About this file

This document contains specifications and quality assurance provisions for a Joint Biological Point Detection System carrier box assembly. Key details include:

The assembly consists of a carrier box, carrier assemblies, assay strips, tops, membranes, and bottoms. Materials include Lexan thermoplastic and silica gel desiccant strips. Specifications cover identification markings, dimensions, flatness, absence of defects, and performance when integrated with the JBPDS identifier subsystem. Samples will undergo inspection and testing for characteristics classified as critical, major, or minor. A performance test ensures proper flow rate and visual control line after assembly. Production lots will be inspected and certified to meet specifications. The first article test requires 150 samples across four configurations to undergo inspection and destructive performance testing.

Attachment 2 - JBPDS CBA

View the file

Other files

File Type Posted
W911QY19R0027-0001.pdf PDF
Attachment_1_-_BSKs.pdf PDF
CDRL_A002.pdf PDF
Attachment_1_-_HHA_Panels.pdf PDF
Attachment_4_-_HHA_Drawings_Specs.pdf PDF
Attachment_9_-_List_of_GFE.pdf PDF
Attachment_3_-_JPS_CBA_Drawings_Specs.pdf PDF
Attachment_8_-_DD254_Form.pdf PDF
Attachment_7_-_CRP_Security_Classifcation_Guide.PDF PDF
Attachment_5_-_Panels_Drawings_Specs.pdf PDF
Attachment_1_-_JPS_CBA.pdf PDF
Attachment_1_-_HHAs.pdf PDF
CDRL_A005.pdf PDF
CDRL_A009.pdf PDF
CDRL_A011.pdf PDF
Attachment_1_-_JBPDS_CBA.pdf PDF
CDRL_A008.pdf PDF
CDRL_A003.pdf PDF
CDRL_A010.pdf PDF
CDRL_A007.pdf PDF
Attachment_6_-_BSK_Drawings_Specs.pdf PDF
CDRL_A001.pdf PDF
CDRL_A004.pdf PDF
CDRL_A006.pdf PDF
W911QY19R0027.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Mar 13 Changes to TDP 5-15-31917

JBPDS Carrier Box Assembly Ultrasonic Welded Configuration

1. Replace QAP 5-15-31917 with attached QAP

2. Drawing 5-15-31917:

a. Note 4, change storage temperature from “4o ± 2o C” to “5o ± 3o C”

b. Note 6, change to read:

“The Carrier Box Assembly and its internal components shall have a shelf life of at least 3 years when stored in their original package at 2-8o C (36-46o F) and relative humidity of less than 40% or at least 12 months when stored in their original package at room temperature at 20-25o C (68-77o F.) and non-condensing relative humidity from 5-100%.

During storage at these conditions, the box assembly and its internal components shall not exhibit any degradation (e.g. decomposition, deformation, discoloration, and illegible markings.”

3. Drawing 5-15-19324:

a. Delete “For Quality Assurance Provisions See QAP5-15-19321”

b. Change suggested source of supply

From: “SA Scientific, Inc 4919 Golden Quail San Antonio, TX 78240”

To: “BBI Detection Inc.

2312 Vondron Rd Madison, WI 53718-6734”

c. Note 4, change storage temperature from “4o ± 2o degrees celcius” to “5o ± 3o C”

d. Note 7, replace address with:

“Joint Program Executive Office for Chemical and Biological Defense Critical Reagents Program

110 Thomas Johnson Drive, Suite 240 Frederick, MD 21702 301-619-2277”

e. Note 8, delete “After assembly, assay strips shall meet the performance requirements stated in QAP 5-15-19321”

f. Note 13, change to read:

“The assay strips shall have a shelf life of at least 3 years when stored at 2-8o C (36-46o F) and relative humidity of less than 40% or at least 12 months when stored at room temperature at 20-25o C (68-77o F) and non-condensing relative humidity from 5-100%.

