19R0008_EIE432_AM_7.pdf
PDF 9 MB Posted
- Attached to
- W911KB19R0008 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATION FACILITY Federal contract opportunity
- Solicitation number
- W911KB19R0008
About this file
AMENDMENT #7SPEVICICATION CHANGES AND PROPOSAL DUE DATE CHANGE
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03_18R0008_EIE432_AM_8.pdf | ||
| B.08.03_1890008_EIE432_AM_6.pdf | ||
| 18R0008_EIE432_AM_5.pdf | ||
| 19R0008_AM_04.pdf | ||
| 19R0008_AM_03.pdf | ||
| 18R0008-EIE432-AM_02.pdf | ||
| EIE432-18R0008-AM_01.pdf | ||
| A.03.11_JA-19_14_Best_Lock_Cores_Redacted.pdf | ||
| A.03.11_JA-_19_13_Whelen_Mass_Notif_Sys_Redacted.pdf | ||
| W911KB19R0008_-_EIE432.pdf | ||
| A.03.11_JA-_19_12_Monaco_Transceiver_SYSTEM_Redacted.pdf | ||
| A.03.11_JA-_19_11_DELTA_HVAC_DDC_SYSTEM_Redacted.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911KB19R0008
EIE 432
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: EIE432 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATIVE FACILITY, EIELSON AFB, ALASKA
a. This amendment provides changes to the solicitation as indicated on the continuation page(s) of this document.
b.PROPOSAL DUE DATE IS CHANGED 25 MARCH 2019 AT 1400 HOURS ALASKA TIME AND MAY BE SUBMITTED ELECTRONICALLY TO:
Robert.l.norris@usace.army.mil and Theresa.m.afrank@usace.army.mil
c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0008
X 9B. DATED (SEE ITEM 11)
03-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Mar-2019
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
1. A-100, A-110, A-120, A-502, A-600, A-603
2. CD101, C-101, C-111, C-501, C-502, C-701, C720, C-721, C-722
3. G-004 Updated UFC 4-010-01 reference date
4. M-103, M-301, M-303, M-501, M-502, M-601, M-602, M-603, M-701, M-806
5. ES101, E-120, E-121, E-401, E-602, E-603, E-604, E-701
6. S-001, S-110, S-301, S-501
b. The following drawings are added:
NONE
c. The following revised documents/sections are substituted for the superseded documents/sections:
The identifier “AM#7” appears before and after new and/or revised materials, except as noted below.
CORRECTED TABLE OF CONTENTS
-- Changed SECTION 33 63 13 Title TO EXTERIOR UNDERGROUND STEAM
DISTRIBUTION SYSTEM
Section 00 11 01 PROPOSAL SCHEDULE
– Changed proposal schedule in its entirety
SECTION 01 33 00 SUBMITTALS
– Updated SECTION 08 51 13 ALUMINUM WINDOWS
– Updated SECTION 33 63 13 EXTERIOR UNDERGROUND STEAM DISTRIBUTION
SYSTEM
SECTION 02 41 00 DEMOLITION
– para 3.3.2 Reuse of Materials and Equipment
SECTION 08 51 13 ALUMINUM WINDOWS
-- Para 1.3 Submittals SD-05 Design Data – Deleted description under “Design Analysis; G”
--Para 1.3 Submittals SD-06 Test Reports – Deleted “Resistance to Forced Entry” submittal, “Standard Airblast Test; G” submittal and description under “Standard Airblast Test”
--updated para 1.4.3 Design Data Requirements.
