W911KB19R0008 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATION FACILITY Federal contract opportunity
Solicitation number
W911KB19R0008
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

AMENDMENT #01

View the file

Other files for this federal contract opportunity

Other files attached to W911KB19R0008 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATION FACILITY, newest first.
File Type Posted
B.08.03_18R0008_EIE432_AM_8.pdf PDF
19R0008_EIE432_AM_7.pdf PDF
B.08.03_1890008_EIE432_AM_6.pdf PDF
18R0008_EIE432_AM_5.pdf PDF
19R0008_AM_04.pdf PDF
19R0008_AM_03.pdf PDF
18R0008-EIE432-AM_02.pdf PDF
A.03.11_JA-19_14_Best_Lock_Cores_Redacted.pdf PDF
A.03.11_JA-_19_13_Whelen_Mass_Notif_Sys_Redacted.pdf PDF
W911KB19R0008_-_EIE432.pdf PDF
A.03.11_JA-_19_12_Monaco_Transceiver_SYSTEM_Redacted.pdf PDF
A.03.11_JA-_19_11_DELTA_HVAC_DDC_SYSTEM_Redacted.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EIE 432

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

EIE432 F-35A Aircraft Maintenance Unit Administrative Facility, Eielson AFB, AK

a) This amendment provides changes to the solicitation as indicated on the continuation pages of this document.

b) Proposal due date is not extended. Remains the same 08 FEBRUARY 2019 @ 2PM AKDST.

c) YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442

POC ROBERT NORRIS @ ROBERT.L.NORRIS@USACE.ARMY.MIL

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0008

X 9B. DATED (SEE ITEM 11)

03-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jan-2019

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

07 JAN 2019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

NONE

b. The following revised documents/sections are substituted for the superseded documents/sections: The identifier “AM#01” appears before and after new and/or revised materials, except as noted below.

1. TABLE OF CONTENTS

The following division requirements are deleted

-- SECTION 40 17 30.00 40 WELDING GENERAL PIPING

-- SECTION 41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING

2. SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

-- PARAGRAPH 1.11

-- SITE VISIT DATE IS CHANGED TO 24 JANUARY 2019 @10:00AM

3. SECTION 00 72 00 CONTRACT CLAUSES

The following were added in their entirety;

-- FAR CLAUSE 52.223-20 AEROSOLS (JUN 2016)

-- FAR CLAUSE 52.223-21 FOAMS (JUN 2016)

The following were deleted in their entirety:

-- FAR CLAUSE 52.203-14 Display of Hotline Poster(s) (Oct 2015)

-- FAR CLAUSE 52.215-23 Limitations on Pass-Through Charges (Oct 2009) -- FAR CLAUSE 52.219-17 Section 8(a) Award (Jan 2017)

c. The following sections are deleted:

NONE

d. The following documents are added:

EIE432-Design Complete Full Size

e. The following revisions are incorporated:

NONE

f. Other:

SECTION 00 73 46

DAVIS BACON WAGE RATES 04 JAN 2019

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

PROJECT TABLE OF CONTENTS Page 1

Design

Complete

F-35A Aircraft Maintenance unit

Administrative Facility

Eielson, Alaska EIE432

PROJECT TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING

REQUIREMENTS

STANDARD FORM 1442

00 11 01 PROPOSAL SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTALPROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 36 00.00 29 RADIOACTIVE MATERIALS PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 04.00 29 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIALINSPECTIONS

01 50 00.04 29 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR

EIELSON AFB PROJECTS

01 57 20.01 29 ENVIRONMENTAL PROTECTION

01 57 34.00 29 STORM WATER POLLUTION PREVENTION MEASURES

01 58 00 PROJECTIDENTIFICATION

01 74 19.01 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUTSUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 01 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACECONCRETE

03 35 00.00 10 CONCRETEFINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

4 20 00 UNIT MASONRY

DIVISION 05 - METALS

5 05 23.16 STRUCTURALWELDING

PROJECT TABLE OF CONTENTS Page 2

EIE432 Design

Complete

F-35A Aircraft Maintenance unit

Administrative Facility

Eielson, Alaska

05 12 00 STRUCTURALSTEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 22 00 ROOF AND DECK INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 42 13 METAL WALL PANELS

07 42 33.13 BIRD NESTING DETERRENT

07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 36 13 SECTIONAL OVERHEAD DOORS