During storage at these conditions, the assay strips shall not exhibit any degradation (e.g.

decomposition, deformation, discoloration, and illegible markings.) After storage, assay strips shall be capable of identifying biological agents and simulants by meeting optical requirements in Note 11.”

g. Delete sheet no “1 of 2” at the bottom right-hand side.

h. Under “next assy” block, add “32011932

i. In the Distribution Statement, change the address From: “Commender, U.S. Army Soldier and Biological Chemical Command.

ATTN: PMJBPDS-SFAE-BD…”

To: “Joint Program Executive Office for Chemical and Biological Defense

ATTN: SFAE-CBD-NBC-BDS…”

4. Drawing 32011930, sheet 1, delete note 11

5. Drawing 32011932, sheet 2 of 2, delete Table II. An updated strip position table will be provided by the government after contract award.

6. Delete drawing 32011933

7. Drawing 32011936, Note 3, change part no from “Dev.#8475 Transfer Adhesive” to

“ARCLEAN 90420”

QUALITY ASSURANCE PROVISION (QAP)

for

JBPDS Carrier Box Assembly

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DOD contractors only, critical technology, determination made 28 November 2007. Other requests shall be referred to U.S. Army, JPEO for Chemical Biological Defense, Office of JPM for Biological Defense Systems, ATTN:

SFAE-CBD-BD-BDS, Aberdeen Proving Ground, MD 21010-5424.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App 2401 et seq.). Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with the provisions of DOD Directive 5230.25.

Note: This Quality Assurance Provision (QAP) only applies to JBPDS carrier box assembly manufactured using accepted government-furnished assay strips.

PART I. APPLICABLE DOCUMENTS AND EQUIPMENT CODING

DRAWINGS

Welded Assembly Configuration:

5-15-31917 - Box Assembly, Carrier 32011930 - Box Assembly, Carrier Assemblies 32011931 - Box, Carrier 32011932 - Carrier Assembly, Assay Strip 32011933 - Assay Strip Assembly 32011935 - Top, Assay Strip Carrier 32011936 - Membrane, Carrier Sample Well 32011937 - Bottom, Assay Strip Carrier 32014013 - Desiccant Strip

STANDARDS

MIL-STD-1916 – DoD Preferred Methods for Acceptance of Product

INSPECTION EQUIPMENT CODING

AD – Army designed special acceptance inspection equipment CD – Contractor designed special acceptance inspection equipment CE – Commercial inspection equipment VI – Visual inspection

PART II. QUALITY PROVISIONS

1. First Article Inspection.

a. Sample Quantity. Contractor shall produce the following carrier box assemblies using the same methods, materials, equipment, and processes as will be used during regular production. The first article samples shall be submitted for inspection and approval in accordance with the terms of the contract.

Carrier Box Assembly Configuration Qty 5-15-31917-10 15 5-15-31917-30 45 5-15-31917-40 45 5-15-31917-60 45 Total: 150

b. Inspection procedure. From the First Article samples above, use the following for the FAT inspections. For each of the 4 configurations, a.) 10 carrier box assemblies shall be used for the first article inspection as described in Table 1. Some sub-components shall need to be inspected prior to next assembly; b.) 2 carrier box assemblies shall be used for the Performance (destructive) test. Of the 2 carrier box assemblies, 2 random carrier assemblies (drawing 32011932) from each box shall be subject to the Performance test specified in Part IV; c.) the remaining shall be used for the packaging test as specified in applicable Special Packaging Instructions. A breakout of the samples used for the FAT inspection is as below:

Configuration # of unit for # of unit for # of units for TOTAL Inspection Perfomrance packaging per Table 1 test (Part IV) inspection

P5-15-31917-10 10 2 3 15 P5-15-31917-30 10 2 30 42 P5-15-31917-40 10 2 30 42 P5-15-31917-60 10 2 30 42

c. Acceptance criteria. If any sample item fails to comply with any of the applicable requirements, the first article sample shall be rejected.