--updated para 1.4.4 Test Report Requirements
--updated para 1.11 Window Performance
--updated para 1.11.2.1 Computational Design Analysis Method
--deleted Para 1.11.2.2 Alternate Dynamic Design Analysis Method
--deleted Para 1.11.2.3 Standard Airblast Test Method
--deleted Para 2.1.3 Forced Entry Resistant Windows
SECTION 08 81 00 GLAZING
--para 2.2 – Insulating glass units
--para 2.2.1 – Buildings
NOTE: Revisions within the following documents do not contain the above referenced identifiers:
d. The following sections are deleted:
NONE
SECTION 00 11 00 – STANDARD FORM 1442, BLOCK 13
– The required response date/time has changed to 25 March 2019
e. The following documents are added:
SECTION 33 63 13 EXTERIOR UNDERGROUND STEAM DISTRIBUTION SYSTEM
--added in its entirety
f. The following revisions are incorporated:
NONE
g. Other:
NONE
(End of Summary of Changes)
EIE432 AMU Administration Facility Design Complete Submittal
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 STANDARD FORM 1442
00 11 01 PROPOSAL SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 36 00.00 29 RADIOACTIVE MATERIALS PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.00 29 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00.04 29 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR
EIELSON AFB PROJECTS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20.01 29 ENVIRONMENTAL PROTECTION
01 57 34.00 29 STORM WATER POLLUTION PREVENTION MEASURES
01 58 00 PROJECT IDENTIFICATION
01 74 19.01 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 2
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 72 00.00 29 FIBERGLASS REINFORCED PANEL (FRP) WAINSCOT
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
PROJECT TABLE OF CONTENTS Page 3
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 4
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 BRACING FOR HVAC AND PLUMBING SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23.00 29 DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA SPECIFIC
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 22 13.35 40 STEAM TRAPS
23 22 23.00 40 STEAM CONDENSATE PUMPS
23 22 25.00 40 STEAM VALVES
23 23 00 REFRIGERANT PIPING
23 36 00.00 40 AIR TERMINAL UNITS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 14.00 20 ELECTRICITY METERING
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 09 20.00 29 FIELD SCREEN TESTING OF SOILS FOR CHEMICAL CONTAMINATION
31 11 00 CLEARING AND GRUBBING
31 62 16.16 STEEL PIPE PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK COAT
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 05 29.00 29 WATER DISTRIBUTION SYSTEMS IN UTILIDUCTS
33 05 33.00 29 SEWERS IN UTILIDUCTS
PROJECT TABLE OF CONTENTS Page 5
33 05 37.00 29 HEAT DISTRIBUTION SYSTEMS IN UTILIDUCTS AND MANHOLES
33 05 41.00 29 UTILIDUCT SYSTEM
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 63 13 AM#7…EXTERIOR UNDERGROUND STEAM DISTRIBUTION
SYSTEM…AM#7
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
W911KB-19-R-0008
PS-1
AM#07...
PROPOSAL SCHEDULE
F-35A AIRCRAFT MAINTENANCE UNIT ADMIN FACILITY
EIELSON AFB, ALASKA
BASE ITEMS
Item No.
Description Quantity Unit Unit Price Amount
0001 Construct Aircraft Maintenance Unit Admin Facility within the building 5-foot lines, Complete
1 Job $_________ $_________
0002 Construct Aircraft Maintenance Unit Admin Facility site work beyond the building 5-foot lines, Complete
1 Job $_________ $_________
0003 Demolish Existing Building 1307, Including Connection to Building 1306, Complete
1 Job $_________ $_________
0004 Building 1306 Renovations, Utility Work, Complete 1 Job $_________ $_________
Total of Base Items 0001 thru 0004 $_________
OPTION ITEMS
Item No.
Description Quantity Unit Unit Price Amount
0005 Dispose of 100 Cubic Yards of POL Contaminated Soil, Complete. Estimated Quantity*
100 CY $_________ $_________
0006 Dispose of 100 Cubic Yards of PFOS/PFOA Contaminated Soil, Complete. Estimated Quantity*
100 CY $_________ $_________
0007 In lieu of Utilidor, Direct Bury Utility Lines Between MH 21A and Bldgs 1306 and 1307, Complete**
1 Job $_________ $_________
Total of Option Items 0005 thru 0007 $_________
Total of Base and Optional Items 0001 thru 0007 $_________
PS-2
Proposed Contract Duration: ____________________
CLINs 0005, 0006, are estimated quantities. Equitable adjustments will be made in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY.