08 39 54 BLAST RESISTANT DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

8 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

9 29 00 GYPSUM BOARD

09 30 13 PORCELAIN TILING

09 51 00 SUSPENDED CEILING SYSTEMS

09 65 00 RESILIENT FLOORING AND WALL BASE

09 68 00 CARPETING

9 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

PROJECT TABLE OF CONTENTS Page 3

Complete

F-35A Aircraft Maintenance unit

Administrative Facility

Eielson, Alaska

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

22 15 26.00 20 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23.00 29 DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA SPECIFIC

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 31 13.00 40 METAL DUCTS

23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS

23 52 00 HEATING BOILERS

23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

DIVISION 26 - ELECTRICAL

26 05 00.00 50 COMMON WORK RESULTS FOR ELECTRICAL - HEADBOLT OUTLET

INSTALLATION

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

PROJECT TABLE OF CONTENTS Page 4

Complete

F-35A Aircraft Maintenance unit

Administrative Facility

Eielson, Alaska

31 09 20.00 29 FIELD SCREEN TESTING OF SOILS FOR CHEMICAL CONTAMINATION

31 11 00 CLEARING AND GRUBBING

31 23 29 GROUND THAWING

31 23 30 DEEP DYNAMIC SOIL IMPROVEMENT

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK COAT

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY

PAVEMENTS

32 13 73 COMPRESSION JOINT SEALS FOR EXTERIOR CONCRETE PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 16 15 WATER STORAGE STEEL TANKS

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 52 10 SERVICE PIPING, FUEL SYSTEMS

33 52 90.00 20 WELDING FOR POL SERVICE PIPING

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

AM#01 DIVISION 40 - PROCESS INTERCONNECTIONS

40 17 30.00 40 WELDING GENERAL PIPING

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING AM#01

-- End of Project Table of Contents --

Section 00 21 00 W911KB19R0008

EIE432

Section 00 21 00 Page 4

The Bidder Inquiry System will be unavailable for new inquires 10 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.9. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Standard Form 1442, block 10 for the small business size standard/NAICS code.

1.10. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.11. SITE VISIT/PRE-PROPOSAL CONFERENCE

Site visit will be conducted on AM#01 24 JANUARY 2019 AM#01 at the Corps of Engineers Eielson

F-35 Resident Office, located across the street from Building 2258, 2310 Central Avenue, Eielson AFB, Alaska 99702. Meet at the Resident Office at 10:00 AM Alaska Time. Contact David Bragg at 907-377-

4111 or David.a.bragg@usace.army.mil by COB 16 January 2018 for base access questions.

1.12. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.13. PROPOSAL SUBMITTALS

Offerors must mail or deliver proposals to be received no later than the date and time stated on the standard form (SF) 1442 or subsequent solicitation amendment. Questions concerning proposal receipt can be directed to the Contract Specialist/Contracting Officer listed in the solicitation.

Offerors are advised to plan accordingly. No arrangements will be made by the government to assist in proposal delivery. Day-pass procedures will not be used for proposal delivery purposes nor are there proposal pick-up services. No escort services will be provided. It is incumbent on the offeror to plan for unanticipated delays in delivery of proposals. Due to heightened security at

Government installations, visitors to Joint Base Elmendorf-Richardson (JBER) must use the Boniface

Gate or Fort Richardson Gate (Visitor Centers). All vehicle occupants are required to wear seatbelts and hand-held cell phone usage by vehicle operators while driving on base/post is prohibited.

Violators will lose their Base/Post driving privileges for these offenses.

For offerors who will have their proposals hand-delivered, or use personal delivery services such as

DHL, UPS or FedEx, the delivery must be by person, courier or personal delivery service with active base access.

mailto:David.a.bragg@usace.army.mil

SECTION 00 72 00 - CONTRACT CLAUSES

52.223-20 AEROSOLS (JUN 2016)

(a) Definitions. As used in this clause--

Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0.

High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA's Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part

82, subpart G, with supplemental tables of alternatives available at http://www.epa.gov/snap/).

Hydrofluorocarbons means compounds that contain only hydrogen, fluorine, and carbon.

(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, or emissions of high global warming potential hydrofluorocarbons, when feasible, from aerosol propellants or solvents under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as--

(1) In-use emission rates, energy efficiency;

(2) Safety, such as flammability or toxicity;

(3) Ability to meet technical performance requirements; and

(4) Commercial availability at a reasonable cost.

