Attachment 2 - CLIN Structure (UPDATED 22 JAN).xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26)
Solicitation number
W911QY-26-R-GROUNDWATER
Issued by

About this file

This is a Contract Line Item (CLIN) Structure document outlining the deliverables and performance periods for an environmental remediation contract with the U.S. Army Natick Soldier Systems Center (NSSC). The contract covers groundwater pump and treatment system operation and semi-annual groundwater monitoring services for three contaminated sites: NRDEC-05, NRDEC-11, and NRDEC-16 located in Natick, Massachusetts.

The contract structure includes CLIN 0001 for initial deliverables comprising five sub-CLINs with zero dollar values: a Project Management Plan (0001AA), Quality Control Plan (0001QB), Health and Safety Plan (0001AC), Quality Assurance Project Plan (0001AD), and an optimization study with draft Optimization Plan (0001AE). The primary work is structured as a base year (CLIN 0002) running from February 23, 2026, through February 22, 2027, with four option years (CLINs 1002-4002) extending through February 22, 2031. Each annual CLIN covers the same scope of annual Remedial Action Operations/Long-Term Maintenance (RA(O)/LTM) across all three sites. The contract is firm-fixed-price with pricing to be determined through the solicitation process (W911QY-26-R-GROUNDWATER), and all work must comply with Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) standards as outlined in the associated Performance Work Statement.

View the file

Other files

File Type Posted
Q and A - No. 2 - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (05 FEB 2026).pdf PDF
Groundwater Remedial Optimization Work Plan - U.S. Army SSC.pdf PDF
Final Optimization Plan for U.S. Army Soldier Systems Center (Sep 2018).pdf PDF
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 1 of 2.pdf PDF
DRAFT Groundwater Monitoring Event 89 and 2024 GWETS Annual Report.pdf PDF
Attachment 1 - Performance Work Statement (PWS) - Final (UPDATED 22 JAN).pdf PDF
QASP - CERCLA Groundwater Pump and Treatment System Operation and Semi-Annual Groundwater Monitoring (16 JAN 2026).pdf PDF
Record of Decision T-25 Area Ground Water (APR 2001).pdf PDF
Federal Facilities Agreement.pdf PDF
Draft Final Ops. and Maint. Manual OU-1 (T-25 Area, Bldgs 22, 36 Area, and Bldgs 63, 2, 45 Area).pdf PDF
Event 79 (Fall 2019) and Groundwater Treatment System 2019 Annual Report for U.S. Army SSC.pdf PDF
Groundwater Solicitation - W911QY26RGROUNDWATER (UPDATED 22 JAN).pdf PDF
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 2 of 2.pdf PDF
Final Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) U.S. Army SSC.pdf PDF
Final Optimization Plan for U.S. Army Soldier Systems Center.pdf PDF
Groundwater Monitoring Event 85 and 2022 GWETS Annual Report.pdf PDF
Q and A - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (22 JAN 2026).pdf PDF
Final Explanation of Significant Differences for T-25 Area Groundwater (Operable Unit 1) US Army SSC.pdf PDF
Final 2017 Third Five Year Review Report U.S. Army Soldier Systems Center, Natick MA (APR 2017).pdf PDF
Groundwater Monitoring Event 81 and 2020 GWETS Annual Report.pdf PDF
Groundwater Monitoring Event 83 and 2021 GWETS Annual Report.pdf PDF
Groundwater Monitoring Event 87 and 2023 GWETS Annual Report.pdf PDF
Attachment 1 - Performance Work Statement (PWS) - Final 16 JAN.pdf PDF
Attachment 2 - CLIN Structure (16 JAN).xlsx XLSX spreadsheet
Groundwater Solicitation - W911QY26RGROUNDWATER.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERALL

CLINDescriptionPoP Start DateCompletion DatePrice
CLIN 0001CDRLsN/AN/AN/A
0001AAGeneral Plans (Project Management Plan (PMP)IAW terms in the CDRLIAW terms in the CDRL$ - 0
0001ABQuality Control Plan (QCP)IAW terms in the CDRLIAW terms in the CDRL$ - 0
0001ACHealth and Safety Plan (HASP)IAW terms in the CDRLIAW terms in the CDRL$ - 0
0001ADQuality Assurance Project Plan (QAPP)IAW terms in the CDRLIAW terms in the CDRL$ - 0
0001AEOptimization - Perform remedial system optimization study and prepare draft Optimization PlanIAW terms in the CDRLIAW terms in the CDRL$ - 0
Perform annual Remedial Action Operations/Long Term Maintenance (RA(O)/LTM) for NRDEC-05 (see Performance Work Statement (PWS) Table I). CLIN 0002, 1002, 2002, 3002, 4002
BASE CLIN 0002Perform annual RA(O)/LTM for NRDEC-05, -11, -16.February 23, 2026February 22, 2027$ - 0
OPTION CLIN 1002Perform annual RA(O)/LTM for NRDEC-05, -11, -16. Option Year 1February 23, 2027February 22, 2028$ - 0
OPTION CLIN 2002Perform annual RA(O)/LTM for NRDEC-05, -11, -16. Option Year 2February 23, 2028February 22, 2029$ - 0
OPTION CLIN 3002Perform annual RA(O)/LTM for NRDEC-05, -11, -16. Option Year 3February 23, 2029February 22, 2030$ - 0
OPTION CLIN 4002Perform annual RA(O)/LTM for NRDEC-05, -11, -16. Option Year 4February 23, 2030February 22, 2031$ - 0
Total$ - 0

File details come from the government source that posted it. Updated .