B.08.03_Amendment3.pdf
PDF 455 KB Posted
- Attached to
- Construct Conventional Munitions Maintenance Facility Federal contract opportunity
- Solicitation number
- W911KB19R0003
About this file
B.08.03 Amendment3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03_Amendment_05.pdf | ||
| B.08.03_EIE431_structural_dwg_AM04.pdf | ||
| B.08.03_Amendent04.pdf | ||
| B.08.03_EIE431_Geotech_Data_Report_AM04.pdf | ||
| B.08.03_AM3_Specs.pdf | ||
| B.08.03_AM3_Drawings.pdf | ||
| B.08.03_EIE431_AM2_Specifications.pdf | ||
| B.08.03_Amendment02.pdf | ||
| B.08.03_EIE431_AM2_Drawings.pdf | ||
| B.08.03_EIE431_Building_6385_As-Built_Dwgs_AM2.pdf | ||
| B.08.03_Amendment1Completev2.pdf | ||
| A.2.11.3_Solic_Vol_3_EIE431_Drwgs_RTA.pdf | ||
| A.2.11.3_Solic_Vol_2_EIE431-_Combined_Specs__RTA.zip | ZIP file | |
| A.2.11.3_Solic_Vol_2_EIE431-_Combined_Specs__RTA.pdf | ||
| A.2.11.3 Solic Vol 2_EIE431- Combined Specs RTA.pdf | ||
| A.2.11.3 Solic J&A's_Redacted - Copy.pdf | ||
| A.2.11.3_Solic_Vol_1_EIE431-.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project titled F-35A Conventional Munitions Maintenance Facility, Eielson A.F.B. is being amended to update Section 00 21 00, Section 00 22 11, specif ications, and draw ings.
See Summary of Changes for all information.
All other terms and conditions of W911KB19R0003 remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0003
X 9B. DATED (SEE ITEM 11)
07-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Aug-2019
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB19R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
G-001 – REVISE rendering to remove windows.
G-103 - REVISE Floor Plan to remove windows.
A-001 – REVISE C, CW, and D wall type; REVISE type 4 floor assembly
A-111 – REVISE Floor Plan to remove windows.
A-112 – REVISE Floor Plan to remove windows. DELETE window tag at Tools room and ADD coiling overhead counter door
A-131 – REVISE Reflected Ceiling Plan to remove windows.
A-201 – REVISE North and East elevations to remove windows.
A-202 – REVISE South elevation to remove windows.
A-301 – REVISE sections A5 and A3 to remove windows.
A-311 – REVISE Wall Sections E2 and G2 to remove windows.
A-312 – REVISE Wall Section A1 to remove windows.
A-502 – DELETE details C1 and C3.
A-511 – REVISE Air Barrier Plan and Section to remove windows.
A-512 – DELETE detail E3.
A-601 – CHANGE door type elevation “E” TO coiling counter door, DELETE window type elevations “E1”, “E2” and “E3” and REVISE window schedule to remove exterior windows.
REVISE door type “D” to CHANGE “glass” TO “acrylic”.
S-101 – (NOT INCLUDED/to be released in AM #04) REVISE Foundation Plan to remove windows.
S-103 - (NOT INCLUDED/to be released in AM #04) REVISE Roof Framing Plan to remove window headers.
S-705 – ADD Detail 40 “Typical Pile Splice”.
I-001 – Finish Legend – DELETE line “WC1” from schedule.
I-201 – REVISE elevations C3, C5 and G3 to remove windows; REVISE elevation F1 to CHANGE sliding window TO coiling counter door.
I-501 – Detail 7; REVISE to reflect coiling counter door condition.
E-110 – REVISE office light fixtures.
E-601 – REVISE light fixture lumen package for type L13 fixtures.
b. The following drawings are added:
NONE
c. The following revised documents/sections are substituted for the superseded documents/sections:
The identifier “AM #03” appears before and after new and/or revised materials, except as noted below.
01 19 30.01 29 REVISE fencing requirements at project site
08 60 45 Translucent Panels – REVISE to indicate UFC 4-010-01 2018 is the applicable standard.
