T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 2 of 2.pdf

PDF 20 MB Posted

Attached to
Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26)
Solicitation number
W911QY-26-R-GROUNDWATER
Issued by

About this file

This is an Operation and Maintenance Manual for a groundwater treatment system located at the T-25 Area (OU-1). The manual is organized into 15 tabs that provide comprehensive technical guidance for the system's equipment and operations. The tabs cover installation guidelines and warranty information, control panel descriptions and drawings, and detailed specifications for key components including signal flowmeters, temperature controllers, well probes, equalization tank switches, bag filters, pressure switches, air stripper equipment, process blowers, heaters, ball valves with actuators, floor sump switches, temperature switches, carbon filtration systems for vapor and liquid phases, and influent/effluent pumps. Each tab section provides technical drawings, operational parameters, maintenance procedures, and equipment specifications necessary for proper system operation and maintenance.

This manual serves as a reference document for contractors and operators performing groundwater pump and treatment system operations under the solicitation W911QY-26-R-GROUNDWATER, which is issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The manual supports the semi-annual groundwater monitoring and treatment system operation requirements for three sites (NRDEC-05, NRDEC-11, and NRDEC-16) at the U.S. Army Natick Soldier Systems Center in Natick, Massachusetts. Contractors bidding on this environmental remediation contract should reference this manual to understand the technical specifications and operational requirements of the treatment systems they will be responsible for maintaining and operating under the Performance Work Statement.

View the file

Other files

File Type Posted
Q and A - No. 2 - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (05 FEB 2026).pdf PDF
Final Optimization Plan for U.S. Army Soldier Systems Center (Sep 2018).pdf PDF
Groundwater Remedial Optimization Work Plan - U.S. Army SSC.pdf PDF
Final 2017 Third Five Year Review Report U.S. Army Soldier Systems Center, Natick MA (APR 2017).pdf PDF
DRAFT Groundwater Monitoring Event 89 and 2024 GWETS Annual Report.pdf PDF
Event 79 (Fall 2019) and Groundwater Treatment System 2019 Annual Report for U.S. Army SSC.pdf PDF
Final Optimization Plan for U.S. Army Soldier Systems Center.pdf PDF
Groundwater Monitoring Event 87 and 2023 GWETS Annual Report.pdf PDF
Groundwater Monitoring Event 85 and 2022 GWETS Annual Report.pdf PDF
Final Explanation of Significant Differences for T-25 Area Groundwater (Operable Unit 1) US Army SSC.pdf PDF
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 1 of 2.pdf PDF
Final Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) U.S. Army SSC.pdf PDF
Attachment 2 - CLIN Structure (UPDATED 22 JAN).xlsx XLSX spreadsheet
Groundwater Solicitation - W911QY26RGROUNDWATER (UPDATED 22 JAN).pdf PDF
Groundwater Monitoring Event 83 and 2021 GWETS Annual Report.pdf PDF
Groundwater Monitoring Event 81 and 2020 GWETS Annual Report.pdf PDF
Q and A - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (22 JAN 2026).pdf PDF
Draft Final Ops. and Maint. Manual OU-1 (T-25 Area, Bldgs 22, 36 Area, and Bldgs 63, 2, 45 Area).pdf PDF
Record of Decision T-25 Area Ground Water (APR 2001).pdf PDF
Federal Facilities Agreement.pdf PDF
Attachment 1 - Performance Work Statement (PWS) - Final (UPDATED 22 JAN).pdf PDF
QASP - CERCLA Groundwater Pump and Treatment System Operation and Semi-Annual Groundwater Monitoring (16 JAN 2026).pdf PDF
Groundwater Solicitation - W911QY26RGROUNDWATER.pdf PDF
Attachment 1 - Performance Work Statement (PWS) - Final 16 JAN.pdf PDF
Attachment 2 - CLIN Structure (16 JAN).xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1: Installation Guidelines & Warranty

Tab 2: Control Panel Description & Drawrings

Tab 3: Signal Flowmeters

Tab 4: Temperature Controller

Tab 5: Well Probe

Tab 6: Equilization Tank Switch

Tab 7: Bagfilters & Pressure Switch

Tab 8: Tray Stripper & Air Stripper Blower Silencer/Filter

Tab 9: Process Blower & Process Blower Silencer

Tab 10: Heater

Tab 11: Ball Valves & Actuator

Tab 12: Floor Sump Switch

Tab 13: Temperature Switch

Tab 14: Vapor, Liquid Phase & Equilization Tank Discharge Carbon

Tab 15: Influent and Effluent Pump