T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 2 of 2.pdf
PDF 20 MB Posted
- Attached to
- Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26)
- Solicitation number
- W911QY-26-R-GROUNDWATER
About this file
This is an Operation and Maintenance Manual for a groundwater treatment system located at the T-25 Area (OU-1). The manual is organized into 15 tabs that provide comprehensive technical guidance for the system's equipment and operations. The tabs cover installation guidelines and warranty information, control panel descriptions and drawings, and detailed specifications for key components including signal flowmeters, temperature controllers, well probes, equalization tank switches, bag filters, pressure switches, air stripper equipment, process blowers, heaters, ball valves with actuators, floor sump switches, temperature switches, carbon filtration systems for vapor and liquid phases, and influent/effluent pumps. Each tab section provides technical drawings, operational parameters, maintenance procedures, and equipment specifications necessary for proper system operation and maintenance.
This manual serves as a reference document for contractors and operators performing groundwater pump and treatment system operations under the solicitation W911QY-26-R-GROUNDWATER, which is issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The manual supports the semi-annual groundwater monitoring and treatment system operation requirements for three sites (NRDEC-05, NRDEC-11, and NRDEC-16) at the U.S. Army Natick Soldier Systems Center in Natick, Massachusetts. Contractors bidding on this environmental remediation contract should reference this manual to understand the technical specifications and operational requirements of the treatment systems they will be responsible for maintaining and operating under the Performance Work Statement.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab 1: Installation Guidelines & Warranty
Tab 2: Control Panel Description & Drawrings
Tab 3: Signal Flowmeters
Tab 4: Temperature Controller
Tab 5: Well Probe
Tab 6: Equilization Tank Switch
Tab 7: Bagfilters & Pressure Switch
Tab 8: Tray Stripper & Air Stripper Blower Silencer/Filter
Tab 9: Process Blower & Process Blower Silencer
Tab 10: Heater
Tab 11: Ball Valves & Actuator
Tab 12: Floor Sump Switch
Tab 13: Temperature Switch
Tab 14: Vapor, Liquid Phase & Equilization Tank Discharge Carbon
Tab 15: Influent and Effluent Pump