08 32 13 Sliding Aluminum Doors – REVISE to glaze doors with acrylic instead of glass.
d. The following sections are added:
08 33 13 Coiling Counter Doors
e. The following sections are deleted:
08 51 13 Aluminum Windows
08 81 00 Glazing
12 24 13 Roller Window Shades
f. Other:
NONE
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
The following have been modified:
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO
OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONTRUCTION COSTS
1.3 OFFEROR'S QUESTIONS AND COMMENTS
1.4 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.5 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.6 ACCURACY IN PROPOSALS
1.7 PROPOSAL SUBMITTALS
1.8 PROPOSAL FORMAT
1.9 BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
The project is located at Eielson Air Force Base (EAFB) in Alaska, approximately 25 miles southeast of Fairbanks. EAFB is the home of the 354 Fighter Wing assigned to the Pacific Air Forces Eleventh Air Force. The US Air Force requires an adequately sized conventional munitions facility to support the beddown of two squadrons of F-35 Aircraft at EAFB. The facility supports the 354 MXS to perform maintenance operations on various munitions components and containers.
The existing building will not accommodate the new personnel arriving to support the two F-35 squadrons.
In addition, the existing building is experiencing structural issues due to thawing permafrost. This project will demolish existing Building 6385 (712 SM) to enable construction at the same site. The fire water storage tank will remain in place and the overhead crane will be salvaged for reinstallation in the new building. The facility will include a deep pile foundation system under the munition bays with a shallow concrete foundation in the administrative area, interior and exterior load-bearing masonry walls, and steel roof framing. The exterior includes EIFS with CMU veneer, standing seam metal roof over the administrative portion and a low slope membrane roof over the munitions bays. Special foundations are included for arctic conditions and thawing permafrost. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. The Contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work.
AM#02 The building site is located within a controlled area at Eielson AFB and will require a munitions attendent at all times. Contractor shall establish set work hours with Eielson Munitions not to exceed 12 hours per day and 6 days per week. Contractor trailers/yard will be located outside the controlled area (specific location identified in drawing sheets). The contractor will be allowed to set up a laydown/equipment yard and workday use trailer on the project site but will only have access to this during established work hours.
The AF will provide a maximum of 2 munitions security attendent for full-time use during construction.
However, if there are anticipated days of high construction traffic and the contractor needs more, contractor must give minimum 72-hour notice to AF. Only contractor/subcontractors' company vehicles and equipment will be allowed to drive to and from the laydown to the site. Contractors cannot stop when driving through the ECM areas. This will be policed by the munitions security escorts. However, they should yield to any Ops vehicles if Ops needs to pass through. AM#02
CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONSTRUCTION COSTS
The construction costs will be subject to the funds available for this project. The contract cost magnitude for contract award is approximately $10 Million to $20 Million. Offerors are notified that they are under no obligation to approach this ceiling however the Government may not be able make an award if the cost magnitude set for this project is exceeded.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Alaska District, U.S. Army Corps of Engineers, either pre- contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at PO Box 6898, JBER, Alaska 99506-6898 if it does not contain a return mailing address. There will be no exceptions.
1.3. OFFEROR'S QUESTIONS AND COMMENTS
1.3.1.1 Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
1.4.1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click on continue.
1.4.1.1.2. From this page you may view all bidder inquiries or add inquiry. A complete listing of all inquiries and responses will be issued by amendment after the inquiry period closes.
1.4.1.1.3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.4.1.1.4. The Bidder Inquiry Key is: 2YX59T-2MFFPI
1.4.1.1.5. AM#02 The Bidder Inquiry System will close 14 Auguest 2019 to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. AM#02
1.4.1.2. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.4.1.3. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.4.1.4. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.4. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The NAICS code/small business size standard for this contract is 236220/$36.5M.
http://www.projnet.org/projnet
1.5. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.6. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.7. PROPOSAL SUBMITTALS
AMD#1
(a) Offerors must mail or deliver proposals to be received no later than no later than the date and time stated on the standard form (SF) 1442 or subsequent solicitation amendment. Electronic or facsimile will not be accepted. Questions concerning proposal receipt can be directed to christopher.e.taylor@usace.army.mil and Michelle.R.Mandel@usace.army.mil.
AMD#1
(b) Offerors are advised to plan accordingly. No arrangements will be made by the government to assist in proposal delivery. Day-pass procedures will not be used for proposal delivery purposes nor are there proposal pick-up services. No escort services will be provided. It is incumbent on the offeror to plan for unanticipated delays in delivery of proposals. Due to heightened security at Government installations, visitors to Joint Base Elmendorf- Richardson (JBER) must use the Boniface Gate or Fort Richardson Gate (Visitor Centers). All vehicle occupants are required to wear seatbelts and hand-held cell phone usage by vehicle operators while driving on base/post is prohibited. Violators will lose their Base/Post driving privileges for these offenses.