(c) The Contractor shall refer to EPA's SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap/.

(End of clause)

52.223-21 FOAMS (JUN 2016)

(a) Definitions. As used in this clause--

Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0. High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA's Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40

CFR part 82, subpart G, with supplemental tables of alternatives available at http://www.epa.gov/snap/.

Hydrofluorocarbons means compounds that contain only hydrogen, fluorine, and carbon.

b. Unless otherwise specified in the contract, the Contractor shall reduce its use, release, and emissions of high global warming potential hydro fluorocarbons and refrigerant blends containing hydrofluorocarbons, when feasible, from foam blowing agents, under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as--

(1) In-use emission rates, energy efficiency, and safety;

(2) Ability to meet performance requirements; and

(3) Commercial availability at a reasonable cost.

(b) The Contractor shall refer to EPA's SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap/.

(End of clause) http://www.epa.gov/snap/) http://www.epa.gov/snap/ http://www.epa.gov/snap/ http://www.epa.gov/snap/

SECTION 00 73 46 W911KB19R0008

General Decision Number: AK190001 01/04/2019 AK1

Superseded General Decision Number: AK20180001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded

(and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

ASBE0097-001 01/01/2018

Rates Fringes

Asbestos Workers/Insulator

(includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 21.57

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55

* BOIL0502-002 10/01/2017

BOILERMAKER......................$ 46.17 29.70

* BRAK0001-002 07/01/2018

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.77

Tile & Terrazzo Finisher.........$ 34.79 19.62

CARP1501-001 09/01/2016

MILLWRIGHT.......................$ 36.74 22.99

CARP2520-003 09/01/2018

Diver

Stand-by....................$ 42.65 25.66

Tender......................$ 41.65 25.66

Working.....................$ 82.45 25.66

Piledriver

Piledriver; Skiff Operator and Rigger..................$ 38.34 25.66

Sheet Stabber...............$ 38.34 25.66

Welder......................$ 43.90 25.66

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot

101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP4059-001 09/01/2018

CARPENTER

Including Lather and

Drywall Hanging.............$ 38.34 25.66

ELEC1547-004 04/01/2018

CABLE SPLICER....................$ 39.82 3%+$26.44

ELECTRICIAN......................$ 39.49 3%+$26.69

ELEC1547-005 04/01/2018

Line Construction

CABLE SPLICER....................$ 52.57 3%+30.81

Linemen (Including Equipment

Operators, Technician)...........$ 50.52 3%+30.81

Powderman........................$ 48.52 3%+30.81

TREE TRIMMER.....................$ 36.21 3%+24.19

ELEV0019-002 01/01/2018

ELEVATOR MECHANIC................$ 55.45 32.645+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after

Thanksgiving, and Christmas Day

ENGI0302-002 04/01/2018

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.28 23.05

GROUP 1A....................$ 42.04 23.05

GROUP 2.....................$ 39.51 23.05

GROUP 3.....................$ 38.79 23.05

GROUP 4.....................$ 32.58 23.05

TUNNEL WORK

GROUP 1....................$ 44.31 23.05

GROUP 1A...................$ 46.24 23.05

GROUP 2....................$ 43.46 23.05

GROUP 3....................$ 42.67 23.05

GROUP 4....................$ 35.84 23.05

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and

Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and

Cablecars; Cleaning Machine; Coating Machine; Concrete

Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching

Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter

Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power

Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through

40 yards; Service Oiler/Service Engineer; Sidebooms-under

45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry

Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment

Operator; Loaders over 5 yds.; Certified Welder, Electrical

Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump

Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade

Technician; Loaders, (i.e., Elevating Grader and Material

Transfer Vehicle); Locomotives: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under

16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air

Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber

Green and similar types (b) Forklifts or Lumber Carrier

(on construction job site) (c) Forklifts with Tower (d)

Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey

(air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and

Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill

Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant

Engineer shall be required on cranes over 85 tons or over

100 feet of boom.

