8030_m4.pdf
PDF 177 KB Posted
- Solicitation number
- W911S7-16-B-0019
About this file
Drawing 14 of 22
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L v
O f
A P
P R
D M
A D
E
D I
R E
C T
O R
A T
E
O F
U
B L I
C
W
R K
S
F O
R
L
O N
A
D
W
O D
M
S S
O U
R I
D E
S C
R I
P T I
O N
R E
V I
S I
O N
S
D A
T E
G A
Y
B E
R
S
E D
B
A P
P R
O V
E D
D A
T E
S U
B M I
T T
E D
C H
E C
K E
D
D R
A W
N
D E
S I
G N
E D
C O
O R
D I
N A
T I
O N
D A
T E
D A
T E
D A
T E
SCALE
DATE
PROJECT NO:
DRAWING NO:
OFSHEET
AS SHOWN
E L
L E
R
22 OCT 15
C8029.20
G
S T
E N
S T
E
J
L L
A R
D I
FIRE PROTECTION SYSTEM NOTES
LEGEND
SPR
FDC
- SPRINKLER RISER LOCATION
- FIRE DEPARTMENT CONNECTION
SEE ALL PROJECT DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL REQUIRED INFORMATION.
SWITCH ON THE RISER DIAGRAM.
REDUCING COUPLINGS, AND WELDED JOINTS SHALL BE INDICATED. INDICATE THE LOCATION OF THE TAMPER OR FLOW
TO CLEARLY DESCRIBE THE PROPOSED ARRANGEMENT. EACH TYPE OF FITTING USED AND THE LOCATIONS OF BUSHINGS, ASSEMBLIES, SWAY BRACING, INSPECTOR'S TEST CONNECTIONS, DRAINS, AND OTHER APPLICABLE DETAILS NECESSARY
LESS THAN 1/8" = 1'-0" WHICH CLEARLY SHOW LOCATIONS OF SPRINKLERS, RISERS, PIPE HANGERS, SEISMIC SEPARATION
LEGEND IDENTIFYING DEVICE SYMBOLS, NOMENCLATURE, AND CONVENTIONS USED. FLOOR PLANS DRAWN TO A SCALE NOT
DESCRIPTIVE INDEX OF DRAWINGS IN THE SUBMITTAL WITH DRAWINGS LISTED IN SEQUENCE BY DRAWING NUMBER. A
SPACES WITH CLEARANCE FOR INSTALLATION AND MAINTENANCE. EACH SET OF DRAWINGS SHALL INCLUDE THE FOLLOWING:
DRAWINGS SHALL INCLUDE PLAN AND ELEVATION VIEWS DEMONSTRATING THAT THE EQUIPMENT WILL FIT THE ALLOTTED
THE LOCATION OF FLEXIBLE OR RIGID COUPLINGS USED.
PROTECTION OF THE SPRINKLER SYSTEM. IF REQUIRED; INDICATE THE BRACING ON DRAWINGS. IF REQUIRED; INDICATE
REFERENCES SHALL BE PROVIDED TO THE FIRE PREVENTION OFFICE PERTAINING TO REQUIRED OR NOT REQUIRED EARTHQUAKE
DETERMINED, THE DESIGN SHALL BE PER CHAPTER 9 OF NFPA 13 IF APPLICABLE. DOCUMENTATION AND SPECIFIC CODE
DESIGN SPECTRAL RESPONSE ACCELERATION COEFFICIENTS PER THE 2015 EDITION OF THE IBC. ONCE THE CATEGORY IS
FIRE PROTECTION ENGINEER SHALL DETERMINE THE SEISMIC DESIGN CATEGORY BASED ON THEIR SEISMIC USE GROUP AND THE
NORTH
4 2 0 4 8
S C A L E I N F E E TSPRINKLER PLAN
- OFFICE AREA, LIGHT HAZARD
- WAREHOUSE, ORDINARY HAZARD GROUP 2
- MECHANICAL ROOM, ORDINARY HAZARD GROUP 1
F I
S
R I
N K
L E
R
FOR FIRE SPRINKLER SYSTEM IS INDICATED ON CIVIL DRAWINGS.
