W911KB19R0008_-_EIE432.pdf
PDF 42 MB Posted
- Attached to
- W911KB19R0008 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATION FACILITY Federal contract opportunity
- Solicitation number
- W911KB19R0008
About this file
SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03_18R0008_EIE432_AM_8.pdf | ||
| 19R0008_EIE432_AM_7.pdf | ||
| B.08.03_1890008_EIE432_AM_6.pdf | ||
| 18R0008_EIE432_AM_5.pdf | ||
| 19R0008_AM_04.pdf | ||
| 19R0008_AM_03.pdf | ||
| 18R0008-EIE432-AM_02.pdf | ||
| EIE432-18R0008-AM_01.pdf | ||
| A.03.11_JA-19_14_Best_Lock_Cores_Redacted.pdf | ||
| A.03.11_JA-_19_13_Whelen_Mass_Notif_Sys_Redacted.pdf | ||
| A.03.11_JA-_19_12_Monaco_Transceiver_SYSTEM_Redacted.pdf | ||
| A.03.11_JA-_19_11_DELTA_HVAC_DDC_SYSTEM_Redacted.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
US Army Corps of Engineers Alaska District
EIE432
F-35A AIRCRAFT MAINTENANCE
UNIT ADMINISTRATION FACILITY
EIELSON AIR FORCE BASE (AFB), ALASKA
W911KB19R0008
JAN 2019
W911KB19R0008
EIE432
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 1
Design Complete
F-35A Aircraft Maintenance unit Administrative Facility
Eielson, Alaska EIE432
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING
REQUIREMENTS
STANDARD FORM 1442
00 11 01 PROPOSAL SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTALPROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 36 00.00 29 RADIOACTIVE MATERIALS PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.00 29 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIALINSPECTIONS
01 50 00.04 29 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR
EIELSON AFB PROJECTS
01 57 20.01 29 ENVIRONMENTAL PROTECTION
01 57 34.00 29 STORM WATER POLLUTION PREVENTION MEASURES
01 58 00 PROJECTIDENTIFICATION
01 74 19.01 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUTSUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 01 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACECONCRETE
03 35 00.00 10 CONCRETEFINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
4 20 00 UNIT MASONRY
DIVISION 05 - METALS
5 05 23.16 STRUCTURALWELDING
PROJECT TABLE OF CONTENTS Page 2
EIE432 Design Complete
F-35A Aircraft Maintenance unit Administrative Facility
Eielson, Alaska
05 12 00 STRUCTURALSTEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 42 13 METAL WALL PANELS
07 42 33.13 BIRD NESTING DETERRENT
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 36 13 SECTIONAL OVERHEAD DOORS
08 39 54 BLAST RESISTANT DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
8 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
9 29 00 GYPSUM BOARD
09 30 13 PORCELAIN TILING
09 51 00 SUSPENDED CEILING SYSTEMS
09 65 00 RESILIENT FLOORING AND WALL BASE
09 68 00 CARPETING
9 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 3
Complete
F-35A Aircraft Maintenance unit
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
22 15 26.00 20 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23.00 29 DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA SPECIFIC
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 31 13.00 40 METAL DUCTS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 52 00 HEATING BOILERS
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
DIVISION 26 - ELECTRICAL
26 05 00.00 50 COMMON WORK RESULTS FOR ELECTRICAL - HEADBOLT OUTLET
INSTALLATION
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
PROJECT TABLE OF CONTENTS Page 4
Complete
F-35A Aircraft Maintenance unit
31 09 20.00 29 FIELD SCREEN TESTING OF SOILS FOR CHEMICAL CONTAMINATION
31 11 00 CLEARING AND GRUBBING
31 23 29 GROUND THAWING
31 23 30 DEEP DYNAMIC SOIL IMPROVEMENT
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK COAT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR EXTERIOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 52 10 SERVICE PIPING, FUEL SYSTEMS
33 52 90.00 20 WELDING FOR POL SERVICE PIPING
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 40 - PROCESS INTERCONNECTIONS
40 17 30.00 40 WELDING GENERAL PIPING
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
-- End of Project Table of Contents --
PROJECT TITLE AND LOCATION: EIE432 - DESIGN-BID-BUILD F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATIVE FACILITY, EIELSON
AFB, ALASKA
NAICS 236220 SIZE $36.5M
Competitive 8(a) Acquisition SBA REQUIREMENT NO: UM1539644208R
General Description of Work: Contractor shall construct an F-35A Aircraft Maintenance Unit Administrative Facility at Eielson AFB, Alaska (EIE432) to accommodate the mission of the facility. The facility w ill include a pile foundation, pre-engineered steel frame, batt insulation, metal siding, and standing seam metal roof. Special foundations are included for arctic conditions. Project demolishes Building 1307 including connection to B 1306 (507 SM) to enable construction on the same site.