(c) For offerors who will have their proposals hand-delivered, or use personal delivery services such as DHL, UPS or FedEx, the delivery must be by person, courier or personal delivery service with active base access.
(d) Proposals will be received no later the date and time stated on the standard form (SF) 1442 or subsequent solicitation amendment..:
Mailing Address:
U.S. Army Corps of Engineers, Alaska District ATTN: CEPOA-CT (Taylor, Rm 30) PO Box 6898 Joint Base Elmendorf-Richardson AFB, Alaska 99506-0898
Physical Address:
U.S. Army Corps of Engineers, Alaska District 2204 3rd Street, Room 30 Joint Base Elmendorf-Richardson, Alaska 99506
(e) Proposals will be accepted in Room 30 during Alaska District Corps of Engineer business hours (7:30 AM to 4:30PM) Monday through Friday excluding holidays but not later than the date and time stated. Proposers are advised that the Alaska District Corps of Engineers building has limited access. Only the main door (in front under the Corps of Engineers red flag facing Talley Ave) and the atrium doors (the tan addition to the main building located on Third Street) are open to individuals without a building pass. Room 30 is located in the basement level of the building (turn right if using the main stairs or elevator). There is a date/time stamp located at the front desk in Room 30 and is the official clock used for proposal receipt.
(f) The Packaging that contains the Proposals shall be marked:
(g) ”Proposals for Solicitation Number: W911KB19R0003, DO NOT OPEN” mailto:christopher.e.taylor@usace.army.mil
1.8. PROPOSAL FORMAT
(h) Each volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein. Within each Tab, it is recommended that the proposal information be presented in the same relative format as the submission requirements are listed.
(i ) Do not assume offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals. In accordance with FAR 52.215-1, Para. (f)(4), the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint.
AMD#1
(j ) Submit proposal in a tabbed, three-ring binder. Page limitation for Volume 1 is 45 pages (not including Past Performance Questionnaires/Evaluations, front cover, table of contents, etc.). Note that the Government will not evaluate any material that exceeds the page limits. Volume 2 has no page limitation.
AMD#1
(k) Submit proposal in separate tabbed, three-ring binders for each volume.
(l ) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number and email address shall appear in the lower left corner of the title page of any document/volume to be evaluated.
(m) Volume number, section, page number and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary). Page numbering shall re-start with each Tab. One (1) page is defined as the front of one (1) sheet; the front and back of one (1) sheet will be counted as two (2) pages. The Government will not evaluate any material exceeding the page limitations stated in the RFP.
AMD#1
(n) Electronic Format: Provide CD in searchable, read-only format, preferably using .pdf files.
Details about price shall be submitted in Excel format.
(o) Number of copies: Submit one original and three copies of the proposal. AM#03 1 original and 3 copies for Volume 1 and 1 original for Volume 2 AM#03
(p) The successful contractor shall provide one (1) searchable, read only electronic (*.pdf) copy of the entire Volumes 1 and 2.
1.9. BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
Your attention is invited to Clause 52.225-11 Buy American--Construction Materials under Trade Agreements. Offerors are advised to inform potential subcontractors and suppliers of the Buy American Act requirements contained in this solicitation. Subparagraph (b) of the clause provides instructions for pre-award determinations as follows: “Requests for determinations of inapplicability.
An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs
(c) and (d) of the clause at FAR 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.” In accordance with FAR Part 25 Foreign Acquisition, subpart 25.205, entitled Post Award determinations, subparagraph (a), if a contractor requests a determination regarding the inapplicability of the Buy American Act after contract award, the contractor must explain why it could not request the determination before contract award or why the need for such determination otherwise was not reasonably foreseeable.
AMD#1
1.10. JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HUBZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively. When proposing as a Limited Liability Company (LLC), a member authorized to bind the LLC shall sign the SF 1442. A copy of the LLC Certificate of Organization, Articles of Organization and the Operating Agreement shall be submitted with the Phase 1 proposal. On SF 25 and 25A, Bonds, where it requests “State of Incorporation,” the LLC should instead put the “State of Organization.” In the Principal’s signature block, the signatory shall indicate whether he or she is signing as a member, manager, or both. Instead of a “Corporate Seal” attach the Certificate of Formation or Certificate of Organization, as appropriate, which should indicate the signatory’s authority to bind the LLC.
