TE - 12

View the file

Other files for this federal contract opportunity

Other files attached to MCTP Draft Solicitation, newest first.
File Type Posted
CDRL_16.pdf PDF
TE-3_MCTP_PRS.pdf PDF
TE-4_C4I_SIM_13.pdf PDF
TE-22_WARISM_Rules_and_Workarounds.pdf PDF
TE-37_Response_Cells_Work_Cells.pdf PDF
TE-33_Security_Addendum.docx DOCX document
CDRL_13.pdf PDF
TE-18_Army_Regulation_350-1.pdf PDF
TE-23_Role_Player_Uniform.pdf PDF
TE-11_MCTP_Warfighter_Exercise_Cost_Estimate_Sheet.xls XLS spreadsheet
CDRL_5.pdf PDF
CDRL_9.pdf PDF
TE-40_WFX_16-2_Exercise_Timeline.pptx PPTX presentation
TE-35_MCTP_Trends_in_a_Decisive_Action_Warfighter_Exercise.pdf PDF
TE-10_Information_Assurance_Workforce_Improvement_Program.pdf PDF
TE-36_Site_Survey_Checklist.docx DOCX document
CDRL_2.pdf PDF
TE-21_MCTP_Rules_and_Workarounds.pdf PDF
TE-9_MCTP_Role_Player.pdf PDF
TE-16_TRADOC_Regulation_350-50-3.pdf PDF
TE-26_MCTP_Problem_Trouble_Report.pdf PDF
TE-27B_MCTP_Korea_WFX_Symbol_Glossary.pdf PDF
CDRL_7.pdf PDF
CDRL_12.pdf PDF
TE-38_Standard_Troop_List_Corps.pdf PDF
CDRL_4.pdf PDF
TE-13B_WFX_15-2__(Example).pdf PDF
TE-15_Exercise_Director's_Guide.pdf PDF
TE-29_Simulation_Control_Plan_(SCP)_Instructions.pdf PDF
CDRL_8.pdf PDF
TE-7A_MCTP_Scheduling.pdf PDF
CDRL_3.pdf PDF
TE-25_Final_Exercise_Report_(FER)_(Example).pdf PDF
TE-17_DRAFT_MCTP_Operations_Group_C_Strandard_Operating_Procedure.pdf PDF
CDRL_11.pdf PDF
TE-5_CDR2.pdf PDF
W911S0-16-R-0007.pdf PDF
TE-28_SCP_Approval_Document.pdf PDF
TE-6_GFE.xlsx XLSX spreadsheet
CDRL_18.pdf PDF
CDRL_17.pdf PDF
CDRL_14.pdf PDF
TE-31_WCOPFOR_Commander_and_Staff_Command_Post_Operations_SOP.pdf PDF
TE-39_ESMD_WFX_16-1.xlsx XLSX spreadsheet
CDRL_1.pdf PDF
TE-7B_MCTP_Exercise_Calender.pptx PPTX presentation
TE-27A_MCTP_UE_Symbol_Glossary.pdf PDF
TE-20_National_Guard_Regulation_350-1.pdf PDF
TE-24__AAR_(Example).pptx PPTX presentation
CDRL_10.pdf PDF
Show all 50