ROBERT L NORRIS
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
03-Jan-2019
(RFP)
(IFB)
X
CALL:
PAF1053834, FY19, CONSTRUCT F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATIVE FACILITY
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________475 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________08 Feb 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
EIE 432
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W911KB19R0008 234
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W911KB-19-R-0008
PS-1
PROPOSAL SCHEDULE
F-35A AIRCRAFT MAINTENANCE UNIT ADMIN FACILITY
EIELSON AFB, ALASKA
BASE ITEMS
Item
No.
Description Quantity Unit Unit Price Amount
0001 Construct, Aircraft Maintenance Unit Admin Facility within the building 5-foot lines, Complete
1 Job $_________ $_________
0002 Construct Aircraft Maintenance Unit Admin Facility site work beyond the building 5-foot lines, Complete
1 Job $_________ $_________
Total of Base Items 0001 thru 0002 $_________
OPTION ITEMS
Item
No.
Description Estimated
Quantity
Unit Unit Price Amount
0003 Dispose of 100 Cubic Yards of POL Contaminated Soil, Complete. Estimated Quantity*
100 CY $_________ $_________
0004 Dispose of 100 Cubic Yards of PFOS/PFOA Contaminated Soil, Complete. Estimated Quantity*
100 CY $_________ $_________
Total of Option Items 0003 thru 0004 $_________
Total of Base and Optional Items 0001 thru 0004 $_________
Proposed Contract Duration: ____________________
CLINs 0003, 0004, are estimated quantities. Equitable adjustments will be made in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY.
PS-2
* For CLINs 0003-0004, these options may be exercised at any time prior to the contract completion date by the Contracting Officer and completion time shall be 150 days from the date of option exercise or by the contract completion date, whichever is later. For CLINs 0003 and 0004, the Contractor shall keep a record of the amount of POL and PFOS/PFOA contaminated soil being disposed of.
EVALUATION OF OFFERS.
1. AWARD: Award will be made in accordance with Section 00 22 11 - EVALUATION
FACTORS FOR AWARD.
2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.
3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PROPOSAL SCHEDULE --
Section 00 21 00 W911KB19R0008
Section 00 21 00 Page 1
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.1 GENERAL INFORMATION
1.2 GENERAL DESCRIPTION OF WORK
1.3 CONTRACT COST MAGNITUDE FOR CONSTRUCTION COSTS
1.4 BOND AMOUNT REQUIRED
1.5 PRE-AWARD SURVEYS
1.6 PERFORMANCE OF WORK BY THE CONTRACTOR
1.7 GOVERNMENT SECURITY REQUIREMENTS
1.8 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.9 OFFEROR'S QUESTIONS AND COMMENTS
1.10 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.11 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.12 PRE-PROPOSAL CONFERENCE
1.13 ACCURACY IN PROPOSALS
1.14 PROPOSAL SUBMITTALS
1.15 PROPOSAL FORMAT
1.16 JOINT VENTURE PROPOSAL REQUIREMENTS
1.17 BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
1.18 SOLICITATION PROVISIONS
Section 00 21 00 Page 2
1.0 GENERAL INFORMATION
It has been determined that competition is limited or restricted geographically to the servicing area of the SBA Alaska District Office. All 8(a) certified firms serviced by the SBA Alaska District
Office and all 8(a) certified firms with a bona fide place of business located in the servicing area of the Alaska District Office are deemed eligible to submit offers. In addition, it has been determined that competition will not be restricted by stage (transitional or developmental) of a firm’s 8(a) program participation.
1.1. GENERAL DESCRIPTION OF WORK
General Description of Work: Contractor shall construct an F-35A Aircraft Maintenance Unit
Administrative Facility at Eielson AFB, Alaska (EIE432) to accommodate the mission of the facility.
The facility will include a pile foundation, pre-engineered steel frame, batt insulation, metal siding, and standing seam metal roof. Special foundations are included for arctic conditions. Project demolishes Building 1307 including connection to B 1306 (507 SM) to enable construction on the same site. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective.
The facility must also be able to withstand wind loads and seismic effect. The Contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work.
1.2. CONTRACT COST MAGNITUDE FOR CONSTRUCTION COSTS
The construction costs will be subject to the funds available for this project. The contract cost magnitude for contract award is approximately $5 Million to $10 Million. Offerors are notified that they are under no obligation to approach this ceiling however the Government may not be able make an award if the cost magnitude set for this project is exceeded.
