EIE432-18R0008-AM_01.pdf
PDF 26 MB Posted
- Attached to
- W911KB19R0008 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATION FACILITY Federal contract opportunity
- Solicitation number
- W911KB19R0008
About this file
AMENDMENT #01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03_18R0008_EIE432_AM_8.pdf | ||
| 19R0008_EIE432_AM_7.pdf | ||
| B.08.03_1890008_EIE432_AM_6.pdf | ||
| 18R0008_EIE432_AM_5.pdf | ||
| 19R0008_AM_04.pdf | ||
| 19R0008_AM_03.pdf | ||
| 18R0008-EIE432-AM_02.pdf | ||
| A.03.11_JA-19_14_Best_Lock_Cores_Redacted.pdf | ||
| A.03.11_JA-_19_13_Whelen_Mass_Notif_Sys_Redacted.pdf | ||
| W911KB19R0008_-_EIE432.pdf | ||
| A.03.11_JA-_19_12_Monaco_Transceiver_SYSTEM_Redacted.pdf | ||
| A.03.11_JA-_19_11_DELTA_HVAC_DDC_SYSTEM_Redacted.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EIE 432
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
EIE432 F-35A Aircraft Maintenance Unit Administrative Facility, Eielson AFB, AK
a) This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
b) Proposal due date is not extended. Remains the same 08 FEBRUARY 2019 @ 2PM AKDST.
c) YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442
POC ROBERT NORRIS @ ROBERT.L.NORRIS@USACE.ARMY.MIL
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0008
X 9B. DATED (SEE ITEM 11)
03-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jan-2019
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
07 JAN 2019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
NONE
b. The following revised documents/sections are substituted for the superseded documents/sections: The identifier “AM#01” appears before and after new and/or revised materials, except as noted below.
1. TABLE OF CONTENTS
The following division requirements are deleted
-- SECTION 40 17 30.00 40 WELDING GENERAL PIPING
-- SECTION 41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
2. SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
-- PARAGRAPH 1.11
-- SITE VISIT DATE IS CHANGED TO 24 JANUARY 2019 @10:00AM
3. SECTION 00 72 00 CONTRACT CLAUSES
The following were added in their entirety;
-- FAR CLAUSE 52.223-20 AEROSOLS (JUN 2016)
-- FAR CLAUSE 52.223-21 FOAMS (JUN 2016)
The following were deleted in their entirety:
-- FAR CLAUSE 52.203-14 Display of Hotline Poster(s) (Oct 2015)
-- FAR CLAUSE 52.215-23 Limitations on Pass-Through Charges (Oct 2009) -- FAR CLAUSE 52.219-17 Section 8(a) Award (Jan 2017)
c. The following sections are deleted:
NONE
d. The following documents are added:
EIE432-Design Complete Full Size
e. The following revisions are incorporated:
NONE
f. Other:
SECTION 00 73 46
DAVIS BACON WAGE RATES 04 JAN 2019
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
PROJECT TABLE OF CONTENTS Page 1
Design
Complete
F-35A Aircraft Maintenance unit
Administrative Facility
Eielson, Alaska EIE432
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING
REQUIREMENTS
STANDARD FORM 1442
00 11 01 PROPOSAL SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTALPROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 36 00.00 29 RADIOACTIVE MATERIALS PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.00 29 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIALINSPECTIONS
01 50 00.04 29 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR
EIELSON AFB PROJECTS
01 57 20.01 29 ENVIRONMENTAL PROTECTION
01 57 34.00 29 STORM WATER POLLUTION PREVENTION MEASURES
01 58 00 PROJECTIDENTIFICATION
01 74 19.01 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUTSUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 01 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACECONCRETE
03 35 00.00 10 CONCRETEFINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
4 20 00 UNIT MASONRY
DIVISION 05 - METALS
5 05 23.16 STRUCTURALWELDING
PROJECT TABLE OF CONTENTS Page 2
EIE432 Design
Complete
F-35A Aircraft Maintenance unit
Administrative Facility
Eielson, Alaska
05 12 00 STRUCTURALSTEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 42 13 METAL WALL PANELS
07 42 33.13 BIRD NESTING DETERRENT
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 36 13 SECTIONAL OVERHEAD DOORS
08 39 54 BLAST RESISTANT DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
