18R0008-EIE432-AM_02.pdf

PDF 32 MB Posted

Attached to
W911KB19R0008 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATION FACILITY Federal contract opportunity
Solicitation number
W911KB19R0008
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

AMENDMENT #02 PROPOSAL DUE HAS NOT CHANGED AND REMAINS 08 FEB 2019 @ 2 PM AKDST

View the file

Other files for this federal contract opportunity

Other files attached to W911KB19R0008 F-35A AIRCRAFT MAINTENANCE UNIT ADMINISTRATION FACILITY, newest first.
File Type Posted
B.08.03_18R0008_EIE432_AM_8.pdf PDF
19R0008_EIE432_AM_7.pdf PDF
B.08.03_1890008_EIE432_AM_6.pdf PDF
18R0008_EIE432_AM_5.pdf PDF
19R0008_AM_04.pdf PDF
19R0008_AM_03.pdf PDF
EIE432-18R0008-AM_01.pdf PDF
A.03.11_JA-19_14_Best_Lock_Cores_Redacted.pdf PDF
A.03.11_JA-_19_13_Whelen_Mass_Notif_Sys_Redacted.pdf PDF
W911KB19R0008_-_EIE432.pdf PDF
A.03.11_JA-_19_12_Monaco_Transceiver_SYSTEM_Redacted.pdf PDF
A.03.11_JA-_19_11_DELTA_HVAC_DDC_SYSTEM_Redacted.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EIE 432

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

EIE432 F-35A Aircraft Maintenance Unit Administrative Facility, Eielson AFB, AK

a) This amendment provides changes to the solicitation as indicated on the continuation pages of this document.

b) Proposal due date is not extended. Remains the same 08 FEBRUARY 2019 @ 2PM AKDST.

c) YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442

POC ROBERT NORRIS AT ROBERT.L.NORRIS@USACE.ARMY.MIL

1. CONTRACT ID CODE PAGE OF PAGES

1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0008

X 9B. DATED (SEE ITEM 11)

03-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jan-2019

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

NONE

b. The following revised documents/sections are substituted for the superseded documents/sections:

The identifier “AM#02” appears before and after new and/or revised materials, except as noted below.

SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

-- Paragraph 3.16

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

SECTION 00 73 46 – WAGE DETERMINATIONS

– Replaced with AK1, dated 01/11/2019

c. The following sections are deleted:

SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS

-- Deleted in its entirety

d. The following documents are added:

--Drawings RD001 thru RD033

e. The following revisions are incorporated:

f. Other:

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

General Decision Number: AK190001 01/11/2019 AK1

Superseded General Decision Number: AK20180001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

1 01/11/2019

ASBE0097-001 01/01/2018

Rates Fringes

Asbestos Workers/Insulator

(includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 21.57

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55

BOIL0502-002 10/01/2017

BOILERMAKER......................$ 46.17 29.70

BRAK0001-002 07/01/2018

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.77

Tile & Terrazzo Finisher.........$ 34.79 19.62

CARP1501-001 09/01/2016

MILLWRIGHT.......................$ 36.74 22.99

CARP2520-003 09/01/2018

Diver

Stand-by....................$ 42.65 25.66

Tender......................$ 41.65 25.66

Working.....................$ 82.45 25.66

Piledriver

Piledriver; Skiff Operator and Rigger..................$ 38.34 25.66

Sheet Stabber...............$ 38.34 25.66

Welder......................$ 43.90 25.66

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot

101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP4059-001 09/01/2018

CARPENTER

Including Lather and

Drywall Hanging.............$ 38.34 25.66

ELEC1547-004 04/01/2018

CABLE SPLICER....................$ 39.82 3%+$26.44

ELECTRICIAN......................$ 39.49 3%+$26.69

ELEC1547-005 04/01/2018

Line Construction

CABLE SPLICER....................$ 52.57 3%+30.81

Linemen (Including Equipment

Operators, Technician)...........$ 50.52 3%+30.81

Powderman........................$ 48.52 3%+30.81

TREE TRIMMER.....................$ 36.21 3%+24.19

* ELEV0019-002 01/01/2019

ELEVATOR MECHANIC................$ 57.23 33.705+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after