-- END OF SECTION 00 21 00 --
SECTION 00 22 11 - PROPOSAL SUBMISSION REQUIREMENTS (ONE STEP, DB)
The following have been added by full text:
SECTION 00 22 11
SELECTION PROCEDURES
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF
AWARD ONE STEP - - BEST VALUE
(SINGLE AWARD)
1.0 OVERVIEW
2.0 BASIS FOR AWARD
3.0 GENERAL INSTRUCTIONS
4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS
5.0 VOLUME 1, TAB A - FACTOR 1: SPECIALIZED EXPERIENCE
6.0 VOLUME 1, TAB B - FACTOR 2: PAST PERFORMANCE (CONFIDENCE ASSESSMENT)
7.0 VOLUME 1, TAB C – FACTOR 3: TECHNICAL APPROACH AND ACTIVITY-BASED
SCHEDULE
8.0 VOLUME 1 – TAB D – FACTOR 4: KEY SUBCONTRACTORS
9.0 VOLUME 2 – TAB A – FACTOR 5: STANDARD FORM 1442, PROPOSAL DATA SHEET,
AND CONTRACT LINE ITEM SCHEDULE
10.0 VOLUME 2, TAB B – REQUIRED PRE-AWARD INFORMATION
11.0 EVALUATION PROCEDURES
11.1 SOURCE SELECTION EVALUATION BOARD (SSEB)
11.2 EVALUATION
11.3 DEFINITIONS
11.4 EVALUATION RATING SYSTEM
11.5 PAST PERFORMANCE RELEVANCY RATING AND PERFORMANCE
CONFIDENCE ASSESSMENT
ATTACHMENTS
1 - PROPOSAL DATA SHEET
2 - COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR
3 - COMPANY SPECIALIZED EXPERIENCE KEY SUBCONTRACTOR (OR PRIME IF WORK
NOT TO BE SUBCONTRACTED)
4 - PAST PERFORMANCE QUESTIONNAIRE
5 - LETTER OF COMMITMENT FOR KEY SUBCONTRACTOR
1.0 OVERVIEW
1.1 Interested firms (here after referred to as Offerors) shall submit proposals demonstrating their capability to successfully execute the construction contract resulting from this solicitation.
The Government will evaluate the proposals in accordance with the criteria described herein.
1.2 This is a “Best Value” solicitation for the construction of the F-35A Conventional Munitions Maintenance Facility at Eielson AFB, Alaska (EIE431). The Government will evaluate the proposals in accordance with the criteria described herein and award a firm fixed price contract to the responsible offeror whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government utilizing the trade-off process described in FAR 15.101-1.
2.0 BASIS FOR AWARD
2.1 The Contracting Officer will award a firm fixed price contract to the responsible Offeror whose proposal the Source Selection Authority has determined conforms to the solicitation, is fair and reasonable, and offers the best value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined are considered significantly more important than price, however the Contract award may not exceed the funds available for this project. The intent of this solicitation is to obtain the best proposal within the cost magnitude. After the Government individually evaluates and rates each proposal, the Contracting Officer/Source Selection Authority will compare proposals to determine which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or to reject all offerors. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR
15.001. If there is a lower priced, conforming offer(s), the Contracting Officer/Source Selection Official must determine that the added value of a more expensive proposal would justify award to that offeror.
3.0 GENERAL INSTRUCTIONS
3.1 Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Do not assume offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.
3.2 Firms formally recognized as small business firms formally organized as construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key subcontractors.
3.2 Submit proposals as identified in Section 00 21 00 para 1.14-PROPOSAL FORMAT.
Note that the Government will not evaluate any material that exceeds the page limits, indicated in the sections below.