8 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
9 29 00 GYPSUM BOARD
09 30 13 PORCELAIN TILING
09 51 00 SUSPENDED CEILING SYSTEMS
09 65 00 RESILIENT FLOORING AND WALL BASE
09 68 00 CARPETING
9 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 3
Complete
F-35A Aircraft Maintenance unit
Administrative Facility
Eielson, Alaska
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
22 15 26.00 20 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23.00 29 DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA SPECIFIC
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 31 13.00 40 METAL DUCTS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 52 00 HEATING BOILERS
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
DIVISION 26 - ELECTRICAL
26 05 00.00 50 COMMON WORK RESULTS FOR ELECTRICAL - HEADBOLT OUTLET
INSTALLATION
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
PROJECT TABLE OF CONTENTS Page 4
Complete
F-35A Aircraft Maintenance unit
Administrative Facility
Eielson, Alaska
31 09 20.00 29 FIELD SCREEN TESTING OF SOILS FOR CHEMICAL CONTAMINATION
31 11 00 CLEARING AND GRUBBING
31 23 29 GROUND THAWING
31 23 30 DEEP DYNAMIC SOIL IMPROVEMENT
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK COAT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR EXTERIOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 52 10 SERVICE PIPING, FUEL SYSTEMS
33 52 90.00 20 WELDING FOR POL SERVICE PIPING
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
AM#01 DIVISION 40 - PROCESS INTERCONNECTIONS
40 17 30.00 40 WELDING GENERAL PIPING
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING AM#01
-- End of Project Table of Contents --
Section 00 21 00 W911KB19R0008
EIE432
Section 00 21 00 Page 4
The Bidder Inquiry System will be unavailable for new inquires 10 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.9. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Standard Form 1442, block 10 for the small business size standard/NAICS code.
1.10. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.11. SITE VISIT/PRE-PROPOSAL CONFERENCE
Site visit will be conducted on AM#01 24 JANUARY 2019 AM#01 at the Corps of Engineers Eielson
F-35 Resident Office, located across the street from Building 2258, 2310 Central Avenue, Eielson AFB, Alaska 99702. Meet at the Resident Office at 10:00 AM Alaska Time. Contact David Bragg at 907-377-
4111 or David.a.bragg@usace.army.mil by COB 16 January 2018 for base access questions.
1.12. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.13. PROPOSAL SUBMITTALS
Offerors must mail or deliver proposals to be received no later than the date and time stated on the standard form (SF) 1442 or subsequent solicitation amendment. Questions concerning proposal receipt can be directed to the Contract Specialist/Contracting Officer listed in the solicitation.
Offerors are advised to plan accordingly. No arrangements will be made by the government to assist in proposal delivery. Day-pass procedures will not be used for proposal delivery purposes nor are there proposal pick-up services. No escort services will be provided. It is incumbent on the offeror to plan for unanticipated delays in delivery of proposals. Due to heightened security at
Government installations, visitors to Joint Base Elmendorf-Richardson (JBER) must use the Boniface
Gate or Fort Richardson Gate (Visitor Centers). All vehicle occupants are required to wear seatbelts and hand-held cell phone usage by vehicle operators while driving on base/post is prohibited.
Violators will lose their Base/Post driving privileges for these offenses.
For offerors who will have their proposals hand-delivered, or use personal delivery services such as
DHL, UPS or FedEx, the delivery must be by person, courier or personal delivery service with active base access.
mailto:David.a.bragg@usace.army.mil
SECTION 00 72 00 - CONTRACT CLAUSES
52.223-20 AEROSOLS (JUN 2016)
(a) Definitions. As used in this clause--
Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0.
High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA's Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part
82, subpart G, with supplemental tables of alternatives available at http://www.epa.gov/snap/).
Hydrofluorocarbons means compounds that contain only hydrogen, fluorine, and carbon.
(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, or emissions of high global warming potential hydrofluorocarbons, when feasible, from aerosol propellants or solvents under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as--
(1) In-use emission rates, energy efficiency;
(2) Safety, such as flammability or toxicity;
(3) Ability to meet technical performance requirements; and
(4) Commercial availability at a reasonable cost.
(c) The Contractor shall refer to EPA's SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap/.
(End of clause)
52.223-21 FOAMS (JUN 2016)
(a) Definitions. As used in this clause--
Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0. High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA's Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40
CFR part 82, subpart G, with supplemental tables of alternatives available at http://www.epa.gov/snap/.
Hydrofluorocarbons means compounds that contain only hydrogen, fluorine, and carbon.
b. Unless otherwise specified in the contract, the Contractor shall reduce its use, release, and emissions of high global warming potential hydro fluorocarbons and refrigerant blends containing hydrofluorocarbons, when feasible, from foam blowing agents, under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as--
(1) In-use emission rates, energy efficiency, and safety;
(2) Ability to meet performance requirements; and
(3) Commercial availability at a reasonable cost.
(b) The Contractor shall refer to EPA's SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap/.
(End of clause) http://www.epa.gov/snap/) http://www.epa.gov/snap/ http://www.epa.gov/snap/ http://www.epa.gov/snap/
SECTION 00 73 46 W911KB19R0008
General Decision Number: AK190001 01/04/2019 AK1
Superseded General Decision Number: AK20180001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded
(and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
ASBE0097-001 01/01/2018
Rates Fringes
Asbestos Workers/Insulator
(includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 21.57
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55
* BOIL0502-002 10/01/2017
BOILERMAKER......................$ 46.17 29.70
* BRAK0001-002 07/01/2018
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.77
Tile & Terrazzo Finisher.........$ 34.79 19.62
CARP1501-001 09/01/2016
MILLWRIGHT.......................$ 36.74 22.99
CARP2520-003 09/01/2018
Diver
Stand-by....................$ 42.65 25.66
Tender......................$ 41.65 25.66
Working.....................$ 82.45 25.66
Piledriver
Piledriver; Skiff Operator and Rigger..................$ 38.34 25.66
Sheet Stabber...............$ 38.34 25.66
Welder......................$ 43.90 25.66
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot
101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2018
CARPENTER
Including Lather and
Drywall Hanging.............$ 38.34 25.66
ELEC1547-004 04/01/2018
CABLE SPLICER....................$ 39.82 3%+$26.44
ELECTRICIAN......................$ 39.49 3%+$26.69
ELEC1547-005 04/01/2018
Line Construction
CABLE SPLICER....................$ 52.57 3%+30.81
Linemen (Including Equipment
Operators, Technician)...........$ 50.52 3%+30.81
Powderman........................$ 48.52 3%+30.81
TREE TRIMMER.....................$ 36.21 3%+24.19
ELEV0019-002 01/01/2018
ELEVATOR MECHANIC................$ 55.45 32.645+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after
Thanksgiving, and Christmas Day
ENGI0302-002 04/01/2018
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.28 23.05
GROUP 1A....................$ 42.04 23.05
GROUP 2.....................$ 39.51 23.05
GROUP 3.....................$ 38.79 23.05
GROUP 4.....................$ 32.58 23.05
TUNNEL WORK
GROUP 1....................$ 44.31 23.05
GROUP 1A...................$ 46.24 23.05
GROUP 2....................$ 43.46 23.05
GROUP 3....................$ 42.67 23.05
GROUP 4....................$ 35.84 23.05
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and
Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and
Cablecars; Cleaning Machine; Coating Machine; Concrete
Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching
Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter
Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power
Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through
40 yards; Service Oiler/Service Engineer; Sidebooms-under
45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry
Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment
Operator; Loaders over 5 yds.; Certified Welder, Electrical
Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump
Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade
Technician; Loaders, (i.e., Elevating Grader and Material
Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under
16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air
Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber
Green and similar types (b) Forklifts or Lumber Carrier
(on construction job site) (c) Forklifts with Tower (d)
Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey
(air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and
Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill
Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant
Engineer shall be required on cranes over 85 tons or over
100 feet of boom.
IRON0751-003 07/01/2018
IRONWORKER
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 37.90 31.48
FENCE, BARRIER INSTALLER....$ 34.40 31.48
GUARDRAIL INSTALLERS........$ 35.14 31.48
GUARDRAIL LAYOUT MAN........$ 35.14 31.48
HELICOPTER, TOWER...........$ 38.90 31.48
LABO0341-005 04/01/2018
Laborers: South of the 63rd
Parallel & West of Longitude
138 Degrees
GROUP 1.....................$ 30.26 27.01
GROUP 2.....................$ 31.26 27.01
GROUP 3.....................$ 32.16 27.01
GROUP 3A....................$ 35.44 27.01
GROUP 3B....................$ 39.98 24.30
GROUP 4.....................$ 19.83 27.01
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.29 27.01
GROUP 2....................$ 34.39 27.01
GROUP 3....................$ 35.38 27.01
GROUP 3A...................$ 38.98 27.01
GROUP 3B...................$ 42.88 24.30
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber
Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers.
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 04/01/2018
Laborers: North of the 63rd
Parallel & East of Longitude
138 Degrees
GROUP 1.....................$ 30.26 27.21
GROUP 2.....................$ 31.26 27.21
GROUP 3.....................$ 32.16 27.21
GROUP 3A....................$ 35.44 27.21
GROUP 3B....................$ 38.98 24.50
GROUP 4.....................$ 19.83 27.21
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.29 27.21
GROUP 2....................$ 34.39 27.21
GROUP 3....................$ 35.38 27.21
GROUP 3A...................$ 38.98 27.21
GROUP 3B...................$ 42.88 24.50
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber
Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers.
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2018
NORTH OF THE 63RD PARALLEL
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 32.09 21.09
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 32.61 21.09
PAIN1959-002 07/01/2018
SOUTH OF THE 63RD PARALLEL
PAINTER
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and
Commercial Spray............$ 32.09 21.09
Machine Taper/Drywall.......$ 32.61 21.09
Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 32.61 20.09
PAIN1959-003 07/01/2018
NORTH OF THE 63RD PARALLEL
GLAZIER..........................$ 39.28 23.49
PAIN1959-004 07/01/2018
FLOOR LAYER: Carpet.............$ 29.13 14.06
PAIN1959-006 07/01/2018
SOUTH OF THE 63RD PARALLEL
GLAZIER..........................$ 39.28 23.49
PLAS0867-001 02/01/2016
PLASTERER
North of the 63rd parallel..$ 37.25 20.41
South of the 63rd parallel..$ 37.00 20.41
PLAS0867-004 02/01/2016
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 37.25 20.41
South of the 63rd parallel..$ 37.00 20.41
PLUM0262-002 01/01/2017
East of the 141st Meridian
Plumber; Steamfitter.............$ 38.02 26.72
PLUM0367-002 07/01/2017
South of the 63rd Parallel
Plumber; Steamfitter.............$ 39.00 23.80
PLUM0375-002 07/01/2018
North of the 63rd Parallel
Plumber; Steamfitter.............$ 41.16 26.55
PLUM0669-002 04/01/2017
SPRINKLER FITTER.................$ 46.00 23.29
ROOF0189-006 04/01/2018
ROOFER...........................$ 44.62 15.50
SHEE0023-003 07/01/2018
South of the 63rd Parallel
SHEET METAL WORKER...............$ 42.70 26.40
SHEE0023-004 07/01/2017
North of the 63rd Parallel
SHEET METAL WORKER...............$ 47.74 23.48
TEAM0959-003 03/01/2018
TRUCK DRIVER
GROUP 1.....................$ 39.59 23.62
GROUP 1A....................$ 40.86 23.62
GROUP 2.....................$ 38.33 23.62
GROUP 3.....................$ 37.51 23.62
GROUP 4.....................$ 36.93 23.62
GROUP 5.....................$ 36.17 23.62
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon
(250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps
(driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over
20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil
Distributor Drivers; Trucks/Jeeps (push or pull); Traffic
Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and
Truck with pups) up to and including 10 yards; Track Truck
Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster
Operators (handling bulk aggregate); Lumber Carrier; Water
Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch
Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and
Swing attachments, over 5 tons; Front End Loader with
Forks; Bus Operator over 30 passengers; All Terrain
Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam
Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire
Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger
(air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type
Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
of Engineers Alaska District
US Army Corps
SHEET OFDWG #:
C
R ev it\
4-
_E
IE
2-lo ca l-R
ES
.rv t
/1 2/
2:
:1
PM
C O
VE
R
S H
EE
T
EIELSON AFB, ALASKA
DESIGN COMPLETE, 10 DEC 2018
W911KB19R0008
REF.
NUM. SHEET TITLESHT REF.
NUM. SHEET TITLESHT REF.
NUM. SHEET TITLESHT REF.
NUM. SHEET TITLESHT REF.
NUM. SHEET TITLESHT
ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS
SCHEDULE OF DRAWINGS
SHEET OFDWG #:
C
R ev it\
4-
_E
IE
2-lo ca l-R
ES
.rv t
/1 2/
2:
:1
PM
SC
H
ED
U
LE
O
F D
R
AW
IN
G
S
EIELSON AFB, ALASKA
EIE432 F-35 AMU ADMINISTRATIVE FACILITY
W911KB19R0008
DESIGN COMPLETE - EIE432, 10 DEC 2018
E-702 ELECTRICAL CONTROL DIAGRAMS
T-001 LEGEND AND ABBREVIATIONS
TD101 TELECOMM SITE DEMOLITION PLAN
TS101 TELECOMM SITE PLAN
T-110 FIRST FLOOR TELECOM PLAN
T-111 BUILDING 1306 TELECOMM PLAN
T-401 ENLARGED TELECOMM PLANS
T-501 TELECOM DETAILS
FP-001 LEGEND AND NOTES
FP-100 FIRST FLOOR FIRE PROTECTION PLAN
FP-101 ENLARGED INTERSTITIAL FIRE PROTECTION SPACE
FP-401 FIRE PROTECTION SECTION
FA-001 FAMNS GENERAL NOTES AND LEGENDS
FA-100 FIRST FLOOR FIRE ALARM PLAN
FA-101 ENLARGED INTERSTITIAL FIRE ALARM SPACE
FA-102 ENLARGED FIRE ALARM BLDG 1306/1307
FA-501 ANTENNA DETAILS
FA-601 FAMNS AND RSFACU RISER DIAGRAM
FA-602 FAMNS OPERATIONAL MATRIX
RD001 TO
RD033
RECORD DRAWINGS
S-005 SPECIAL INSPECTIONS
S-010 LOADING PLANS
S-101 PILE FOUNDATION PLAN
S-110 STRUCTURAL SLAB PLAN
S-120 INTERSTITIAL MECHANICAL SPACE AND ROOF FRAMING PLANS
S-201 BRACED FRAME ELEVATION
S-301 BUILDING SECTIONS
S-401 ENLARGED TRUSS PROFILE
S-501 FOUNDATION AND SLAB DETAILS
S-510 FRAMING DETAILS
S-511 FRAMING DETAILS
S-512 ENTRY CANOPY FRAMING
S-520 BRACED FRAME DETAILS
S-530 METAL STUD WALL DETAILS
S-540 BUILDING 1306 DETAILS
S-541 BLDG 1306 CANOPY FRAMING DETAILS
S-601 STRUCTURAL CONCRETE SCHEDULES
M-001 LEGEND AND ABBREVIATIONS
M-101 UNDERFLOOR PLUMBING PLAN
M-102 FIRST FLOOR PLUMBING PLAN
M-103 FIRST FLOOR HEATING PLAN
M-104 FIRST FLOOR VENTILATION & AIR CONDITIONING PLAN
M-301 ENLARGED MECHANICAL ROOM
M-302 ENLARGED INTERSTITIAL MECHANICAL SPACE
M-303 ENLARGED MECHANICAL PLAN BLDG 1306
M-401 MECHANICAL SECTIONS
M-501 PLUMBING DETAILS
M-502 HEATING
M-503 VENTILATION
M-601 PLUMBING
M-602 HEATING
M-603 VENTILATION
M-701 DIAGRAMS - HEATING
M-702 DIAGRAMS - HEATING
M-801 CONTROL SEQUENCES