Thanksgiving, and Christmas Day

* ENGI0302-002 01/01/2019

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.53 23.65

GROUP 1A....................$ 42.29 23.65

GROUP 2.....................$ 39.76 23.65

GROUP 3.....................$ 39.04 23.65

GROUP 4.....................$ 32.83 23.65

TUNNEL WORK

GROUP 1....................$ 44.58 23.65

GROUP 1A...................$ 46.52 23.65

GROUP 2....................$ 43.74 23.65

GROUP 3....................$ 42.94 23.65

GROUP 4....................$ 36.11 23.65

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and

Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and

Cablecars; Cleaning Machine; Coating Machine; Concrete

Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching

Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter

Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power

Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through

40 yards; Service Oiler/Service Engineer; Sidebooms-under

45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry

Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment

Operator; Loaders over 5 yds.; Certified Welder, Electrical

Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump

Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade

Technician; Loaders, (i.e., Elevating Grader and Material

Transfer Vehicle); Locomotives: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under

16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air

Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber

Green and similar types (b) Forklifts or Lumber Carrier

(on construction job site) (c) Forklifts with Tower (d)

Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey

(air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and

Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill

Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant

Engineer shall be required on cranes over 85 tons or over

100 feet of boom.

IRON0751-003 07/01/2018

IRONWORKER

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 37.90 31.48

FENCE, BARRIER INSTALLER....$ 34.40 31.48

GUARDRAIL INSTALLERS........$ 35.14 31.48

GUARDRAIL LAYOUT MAN........$ 35.14 31.48

HELICOPTER, TOWER...........$ 38.90 31.48

LABO0341-005 04/01/2018

Laborers: South of the 63rd

Parallel & West of Longitude

138 Degrees

GROUP 1.....................$ 30.26 27.01

GROUP 2.....................$ 31.26 27.01

GROUP 3.....................$ 32.16 27.01

GROUP 3A....................$ 35.44 27.01

GROUP 3B....................$ 39.98 24.30

GROUP 4.....................$ 19.83 27.01

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.29 27.01

GROUP 2....................$ 34.39 27.01

GROUP 3....................$ 35.38 27.01

GROUP 3A...................$ 38.98 27.01

GROUP 3B...................$ 42.88 24.30

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush

Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke

Setters, Hook Tender, Rigger, Signalman; Concrete

Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos

(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail

Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of

Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or

Power Tools; Portable or Chemical Toilet Serviceman; Pump

Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot

Tender; Saw Tenders; Scaffold Building and Erecting; Slurry

Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor

Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or

Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine

Operator; Green Cutter (dam work); Gunnite Operator; Hod

Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and

Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad

Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer

Plant Maintenance Man; Thermal Plastic Applicator; Timber

Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine

Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill

Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);

type drills); Pipelayers.

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

LABO0942-001 04/01/2018

Laborers: North of the 63rd

Parallel & East of Longitude

138 Degrees

GROUP 1.....................$ 30.26 27.21

GROUP 2.....................$ 31.26 27.21

GROUP 3.....................$ 32.16 27.21

GROUP 3A....................$ 35.44 27.21

GROUP 3B....................$ 38.98 24.50

GROUP 4.....................$ 19.83 27.21

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.29 27.21

GROUP 2....................$ 34.39 27.21

GROUP 3....................$ 35.38 27.21

GROUP 3A...................$ 38.98 27.21

GROUP 3B...................$ 42.88 24.50

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush

Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke

Setters, Hook Tender, Rigger, Signalman; Concrete

Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos

(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail

Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of

Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or

Power Tools; Portable or Chemical Toilet Serviceman; Pump

Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot

Tender; Saw Tenders; Scaffold Building and Erecting; Slurry

Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor

Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or

Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine

Operator; Green Cutter (dam work); Gunnite Operator; Hod

Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and

Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad

Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer

Plant Maintenance Man; Thermal Plastic Applicator; Timber

Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine

Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man to, wagon drills, air track drills; hydraulic drills);

type drills); Pipelayers

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);

type drills); Pipelayers.

