The document is an Accident Prevention Plan (APP) Table of Contents for a construction project at the Natick Soldiers Systems Center. The comprehensive APP outlines a detailed framework for health and safety management, covering critical areas such as:

Key sections include signature sheets, background information, health and safety policy, responsibilities and authority lines, subcontractor safety requirements, training protocols, safety inspections, incident reporting, and an extensive list of 43 specific plans and procedures. The appendices include key personnel resumes, health and safety inspection forms, emergency action plan, accident prevention plan sign-off sheet, and OSHA reference materials. The plan is designed to comprehensively address safety management across various potential workplace hazards and operational scenarios for a construction project, demonstrating a thorough approach to worker safety and risk mitigation.

View the file

Other files

File Type Posted
W911QY-25-R-0003 RFP amendment 0006 02 July 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0006 02 July 2025 Conformed Copy.pdf PDF
W911QY25R0003 Questions and Responses Master 06262025.pdf PDF
W911QY-25-R-0003 RFP amendment 0005 26 May 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0005 26 May 2025 Conformed Copy.pdf PDF
Bid Bond SF24-23a.pdf PDF
W911QY-25-R-0003 RFP amendment 0001 14 May 2025.pdf PDF
Seed Project SOW Attachment 5 Submittal Register.pdf PDF
W911QY25R0003 Questions and Responses Master 06182025.pdf PDF
EM 385-1-1 _EFFECTIVE 15 March 2024.pdf PDF
Attachment 2 Cost Proposal Rev 06 18 2025.xlsx XLSX spreadsheet
W911QY25R0003 Questions and Responses MASTER 06182025.xlsx XLSX spreadsheet
Tax Exempt Form.PDF PDF
UFC 4 010.pdf PDF
Seed Project SOW Attachment 5 Submittal Register.docx DOCX document
W911QY-25-R-0003 RFP amendment 0004 18 June 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0004 18 June 2025 Conformed Copy.pdf PDF
Bldg45 Reno Addendum1.pdf PDF
W911QY-25-R-0003RFP amendment 0003 04 June 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0002 04 June 2025.pdf PDF
MATOC Sign in Sheet.xlsx XLSX spreadsheet
W911QY-25-R-0003-RFP Conformed Copy 04 June 2025.pdf PDF
W911QY25R0003 Questions and Responses 23MAY2025.xlsx XLSX spreadsheet
W911QY25R0003 Questions and Responses.xlsx XLSX spreadsheet
Attachment 3 - Seed Project SOW.pdf PDF
Seed Project SOW Attachment 5 - Submittal Register.pdf PDF
W911QY25R0003 RFP 14MAY2025 v2.pdf PDF
Seed Project SOW Attachment 2 - Integrated Solid Waste Management Plan.pdf PDF
Attachment 1 Past Performance Questionaire.pdf PDF
Attachment 2 - Cost Proposal.xlsx XLSX spreadsheet
Seed Project SOW Attachment 4 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 4 - NSSC Contractor Site Access Request Form.pdf PDF
Seed Project SOW Attachment 5 - Submittal Register.docx DOCX document
Attachment 5 - Davis-Bacon Wage Determination MA20250001 Rev5.pdf PDF
Attachment 3 - Seed Project SOW.docx DOCX document
Seed Project SOW Attachment 1 - Construction Drawings B.45 Seed Project (1).pdf PDF
W911QY25R0003 RFP 14MAY2025.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

15 GENERAL GREENE AVENUE

NATICK MA 01760

1 | P a g e

ACCIDENT PREVENTION PLAN

HEALTH AND SAFETY PLAN

TABLE OF CONTENTS

A. Signature Sheet

1. Plan Preparer

2. Plan Approver

3. Plan Concurrence

B. Background Information

1. Contractor Name

2. Contract Number

3. Project Name

4. Brief Project Description

5. Location of the Project (Map)

6. Contractor Accident Experience

7. Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).

C. Statement of Health and Safety Policy

1. Corporate Safety and Health Policy Statement

2. Contractor’s Written Safety Program Goals

3. Contractor’s Written Safety Program Objectives

4. Contractor Accident Experience

D. Responsibilities and Lines of Authority

1. Statement of Ultimate Responsibility

2. Identification and accountability of personnel responsible for safety and health at both the corporate and project level

3. Equivalent Training to the OSHA 30-Hour Classes is Being Presented as Qualification

4. Site Specific Competent Person(s)

5. Requirements and Details of the Employer’s Risk Management Process.

6. Requirements for Initial Activity-Specific AHAs to be Submitted and Accepted at

Preparatory Meetings, Prior to Work Being Performed

7. No Work Requirement

8. Policies and Procedures Regarding Non-Compliance with Safety Requirements

9. Lines of authority

10. Written company procedures for holding managers and supervisors accountable for safety.

E. Subcontractors and Suppliers

1. Identification of Subcontractors and Suppliers

2. Safety Responsibilities of Subcontractors and Suppliers

F. Training

1. Newcomer Safety Orientation Training

2. Requirements for Mandatory Training and Certifications that are Applicable to this Project.

3. Procedures for Periodic Safety and Health Training for Supervisors and Employees

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

2 | P a g e

4. Emergency Response Training

G. Safety and Health Inspections

1. Specific Assignment of Responsibilities

1.a Name(s) of Individual(S) Responsible for Conducting Safety Inspections

1.b Documented Proof of Inspector's Training / Qualifications

1.c Frequency that Inspections Shall be Conducted.

1.d Procedures for Documentation

1.e Deficiency Tracking System and Follow-Up Procedures

2. External Inspections/Certifications

H. Incident Reporting and Investigation

1. Exposure Data

1.a Mishap Investigations, Reports and Logs

2.b Immediate Notification of Major Accidents

2.c KO/COR Notification

I. Plans, Programs and Procedures

1. Fatigue Management Plan

2. Emergency Response Plans

2.a Procedures & Test

2.b Spill Plans

2.c Fire Fighting Plan

2.d Posting of Emergency Telephone Numbers

2.e Man Overboard/Abandon Ship

2.f Plan for Prevention of Alcohol and Drug Abuse

3. Site Sanitation/Housekeeping Plan

4. Medical Support Agreement

5. Blood-Borne Pathogen Program

6. Exposure Control Plan

7. Automatic External Defibrillator (AED) Program

8. Site Layout Plan

9. Access and Haul Road Plan

10. Hearing Conservation Program

11. Respiratory Protection Plan

12. Health Hazard Control Program

13. Hazard Communication Program

14. Process Safety Management Plan

15. Lead Compliance Plan

16. Asbestos Abatement Plan

17. Abrasive Blasting

18. Heat Stress Monitoring Plan (HSMP)

19. Cold Stress Monitoring Plan (CSMP)

20. Indoor Air Quality Management Plan

21. Mold Remediation Plan

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

3 | P a g e

22. Lighting Plan for Night Operations

23. Traffic Control Plan

24. Fire Prevention Plan

25. Arc Flash Hazard Analysis

26. Assured Equipment Grounding Control Program (AEGCP)

27. Hazardous Energy Control Program and Procedures

28. Standard Pre-Lift Plan – LHE

Critical Lift Plan – LHE

29. Fall Protection and Prevention Plan

30. Demolition/Renovation Plan

31. Rope Access Work Plan

32. Excavation/Trenching Plan

33. Fire Prevention and Protection Plan for Underground Construction

34. Compressed Air Work Plan for Underground Construction

35. Erection and Removal Plan for Formwork and Shoring

36. Precast Concrete Plan

37. Lift-slab Plans

38. Masonry Bracing Plan

39. Steel Erection Plan

40. Tree Felling/Maintenance Program

41. Site Safety and Health Plan (HTRW)

42. Confined Space Entry Procedures

43. Confined Space Program

J. Risk Management Processes

Appendixes

Appendix A – Key Personnel Resumes

Appendix B – Health and Safety Inspection Forms

Appendix C - Emergency Action Plan

Appendix D - Accident Prevention Plan Sign off Sheet.

Appendix E - OSHA Whistleblower Fact Sheet and OSHA Lightning Safety Fact Sheet