Metal Building Addition to Building 2327, Fort Leonard Wood, MO
Solicitation number
W911S7-16-B-0019
Issued by

About this file

W911S7-16-B-0019-0001 Addition to Bldg 2327 Amendment

View the file

Other files

File Type Posted
W911S7-16-B-0019_Bid_Abstract.pdf PDF
W911S7-16-B-0019-0002_Addition_to_Building_2327.pdf PDF
Attachment_A _Statement_of_Work_Final_16-B-0019_Amendment_0002.pdf PDF
8030_c1v8rev.pdf PDF
Questions_and_Answers__W911S7-16-D-0019_Final.pdf PDF
8030_s1v8.pdf PDF
8030_e6v8.pdf PDF
8030_m2.pdf PDF
8030_mi4.pdf PDF
8030_e5v8.pdf PDF
8030_c1v8.pdf PDF
8030_a3v8.pdf PDF
8030_mi2.pdf PDF
Attachment_A _Statement_of_Work_Final_16-B-0019_Amendment_0001.pdf PDF
8030_e2v8.pdf PDF
DBA_Wage_Determination _19_August_2016.pdf PDF
8030_m3.pdf PDF
8030_m4.pdf PDF
8030_a2v8.pdf PDF
8030_mi3.pdf PDF
8030_a1v8.pdf PDF
8030_s2v8.pdf PDF
8030_s3v8.pdf PDF
8030_mi5.pdf PDF
8030_m1.pdf PDF
8030_e1v8.pdf PDF
8030_mi1.pdf PDF
8030_e3v8.pdf PDF
8030_e4v8.pdf PDF
16-B-0019_Site_Visit_Roster.pdf PDF
Attachment_B _Drawings_16-B-0019.pdf PDF
DBA_Wage_Determination_MO160019_29_July_2016.pdf PDF
Attachment_A _Statement_of_Work_Final_16-B-0019.pdf PDF
W911S7-16-B-0019_Addition_to_Bldg_2327_Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010866654

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the follow ing items: Updated Attachment A, Statement of Work; updated DBA Wages as of 19 August 2016; correction to Section 10, updated period of performance and individually uploading draw ings into FBO.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S7-16-B-0019

X 9B. DATED (SEE ITEM 11)

19-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Sep-2016

CODE

MICC - FT LEONARD WOOD

U.S. ARMY MISSION AND INSTALLATION CONTRACTIN

8112 NEBRASKA AVENUE, BUILDING 11400

FORT LEONARD WOOD MO 65473

W911S7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911S7-16-B-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The contractor period of performance end date has increased by 60 days from 120 days to 180 days.

The required performance has changed from 1. Provide Metal Building Addition to an Existing Metal Building 2327, Fort Leonard Wood, MO. See SOW for specifications.2. This acquisition is restricted to HUBZone Business. The NAICS is 236220 with a size standard of $36.5M.3. The magnitude of this effort is between $500,000 and $1,000,000.4. Drawings are available electronically and will be provided with the Solicitation.

Requests for hardcopy drawings will not be considered.5. A Site Visit will be conducted at 9:00am (local time) on 30 August 2016. See FAR 52.236-27 for details.6. Written questions shall be submitted to nicole.j.black.civ@mail.mil not later than 2:00pm (local time) 8 September 2016.7. Original bids will not be accepted by facsimile or other electronic submission, how ever, facsimile or other electronically submitted modifications or w ithdraw als will be permitted8. Contractor shall start physical performance of aw arded project in accordance w ith the specifications and draw ings as incorporated not later than close of business, 31 December 2016. (DoD FMR 7000.14-R, Vol. 3;080305) to 1. Provide Metal Building Addition to an Existing Metal Building 2327, Fort Leonard Wood, MO. See SOW for specifications.2. This acquisition is restricted to HUBZone Business.

The NAICS is 236220 with a size standard of $36.5M.3. The magnitude of this effort is between $500,000 and $1,000,000.4. Drawings are available electronically and will be provided with the Solicitation. Requests for hardcopy drawings will not be considered.5. A Site Visit will be conducted at 9:00am (local time) on 30 August 2016. See FAR 52.236-27 for details.6. Written questions shall be submitted to nicole.j.black.civ@mail.mil not later than 2:00pm (local time) 8 September 2016.7. Original bids will not be accepted by facsimile. Facsimile modifications or withdrawals will not be permitted.8. Contractor shall start physical performance of aw arded project in accordance w ith the specifications and draw ings as incorporated not later than close of business, 31 December 2016. (DoD FMR 7000.14-R, Vol. 3;080305).

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984

The following have been added by full text:

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that--

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

(End of provision)

The following have been deleted:

52.232-25 Alt I Prompt Payment (July 2013) Alternate I FEB 2002

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DBA WAGE DETERMINATION

General Decision Number: MO160019 08/19/2016 MO19

Superseded General Decision Number: MO20150019

State: Missouri

Construction Type: Building

County: Pulaski County in Missouri.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 03/04/2016 2 05/20/2016 3 06/17/2016 4 06/24/2016 5 07/01/2016 6 07/29/2016 7 08/19/2016

ASBE0063-002 11/01/2015

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 25.47 11.25

BRMO0011-009 03/01/2016

Rates Fringes

TILE SETTER......................$ 29.26 16.31

CARP0012-002 05/03/2015

Rates Fringes

CARPENTER (Including Drywall Hanging & Form Work).............$ 35.61 15.05

CARP1310-003 05/01/2015

Rates Fringes

CARPENTER (Floor Layer) (Resilient & Vinyl Flooring Only)............................$ 31.08 15.45

