The file is a cost proposal template for a renovation project at Building 45, 1st floor, spanning 5,400 square feet. The document is part of solicitation W911QY25R0003 for the Natick Soldier Systems Center Multiple Award Task Order Contract (MATOC), which is a small business set-aside construction contract. The cost proposal breaks down potential work across multiple divisions including general requirements, site construction, and specialized areas such as asbestos abatement, demolition, and various building systems (electrical, HVAC, plumbing). While the template shows zero dollar amounts, it provides a structured framework for bidders to detail labor, materials, overhead, profit, and bonding costs for the renovation project. The associated MATOC has a total shared capacity of $99,000,000 over an 8-year period, with up to ten contractors potentially awarded, and includes a "seed" renovation project estimated between $1-5 million to evaluate contractor capabilities.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Form - Building 45, 1st floor, G6 | Date: 12/10/2024 | |||
| Renovation of Building 45, 1st Floor (5,400 ft2) | ||||
| DIVISION | UNIT OF MEASURE | LABOR | MATERIALS | BID AMOUNT |
| Division 1 - General Requirements | JOB | |||
| 01500 Temporary Construction Facilities & Controls | JOB | |||
| Division 2 - Site Construction | JOB | |||
| 02221 Building Demolition | JOB | |||
| 028214 Asbestos Abatement- Full abatement of ACM within Transite Walls | N/A | |||
| 028214 Asbestos Abatement - Full abatement of ACM within floor tile and associated mastic | N/A | |||
| 028214 Asbestos Abatement - Contained within and Associated fan coil units | ||||
| N/A | ||||
| 028214 Asbestos Abatement - Full abatement of ACM within pipe insulation | N/A | |||
| Division 3 - Concrete | JOB | |||
| Division 4 - Masonry | JOB | |||
| Division 5 - Metals | JOB | |||
| Division 6 - Wood and Plastics | JOB | |||
| Division 7 - Thermal and Moisture Protection | JOB | |||
| Division 8 - Doors and Windows | JOB | |||
| Division 9 - Finishes | JOB | |||
| Division 10 - Specialities | JOB | |||
| Division 11 - Equipment | JOB | |||
| Division 12 - Furnishings | JOB | |||
| Division 13 - Special Construction | JOB | |||
| Moving | JOB | |||
| Division 14 - Conveying Systems | JOB | |||
| Division 22 - Plumbing | JOB | |||
| Division 21 - Fire Suppression | JOB | |||
| Division 23 - Heating Ventilation, and Air Conditioning (HVAC) | JOB | |||
| Division 25 - Intergrated Automation - controls | JOB | |||
| Division 26 - Electrical | JOB | |||
| Division 27 - Communications | JOB | |||
| Division 28 - Electronic Safety and Security | JOB | |||
| Division 31 - Earthwork | JOB | $ - 0 | $ - 0 | |
| Division 32 - Exterior Improvements | JOB | $ - 0 | $ - 0 | |
| Division 33 - Utilities | JOB | $ - 0 | $ - 0 | |
| TOTAL LABOR | $ - 0 | |||
| TOTAL MATERIAL | $ - 0 | |||
| TOTAL MATERIAL AND LABOR | $ - 0 | |||
| OVERHEAD | $ - 0 | |||
| PROFIT | $ - 0 | |||
| BOND | $ - 0 | |||
| TOTAL BID | $ - 0 |