Final Explanation of Significant Differences for T-25 Area Groundwater (Operable Unit 1) US Army SSC.pdf

PDF 5 MB Posted

Attached to
Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26)
Solicitation number
W911QY-26-R-GROUNDWATER
Issued by

About this file

This is an Explanation of Significant Differences (ESD) document for environmental remediation services at the U.S. Army Natick Soldier Systems Center in Natick, Massachusetts, covering modifications to the T-25 Area Ground Water (Operable Unit 1) remedial action under Contract Number W912CG-05-D-0007.

The document describes a modification to the previously selected remedy for groundwater contamination in the T-25 Area, which is contaminated with volatile organic compounds (VOCs)—primarily tetrachloroethene (PCE) and trichloroethene (TCE)—located 30 to 65 feet below ground surface. The significant change consists of discharging an additional 15 gallons per minute of extracted groundwater from the Buildings 22 and 36 Area and Buildings 63, 2, and 45 Area to the T-25 Area Treatment Facility for treatment. In 2007, the average flow from the T-25 Area was 65 gallons per minute; adding 15 gallons per minute from the other building areas results in a combined flow of approximately 80 gallons per minute. The selected remedy employs Groundwater Extraction with Air Stripping/Carbon Adsorption and Long-Term Monitoring, Institutional Controls, and Monitored Natural Attenuation. The groundwater extraction system has been operating since November 1997 and treats contaminated groundwater through air stripping and activated carbon adsorption at a treatment facility. The treatment facility has a capacity of approximately 160 gallons per minute, so the increased volume remains within operational capacity with no significant cost impact. The U.S. Environmental Protection Agency, the U.S. Department of the Army, and the Massachusetts Department of Environmental Protection all concurred with and authorized this modification. Public participation compliance was achieved through notification in the MetroWest Daily News and presentation at a Restoration Advisory Board meeting on April 20, 2006.

View the file

Other files

File Type Posted
Q and A - No. 2 - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (05 FEB 2026).pdf PDF
Final Optimization Plan for U.S. Army Soldier Systems Center (Sep 2018).pdf PDF
Groundwater Remedial Optimization Work Plan - U.S. Army SSC.pdf PDF
Final 2017 Third Five Year Review Report U.S. Army Soldier Systems Center, Natick MA (APR 2017).pdf PDF
DRAFT Groundwater Monitoring Event 89 and 2024 GWETS Annual Report.pdf PDF
Event 79 (Fall 2019) and Groundwater Treatment System 2019 Annual Report for U.S. Army SSC.pdf PDF
Final Optimization Plan for U.S. Army Soldier Systems Center.pdf PDF
Groundwater Monitoring Event 87 and 2023 GWETS Annual Report.pdf PDF
Groundwater Monitoring Event 85 and 2022 GWETS Annual Report.pdf PDF
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 1 of 2.pdf PDF
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 2 of 2.pdf PDF
Final Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) U.S. Army SSC.pdf PDF
Attachment 2 - CLIN Structure (UPDATED 22 JAN).xlsx XLSX spreadsheet
Groundwater Solicitation - W911QY26RGROUNDWATER (UPDATED 22 JAN).pdf PDF
Groundwater Monitoring Event 83 and 2021 GWETS Annual Report.pdf PDF
Groundwater Monitoring Event 81 and 2020 GWETS Annual Report.pdf PDF
Q and A - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (22 JAN 2026).pdf PDF
Draft Final Ops. and Maint. Manual OU-1 (T-25 Area, Bldgs 22, 36 Area, and Bldgs 63, 2, 45 Area).pdf PDF
Record of Decision T-25 Area Ground Water (APR 2001).pdf PDF
Federal Facilities Agreement.pdf PDF
Attachment 1 - Performance Work Statement (PWS) - Final (UPDATED 22 JAN).pdf PDF
QASP - CERCLA Groundwater Pump and Treatment System Operation and Semi-Annual Groundwater Monitoring (16 JAN 2026).pdf PDF
Groundwater Solicitation - W911QY26RGROUNDWATER.pdf PDF
Attachment 1 - Performance Work Statement (PWS) - Final 16 JAN.pdf PDF
Attachment 2 - CLIN Structure (16 JAN).xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .