attachment_02,_TE1-ICIDSCCTV_SOP.pdf PDF
Attachment_19,_TE18_-ICIDS_Account_Map.pdf PDF
Attachment_22,_TE21_-_AIE_LONG_TERM_BADGE_APPLICATION_FORM.PDF PDF
Attachment_15,_TE14-QUALITY_CONTROL_CHECK_SHEET.pdf PDF
Attachment_20,_TE19_-_New_Account_Activation_Request.pdf PDF
Attachment_01,_ICIDS-MMR-PWS_12SEP18.pdf PDF
Attachment_18,_TE17_-Deactivation.pdf PDF
Attachment_05,_TE4_-_ARMS_ROOM_TEST_LOG_-_MAR_-_2018.pdf PDF
Attachment_12,_TE11_MCA-ICIDS_IV-MaterialOrder.pdf PDF
Attachment_08,_TE7-ICIDSCatastrophicFailureReport.pdf PDF
Attachment_03,_TE2_-_ICIDS-DailyAlarmEventLog_example.pdf PDF
Attachment_04,_TE3_-_Open_Accounts_Report_(example).pdf PDF
Attachment_06,_TE5-_Contract_Service_Order.pdf PDF
Attachment_09,_TE8_-_MFR-ICIDS-PINUserPolicy-Oct17.pdf PDF
Attachment_21,_TE20_-_JBLM_Master_Worksheet.xlsx XLSX spreadsheet
Attachment_07,_TE6-FieldReport_w-CSO.pdf PDF
Attachment_11,_TE10-MCA-ICIDS_II_MaterialOrder.pdf PDF
Attachment_14,_TE13-CCTV_Acceptance(PVT)Mstr.pdf PDF
Attachment_17,_TE16_-Activation_Checklist.pdf PDF
Attachment_10,_TE9_-_LMT_example.pdf PDF
W911S8-19-R-0002_Solicitatioin.pdf PDF
Attachment_16,_TE15-ICIDS&CCTV_Addition-Removal_Request.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Start with the IDS system in the ARMED mode, testers inside the alarmed area and all doors and windows with BMS installed closed:

2. Open the RTU: receive TAMPER alarm Y/N NA

3. Move tamper switches to maintenance position: TAMPER return Y/N NA

4. Disconnect the communication line (RJ45 or copper): COMM FAIL alarm Y/N NA

5. Reconnect the communication line: COMM FAIL return Y/N NA

6. Turn off AC: AC FAIL alarm Y/N NA

7. Turn on AC: AC & COMMS return Y/N NA

8. Test S-fault & short (in sequence): remove and replace each active jumper Y/N NA

9. Open door(s) with BMS: INTRUSION alarm Y/N NA

10. Close door(s): INTRUSION return Y/N NA

11. Trigger motion sensor(s): INTRUSION alarm Y/N NA

12. Stand still: INTRUSION return Y/N NA

13. Place RTU into the UNARMED mode Y/N NA

14. Activate BMS tamper switch(all in sequence): TAMPER alarm Y/N NA

15. Return BMS tamper switch (all in sequence): TAMPER return Y/N NA

16. Activate PIMS tamper switch (all in sequence): TAMPER alarm Y/N NA

17. Return PIMS tamper switch (all in sequence): TAMPER return Y/N NA

18. Close RTU: TAMPER alarm & TAMPER return Y/N NA

19. Close facility and FORCE CLOSE the IDS: verify alarmed status Y/N NA

20. Reenter facility & input DURESS PIN: DURESS OPEN alarm Y/N NA

21. Reenter proper PIN: DURESS return Y/N NA

22. Activate duress switch(s) (all in sequence): DURESS alarm Y/N NA

23. Reset duress switch(s): DURESS return Y/N NA

24. Test Glass Break sensor(s) (all in sequence): INTRUSION alarm Y/N NA

25. Wait: INTRUSION return Y/N NA

26. Test fence sensor(s) (all in sequence): INTRUSION alarm Y/N NA

27. Wait: INTRUSION return Y/N NA

28. Test proximity sensor(s) (all in sequence): INTRUSION alarm Y/N NA

29. Wait: INTRUSION return Y/N NA

W911S8-19-R-0002 Attachment 13, TE12, ICIDS Performance Verification Test (PVT)

30. Test vibration sensor(s): INTRUSION alarm Y/N NA

31. Wait: INTRUSION return Y/N NA

32. Conducted IDS training for the building manager/POC Y/N NA

Name: Position: Date: .

Name: Position: Date: .

Name: Position: Date: .

33. Verify graphic map for each alarm point (provide accurate map) Y/N NA

34. Comments: _____________________________________________________________________________

By signing this form, you are attesting to the accuracy of the information contained in items 1 through 32 either by personal observation or by report of subordinate employee that personally observed the PVT.

Primary PSI:_________________________\___________________________Date:_____________

PRINT NAME SIGNATURE

USACE

PM/PE/QA:_________________________\___________________________Date:_____________

Prime Contractor

QA:_________________________\___________________________Date:_____________

Sub-contractor QA:_________________________\___________________________Date:_____________