MCTP Draft Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

MCTP WFX Generic Models Timeline
Milestones and Meetings Schedule
Today:
MCT Start Date:
MCT End Date:
Warfighter Start Date:
Warfighter End Date:
Note: All days after Day 0 incorporate all Meeting, Huddles and Rehearsals to include day to day troubleshooting, maintenance issues and Training Audiences/ECG directed changes or requests to support operations. These tasks are in the IOM category of normal network operations for Installation, Operation and Maintnenace of 24-7 Networks and Simulations support.
EVENTSUSPENSEDATESDATES
StatusOCONUS/CONUSSEMINARCONUSOCONUSSeminar
WFX Equipment Shipment to WFX SiteW-19-19.0
Advance Party DeploysW-15/18-15.0
TECH Advance Party Deploys(50% Commo FST)StatusW-16/18-16.0-18.0
Advance Party ProceduresW-15
Tech ADVON ARRIVESW-15
Equipment ArrivesW-15-15.0-15.0
Unpack/Accountability/Roll OutW-15-15.0
Site Coordinator MeetingW-15-15.0
Tables and Chairs on HandW-15-15.0
Minimum of four telephones operationalW-15-15.0
Send initial report to MCTP HQsW-15-15.0
Advance Party CompositionW-15-15.0
Safe AvailableW-15-15.0
COMSEC/CCI AvailableW-15-15.0
MCTP OPS DetailReports for DutyW-15-15.0
Conduct Operations Detail In-BriefW-15-15.0
Set Up Table and ChairsW-15-15.0
Off-load of ShipmentW-15-15.0
Confirm Life Support FacilitiesW-15-15.0
Confirm MCTC Climate ControlW-15-15.0
Set Up "Working Issues" and "To Do-Checklist" Charts.W-15-15.0
Arrange Daily Site Coordination MeetingsW-15-15.0
Establish the WAN
Begin LAN buildout for all Enclaves
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
10% of Work CompletedStatus
Advance Party ProceduresW-14-14.0
OSPGRPS ADVON ARRIVES 1AW-14-14.0
Equipment arrives, begin setupW-14
Site Coordinator MeetingW-14
Establish MCTP Operations/Admin AreaW-14
Installation/Configuration/Test of Workstation/FWD Suites/C2 AdapterW-14
Confirm Copier InstallationW-14
Establish Distribution CenterW-14
Confirm VOQs for VIPsW-14
Contact ProtocolW-14
WAN OperationalW-14
Continue LAN buildout for all EnclavesW-14
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Personal Computer Ready for InstallationW-14
20% of Work CompletedStatus
Advance Party ProceduresW-13-13.0
Establish MCTP Admin Area & AAR Prep RoomW-13
Installation/Configuration/Test of Workstation/FWD Suites/C2 AdapterW-13
C4I TiWGs BeginW-13
Production & Test Federation Golden Checkpoint All ModelsW-13
Connect ADMIN Fax MachineW-13
Establish VIP OfficesW-13
Establish AAR Room/AAR Overflow AreasW-13
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
30 % of Work CompletedStatus
Advance Party ProceduresW-12-12.0
Site Coordinator MeetingW-12
Establish MCTP Operations/Admin AreaW-12
Installation/Configuration/Test of Workstation/FWD Suites/C2 AdapterW-12
Limited DSN/NIPR Services EstablishedW-12-12.0
OPSGRPS ADVON 1B ARRIVESW-12-12.0
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
40% of Work CompletedStatus
Advance Party ProceduresW-11-11.0
Establish White Cell Meeting AreaW-11
Installation/Configuration/Test of Workstation/FWD Suites/C2 AdapterW-11
Install Maps/BoardsW-11
Verify TelephonesW-11
Establish LNO AreaW-11
Continue LAN buildout for all EnclavesW-11
Establish Break AreaW-11
SIM Specialists & FST Arrive(100%)W-11-11.0
Confirmation of Supply StockagesW-11
Establish OC HoochW-11
Coordinate ENDEX PlaqueW-11
Verify Work Cell Supplies are on HandW-11
Verify Badge SystemW-11
Install Secure Fax MachinesW-11
OCPOC/NCO ArriveW-11
LAN buildout for all Enclaves CompleteW-11
Site Coordinator MeetingW-11
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
50% of Work CompletedStatus
Advance Party ProceduresW-10-10.0
Installation/Configuration/Test of Workstation/FWD Suites/C2 AdapterW-10
Production & Test Federation restored to Golden CheckpointW-10
Site Coordinator MeetingW-10
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
60% of Work CompletedStatus
Advance Party ProceduresW-9-9.0
Installation/Configuration/Test of Workstation/FWD Suites/C2 Adapter