* For CLINs 0005-0006, these options may be exercised at any time prior to the contract completion date by the Contracting Officer and completion time shall be 150 days from the date of option exercise or by the contract completion date, whichever is later. For CLINs 0005 and 0006, the Contractor shall keep a record of the amount of POL and PFOS/PFOA contaminated soil being disposed of.
** For CLIN 0007, this option may be exercised at the time of award.
EVALUATION OF OFFERS.
1. AWARD: Award will be made in accordance with Section 00 22 11 - EVALUATION
FACTORS FOR AWARD.
2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.
3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PROPOSAL SCHEDULE --
....AM#07
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 76 PAGES
EIE432 AMU Admin Facility
01 19 30.02 29 SD-01 Preconstruction Submittals 1.19Temporary Heating Monitoring
Plan
1.6 GTraffic Control Plan
1.6 GTraffic Control Plan
1.12.1.1 GTemporary Facilities Site Plan
1.16 GTemporary Facilities Site Plan
1.8.2 GUtility Outage
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 LPreliminary Project Schedule
3.4.2 LInitial Project Schedule
3.6.2 LPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.1 GPreliminary Sustainability
eNotebook SD-11 Closeout Submittals
1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
1.5.3.1 GFinal Sustainability eNotebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 76 PAGES
01 33 29 1.5.3.1 GAmended Final Sustainability eNotebook
1.5.3.1 GAmended Final High
Performance and Sustainable Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.5Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet 01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 76 PAGES
01 45 35 3.1.2NDT Procedures and Equipment Calibration Records
SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1Steel Joist Institute Membership 2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals 3.1.2Interim Final Report
2.1 GComprehensive Final Report
3.1.2 GComprehensive Final Report
01 50 00.04 29 SD-01 Preconstruction Submittals
1.4 GCONSTRUCTION SITE PLAN
3.3.1 GTraffic Control Plan
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey
1.6.2 GRegulatory Notifications
1.7 GEnvironmental Protection Plan
3.2.1.2Stormwater Notice of Intent
3.2.1.2 Gcopy of ADEC approval
1.7.11.1 GDirt and Dust Control Plan
1.6.5 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 76 PAGES
01 57 19 1.6.4 GEnvironmental Manager Qualifications
3.7.2.2 GCompleted Checklist For Spruce
Lake Disposal
3.10 GNotice of Intent For Asbestos
Abatement
1.7.6 GNotice Of Building Demolition
3.2.1.1 GStormwater Pollution Prevention
Plan (SWPPP)
3.2.1.2 GEvidence Of Delivery Of SWPPP
to ADEC
1.5.1 GContaminated Soil Sampling And
Analysis Plan (SAP)
3.8.1 GInitial Contractor Hazardous
Material Inventory
3.8.1 GContractor Hazardous Material
Inventory Log SD-06 Test Reports
3.7.1.1.2Laboratory Analysis 3.2.1.3Inspection Reports
3.7.2.1 GSolid Waste Management Report
1.5.2Contaminated Soil Sampling And
Analysis Field Report SD-07 Certificates
1.6.5 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 76 PAGES
01 57 19 1.6.5Erosion and Sediment Control Inspector
1.5.5 GADEC Transport, Treatment, &
Disposal Approval Form For Contaminated Media (ATT)
SD-11 Closeout Submittals
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
to ADEC
3.7.1 GWaste Determination
Documentation
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste, monthly (weight tickets, invoices, receipts, manifests)
1.6.5 GAssembled Employee Training
Records
3.7.3.1 GHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
1.5.6 GADEC Approved Disposal Facility
Weight And/Or Acceptance Ticket For Contaminated Soil
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 76 PAGES