4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS
Location Factor Number Description Relative Importance
Volume 1, Tab A Factor 1 Specialized Experience Most Important Factor
Volume 1, Tab B Factor 2 Past Performance
(Confidence Assessment) Most Important Factor (equally important to Factor 1)
Volume 1, Tab C Factor 3 Technical Approach and Activity-Based
Schedule 2nd Most Important Factor (slightly less important than Factor 2, equally important to Factor 4)
Volume 1, Tab D Factor 4 Key Subcontractors
2nd Most Important Factor (slightly less important than Factor 2, equally important to Factor 3)
Location Factor Number Description Relative Importance
Volume 2, Tab A Factor 5
Price (Standard Form 1442, Proposal Data Sheet Contract Line Item Schedule)
Slightly less important than Factors 1, 2, 3 and 4, combined
Volume 2 Tab B N/A Required Pre-Award Information Not Rated
5.0 VOLUME 1- TAB A - FACTOR 1: SPECIALIZED EXPERIENCE
5.1 Submission Requirements:
5.1.1 The prime contractor shall demonstrate experience on recent, relevant projects.
Relevant projects shall demonstrate experience with projects of similar magnitude and scope.
Utilize the CONSTRUCTION – SPECIALIZED EXPERIENCE FORM (Attachment 2) at the end of the section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the offeror is a newly formed joint venture without any previous experience as the joint venture, each joint venture partner shall provide information demonstrating experience relevant to their role on this project. Submit projects that are currently well underway (at least 50% construction progress completed) or completed and turned over no longer than ten (10) years preceding the date of this Solicitation. An offeror may receive credit for relevant experience under a previous business arrangement (joint venture for example); if the offeror demonstrates that their role on the project submitted for Specialized Experience is relevant to their anticipated role on this project. The prime contractor shall submit no more than five (5) projects for Specialized Experience.
Offerors who submit experience information of a parent, sister or other affiliated company must describe what involvement such company will have on the instant acquisition. The offeror shall provide a one page narrative that clearly and specifically indicates what resources of the parent, sister or other affiliated company – its workforce, management, facilities, or other resources – will be provided or relied upon for contract performance. The Government may discount the experience of a parent, sister or other affiliated company unless the prime contractor clearly provides evidence of a binding teaming agreement or other contractual agreement which creates legal responsibility on the part of the parent, sister or other affiliated company or provides a Meaningful Relationship Commitment Letter including the following:
1. A statement of commitment as to the performance and utilization of the identified entity’s resources on the project.
2. Signatures of both the Offeror and Meaningful Relationship Entity.
5.1.2 Provide a one-page consolidated list of the Specialized Experience projects submitted for the prime contractor and key subcontractors (required to be submitted for Factor 4) to include a matrix that identifies the projects and the firms that worked on each one (teaming).
5.1.3 Provide a supplemental narrative, not to exceed two (2) pages, to address any of the following that are applicable.
(a) If submitting projects performed under a prior business arrangement (joint venture for example) for Specialized Experience, address why that experience is relevant to the experience of the firm submitting the offer. Clearly identify the role and responsibilities of each joint venture partner.
(b) Describe any previous teaming experience between current team members, if not described on the specialized experience forms. Identify specific projects.
5.2 Evaluation Criteria:
5.2.1 The Government will evaluate the extent of recent, related experience of the prime contractor as relevant to their role on this project. Experience on the similar projects identified in the project experience sheets will receive more consideration than experience provided in the supplemental narrative. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.
5.2.2 The Offeror must submit the requested information to demonstrate a record of recent, related experience for construction of the facility type (which may include similar state or local government or private counterparts) included in this contract. Recent experience includes projects well underway (at least 50% construction progress completed) or those completed and turned over within ten (10) years of the proposal issue date for this RFP for construction experience. Joint Venture partners shall each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.
5.2.3 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Contractor Performance Assessment Reporting System (CPARS), other DoD or Government appraisal systems or to interview owners or references.
The Government may check any or all cited references to verify supplied information.
5.2.4 To receive credit for extent (amount) of experience, the Offeror shall demonstrate a history of recent, relevant experience. Experience under a previous business arrangement will not be considered relevant if the offeror’s role on the submitted project is not considered relevant.
5.2.5 The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions.
Some examples of relevancy to this project may include, but not be limited to:
(a) Size, type and complexity of the work;
(b) Location of work and similarity to the climate of Climate Zone 8, as defined by ANSI/ASHRAE Standard 169 climate zone map for the United States;
(c) Firm's role and extent of work self-performed (brokering out all work and simply “pouring the sidewalks” on a cited project are examples of less relevant experience)
5.2.6 The Government may consider previous recent teaming experience among the team members as value added, even if on different types of construction projects than this project. The more relevant the experience, the more credit will be given.