ARM-OVER EXCEEDS 12 INCHES. NEW PIPING SHALL BE FLUSHED. CONNECTION POINT LOCATION AND WATER LINE
THREADED. HANGERS SHALL BE PROVIDED ON ARM-OVERS TO DROP NIPPLES SUPPLYING PENDENT SPRINKLERS WHEN THE
SHALL CONSIST OF MINIMUM 1-INCH PIPE WITH A REDUCING COUPLING INTO WHICH THE SPRINKLER SHALL BE
THREAD SEALER AND TEFLON TAPE MEETING EQUIREMENTS ON ALL THREADS. DROP NIPPLES TO PENDENT SPRINKLERS
ADDITIONAL FITTINGS AND PIPE TO AVOID PLUMBING, CEILING LIGHTS, DUCT WORK, AND ELECTRICAL. USE
LEAKS ARE REPAIRED. SPRINKLER HEADS SHALL BE LOCATED A MINIMUM OF 6" FROM THE WALLS. PROVIDE
IN THE SYSTEM PIPING, THE CONTRACTOR SHALL REPAIR, THEN REPEAT THE PRESSURE TEST PROCESS UNTIL ALL
BEEN PRESSURIZED THE CONTRACTOR SHALL CHECK PIPING MODIFICATIONS FOR LEAKS. WHERE LEAKS ARE FOUND
THE FLW FIRE DEPARTMENT SO THAT A PRESSURE TEST CAN BE COMPLETED. IMMEDIATELY AFTER THE SYSTEM HAS
FIRE PROTECTION ENGINEER. ONCE THE SPRINKLERS HAVE BEEN INSTALLED, THE CONTRACTOR SHALL NOTIFY
BE COMPLETE. ACTUAL LOCATION AND QUANTITIES OF SPRINKLER HEADS TO BE DETERMINED BY CONTRACTOR'S
THE SPRINKLER ENTRANCE SERVICE AND RISER SHALL BE SIZED FOR THE ENTIRE BLDG. SPRINKLER SYSTEM SHALL
PIPING TO BE SEISMICALLY BRACED PER NFPA 13
ALL HANGERS AND COMPONENTS TO BE INSTALLED PER NFPA 13
UFC-3-600-01 CHANGE 3 1 MAR 2013.
ALL DESIGN, MATERIAL, AND INSTALLATION SHALL MEET THE REQUIREMENTS OF NFPA 13, 2013 ED., AND
M4 4
F
N T
R A
L
I
S S
U E
A D
D I
T I
B
I
L D I
N G
DPW 02643-5J
C.0004125
SPR
FDC
FLW FIRE DEPARTMENT.
WTITH AND WITNESSED BY DPW AND THE
NFPA GUIDANCE AND SHALL BE COORDINATED
SHALL BE PERFORMED IN ACCORDANCE WITH
PRIOR TO COMMENCING DESIGN. FLOW TEST
FOR REVIEW AND MUST HAVE APPROVAL
PRESSSURE DATA TO CONTRACTING OFFICER
CONTRACTOR SHALL SUBMIT FLOW AND
CONFIRM FLOW AND PRESSURE AVAILABILITY.
TEST PRIOR TO SYSTEM DESIGN TO
CONTRACTOR SHALL PERFORM FLOW 4.
AT 0 PSI RESIDUAL: 6136 GPM.
AT 20 PSI RESIDUAL: 4833 GPM,
TOTAL FLOW DURING TEST: 2671 GPM
FLOW HYDRANT 2: PITOT: 25, GMP:839
FLOW HYDRANT 1: PITOT: 35, GPM:993
OPENING: 2.5CO-EFF: 0.9
RESIDUAL: 44 PSISTATIC: 56 PSI
WATER SUPPY CHARACTERISTICS:3.
FOR ENTIRE FACILITY.
SPRINKLER SYSTEM AND STANDPIPE
PROVIDE WET PIPE AUTOMATIC 2.
= 13,956 SQFTTOTAL
OFFICE/LATRINE SPACE= 1,583 SQFT
= 252 SQFTMECHANICAL ROOM
= 12,121 SQFTWAREHOUSE
OCCUPANCIES1.
| 2016-07-01T13:01:47-0500 | |
| ROBERTS.GARY.L.1231307644 |
File details come from the government source that posted it. Updated .