01 57 19 1.5.6 GADEC Approved Disposal Facility Certificate Of Thermal Incineration Or Disposal Of Contaminated Soil Along With Confirmatory Sample Results
01 57 20.01 29 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
1.12 GDewatering Work Plan
3.1.1 GDewatering Work Plan
1.12CES/CEIEC
SD-06 Test Reports
1.7.2 GHAZMAT Inventory
1.12CES/CEIEC
1.12CES/CEIEC
1.7.2 GMonthly Waste Diversion Reports
01 57 34.00 29 SD-01 Preconstruction Submittals
1.4.1 GStorm Water Pollution Prevention
Plan (SWPPP)
1.4.2 GNotice of Intent (NOI)
SD-11 Closeout Submittals
3.1.2 GRecords
1.4.4 GNotice of Termination (NOT)
01 74 19.01 29 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-06 Test Reports
1.7 GSolid Waste Weight Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 76 PAGES
01 74 19.01 29 SD-11 Closeout Submittals 1.7Records
01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.7.1Instructions
SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract
Specifications
2.3 GCertification of EPA Designated
Items 3.9Draft DD FORM 1354 3.9High Performance And
Sustainable Building (Hpsb) Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 76 PAGES
01 78 23 SD-10 Operation and Maintenance Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals 3.3.4Receipts
02 61 13 SD-01 Preconstruction Submittals
1.3.2 GWork Plan
SD-02 Shop Drawings 3.1Surveys
SD-06 Test Reports
3.9 GClosure Report
02 81 00 SD-03 Product Data
3.1 GOnsite Hazardous Waste
Management
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 76 PAGES
02 81 00 3.2Notices of Non-Compliance and Notices of Violation
2.1.1Packaging Notifications SD-06 Test Reports
3.7 GRecordkeeping
3.8Spill Response
3.7 GException Report
SD-07 Certificates 1.4.3Certification 3.2.4Security Plan
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal
3.2.3 GShipping Documents and
Packagings Certification 3.6Waste Minimization
02 82 16.00 20 SD-03 Product Data 3.1.4Local Exhaust Equipment 3.1.5Vacuums
3.1.1.1 GRespirators
3.1.4Pressure Differential Automatic
Recording Instrument 1.2.2Amended Water 3.1.7Glovebags
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 76 PAGES
02 82 16.00 20 1.3.8Safety Data Sheets (SDS) For All Materials
2.1Encapsulants SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
For Local Exhaust System
3.3.3.2 GAsbestos Disposal Quantity
Report
3.2.6.3 GClearance Sampling
SD-07 Certificates
1.3.9 GAsbestos Hazard Abatement Plan
1.3.10 GTesting Laboratory
1.5.1 GPrivate Qualified Person
Documentation
1.5.4 GContractor's License
1.5.2 GCompetent Person
1.5.3 GWorker's License
1.3.11 GLandfill Approval
1.3.3 GEmployee Training
1.3.12Medical Certification
1.3.11 GWaste Shipment Records
1.3.6Respiratory Protection Program
1.3.11 GDelivery Tickets
3.1.2.3 GWater Filtration Equipment
3.1.5 GVentilation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 76 PAGES
02 82 16.00 20 3.1 GEquipment Used To Contain Airborne Asbestos Fibers
2.1 GEncapsulants
1.3.4Notifications
SD-11 Closeout Submittals
1.3.4 GNotifications
1.6.1 GRental Equipment
1.3.6.1Respirator Program Records
1.3.4 GPermits and Licenses
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.2 GLead Compliance Plan
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.8 GLead Waste Management Plan
3.5.2.1 GWritten Evidence
1.5.2.4Medical Examinations
SD-06 Test Reports
1.5.2.3 GSampling Results
1.5.2.3 GOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.3 GTesting Laboratory
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 76 PAGES
02 83 13.00 20 3.5.2.1 Ghazardous waste manifest
3.5.2.1 Gturn-in documents or weight
tickets 02 84 16 SD-07 Certificates
1.8.1 GQualifications of Contractor's IH
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
1.8.1 GTraining and resume
