Attachment 2 Cost Proposal Rev 06 18 2025.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Natick Soldier Systems Center Multiple Award Task Order Contract (MATOC) for Construction
Solicitation number
W911QY25R0003
Issued by

About this file

The file is a Cost Proposal spreadsheet for the Renovation of Building 45, 1st Floor, located at the Natick Soldier Systems Center. The document details a comprehensive construction cost breakdown across multiple divisions, including general requirements, site construction, asbestos abatement, and various building systems such as electrical, HVAC, plumbing, and communications. However, all line items currently show $0.00 for labor, materials, and total costs, suggesting this is a template or draft cost proposal.

This cost proposal is directly related to Solicitation Number W911QY25R0003, a Multiple Award Task Order Contract (MATOC) issued by the Army Contracting Command. The solicitation is a small business set-aside for construction-related work at Natick Soldier Systems Center, with a total shared contract capacity of $99 million over an 8-year period. The contract will support various construction services including facility alterations, repairs, electrical and mechanical system work, demolition, and remediation, with up to ten contractors potentially awarded and an initial $1,000 task order for each successful bidder.

View the file

Other files

File Type Posted
W911QY-25-R-0003 RFP amendment 0006 02 July 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0006 02 July 2025 Conformed Copy.pdf PDF
W911QY25R0003 Questions and Responses Master 06262025.pdf PDF
W911QY-25-R-0003 RFP amendment 0005 26 May 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0005 26 May 2025 Conformed Copy.pdf PDF
Bid Bond SF24-23a.pdf PDF
W911QY-25-R-0003 RFP amendment 0001 14 May 2025.pdf PDF
Seed Project SOW Attachment 5 Submittal Register.pdf PDF
W911QY25R0003 Questions and Responses Master 06182025.pdf PDF
EM 385-1-1 _EFFECTIVE 15 March 2024.pdf PDF
W911QY25R0003 Questions and Responses MASTER 06182025.xlsx XLSX spreadsheet
Tax Exempt Form.PDF PDF
UFC 4 010.pdf PDF
Seed Project SOW Attachment 5 Submittal Register.docx DOCX document
W911QY-25-R-0003 RFP amendment 0004 18 June 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0004 18 June 2025 Conformed Copy.pdf PDF
Bldg45 Reno Addendum1.pdf PDF
W911QY-25-R-0003RFP amendment 0003 04 June 2025.pdf PDF
W911QY-25-R-0003 RFP amendment 0002 04 June 2025.pdf PDF
MATOC Sign in Sheet.xlsx XLSX spreadsheet
W911QY-25-R-0003-RFP Conformed Copy 04 June 2025.pdf PDF
W911QY25R0003 Questions and Responses 23MAY2025.xlsx XLSX spreadsheet
W911QY25R0003 Questions and Responses.xlsx XLSX spreadsheet
Attachment 3 - Seed Project SOW.pdf PDF
Seed Project SOW Attachment 5 - Submittal Register.pdf PDF
W911QY25R0003 RFP 14MAY2025 v2.pdf PDF
Seed Project SOW Attachment 2 - Integrated Solid Waste Management Plan.pdf PDF
Attachment 1 Past Performance Questionaire.pdf PDF
Attachment 2 - Cost Proposal.xlsx XLSX spreadsheet
Seed Project SOW Attachment 4 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 4 - NSSC Contractor Site Access Request Form.pdf PDF
Seed Project SOW Attachment 5 - Submittal Register.docx DOCX document
Attachment 5 - Davis-Bacon Wage Determination MA20250001 Rev5.pdf PDF
Attachment 3 - Seed Project SOW.docx DOCX document
Seed Project SOW Attachment 1 - Construction Drawings B.45 Seed Project (1).pdf PDF
W911QY25R0003 RFP 14MAY2025.pdf PDF
Seed Project SOW Attachment 3 - Accident Prevention Plan TOC.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bid Form - Building 45, 1st floor, G6Date: 6/18/2025
Renovation of Building 45, 1st Floor (5,400 ft2)
DIVISIONUNIT OF MEASURELABOR RATELABOR HOURSTotal LaborMATERIALSBID AMOUNT
Division 1 - General RequirementsJOB0.00$ - 0
01500 Temporary Construction Facilities & ControlsJOB0.00$ - 0
Division 2 - Site ConstructionJOB0.00$ - 0
02221 Building DemolitionJOB0.00$ - 0
028214 Asbestos Abatement- Full abatement of ACM within Transite WallsN/A0.00$ - 0
028214 Asbestos Abatement - Full abatement of ACM within floor tile and associated masticN/A0.00$ - 0
028214 Asbestos Abatement - Contained within and Associated fan coil units
N/A0.00$ - 0
028214 Asbestos Abatement - Full abatement of ACM within pipe insulationN/A0.00$ - 0
Division 3 - ConcreteJOB0.00$ - 0
Division 4 - MasonryJOB0.00$ - 0
Division 5 - MetalsJOB0.00$ - 0
Division 6 - Wood and PlasticsJOB0.00$ - 0
Division 7 - Thermal and Moisture ProtectionJOB0.00$ - 0
Division 8 - Doors and WindowsJOB0.00$ - 0
Division 9 - FinishesJOB
Division 10 - SpecialitiesJOB0.00$ - 0
Division 11 - EquipmentJOB0.00$ - 0
Division 12 - FurnishingsJOB0.00$ - 0
Division 13 - Special ConstructionJOB0.00$ - 0
MovingJOB0.00$ - 0
Division 14 - Conveying SystemsJOB0.00$ - 0
Division 22 - PlumbingJOB0.00$ - 0
Division 21 - Fire SuppressionJOB0.00$ - 0
Division 23 - Heating Ventilation, and Air Conditioning (HVAC)JOB0.00$ - 0
Division 25 - Intergrated Automation - controlsJOB0.00$ - 0
Division 26 - ElectricalJOB0.00$ - 0
Division 27 - CommunicationsJOB0.00$ - 0
Division 28 - Electronic Safety and SecurityJOB0.00$ - 0
Division 31 - EarthworkJOB$ - 00.00$ - 0$ - 0
Division 32 - Exterior ImprovementsJOB$ - 00.00$ - 0$ - 0
Division 33 - UtilitiesJOB$ - 00.00$ - 0$ - 0
TOTAL LABOR$ - 0
TOTAL MATERIAL$ - 0
TOTAL MATERIAL AND LABOR$ - 0
OVERHEAD*$ - 0
PROFIT**$ - 0
BOND***$ - 0
TOTAL BID$ - 0
*Overhead- if overhead rate is other than 10% please adjust formula
**Profit- if overhead rate is other than 10% please adjust formula
***Bond rate is fixed.