1.3. BOND AMOUNT REQUIRED
Offeror Guarantee: The requirements for an Offer Guarantee as required in FAR Clause 52.228-1
Bid Guarantee (Sep 1996) are hereby waived. However, the offeror must submit a letter from their bonding company indicating the offeror’s ability to obtain performance and payment bonds in the amount of the proposal price.
1.4. PRE-AWARD SURVEYS
The Government reserves the right to conduct a pre-award survey of any firm under consideration to confirm any part of the information furnished by the Offeror, or to require other evidence of managerial, financial, technical, and other capabilities, the positive establishment of which is determined by the Government to be necessary for the successful performance of the contract.
1.5. PERFORMANCE OF WORK BY THE CONTRACTOR
Your attention is invited to Section 00 72 00, FAR 52.219-14 entitled “Limitations on Subcontracting.”
Submit with the proposal, a description of the work that the contractor intends to perform with his own organization (e.g. earthwork, paving, brickwork, roofing, etc.), the percentage of the total work and the estimated cost thereof.
Section 00 21 00 Page 3
1.6. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Alaska District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be
REJECTED by the US Army Corps of Engineers mail room facility located at PO Box 6898, Joint Base
Elmendorf-Richardson (JBER), Alaska 99506-6898 if it does not contain a return mailing address.
There will be no exceptions.
1.7. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities website at:
http://www.fbo.gov/ via Quick Search (Solicitation No. W911KB19R0008).
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov/ via Quick Search
(Solicitation No. W911KB19R0008).
1.8. OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to these documents should be submitted via the Bidder Inquiry system as indicated below.
All questions and/or comments should be submitted no later than ten (10) calendar days prior to the proposal due date.
Bidder Inquiry
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via
Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click on continue.
From this page you may view all bidder inquiries or add inquiry. A complete listing of all inquiries and responses will be issued by amendment after the inquiry period closes.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W911KB19R0008
The Bidder Inquiry Key is: ZVXHXI-G687GE http://www.fbo.gov/ http://www.fbo.gov/ http://www.projnet.org/projnet
Section 00 21 00 Page 4
The Bidder Inquiry System will be unavailable for new inquires 10 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.9. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Standard Form 1442, block 10 for the small business size standard/NAICS code.
1.10. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.11. SITE VISIT/PRE-PROPOSAL CONFERENCE
Site visit will be conducted on 22 JANUARY 2019 at the Corps of Engineers Eielson F-35 Resident
Office, located across the street from Building 2258, 2310 Central Avenue, Eielson AFB, Alaska
99702. Meet at the Resident Office at 10:00 AM Alaska Time. Contact David Bragg at 907-377-4111 or David.a.bragg@usace.army.mil by COB 16 January 2019 for base access questions.
1.12. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.13. PROPOSAL SUBMITTALS
Offerors must mail or deliver proposals to be received no later than the date and time stated on the standard form (SF) 1442 or subsequent solicitation amendment. Questions concerning proposal receipt can be directed to the Contract Specialist/Contracting Officer listed in the solicitation.
Offerors are advised to plan accordingly. No arrangements will be made by the government to assist in proposal delivery. Day-pass procedures will not be used for proposal delivery purposes nor are there proposal pick-up services. No escort services will be provided. It is incumbent on the offeror to plan for unanticipated delays in delivery of proposals. Due to heightened security at
Government installations, visitors to Joint Base Elmendorf-Richardson (JBER) must use the Boniface
Gate or Fort Richardson Gate (Visitor Centers). All vehicle occupants are required to wear seatbelts and hand-held cell phone usage by vehicle operators while driving on base/post is prohibited.
Violators will lose their Base/Post driving privileges for these offenses.
For offerors who will have their proposals hand-delivered, or use personal delivery services such as
DHL, UPS or FedEx, the delivery must be by person, courier or personal delivery service with active mailto:David.a.bragg@usace.army.mil
Section 00 21 00 Page 5 base access.
Proposals will be received no later than the date and time stated on the SF1442 or subsequent solicitation amendment at:
Mailing Address:
U.S. Army Corps of Engineers, Alaska District
ATTN: CEPOA-CT (Norris, Rm 30)
PO Box 6898
Joint Base Elmendorf-Richardson AFB, Alaska 99506-0898
Physical Address:
U.S. Army Corps of Engineers, Alaska District
ATTN: CEPOA-CT (Norris)
2204 3rd Street, Room 30
Joint Base Elmendorf-Richardson, Alaska 99506
Proposals will be accepted in Room 30 during Alaska District Corps of Engineer business hours (7:30
AM to 4:30PM) Monday through Friday excluding holidays but not later than the date and time stated on the SF1442 or subsequent solicitation amendment. Proposers are advised that the Alaska District
Corps of Engineers building has limited access. Only the main door (in front under the Corps of
Engineers red flag facing Talley Ave) and the atrium doors (the tan addition to the main building located on Third Street) are open to individuals without a building pass. Room 30 is located in the basement near the Fitness Area (turn right if using the main stairs or elevator). There is a date/time stamp located at the front desk in Room 30 and is the official clock used for proposal receipt.