Table 1 First Article Inspection

Component Drawing no. Requirement Sample Inspection Note Size Method

Storage and No degradation* during storage 100% CE** Manufacturing (storage condition shall not be out of the 2o - 8o C Condition (36o - 46o F) range and less than 40% RH for more than

8 consecutive hours)

No degradation* during manufacturing 100% CE** (assembly room shall not be out of the 20o - 25o C (68o - 77o F) range and less than 40% RH for more than 8 hours) of possible power failure and loss of environmental control Box Assembly, 32011930 Identification markings legible and correct 10 boxes VI 10 boxes for each configuration Carrier Assemblies 15 Carriers assemblies installed correctly 10 VI

Date of Manufacture (DOM) matches strip lot DOM 10 VI◊

Carrier code matches marking on rear of box 10 VI○

Carriers snap fit into place inside box 10 VI Correct color (black for -250, blue for -230 ,-240, -260) 10 VI

◊ DOM on marking label matches government-provided DOM of strips used

○ Codes match government-provided color code chart and strip position

Box, Carrier 32011931 Flatness within tolerance (not to exeed 0.020") 10 CE 10 boxes of each type (10 for blue, Rear lock height (30 x 0.030 +0.002/-0) 10 CE and 10 for black) Free of flash 10 VI All other dimensions 10 CE

Correct color (black for -01, blue for -03) 10 VI Carrier Assembly, 32011932 Identification legible and correct 100% VI Assay Strip Free from contaminants, smudges, scratches & fingerprint 100% VI

Desciccant strips and Membrance visible and correct 100% VI Correct color of bottom carrier assembly 100% VI

* Degradation includes material decomposition, deformation, discoloration, and illegible markings

** An automated monitoring system with recorder and alarm shall be used to notify personnel

(black for -250, blue for -230, -240, -260, and -270) No bubbles, creases, wrinkles in sample well 15** VI Overall height, 0.170 ± 0.005 15** CE Assay strip position correct 15** VI□

□ Assay trip position matches government-provided strip position table ** Select 15 random samples from each of 5 carrier configurations: -230, -240, -250, -260, and-270

Assay Strip 5-15-19324* Free of visible contamination, loose fibers 100% VI Assembly

* Inspect prior to assembly onto assay strip carrier Top, 32011935* Free of visible contamination 100% VI Assay Strip Carrier No scratches or stray marks 100% VI

Flatness within tolerance (not to exeed 0.020") 30** CE Warp/bend that would prevent assembly 30** VI No flash 30** VI

* Inspect prior to assembly onto assay strip carrier ** Select 30 random samples from quantity required for FAT samples

Membrane, 32011936* Free of visible contamination 100% VI Carrier Sample Length and width 30** CE well (L: 4.492+0.010/-0, W: 0.750+0.010/-0)

* Inspect prior to assembly onto assay strip carrier ** Select 30 random samples from quantity required for FAT samples

Bottom, 32011937* Free of visible contamination 100% VI Assay Strip Carrier No scratches or stray marks 100% VI

Flatness within tolerance (not to exeed 0.030") 20** CE Wall thickness (0.040") 20** CE Warp/bend that would prevent assembly 20** VI No flash 20** VI Correct color (black for -01, blue for -03) 20** VI

* Inspect prior to assembly onto assay strip carrier ** Select 20 random samples from Black-colored bottom and 20 from Blue-colored bottom from quantity required for FAT samples

Desiccant Strip 32014013* Desiccant not exposed or spoiled 30** VI Mass: 75g ± 10% 30** CE Length: 3.99 ± 0.21, Width: 0.63 ± 0.03, H: 0.085 max 30** CE

* Inspect prior to assembly onto assay strip carrier ** Select 30 random samples from quantity required for FAT samples