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PAIN1959-001 07/01/2018

NORTH OF THE 63RD PARALLEL

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 32.09 21.09

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 32.61 21.09

PAIN1959-002 07/01/2018

SOUTH OF THE 63RD PARALLEL

PAINTER

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and

Commercial Spray............$ 32.09 21.09

Machine Taper/Drywall.......$ 32.61 21.09

Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 32.61 20.09

PAIN1959-003 07/01/2018

NORTH OF THE 63RD PARALLEL

GLAZIER..........................$ 39.28 23.49

PAIN1959-004 07/01/2018

FLOOR LAYER: Carpet.............$ 29.13 14.06

PAIN1959-006 07/01/2018

SOUTH OF THE 63RD PARALLEL

GLAZIER..........................$ 39.28 23.49

PLAS0867-001 02/01/2016

PLASTERER

North of the 63rd parallel..$ 37.25 20.41

South of the 63rd parallel..$ 37.00 20.41

PLAS0867-004 02/01/2016

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 37.25 20.41

South of the 63rd parallel..$ 37.00 20.41

PLUM0262-002 01/01/2017

East of the 141st Meridian

Plumber; Steamfitter.............$ 38.02 26.72

PLUM0367-002 07/01/2017

South of the 63rd Parallel

Plumber; Steamfitter.............$ 39.00 23.80

PLUM0375-002 07/01/2018

North of the 63rd Parallel

Plumber; Steamfitter.............$ 41.16 26.55

PLUM0669-002 04/01/2017

SPRINKLER FITTER.................$ 46.00 23.29

ROOF0189-006 04/01/2018

ROOFER...........................$ 44.62 15.50

SHEE0023-003 07/01/2018

South of the 63rd Parallel

SHEET METAL WORKER...............$ 42.70 26.40

SHEE0023-004 07/01/2017

North of the 63rd Parallel

SHEET METAL WORKER...............$ 47.74 23.48

TEAM0959-003 03/01/2018

TRUCK DRIVER

GROUP 1.....................$ 39.59 23.62

GROUP 1A....................$ 40.86 23.62

GROUP 2.....................$ 38.33 23.62

GROUP 3.....................$ 37.51 23.62

GROUP 4.....................$ 36.93 23.62

GROUP 5.....................$ 36.17 23.62

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon

(250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps

(driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over

20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;

Stringing Truck

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil

Distributor Drivers; Trucks/Jeeps (push or pull); Traffic

Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and

Truck with pups) up to and including 10 yards; Track Truck

Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster

Operators (handling bulk aggregate); Lumber Carrier; Water

Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch

Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and

Swing attachments, over 5 tons; Front End Loader with

Forks; Bus Operator over 30 passengers; All Terrain

Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam

Distributor Truck/dual axle; Hydro-seeders, dual axle;

Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire

Truck/Ambulance Driver; Combination Truck-fuel and grease;

Compactor (when pulled by rubber tired equipment); Rigger

(air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type

Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

F-35 AMU ADMIN FACILITY W911KB19R0008

EIE432 100%

operations; adequate absorbent material must be onsite to clean up any spills and prevent releases to the environment. Cover tanks and drip pans during inclement weather. Provide procedures and equipment to prevent overfilling of tanks. If tanks and containers with an aggregate aboveground capacity greater than 1320 gallons will be used onsite (only containers with a capacity of 55 gallons or greater are counted), provide and implement a SPCC plan meeting the requirements of 40 CFR 112. Do not bring underground storage tanks to the installation for Contractor use during a project. Submit the SPCC plan to the Contracting Officer for approval.

Monitor and remove any rainwater, debris and vegetation that accumulates in open containment dikes or berms at least monthly to comply with 40 CFR

112.8 requirements. Check for cracks, fire hazards and any holes in the tanks containment. Inspect the accumulated rainwater prior to draining from a containment dike to the environment, to determine there is no oil sheen present.

3.16 INADVERTENT DISCOVERY OF CONTAMINATED SOIL OR HAZARDOUS WASTES

If petroleum-contaminated soil, water, or suspected hazardous waste (odors, free product, sheen, field screening readings > 20 ppm) is found during construction that was not identified in the Contract documents, immediately notify the Contracting Officer and the Environmental Element Spills Program Manager by calling 907-377-SPIL (7745). The Environmental Element shall make all required agency spill reporting notifications. Do not disturb this material until authorized by the Contracting Officer.