M-802 CONTROL SEQUENCES
M-803 CONTROL SEQUENCES
M-804 CONTROL SEQUENCES
M-805 CONTROL SEQUENCES
M-806 CONTROL SEQUENCES
M-807 CONTROL SEQUENCES
M-808 CONTROL SEQUENCES
E-001 LEGEND AND ABBREVIATIONS
E-002 GENERAL NOTES
ED101 ELECTRICAL SITE DEMOLITION PLAN
ES101 ELECTRICAL SITE PLAN
E-110 FIRST FLOOR LIGHTING PLAN
E-120 FIRST FLOOR POWER PLAN
E-121 BUILDING 1306 POWER PLAN
E-401 ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-601 LIGHT FIXTURES & CONTROLS
E-602 EQUIPMENT SCHEDULES
E-603 PANEL SCHEDULES
E-604 BLDG 1306 SCHEDULES
E-701 POWER ONE-LINE DIAGRAM
G-001 COVER SHEET
G-002 SCHEDULE OF DRAWINGS
G-003 ABBREVIATIONS
G-004 GENERAL NOTES & CODE STUDY
G-005 PARTITION TYPES
G-006 EGRESS PLAN - FIRST FLOOR
G-007 EGRESS PLAN - INTERSTITIAL MECHANICAL SPACE
G-008 OCCUPANT LOAD
G-101 LOCATION AND VICINITY MAP
G-102 OVERALL SOUTH LOOP PLAN
H100 GENERAL NOTES, SHEET NOTES, AND QUANTITIES
H101 GENERAL NOTES, SHEET NOTES, AND QUANTITIES
C-001 NOTES, LEGEND, AND ABBREVIATIONS
V-101 EXISTING CONDITIONS PLAN
CD101 SITE DEMOLITION PLAN
C-101 SITE PLAN
C-111 GRADING PLAN
C-301 SECTIONS
C-501 DETAILS
C-502 DETAILS
C-701 UTILITY PLAN & PROFILE
C-711 STEAM AND CONDENSATE SCHEMATIC
C-720 UTILIDUCT DETAILS
C-721 UTILIDUCT DETAILS
C-722 FIRE HYDRANT DETAILS
C-723 STEAM AND CONDENSATE PIPING DETAILS
CD740 UTILIDUCT MANHOLE DETAILS MH21A - DEMO
C-740 UTILIDUCT MANHOLE DETAILS MH21A
C-741 PIPING ISOMETRIC
AD100 BUILDING DEMOLITION PLAN
A-100 FIRST FLOOR PLAN - OVERALL
A-101 INTERSTITIAL MECHANICAL SPACE PLAN
A-102 ROOF PLAN
A-110 FIRST FLOOR REFLECTED CEILING PLAN
A-120 ENLARGED PLANS
A-130 FURNITURE PLAN
A-201 EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-310 WALL SECTIONS
A-501 DETAILS
A-502 DETAILS
A-503 DETAILS
A-504 DETAILS
A-600 DOOR SCHEDULE AND DETAILS
A-601 OPENING DETAILS
A-602 OPENING DETAILS
A-603 ROOM FINISH SCHEDULE AND LEGEND
A-604 SIGNAGE SCHEDULE
A-801 INTERIOR ELEVATIONS
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 ABBREVIATIONS AND STRUCTURAL LEGEND
S-004 SPECIAL INSPECTIONS
DRAWING ABBREVIATIONS
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.