The Packaging that contains the Proposals shall be marked:
”Proposals for Solicitation Number: W911KB19R0008, DO NOT OPEN”
1.14. PROPOSAL FORMAT
Written materials. Documents within proposal must be 8 ½” x 11” format, using 10 point or larger font size. Each volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein. Within each Tab, it is recommended that the proposal information be presented in the same relative format as the submission requirements are listed. Each Factor will be bookmarked for ease of proposal review.
The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number and email address shall appear in the lower left corner of the title page of any document/volume to be evaluated.
Volume number, section, page number and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).
Drawings will use 11” x 17” for half size drawings (if required).
Electronic Format: Provide CD in searchable, read-only format, preferably using .pdf files, following written format. All price breakdown information to aide in the price evaluation shall be submitted in Excel format.
Section 00 21 00 Page 6
Number of copies: For Volume 1, submit TWO original copies of printed matter (Bound Volumes), as well as TWO (2) CDs. For Volume 2, submit the original and one separate CD.
The successful contractor shall provide one (1) searchable, read only electronic (*.pdf) copy of the entire
Volumes 1 and 2.
1.15. JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS
Joint Ventures are allowable on competitive 8(a) set-asides. SBA must receive the joint venture agreement and all supporting documentation no less than twenty (20) working days prior to the scheduled date for contract award. If you are contemplating a joint venture on this project, you must advise your assigned Business Opportunity Specialist (BOS) in writing as soon as possible.
The joint venture must be approved by SBA prior to contract award.
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HUBZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13
CFR Part 126, respectively.
When proposing as a Limited Liability Company (LLC), a member authorized to bind the LLC shall sign the SF 1442. A copy of the LLC Certificate of Organization, Articles of Organization and the
Operating Agreement shall be submitted with the proposal.
On SF 25 and 25A, Bonds, where it requests “State of Incorporation,” the LLC should instead put the
“State of Organization.” In the Principal’s signature block, the signatory shall indicate whether he or she is signing as a member, manager, or both. Instead of a “Corporate Seal” attach the Certificate of
Formation or Certificate of Organization, as appropriate, which should indicate the signatory’s authority to bind the LLC.
1.16. BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
Your attention is invited to Clause 52.225-10 Notice of Buy American Act Requirement-
Construction Materials. You are advised to inform your potential subcontractors and suppliers of the Buy American Act requirements contained in this solicitation. Subparagraph (b) of the clause provides instructions for pre-award determinations as follows: “Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at
FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.” In accordance with FAR Part 25 Foreign Acquisition, subpart 25.205, entitled Post
Award determinations, subparagraph (a), if a contractor requests a determination regarding the inapplicability of the Buy American Act after contract award, the contractor must explain why it could not request the determination before contract award or why the need for such determination otherwise was not reasonably foreseeable.
Section 00 21 00 Page 7
1.17. SOLICITATION PROVISIONS
52.204-7 System for Award Management
52.211-14 Notice Of Priority Rating For National Defense, Emergency Preparedness, and Energy
Program Use
52.215-1 Instructions to Offerors--Competitive Acquisition
52.216-1 Type Of Contract
52.217-5 Evaluation Of Options
52.222-5 Davis-Bacon Act--Secondary Site of the Work
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment
Opportunity for Construction 52.225-10 Notice of Buy American Act Requirement – Construction Materials
52.233-2 Service Of Protest
52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I
52.236-28 Preparation of Proposals – Construction 252.204-7004 System for Award Management – Alternate A
252.225-7031 Secondary Boycott of Israel
252.236-7008 Contract Prices-Bidding Schedules
Section 00 21 00 Page 8
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for
Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) database means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding
Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM database;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification
Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or
Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) By submission of an offer, the Offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation
``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
http://www.sam.gov/ http://www.sam.gov/
Section 00 21 00 Page 9
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov.
(End of clause)
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be N/A DX rated order; C2 DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations
System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]
(End of provision)
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting
Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include
Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the https://www.acquisition.gov/
Section 00 21 00 Page 10 information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the
Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the
Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent
Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal
Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at
52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, Section 00 21 00 Page 11 if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the
Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--
(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the
Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.
(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government's interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
Section 00 21 00 Page 12
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the
Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the
Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
Section 00 21 00 Page 13
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting
Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
8.7% Alaska
15.1% (Locations Outisde
City of Anchorage, Alaska)
6.9% Alaska
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.