2. Conformance inspection.

a. Lotting. A lot shall consist of the items produced by one manufacturer, at one plant, from the same materials, under essentially the same manufacturing conditions, and at essentially the same time. At each change in assay strip lot, a new lot identification shall be assigned. Lot number format shall be in accordance with MIL-STD-1168. The contractor shall also record the lot numbers of the other components used in each lot of carriers produced.

b. Sampling. Attribute type normal inspection sampling in MIL-STD-1916 shall be used.

c. Inspection characteristic. Three classes of characteristics are covered in this QAP. These are: critical characteristics, major characteristics, and minor characteristics, as defined in

MIL-STD-1916.

d. Inspection. Inspection shall consist of examination and test of all the characteristics contained in the Classification of Characteristics of this QAP. Every item in the lot shall be inspected for critical and selected major characteristics. If an item is found that does not conform to a characteristic inspected 100%, the non-conforming item shall be removed from the lot. For each of the other characteristics in Part III, failure of any sample item to conform to the characteristic shall be cause for rejection of the lot represented. The following inspections apply to each of the 4 configurations.

Classification of Characteristics.

a. Storage and Manufacturing conditions

Class Characteristic Sampling Inspection Method Critical

1. No degradation* during 100% inspection CE** storage (storage condition shall not be out of the 2o – 8o C (36o – 46o F) range and less than 40% RH for more than 8 consecutive hours)

2. No degradation* during 100% inspection CE** manufacturing (assembly room shall not be out of the 20o – 25o C (68o – 77o F) range and less than 40% RH for more than 8 hours.

* Degradation includes material decomposition, deformation, discoloration, and illegible markings.

** An automated monitoring system with recorder and alarm shall be used to notify personnel of possible power failure and loss of environment control.

b. Box Assembly, Carrier Assemblies (Drawing 32011930)

Critical

1. Identification markings 100% VI legible and correct inspection

Major 101 15 carrier assemblies 100% VI installed correctly

102◊ Date of Manufacture (DOM) Level IV VI matches strip lot DOM

103○ Carrier code matches marking Level IV VI on rear of box

104 Carrier snap fits into place Level II VI inside box

Minor

201 Correct color Level I VI

◊ DOM on marking label matches government-provided DOM of strips used.

○ Codes match government-provided color code chart and strip position table.

c. Box, Carrier (Drawing 32011931)

Critical

None

101 Flatness within tolerance Level III CE

102 Rear lock height, Level III CE

30 x 0.030 +0.002/-0

201 Free of flash Level I VI

202 All dimensions not categorized * CE as Major

* Inspect the first 10 consecutive pieces per mold cavity. Re-inspect after each 100,000 pieces are produced on a cavity and after each tool change.

d. Carrier Assembly, Assay Strip (Drawing 32011932)

Critical

1. Identification markings 100% VI legible and correct inspection

101 Free from contaminants, smudges, 100% VI scratches & fingerprint

102 Desiccant strips and membrane Level II VI visible and correct

103 No bubbles, creases, wrinkles Level II VI in sample well membrane

104 Overall height, 0.170 ± 0.005 Level III CE

105□ Assay strip position correct Level IV VI

201 Correct color of bottom carrier assembly Level I VI

202 No stray marks Level I VI

□ Assay strip position matches government-provided color code chart and strip position table

e. Assay Strip Assembly (Drawing 5-15-19324) (Inspect prior to next assembly)

101 Free of visible contamination 100% VI

102 No loose fiber Level II VI

f. Top, Assay Strip Carrier (Drawing 32011935)

102 No scratches or stray marks 100% VI

103 Flatness within tolerance Level II CE

(not to exceed 0.020)

104 Warp/bend that would prevent Level III VI assembly

201 No flash Level II VI

g. Membrane, Carrier Sample Well (Drawing 32011936)

102 Width 0.750 +0.010/-0 Level II CE

103 Length 4.492 +0.010/-0 Level II CE

h. Bottom, Assay Strip Carrier (Drawing 32011937)