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4Certification of Decontamination 3.5.2.1Certificate of Disposal and/or recycling 03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications 1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data 2.4.8Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 76 PAGES
03 30 00 2.4.7Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials 2.4.6Vapor Retarder 2.3.3Concrete Curing Materials 2.5Reinforcement
2.6.1 GLiquid Chemical Floor Hardener
2.4.5Admixtures 2.5.2Mechanical Reinforcing Bar
Connectors 2.2.1Waterstops 1.8.1Local/Regional Materials 2.4.9Biodegradable Form Release
Agent 1.6.3.2Pumping Concrete 1.6.3.3Finishing Plan 3.7.5Bonding Agent
SD-04 Samples
1.6.5.1 GSlab Finish Sample
SD-05 Design Data
2.3.1 GMix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Ground Granulated Blast-Furnace
Slag 2.4.3Aggregates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 76 PAGES
03 30 00 3.13.2.3 GCompressive Strength Tests
3.13.2.4 GAir Content
3.13.2.1 GSlump Tests
2.4.2Water
SD-07 Certificates 2.5.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.4VOC Content for Form Release
Agents, Curing Compounds, and Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets 1.6.7.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.6.1Liquid Chemical Floor Hardener 05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 GErection Drawings
SD-02 Shop Drawings
1.5.2 GFabrication drawings
SD-03 Product Data
2.6.2Shop primer 2.4.1Welding electrodes and rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension control bolts
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 76 PAGES
05 12 00 2.6.2Class B coating 2.3Bolts, nuts, and washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer
Inspection Reports 3.7.3.1Bolt Testing Reports
SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 2.5Galvanizing 2.4.4Pins and rollers 1.3AISC Fabrication Plant Quality
Certification 1.3AISC Erector Quality Certification 1.5.3.1Welding procedures and qualifications 2.4.1Welding electrodes and rods
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.5Galvanizing Repair Paint 2.2.16Mechanical Fasteners 2.1.5Touch-up Paint 1.3.3Welding Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 76 PAGES
05 30 00 1.3.3Welding Rods and Accessories SD-04 Samples
2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.12Stud Manufacture's Certification 2.2.12Stud Manufacture's Test Reports
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products 05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.1.1Welds SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 76 PAGES
05 40 00 2.1 SRecycled Content of Steel Products
05 51 33 SD-02 Shop Drawings 2.3Ladders
SD-03 Product Data 2.3Ladders
SD-07 Certificates 1.3Fabricator Certification for Ladder
Assembly 05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2Iron and Steel Hardware 3.2Steel Shapes, Plates, Bars and
Strips SD-03 Product Data
2.2.3Steel Railings and Handrails 1.2.1Anchorage and Fastening
Systems SD-07 Certificates
1.4.1Welding Procedures
1.4.2 GWelder Qualification
06 41 16.00 10 SD-02 Shop Drawings 1.5.2Shop Drawings 2.9Shop Drawings 3.1Installation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 76 PAGES
06 41 16.00 10 2.1Wood Materials 2.9.7.3Finish Schedule 1.5.3Certification
SD-04 Samples 2.3Plastic Laminates 2.5Cabinet Hardware
SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework
SD-11 Closeout Submittals 1.3HPSB Documentation
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data 2.1Solid Polymer Material 1.5.1Qualifications 2.3Fabrications 1.5.2Certification 1.5.2VOC Content
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter Tops
SD-06 Test Reports 2.1Solid Polymer Material
SD-07 Certificates 2.3Fabrications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 76 PAGES