Suspect soil shall be tested to determine if it contains any contaminants prior to relocating it. Sampling and associated costs are the responsibility of the contractor. Testing and disposal of soil shall follow 18 AAC 75 (Oil and Other Hazardous Substances Pollution Control), 18 AAC 78 (Underground Storage Tanks), and pertinent guidance such as the ADEC Field Sampling Guidance. AM#02... Testing shall include: gasoline range organics (GRO); diesel range organics (DRO); residual range organics (RRO); benzene, toluene, ethylbenzene, and xylenes (BTEX); volatile organic compounds (VOCs); semi-volatile organic compounds (SVOCs); polycyclic aromatic hydrocarbons (PAHs); polychlorinated biphenyls (PCBs); pesticides;

perfluorooctanoic acid (PFOA), perfluorooctane sulfonate (PFOS); and RCRA metals (Toxicity Characteristic Leaching Procedures and as described in ADEC's Field Sampling Guidance) unless other information (e.g. analytical results from previous sampling at the site, known source/type of contamination) can be used to eliminate analytes after coordination between the contractor, CEIEC staff, and ADEC. ...AM#02 If test results determine "other than clean", the material shall be transported to a permitted Subtitle C facility for hazardous waste or a permitted Subtitle D facility for nonhazardous waste, in accordance with state and federal regulations.

All sample results must be provided to the Contracting Officer for review and approval by the Environmental Element. Once approved for disposal, please contact the installation's Hazardous Waste Facility at 907-377-1668 to obtain a signature on the waste manifest(s) prior to shipment.

Contaminated soils, in sludge or slurry form, shall be containerized and managed as either hazardous waste or non-hazardous regulated waste, depending on the contaminant in question.

UNDER NO CIRCUMSTANCES shall soil, clean or contaminated, from Eielson AFB be delivered to or donated to off-base sources (other than an appropriate