OPSGRP ADVON 2 ARRIVESW-9-9.0
CIC DST ARRIVALW-9-9.0
Site Coordinator Meeting
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
70% of Work CompletedStatus
Advance Party Procedures
VoIP EstablishedW-8-8.0
Electronic Telephone Book CompletedW-8-8.0
Test Federation available for Senior ControlW-8
Validate that contact information has been shared between: WIM & CSP operatorsW-8
BE Server / AWSIM to ADSIW-8
C2 Adapter to GCCS-A / AJAXW-8
C2 Adapter to AFATDSW-8
Main Gateway (FT Lee) to DFGW-8
MTI Sim to TGSW-8
Obtain Orders/Make Copies
Site Coordinator Meeting
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
80% of Work CompletedStatus
Advance Party ProceduresW-7-7.0
Inform TA to clear all COPs 2 hours priorW-7
Begin inject point stimulation to Training Audience @0900W-7-7.0
MCTC Secure for Open Storage of COMSEC/CCIW-7-7.0
Exercise Control Group Services AvailableW-7-7.0
Email/Portal/MSEL Services AvailableW-7-7.0
Site Coordinator MeetingW-7
Functional Testing BeginsW-7-7.0
MUSE and MTI Sim availableW-7-7.0
Provide TA with MUSE Media page linkW-7
Map to TOC Sites with Grid Coordiantes & RoutesW-7
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
90% of Work CompletedStatus
Advance Party ProceduresW-6-6.0
Cellular Phones Ready for Issue
Parking Signs Installed
COG, BOS Chief, EXCON, and Contractor Main Body ArriveW-6-6.0
Install Work Cell SuppliesW-6-6.0
MCTC Security SweepW-6-6.0
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
WFX Unit and MSC OPORDs to MCTP
100% of Work CompletedStatus
Key Events W-5W-5-5.0
12 Hour Shifts Begin
DAY ONE of Workstation Training BeginsW-5-5.0
CIC/ADOBE/CHAT AvailableW-5-5.0
Set-Up Theater for In-Brief
Unit Issues Badges
Pre-Exercise Schedule
Work Cell OIC In-Brief
Theater In-Brief with Security Check
Receive Tactical Vehicles
Driver/NCO Brief
Drivers Check Out TOC Sites
Briefing Officers Returns
OPS Section establishes two shifts
OPS Detail receives WARSIM Training
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
Status
Key Events W-4W-4-4.0
DAY TWO of Workcell Training BeginsW-4
Main Body of MCTP and Augmentee OCs ArriveW-4
Precision Targeting Testing with MUSEW-4
MUSE Training / ChatW-4
Confrim Visitor ListW-4
MCTP VIP Books PreparedW-4
Cell Phones and Pagers to OCsW-4
WCOPFOR Advance Party ArrivesW-4
Senior Observer Escort Officer BriefW-4
Coordinate Preparation of Certificates of Achievements for Support PersonnelW-4
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
Status
Key Events W-3W-3-3.0
DAY THREE of Workcell Training Begins
Telephone Cards MadeW-3-3.0
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
White Cell Rehearsal
White Cell
Attend Daily ECG meeting
Commander, MCTP Arrives
Senior Observer Arrives
Status
Key Events W-2W-2-2.0
Startup from Golden CheckpointW-2
Simulation runoff (Gametime =Zulu)W-2
STARTEX DATALOAD BEGINS (Blue & Red)W-2-2.0
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
White Cell Rehearsal
White Cell
Attend Daily ECG meeting
Status
Key Events W-1W-1-1.0
STARTEX DATALOAD CONTINUES (Blue & Red)W-1
After Task Org Checkpoint (Platinum)W-1
OPFOR Data Load (Stuff Files)
STARTEX Checkpoint after OPFOR Load (Diamond)
Mini-ExW-1-1.0
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
White Cell Rehearsal
White Cell
Attend Daily ECG meeting
Status
Key Events W Day
Continuation of Mini-ExW-031-Dec-99
Reset Federation to STARTEX CheckpointW-0
Unlock Approved WorkstationsW-0
Final AdjustmentsW-0
Run Time Forward to ZuluW-0
Take WARMSTART Check PointW-0
Confirm PAUSEX Procedures w/ OPSW-0
Begin WARM START / INTEL BuildW-0
STARTEX +/- 6W-0
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
Note: All days after Day 0 incorporate all Meeting, Huddles and Rehearsals to include day to day troubleshooting, maintenance issues and Training Audiences/ECG directed changes or requests to support operations. These tasks are in the IOM category of normal network operations for Installation, Operation and Maintnenace of 24-7 Networks and Simulations support.