IRON0751-003 07/01/2018

IRONWORKER

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 37.90 31.48

FENCE, BARRIER INSTALLER....$ 34.40 31.48

GUARDRAIL INSTALLERS........$ 35.14 31.48

GUARDRAIL LAYOUT MAN........$ 35.14 31.48

HELICOPTER, TOWER...........$ 38.90 31.48

LABO0341-005 04/01/2018

Laborers: South of the 63rd

Parallel & West of Longitude

138 Degrees

GROUP 1.....................$ 30.26 27.01

GROUP 2.....................$ 31.26 27.01

GROUP 3.....................$ 32.16 27.01

GROUP 3A....................$ 35.44 27.01

GROUP 3B....................$ 39.98 24.30

GROUP 4.....................$ 19.83 27.01

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.29 27.01

GROUP 2....................$ 34.39 27.01

GROUP 3....................$ 35.38 27.01

GROUP 3A...................$ 38.98 27.01

GROUP 3B...................$ 42.88 24.30

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush

Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke

Setters, Hook Tender, Rigger, Signalman; Concrete

Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos

(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail

Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of

Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or

Power Tools; Portable or Chemical Toilet Serviceman; Pump

Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot

Tender; Saw Tenders; Scaffold Building and Erecting; Slurry

Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor

Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or

Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine

Operator; Green Cutter (dam work); Gunnite Operator; Hod

Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and

Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad

Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer

Plant Maintenance Man; Thermal Plastic Applicator; Timber

Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine

Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill

Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);

type drills); Pipelayers.

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

LABO0942-001 04/01/2018

Laborers: North of the 63rd

Parallel & East of Longitude

138 Degrees

GROUP 1.....................$ 30.26 27.21

GROUP 2.....................$ 31.26 27.21

GROUP 3.....................$ 32.16 27.21

GROUP 3A....................$ 35.44 27.21

GROUP 3B....................$ 38.98 24.50

GROUP 4.....................$ 19.83 27.21

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.29 27.21

GROUP 2....................$ 34.39 27.21

GROUP 3....................$ 35.38 27.21

GROUP 3A...................$ 38.98 27.21

GROUP 3B...................$ 42.88 24.50

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush

Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke

Setters, Hook Tender, Rigger, Signalman; Concrete

Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos

(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail

Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of

Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or

Power Tools; Portable or Chemical Toilet Serviceman; Pump

Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot

Tender; Saw Tenders; Scaffold Building and Erecting; Slurry

Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor

Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or

Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine

Operator; Green Cutter (dam work); Gunnite Operator; Hod

Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and

Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad

Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer

Plant Maintenance Man; Thermal Plastic Applicator; Timber

Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine

Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man to, wagon drills, air track drills; hydraulic drills);

type drills); Pipelayers

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);

type drills); Pipelayers.

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PAIN1959-001 07/01/2018

NORTH OF THE 63RD PARALLEL

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 32.09 21.09

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 32.61 21.09

PAIN1959-002 07/01/2018

SOUTH OF THE 63RD PARALLEL

PAINTER

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and

Commercial Spray............$ 32.09 21.09

Machine Taper/Drywall.......$ 32.61 21.09

Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 32.61 20.09

PAIN1959-003 07/01/2018

NORTH OF THE 63RD PARALLEL

GLAZIER..........................$ 39.28 23.49

PAIN1959-004 07/01/2018

FLOOR LAYER: Carpet.............$ 29.13 14.06

PAIN1959-006 07/01/2018

SOUTH OF THE 63RD PARALLEL

GLAZIER..........................$ 39.28 23.49

PLAS0867-001 02/01/2016

PLASTERER

North of the 63rd parallel..$ 37.25 20.41

South of the 63rd parallel..$ 37.00 20.41

PLAS0867-004 02/01/2016

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 37.25 20.41

South of the 63rd parallel..$ 37.00 20.41

PLUM0262-002 01/01/2017

East of the 141st Meridian

Plumber; Steamfitter.............$ 38.02 26.72

PLUM0367-002 07/01/2017

South of the 63rd Parallel

Plumber; Steamfitter.............$ 39.00 23.80

PLUM0375-002 07/01/2018

North of the 63rd Parallel

Plumber; Steamfitter.............$ 41.16 26.55

PLUM0669-002 04/01/2017

SPRINKLER FITTER.................$ 46.00 23.29

ROOF0189-006 04/01/2018

ROOFER...........................$ 44.62 15.50

SHEE0023-003 07/01/2018

South of the 63rd Parallel

SHEET METAL WORKER...............$ 42.70 26.40

SHEE0023-004 07/01/2017

North of the 63rd Parallel

SHEET METAL WORKER...............$ 47.74 23.48

TEAM0959-003 03/01/2018

TRUCK DRIVER

GROUP 1.....................$ 39.59 23.62

GROUP 1A....................$ 40.86 23.62

GROUP 2.....................$ 38.33 23.62

GROUP 3.....................$ 37.51 23.62

GROUP 4.....................$ 36.93 23.62

GROUP 5.....................$ 36.17 23.62

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon

(250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps

(driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over

20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;