06 61 16 1.5.1Qualifications SD-10 Operation and Maintenance Data
3.2Clean-up SD-11 Closeout Submittals
1.3HPSB Documentation 07 11 13 SD-07 Certificates
1.3Materials 07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2Block or Board Insulation 2.3Vapor Retarder 2.4Pressure Sensitive Tape 1.4Protection Board or Coatings 2.6Accessories
SD-07 Certificates 2.2Block or Board Insulation 2.3Vapor Retarder 2.5Protection Board or Coating 3.4.4Protection Board or Coating 1.8Special Warranties 1.8Special Warranties 1.5ULE Greenguard
SD-08 Manufacturer’s Instructions 2.2Block or Board Insulation 2.6.1Adhesive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 76 PAGES
07 21 13 SD-11 Closeout Submittals
1.5 SULE Greenguard
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 21 16 SD-03 Product Data 2.4Accessories 2.2Thermal And Sound Insulation
Batts SD-08 Manufacturer’s Instructions
3.2.1Insulation SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SReduce Volatile Organic
Compounds (VOC)
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3Verification of Existing Conditions
SD-03 Product Data
2.2 GInsulation
1.4Cover Board 2.5Fasteners 2.4Moisture Control 1.10.1Asphalt
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 76 PAGES
07 22 00 1.8.1 GFlame Spread Rating SD-07 Certificates
1.9Volatile Organic Compounds (VOC) Content
1.6Installer Qualifications
1.6 GCertificates Of Compliance For
Felt Materials SD-08 Manufacturer’s Instructions
2.5Fasteners 2.2Insulation
SD-11 Closeout Submittals
1.9 SVolatile Organic Compounds
(VOC) Content 07 27 10.00 10 SD-06 Test Reports
3.1.2 GTesting and Inspection
SD-07 Certificates
1.6 GAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.8.1 GQualifications of Manufacturer
1.8.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.3 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 76 PAGES
07 27 19.01 SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.3Flame Propagation of Wall
Assemblies 1.4.3Flame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections and Testing
SD-07 Certificates 1.4Self-adhering Air Barrier
1.8.1 GQualifications of Manufacturer
1.8.2Qualifications of Installer
SD-08 Manufacturer’s Instructions 1.4Self-adhering Air Barrier
2.3 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content 07 27 36 SD-01 Preconstruction Submittals
1.10.1 GQualification of Manufacturer
1.10.2 GQualification of Installer
1.11 GQuality Control Plan
1.11 GSafety Plan
1.9.1 GFire Prevention Plan
1.9.2 GRespirator Plan
SD-02 Shop Drawings 1.5Spray Foam Air Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 76 PAGES
07 27 36 1.11 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.2.2 GClosed Cell
2.3 GTransition Membrane
2.4 GPrimers, Adhesives, and Mastics
2.6 GSealants
1.5.2 GSafety Data Sheets
2.2.1 GThermal Barrier Materials
1.12.3 GIgnition Barrier Coatings
2.2.1 GAccessories
SD-06 Test Reports
1.5.3 GField Peel Adhesion Test
1.12.2 GPrimers
1.5.3 GFlame Spread And Smoke
Developed Index Ratings Of SPF Products
3.4.1 GSite Inspections
SD-07 Certificates
2.2.2 GClosed cell
1.10.1 GQualification of Manufacturer
1.10.2 GQualification of Installer
2.3 GTransition Membrane
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 76 PAGES
07 27 36 3.2.1 GSubstrate Preparation
1.5.1 GThermal Barrier
1.12.3 GIgnition Barrier
2.3 GTransition Membrane
2.4 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field Reports
1.11Core Samples 3.3.3Daily Work Record
Visual Inspection and Thermal Scanning
SD-11 Closeout Submittals 2.1.1Volatile Organic Compound
(VOC) Content 2.1.2Recycled Content
07 42 13 SD-01 Preconstruction Submittals 1.5.3Qualification of Manufacturer 1.5.4Qualification of Installation
Contractor 1.8Warranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data 2.1Recycled Content;