Section 01 57 19 Page 44

RD001

RD002

RD003

RD004

RD005

RD006

RD007

RD008

RD009

RD010

RD011

RD012

RD013

RD014

RD015

RD016

RD017

RD018

RD019

RD020

RD021

RD022

RD023

RD024

RD025

RD026

RD027

RD028

RD029

RD030

RD031

RD032

RD033

SF30 PG 1 AM#02 18R0008
SF30 CONT PAGE
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 00 73 46 DAVIS BACON WAGE RATES 11 JAN 2019
EIE432-Design Complete_Record Drawings_Full Size.pdf
GENERAL
G-001 - COVER SHEET
G-002 - SCHEDULE OF DRAWINGS
G-003 - GENERAL_PROJECT INFORMATION - ABBREVIATIONS
G-004 - GENERAL_PROJECT INFORMATION - GENERAL NOTES & CODE STUDY
G-005 - GENERAL_PROJECT INFORMATION - PARTITION TYPES
G-006 - GENERAL_PLANS - EGRESS PLAN - FIRST FLOR
G-007 - GENERAL_PLANS - EGRESS PLAN - INTERSTITIAL MECHANICAL SPACE
G-008 - GENERAL_PROJECT INFORMATION - OCCUPANT LOAD
G-101 - GENERAL_PLANS - LOCATION AND VICINITY MAP
G-102 - GENERAL_PLANS - OVERALL SOUTH LOOP PLAN
HAZMAT
H100 - HAZARDS ABATEMENT_PLANS - GENERAL NOTES, SHEET NOTES, AND QUANTITIES
H101 - HAZARDS ABATEMENT_PLANS - GENERAL NOTES, SHEET NOTES, AND QUANTITIES
CIVIL
C-001 - CIVIL_PLANS - NOTES, LEGEND, AND ABBREVIATIONS
V-101 - CIVIL_PLANS - EXISTING CONDITIONS PLAN
CD101 - CIVIL_PLANS - SITE DEMOLITION PLAN
C-101 - CIVIL_PLANS - SITE PLAN
C-111 - CIVIL_PLANS - GRADING PLAN
C-301 - CIVIL_SECTIONS - SECTIONS
C-501 - CIVIL_DETAILS - DETAILS
C-502 - CIVIL_DETAILS - DETAILS
C-701 - CIVIL_PLANS - UTILITY PLAN & PROFILE
C-711 - CIVIL_SCHEMATICS - STEAM AND CONDENSATE SCHEMATIC
C-720 - CIVIL_DETAILS - UTILIDUCT DETAILS
C-721 - CIVIL_DETAILS - UTILIDUCT DETAILS
C-722 - CIVIL_DETAILS - FIRE HYDRANT DETAILS
C-723 - CIVIL_DETAILS - STEAM AND CONDENSATE PIPING DETAILS
CD740 - CIVIL_DETAILS - UTILIDUCT MANHOLE DETAILS MH21A - DEMO
C-740 - CIVIL_DETAILS - UTILIDUCT MANHOLE DETAILS MH21A
C-741 - CIVIL_ISOMETRICS - PIPING ISOMETRIC
ARCHITECTURE
AD100 - ARCHITECTURE_DEMOLITION - BUILDING DEMOLITION PLAN
A-100 - ARCHITECTURE_PLANS - FIRST FLOOR PLAN - OVERALL
A-101 - ARCHITECTURE_PLANS - INTERSTITIAL MECHANICAL SPACE PLAN
A-102 - ARCHITECTURE_PLANS - ROOF PLAN
A-110 - ARCHITECTURE_PLANS - FIRST FLOR REFLECTED CEILING PLAN
A-120 - ARCHITECTURE_PLANS - ENLARGED PLANS
A-130 - ARCHITECTURE_PLANS - FURNITURE PLAN
A-201 - ARCHITECTURE_ELEVATIONS - EXTERIOR ELEVATIONS
A-301 - ARCHITECTURE_SECTIONS - BUILDING SECTIONS
A-310 - ARCHITECTURE_SECTIONS - WALL SECTIONS
A-501 - ARCHITECTURE_DETAILS - DETAILS
A-502 - ARCHITECTURE_DETAILS - DETAILS
A-503 - ARCHITECTURE_DETAILS - DETAILS
A-504 - ARCHITECTURE_DETAILS - DETAILS
A-600 - ARCHITECTURE_SCHEDULES - DOOR SCHEDULE AND DETAILS
A-601 - ARCHITECTURE_DETAILS - OPENING DETAILS
A-602 - ARCHITECTURE_DETAILS - OPENING DETAILS
A-603 - ARCHITECTURE_SCHEDULES - ROOM FINISH SCHEDULE AND LEGEND
A-604 - ARCHITECTURE_SCHEDULES - SIGNAGE SCHEDULE
A-801 - ARCHITECTURE_INTERIORS - INTERIOR ELEVATIONS
STRUCTURAL
S-001 - STRUCTURAL_PROJECT INFORMATION - GENERAL STRUCTURAL NOTES
S-002 - STRUCTURAL_PROJECT INFORMATION - GENERAL STRUCTURAL NOTES
S-003 - STRUCTURAL_PROJECT INFORMATION - ABREVIATIONS AND STRUCTURAL LEGEND
S-004 - STRUCTURAL_PROJECT INFORMATION - SPECIAL INSPECTIONS
S-005 - STRUCTURAL_PROJECT INFORMATION - SPECIAL INSPECTIONS
S-010 - STRUCTURAL_PLANS - OADING PLANS
S-101 - STRUCTURAL_ - PILE FOUNDATION PLAN
S-110 - STRUCTURAL_PLANS - STRUCTURAL SLAB PLAN
S-120 - STRUCTURAL_PLANS - INTERSTITIAL MECHANICAL SPACE AND ROF RAMING PLANS
S-201 - STRUCTURAL_ELEVATIONS - BRACED FRAME ELEVATION
S-301 - STRUCTURAL_SECTIONS - BUILDING SECTIONS
S-401 - STRUCTURAL_ENLARGED - ENLARGED TRUS PROFILE
S-501 - STRUCTURAL_ - FOUNDATION AND SLAB DETAILS