Stringing Truck

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil

Distributor Drivers; Trucks/Jeeps (push or pull); Traffic

Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and

Truck with pups) up to and including 10 yards; Track Truck

Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster

Operators (handling bulk aggregate); Lumber Carrier; Water

Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch

Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and

Swing attachments, over 5 tons; Front End Loader with

Forks; Bus Operator over 30 passengers; All Terrain

Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam

Distributor Truck/dual axle; Hydro-seeders, dual axle;

Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire

Truck/Ambulance Driver; Combination Truck-fuel and grease;

Compactor (when pulled by rubber tired equipment); Rigger

(air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type

Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

of Engineers Alaska District

US Army Corps

SHEET OFDWG #:

C

R ev it\

4-

_E

IE

2-lo ca l-R

ES

.rv t

/1 2/

2:

:1

PM

C O

VE

R

S H

EE

T

EIELSON AFB, ALASKA

DESIGN COMPLETE, 10 DEC 2018

W911KB19R0008

REF.

NUM. SHEET TITLESHT REF.

NUM. SHEET TITLESHT REF.

NUM. SHEET TITLESHT REF.

NUM. SHEET TITLESHT REF.

NUM. SHEET TITLESHT

ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS

SCHEDULE OF DRAWINGS

SHEET OFDWG #:

C

R ev it\

4-

_E

IE

2-lo ca l-R

ES

.rv t

/1 2/

2:

:1

PM

SC

H

ED

U

LE

O

F D

R

AW

IN

G

S

EIELSON AFB, ALASKA

EIE432 F-35 AMU ADMINISTRATIVE FACILITY

W911KB19R0008

DESIGN COMPLETE - EIE432, 10 DEC 2018

E-702 ELECTRICAL CONTROL DIAGRAMS

T-001 LEGEND AND ABBREVIATIONS

TD101 TELECOMM SITE DEMOLITION PLAN

TS101 TELECOMM SITE PLAN

T-110 FIRST FLOOR TELECOM PLAN

T-111 BUILDING 1306 TELECOMM PLAN

T-401 ENLARGED TELECOMM PLANS

T-501 TELECOM DETAILS

FP-001 LEGEND AND NOTES

FP-100 FIRST FLOOR FIRE PROTECTION PLAN

FP-101 ENLARGED INTERSTITIAL FIRE PROTECTION SPACE

FP-401 FIRE PROTECTION SECTION

FA-001 FAMNS GENERAL NOTES AND LEGENDS

FA-100 FIRST FLOOR FIRE ALARM PLAN

FA-101 ENLARGED INTERSTITIAL FIRE ALARM SPACE

FA-102 ENLARGED FIRE ALARM BLDG 1306/1307

FA-501 ANTENNA DETAILS

FA-601 FAMNS AND RSFACU RISER DIAGRAM

FA-602 FAMNS OPERATIONAL MATRIX

RD001 TO

RD033

RECORD DRAWINGS

S-005 SPECIAL INSPECTIONS

S-010 LOADING PLANS

S-101 PILE FOUNDATION PLAN

S-110 STRUCTURAL SLAB PLAN

S-120 INTERSTITIAL MECHANICAL SPACE AND ROOF FRAMING PLANS

S-201 BRACED FRAME ELEVATION

S-301 BUILDING SECTIONS

S-401 ENLARGED TRUSS PROFILE

S-501 FOUNDATION AND SLAB DETAILS

S-510 FRAMING DETAILS

S-511 FRAMING DETAILS

S-512 ENTRY CANOPY FRAMING

S-520 BRACED FRAME DETAILS

S-530 METAL STUD WALL DETAILS

S-540 BUILDING 1306 DETAILS

S-541 BLDG 1306 CANOPY FRAMING DETAILS

S-601 STRUCTURAL CONCRETE SCHEDULES

M-001 LEGEND AND ABBREVIATIONS

M-101 UNDERFLOOR PLUMBING PLAN

M-102 FIRST FLOOR PLUMBING PLAN

M-103 FIRST FLOOR HEATING PLAN

M-104 FIRST FLOOR VENTILATION & AIR CONDITIONING PLAN

M-301 ENLARGED MECHANICAL ROOM

M-302 ENLARGED INTERSTITIAL MECHANICAL SPACE

M-303 ENLARGED MECHANICAL PLAN BLDG 1306

M-401 MECHANICAL SECTIONS

M-501 PLUMBING DETAILS

M-502 HEATING

M-503 VENTILATION

M-601 PLUMBING

M-602 HEATING

M-603 VENTILATION

M-701 DIAGRAMS - HEATING

M-702 DIAGRAMS - HEATING

M-801 CONTROL SEQUENCES

M-802 CONTROL SEQUENCES

M-803 CONTROL SEQUENCES

M-804 CONTROL SEQUENCES

M-805 CONTROL SEQUENCES

M-806 CONTROL SEQUENCES

M-807 CONTROL SEQUENCES

M-808 CONTROL SEQUENCES

E-001 LEGEND AND ABBREVIATIONS

E-002 GENERAL NOTES

ED101 ELECTRICAL SITE DEMOLITION PLAN

ES101 ELECTRICAL SITE PLAN

E-110 FIRST FLOOR LIGHTING PLAN

E-120 FIRST FLOOR POWER PLAN

E-121 BUILDING 1306 POWER PLAN

E-401 ENLARGED PLANS

E-501 ELECTRICAL DETAILS

E-601 LIGHT FIXTURES & CONTROLS

E-602 EQUIPMENT SCHEDULES

E-603 PANEL SCHEDULES

E-604 BLDG 1306 SCHEDULES

E-701 POWER ONE-LINE DIAGRAM

G-001 COVER SHEET

G-002 SCHEDULE OF DRAWINGS

G-003 ABBREVIATIONS

G-004 GENERAL NOTES & CODE STUDY

G-005 PARTITION TYPES

G-006 EGRESS PLAN - FIRST FLOOR

G-007 EGRESS PLAN - INTERSTITIAL MECHANICAL SPACE

G-008 OCCUPANT LOAD

G-101 LOCATION AND VICINITY MAP

G-102 OVERALL SOUTH LOOP PLAN

H100 GENERAL NOTES, SHEET NOTES, AND QUANTITIES

H101 GENERAL NOTES, SHEET NOTES, AND QUANTITIES

C-001 NOTES, LEGEND, AND ABBREVIATIONS

V-101 EXISTING CONDITIONS PLAN

CD101 SITE DEMOLITION PLAN

C-101 SITE PLAN

C-111 GRADING PLAN

C-301 SECTIONS

C-501 DETAILS

C-502 DETAILS

C-701 UTILITY PLAN & PROFILE

C-711 STEAM AND CONDENSATE SCHEMATIC

C-720 UTILIDUCT DETAILS

C-721 UTILIDUCT DETAILS

C-722 FIRE HYDRANT DETAILS

C-723 STEAM AND CONDENSATE PIPING DETAILS

CD740 UTILIDUCT MANHOLE DETAILS MH21A - DEMO

C-740 UTILIDUCT MANHOLE DETAILS MH21A

C-741 PIPING ISOMETRIC

AD100 BUILDING DEMOLITION PLAN

A-100 FIRST FLOOR PLAN - OVERALL

A-101 INTERSTITIAL MECHANICAL SPACE PLAN

A-102 ROOF PLAN

A-110 FIRST FLOOR REFLECTED CEILING PLAN

A-120 ENLARGED PLANS

A-130 FURNITURE PLAN

A-201 EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS

A-310 WALL SECTIONS

A-501 DETAILS

A-502 DETAILS

A-503 DETAILS

A-504 DETAILS

A-600 DOOR SCHEDULE AND DETAILS

A-601 OPENING DETAILS

A-602 OPENING DETAILS

A-603 ROOM FINISH SCHEDULE AND LEGEND

A-604 SIGNAGE SCHEDULE

A-801 INTERIOR ELEVATIONS

S-001 GENERAL STRUCTURAL NOTES

S-002 GENERAL STRUCTURAL NOTES

S-003 ABBREVIATIONS AND STRUCTURAL LEGEND

S-004 SPECIAL INSPECTIONS

DRAWING ABBREVIATIONS

A ---------------------

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.