2.2 GInsulated Metal Panels
2.3.1Factory Color Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 76 PAGES
07 42 13 1.5.5Closure Materials 2.6.4.4Pressure Sensitive Tape 2.6.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.6Accessories
SD-04 Samples
2.2 GInsulated Metal Panels
1.5.3.1 GFasteners
2.6.3 GMetal Closure Strips
1.5.1 GColor charts
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports 3.7.2Leakage Tests 1.3.2Wind Load Tests 2.3.1.2Coating 2.3.1.2Chalking 1.3.2Seismic Tests
SD-07 Certificates 1.5.3.1Coil Stock 1.5.3.1Fasteners 1.5.3.1Enamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 76 PAGES
07 42 13 SD-09 Manufacturer’s Field Reports
3.8.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material 07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal 3.1.17Expansion Joints 2.2.1Fasciae 3.1.11Base Flashing 3.1.12Counterflashing 3.1.14Drip Edges 3.1.15Eave Flashing
SD-04 Samples 1.4.2Finish Samples
SD-07 Certificates 2.1Certificates of Compliance
SD-08 Manufacturer’s Instructions 1.4.3Instructions for Installation 3.5Quality Control Plan
SD-10 Operation and Maintenance Data
1.4.3Cleaning and Maintenance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 76 PAGES
07 60 00 SD-11 Closeout Submittals 2.1Recycled Content
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 GRoofing
SD-03 Product Data
2.2 GRoofing Panels
2.3Attachment Clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants
1.7 GWarranty
SD-04 Samples 2.2Panel 2.4Accessories 2.4.3Sealants
SD-05 Design Data 1.5Design Calculations
SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish
SD-07 Certificates 1.6.3Manufacturer's Technical
Representative 1.6.4Installer's Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 76 PAGES
07 61 14.00 20 2.2 GCoil Stock SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8Information Card
2.2 SEnergy Star Label for Steel
Roofing Product
2.2.1 SRecycled Content for Steel
Roofing Product 1.7Warranty
07 81 00 SD-03 Product Data
3.3 GFireproofing Material
SD-04 Samples 2.1Spray-Applied Fireproofing
SD-06 Test Reports
1.2.2 GFire Resistance Rating
3.6 GField Tests
1.2.3Evaluation Reports
SD-07 Certificates
1.4.1 GInstaller Qualifications
3.1 GSurface Preparation Report
07 84 00 SD-02 Shop Drawings 2.1Firestopping System
SD-03 Product Data 2.2Firestopping Materials
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 76 PAGES
07 84 00 3.3Inspection SD-07 Certificates
1.5.2Inspector Qualifications 2.2Firestopping Materials 1.5.1Installer Qualifications
07 92 00 SD-03 Product Data 2.2Sealants 2.3Primers 2.4Bond Breakers 2.5Backstops 3.1Field Adhesion
SD-07 Certificates 1.4.1Indoor Air Quality
SD-11 Closeout Submittals
2.2.1 SIndoor Air Quality For Interior
Sealants
2.2.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.2.4 SIndoor Air Quality For Interior
Acoustical Sealants 07 95 00 SD-02 Shop Drawings
1.5 GPlacement Drawings
SD-03 Product Data
1.6 GProduct Data
08 11 13 SD-02 Shop Drawings
2.1 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 76 PAGES
08 11 13 2.1 GDoors
2.5 GFrames
2.5 GFrames
2.3Accessories 2.6Weatherstripping
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.10Fabrication Drawings
SD-03 Product Data 2.1Windows 2.2.8.1Hardware 2.2.3Fasteners 1.11Window Performance 2.3Thermal-Barrier Windows 2.4Mullions 2.2.10Screens 2.2.2Weatherstripping 2.2.8Accessories 2.2.4Adhesives 1.11.5Thermal Performance
SD-04 Samples 1.4.2.1Finish Sample
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 76 PAGES
08 51 13 1.4.2.2Window Sample SD-05 Design Data
2.1Structural Calculations for Deflection
GDesign Analysis SD-06 Test Reports
1.4.4Minimum Condensation Resistance Factor
SD-10 Operation and Maintenance Data
2.1Windows 1.7Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.