S-510 - STRUCTURAL_DETAILS - FRAMING DETAILS
S-511 - STRUCTURAL_ - FRAMING DETAILS
S-512 - STRUCTURAL_ - ENTRY CANOPY FRAMING
S-520 - STRUCTURAL_ - BRACED FRAME DETAILS
S-530 - STRUCTURAL_ - METAL STUD WALL DETAILS
S-540 - STRUCTURAL_DETAILS - BUILDING 1306 DETAILS
S-601 - STRUCTURAL_CONCRETE - STRUCTURAL CONCRETE SCHEDULES
MECHANICAL
M-001 - MECHANICAL_PROJECT INFORMATION - LEGEND AND ABBREVIATIONS
M-101 - MECHANICAL_PLAN - UNDERFLOOR PLUMBING PLAN
M-102 - MECHANICAL_PLAN - FIRST FLOOR PLUMBING PLAN
M-103 - MECHANICAL_PLAN - FIRST FLOOR HEATING PLAN
M-104 - MECHANICAL_PLAN - FIRST FLOOR VENTILATION & AIR CONDITIONING PLAN
M-301 - MECHANICAL_PLAN - ENLARGED MECHANICAL ROOM
M-302 - MECHANICAL_PLAN - ENLARGED INTERSTITIAL MECHANICAL SPACE
M-303 - MECHANICAL_PLAN - ENLARGED MECHANICAL PLAN BLDG 1306
M-401 - MECHANICAL_SECTION - MECHANICAL SECTIONS
M-501 - MECHANICAL_DETAILS - PLUMBING DETAILS
M-502 - MECHANICAL_DETAILS - HEATING
M-503 - MECHANICAL_DETAILS - VENTILATION
M-601 - MECHANICAL_SCHEDULES - PLUMBING
M-602 - MECHANICAL_SCHEDULES - HEATING
M-603 - MECHANICAL_SCHEDULES - VENTILATION
M-701 - MECHANICAL_DIAGRAMS - DIAGRAMS - HEATING
M-702 - MECHANICAL_DIAGRAMS - DIAGRAMS - HEATING
M-801 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
M-802 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
M-803 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
M-804 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
M-805 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
M-806 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
M-807 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
M-808 - MECHANICAL_DIAGRAMS - CONTROL SEQUENCES
ELECTRICAL
E-001 - ELECTRICAL_PROJECT INFORMATION - LEGEND AND ABBREVIATIONS
E-002 - ELECTRICAL_PROJECT INFORMATION - GENERAL NOTES
ED101 - ELECTRICAL_PLANS - ELECTRICAL SITE DEMOLITION PLAN
ES101 - ELECTRICAL_PLANS - ELECTRICAL SITE PLAN
E-110 - ELECTRICAL_PLAN - FIRST FLOOR LIGHTING PLAN
E-120 - ELECTRICAL_PLAN - FIRST FLOOR POWER PLAN
E-121 - ELECTRICAL_PLAN - BUILDING 1306 POWER PLAN
E-401 - ELECTRICAL_PLAN - ENLARGED PLANS
E-501 - ELECTRICAL_DETAILS - ELECTRICAL DETAILS
E-601 - ELECTRICAL_SCHEDULES - LIGHT FIXTURES & CONTROLS
E-602 - ELECTRICAL_SCHEDULES - EQUIPMENT SCHEDULES
E-603 - ELECTRICAL_SCHEDULES - PANEL SCHEDULES
E-604 - ELECTRICAL_SCHEDULES - BLDG 1306 SCHEDULES
E-701 - ELECTRICAL_DIAGRAMS - POWER ONE-LINE DIAGRAM
E-702 - ELECTRICAL_DIAGRAMS - ELECTRICAL CONTROL DIAGRAMS
TELECOMMUNICATION
T-001 - TELECOMM_PROJECT INFORMATION - LEGEND AND ABBREVIATIONS
TD101 - TELECOMMUNICATIONS_PLANS - TELECOMM SITE DEMOLITION PLAN
TS101 - TELECOMMUNICATIONS_PLANS - TELECOMM SITE PLAN
T-110 - TELECOMM_PLAN - FIRST FLOOR TELECOM PLAN
T-111 - TELECOMM_PLAN - BUILDING 1306 TELECOMM PLAN
T-401 - TELECOMM_PLAN - ENLARGED TELECOMM PLANS
T-501 - TELECOMM_DETAILS - TELECOMM DETAILS
FIRE PROTECTION
FP-001 - FIRE PROTECTION_PROJECT INFORMATION - LEGEND AND NOTES
FP-100 - FIRE PROTECTION_PLAN - FIRST FLOOR FIRE PROTECTION PLAN
FP-101 - FIRE PROTECTION_PLAN - ENLARGED INTERSTITIAL FIRE PROTECTION SPACE
FP-401 - FIRE PROTECTION_SECTION - FIRE PROTECTION SECTION
FIRE ALARM
FA-001 - FIRE ALARM_PROJECT INFORMATION - FAMNS GENERAL NOTES AND LEGENDS
FA-100 - FIRE ALARM_PLAN - FIRST FLOOR FIRE ALARM PLAN
FA-101 - FIRE ALARM_PLAN - ENLARGED INTERSTITIAL FIRE ALARM SPACE
FA-102 - FIRE ALARM_PLAN - ENLARGED FIRE ALARM BLDG 1306/1307
FA-501 - FIRE ALARM_DETAILS - ANTENNA DETAILS
FA-601 - FIRE ALARM_DIAGRAM - FAMNS AND RSFACU RISER DIAGRAM
FA-602 - FIRE ALARM_DIAGRAMS - FAMNS OPERATIONAL MATRIX

RECORD DRAWINGS