ELEC0453-003 09/01/2015

Rates Fringes

ELECTRICIAN......................$ 29.80 14.83

ENGI0513-001 05/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe/Excavator/ Trackhoe.$ 28.86 24.98 Bulldozer...................$ 28.86 24.98

Grader/Blade................$ 28.86 24.98 Loader......................$ 28.86 24.98 Paver.......................$ 28.86 24.98 Roller......................$ 28.86 24.98

IRON0396-017 07/30/2014

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 28.01 22.36

LABO0840-003 03/01/2016

Rates Fringes

LABORER

Brick Mason Tender..........$ 25.81 12.44 Common or General & Landscape...................$ 23.91 12.44

PAIN1265-002 07/01/2013

Rates Fringes

PAINTER: Drywall Finishing/Taping.................$ 26.64 13.27

PAIN1265-008 07/01/2013

Rates Fringes

PAINTER

Brush & Roller Only.........$ 25.64 13.27

PLAS0527-006 06/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 31.64 17.78

PLUM0562-011 07/01/2016

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 36.66 21.49 Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 38.00 26.93 PLUMBER, Excludes HVAC Pipe Installation

Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 36.66 21.49 Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 38.00 26.93

ROOF0020-012 09/19/2014

Rates Fringes

ROOFER...........................$ 29.30 14.52

* SFMO0669-003 04/01/2016

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 33.49 19.45

SHEE0036-010 02/01/2011

Rates Fringes

SHEET METAL WORKER (HVAC Duct & System Installation Only)......$ 35.86 21.20

SUMO2010-018 03/08/2010

Rates Fringes

BRICKLAYER.......................$ 23.65 7.92

GLAZIER..........................$ 29.87 1.47

IRONWORKER, REINFORCING..........$ 20.90 8.88

LABORER: Asbestos Abatement (Removal from Floors, Walls, & Ceilings)......................$ 24.90 0.00

PAINTER: Spray..................$ 18.79 8.12

SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation.....................$ 23.65 4.50

TRUCK DRIVER: Dump Truck........$ 25.57 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO CONTRACTORS

INSTRUCTIONS TO CONTRACTORS

O-1 BIDDING ON LINE ITEMS

Bidding on all line items is required. Failure to provide a price for each line item specified in the Bid Schedule shall render the entire bid nonresponsive.

O-2SUBMISSION OF BIDS/PROPOSALS (HANDCARRIED AND MAILED)

HANDCARRIED: Handcarried bids/proposals may be turned in at the Receptionist Desk, Building 11400, located at 8112 Nebraska Avenue, Fort Leonard Wood, MO, Monday thru Friday, between the hours of 7:30a.m.

and 4:00 p.m.

MAILED: Bids/proposals mailed for submission shall be mailed to Mission Installation Contracting Command, Fort Leonard Wood, 8112 Nebraska Avenue, Building 11400, Fort Leonard Wood, Missouri 65473 when using regular postal service or any express or overnight mailing service.

All bids submitted shall have the Solicitation Number and Contract Specialist Name clearly identified on the outermost container for reference and routing purposes.

L-3 FACSIMILE SUBMISSION OF BIDS

Original bids will not be accepted by facsimile. Facsimile modifications or withdrawals will not be permitted.

L-4 BID OPENING

1. The bid opening for this solicitation will be held at Mission Installation Contracting Command, Fort Leonard Wood, 8112 Nebraska Avenue, Building 11400, Fort Leonard Wood, Missouri at 2:00 P.M. on 20 September 2016. Bids/proposals mailed through the United States Postal Service shall be addressed as follows:

MICC, Fort Leonard Wood W911S7-16-B- ATTN: Nicole J. Black 8112 Nebraska Avenue, Building 11400 Fort Leonard Wood, MO. 65473

3. Bids/proposals delivered via carrier service shall be addressed to:

MICC, Fort Leonard Wood W911S7-16-B-0019 ATTN: Nicole J. Black 8112 Nebraska Avenue, Building 11400 Fort Leonard Wood, MO. 65473

4. Bids/proposals may be handcarried. However, due to security checks at the Installation Gates, bidders/offerors may experience lengthy delays before being allowed to enter the installation. Delays caused by traffic congestion or installation security procedures shall not entitle bidders/offerors to additional time to submit their bid/proposal. All bids/proposals reaching the Mission Installation Contracting Command- Installation Contracting Office, Fort Leonard Wood after the date and time set for the receipt of bids/proposals shall be considered late.

NOTE: Bids/Proposals delivered via carrier service are routed through a mail distribution point prior to arrival at Building 11400. Irrespective of this fact, bids that are not at Building 11400 by the date and time set for the receipt of bids/proposals will be considered late. Based on current conditions, bidders/offerors are cautioned to allow ample time for their bid/proposal to arrive at Building 11400 by the time designated in paragraph 1 for the IFB/RFP opening.

NOTE: Bidders/Offerors are reminded that pursuant to FAR 52.214-5 bids should be addressed and mailed to the office specified in the solicitation. Bidders/Offerors are warned that packages addressed otherwise might be subject to opening and inspection by installation security personnel. Bids/proposals that are opened by security personnel due to a Contractor’s failure to comply with mailing instructions will be evaluated based on the information in the packets received by the Contracting Officer. If any required information is not in the bid/proposal packet when received by the Contracing Officer, it will be conclusively presumed that the bidder/offeror failed to include such information with its bid/offer. Allegations that information must have been removed by security personnel will not receipt of bids/proposals. Therefore, bidders/offerors are to exercise due care and mail all bids/proposals to the address indicated in the solicitation (above).

(End of Summary of Changes)

File details come from the government source that posted it. Updated .