Seed Project SOW Attachment 5 Submittal Register.pdf

PDF 351 KB Posted

Attached to
Natick Soldier Systems Center Multiple Award Task Order Contract (MATOC) for Construction
Solicitation number
W911QY25R0003
Issued by

About this file

This document is a Submittal Register for the DEVCOM Soldiers Center Building 45 G6 Helpdesk Renovation project, detailing required product submittals across multiple construction divisions. The register comprehensively lists product information, samples, and documentation requirements for various building components including metal framing, rock wool insulation, doors, door hardware, gypsum board, acoustical ceilings, paints, flooring, HVAC systems, electrical systems, data systems, and other renovation-related materials.

The submittal register is organized by CSI MasterFormat divisions, with most divisions requiring product information submissions and some requiring additional product samples. Notable submission categories include two-week work schedules, accident prevention plans, daily reports, qualification records, commissioning documentation, waste management plans, operation and maintenance manuals, and product-specific information across architectural and engineering disciplines. The document includes a disclaimer that the checklist is for contractor convenience and that contractors must provide submittals as required by project documents to execute the design intent.

View the file

Other files

File Type Posted
W911QY-25-R-0003 RFP amendment 0006 02 July 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0006 02 July 2025 Conformed Copy.pdf PDF
W911QY25R0003 Questions and Responses Master 06262025.pdf PDF
W911QY-25-R-0003 RFP amendment 0005 26 May 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0005 26 May 2025 Conformed Copy.pdf PDF
Bid Bond SF24-23a.pdf PDF
W911QY-25-R-0003 RFP amendment 0001 14 May 2025.pdf PDF
W911QY25R0003 Questions and Responses Master 06182025.pdf PDF
EM 385-1-1 _EFFECTIVE 15 March 2024.pdf PDF
Attachment 2 Cost Proposal Rev 06 18 2025.xlsx XLSX spreadsheet
W911QY25R0003 Questions and Responses MASTER 06182025.xlsx XLSX spreadsheet
Tax Exempt Form.PDF PDF
UFC 4 010.pdf PDF
Seed Project SOW Attachment 5 Submittal Register.docx DOCX document
W911QY-25-R-0003 RFP amendment 0004 18 June 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0004 18 June 2025 Conformed Copy.pdf PDF
Bldg45 Reno Addendum1.pdf PDF
W911QY-25-R-0003RFP amendment 0003 04 June 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0002 04 June 2025.pdf PDF
MATOC Sign in Sheet.xlsx XLSX spreadsheet
W911QY-25-R-0003-RFP Conformed Copy 04 June 2025.pdf PDF
W911QY25R0003 Questions and Responses 23MAY2025.xlsx XLSX spreadsheet
W911QY25R0003 Questions and Responses.xlsx XLSX spreadsheet
Attachment 3 - Seed Project SOW.pdf PDF
Seed Project SOW Attachment 5 - Submittal Register.pdf PDF
W911QY25R0003 RFP 14MAY2025 v2.pdf PDF
Seed Project SOW Attachment 2 - Integrated Solid Waste Management Plan.pdf PDF
Attachment 1 Past Performance Questionaire.pdf PDF
Attachment 2 - Cost Proposal.xlsx XLSX spreadsheet
Seed Project SOW Attachment 4 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 4 - NSSC Contractor Site Access Request Form.pdf PDF
Seed Project SOW Attachment 5 - Submittal Register.docx DOCX document
Attachment 5 - Davis-Bacon Wage Determination MA20250001 Rev5.pdf PDF
Attachment 3 - Seed Project SOW.docx DOCX document
Seed Project SOW Attachment 1 - Construction Drawings B.45 Seed Project (1).pdf PDF
W911QY25R0003 RFP 14MAY2025.pdf PDF
Seed Project SOW Attachment 3 - Accident Prevention Plan TOC.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEVCOM SOLIDIERS

CENTER

BUILIDNG 45 G6 HELPDESK RENOVATION

SUBMITTAL REGISTER

Division 01 — General Requirements

Two-Week Schedule of work activities Submittal Register Accident Prevention Plan (APP) Daily Reports Qualification Records Closeout Submittals o Indoor Air Quality o Commissioning: HVAC, Fire Protection, Electrical, Steam and Chilled Water

Commissioning Plan Commissioning Reports

Waste Management Plan Operation and Maintenance (O&M) o O&M Manuals o O&M Training

Division 02 — Existing Conditions

Demolition Plan

Division 03 — Concrete (Not Applicable)

Division 04 — Masonry (Not Applicable)

Division 05 — Metals

Cold-Formed Metal Framing / Metal Studs o Product information

Division 06 — Wood, Plastics, and Composites (Not Applicable)

Division 07 — Thermal and Moisture Protection

Rock wool insulation o Product information

Division 08 — Openings

Doors o Product information o Product sample

Door Hardware o Hardware schedule

Division 09 — Finishes

Interior Gypsum Board o Product Information Fire Rated Gypsum Board o Product Information Joint tape and Compound o Product Information Acoustical Ceilings o Product information o Product samples

Paints o Product information o Paint drawdown samples

Resilient Flooring o Product information o Product samples

Carpet o Product samples

Division 10 — Specialties (Not Applicable)

Division 11 — Equipment (Not Applicable)

Division 12 — Furnishings

Division13 — Special Construction (Not Applicable)

Division 14 — Conveying Equipment (Not Applicable)

Division 21 — Fire Suppression (Not Applicable)

Division 22 — Plumbing (Not Applicable)

Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)

HVAC systems

Division 25 — Integrated Automation (Not Applicable)

Division 26 — Electrical

Electrical systems

Division 27 — Communications

Data systems

Division 28 — Electronic Safety and Security

*This checklist is provided for the Contractor’s convenience. Contractor shall provide submittals as required by the documents and to execute the design intent of the drawings.