102 No scratches or stray marks 100% VI

103 Flatness within tolerance Level II CE (not to exceed 0.030”)

104 Wall thickness (0.040”) Level II CE

105 Warp/bend that would prevent Level III VI assembly

106 Correct color Level II VI

201 No flash Level II VI

i. Desiccant Strip (Drawing 32014013)

101 Desiccant not exposed or spoiled Level I VI

102 Mass: 75 g ± 10% Level I CE

103 Length: 3.99 ± 0.21 Level II CE

104 Width: 0.63 ± 0.03 Level II CE

105 Height: 0.085 max Level II CE

201 Bag not torn or damaged Level II VI

PART III. CERTIFICATION REQUIREMENTS

Certification shall be required for each characteristic specified below and shall include actual examination and test results when required herein. Results of examination and tests shall be on file at the contractor’s facility and shall be available to the Government for review.

NUMBER CHARACTERISTIC TO COMPLY WITH

401 Material: Top, Assay Strip Carrier - 5-15-19325/32011935 Lexan™ thermoplastic 402 Material: Membrane, Carrier Sample Well - 5-15-19326/32011936 403 Material: Desiccant strip – silica gel 5-15-19328/32014013

Inspection equipment. Inspection equipment used to perform the examinations and tests in this QAP should be designed, documented and maintained by the contractor using ISO 10012 as guidance, including any fixtures necessary to accommodate the test procedures.

Inspection equipment should incorporate the appropriate measurement capability, precision and accuracy to assure rejection of nonconforming product. Equivalent inspection equipment standards may be accepted when such alternative(s) provide an equivalent or better level of quality, and provided they have been described in a written proposal, which has been approved by the Government.

PART IV. PERFORMANCE/DESTRUCTIVE TEST

1. Intended use. The carrier box assemblies are boxes which contain trays of carrier assemblies. The carrier box assemblies are used by and interface with the Identifier subsystem of the Joint Biological Point Detection System (JBPDS.) The assay strips within each carrier assembly are inoculated by a liquid, optically scanned by the Identifier and analyzed to determine the presence or absence of specific biological warfare agents.

2. Box Carrier Assembly Performance test. The purpose of this Performance test is to insure the assay strip is still functioning after being assembled into the carrier assembly.

It also insures the fit and interface between the box carrier assembly and the JBPDS system. This test is required for the First Article Test only and is not required for the production lot acceptance test. However, if one or more components in the production lot changes since first article inspection, or if the manufacturer, materials or process associated with the component(s) changes, this Performance Test will need to be re-verified.

2.1 Flow Rate. Allow dilution buffer and carriers to reach 35-400 C before conducting test. Test is conducted by inserting the carrier box assembly into the JBPDS and inoculating each assay trip on the carrier with 115µL of dilution buffer on sample wells. Assay shall run within 15 min ± 15 seconds.

2.2 Visual Control Line. Allow dilution buffer and carriers to reach 35-400 C before conducting test. Test is conducted by inserting the carrier box assembly into the JBPDS and inoculating each assay trip on the carrier with 115µL of dilution buffer on sample wells. The optical density of the control line shall be 0.175.

TDPL 5-15-31917-30
32011930 sh1
32011930 sh2
32011931
32011932 sh1
32011932 sh2
32011935
32011936
32011937 sh1
32011937 sh2
32011937 sh3
32014013 sh1
32014013 sh2
5-15-19324
5-15-19324_changes
5-15-31917
P5-15-31917-30
QAP - JBPDS
FAT Table-JBPDS.pdf
Sheet1
FAT Table-JBPDS.pdf
Sheet1
TDP - JBPDS.pdf
QAP - JBPDS.pdf
FAT Table-JBPDS.pdf
Sheet1
FAT Table-JBPDS.pdf
Sheet1

File details come from the government source that posted it. Updated .