6.0 VOLUME 1, TAB B - FACTOR 2: PAST PERFORMANCE (CONFIDENCE ASSESSMENT)
6.1 Submission Requirements:
6.1.1 Past performance refers to the quality of recent project experience from the owner's perspective.
Past performance evaluations or questionnaires shall be provided for all projects submitted under Specialized Experience (Tab A). The offeror may rely on finalized CPARS reports, otherwise the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project. Previously completed PPQ’s may be submitted however ensure a current phone number and email address is provided for the client point of contact.
Completed Past Performance Questionnaires should be submitted with your proposal and may be duplicated for submission on future solicitations. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the offeror should complete and submit with the proposal the first 2 pages of the PPQ (Attachment 4), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Christopher Taylor via email at Christopher.E.Taylor@usace.army.mil prior to the proposal closing date. Offerors shall not mailto:Christopher.E.Taylor@usace.army.mil incorporate by reference into their proposal PPQs previously submitted for other RFPs.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Projects cited shall be currently well underway (at least 50% construction progress completed) or that have been completed and turned over within ten (10) years preceding the date of this solicitation. Also include performance recognition documents received within the last ten (10) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may be include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting Systems (CPARS), inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
Experience of a parent, sister or other affiliated company will not be considered if the offeror fails to demonstrate what resources of the parent, sister or other affiliated company will be provided or relied upon or fails to demonstrate the existence of a contractual or meaningful relationship with the parent, sister or other affiliated company. An offeror may receive credit for relevant past performance under a previous business arrangement (joint venture for example) if the offeror demonstrates that their role on the submitted project is relevant to their role on this project.
6.2 Evaluation Criteria:
6.2.1 The Government will first assess and rate the relevancy of recent projects accomplished by the offeror to the scope of this contract for application to the performance confidence assessment ratings described hereinafter. The projects will include those submitted under the Specialized Experience Factor as well as from other sources described above. This rating is not a separate proposal rating but is only used in developing past performance confidence assessment rating assigned to the Past Performance Factor. The past performance relevancy ratings are described below:
a. Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires
b. Relevant: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
c. Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
d. Not Relevant: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
6.2.2 The Government will next consider how well the offeror performed on the contracts. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy, past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance. An offeror will not receive credit for past performance of a parent, sister or other affiliated company if the offeror fails to demonstrate what resources of the parent, sister or other affiliated company will be provided or relied upon or fails to demonstrate the existence of a contractual or meaningful relationship with the parent, sister or other affiliated company. An offeror may receive credit for relevant past performance under a previous business arrangement (joint venture for example); if the offeror demonstrates that their role on the project submitted is relevant to their role on this project. The Government will target areas covered in the requirements of this proposal including records of conforming to quality, schedule, cost control, customer satisfaction, level of support for such things as as-built documentation, O&M manuals, training, problem resolution for construction errors, warranty work, and safety. The Government places a higher value on projects, which document successful outcomes and are supported by outside source confirmation, for example, but not limited to CPARS or other agency performance databases, offeror furnished references, or personal knowledge. The Government also places a higher value on projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. The rating for this factor will be expressed as a degree of confidence in the offeror’s ability to successfully accomplish the contract requirements. The rating system used for the performance confidence assessment is described at the end of this section.
6.2.3 Each entity (firm) will be rated on its own performance. Past performance under a previous business arrangement will not be considered relevant if the offeror’s role on the project is not considered relevant. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance confidence assessment will be considered “Unknown Confidence (Neutral)”.
7.0. VOLUME 1 - TAB C - FACTOR 3 – TECHNICAL APPROACH AND ACTIVITY-
BASED SCHEDULE
7.1. Submission Requirements:
7.1.1. Technical Approach: The offeror shall propose a technical approach on the Statement of Work and under this Tab C, to include Identification of risks associated with the proposed technical approach, mitigation strategies, and contingencies to address the risk, detailed summary of the proposed mobilization/demobilization and field logistics of working in a secure area, and explanation of the proposed technical approach to deep pile construction and any work performed over winter months (Oct-Mar).
7.1.2. Activity-Based Schedule: Submit an activity-based schedule for construction. Schedules or diagrams may be provided separately in a size that is easily read, and clearly labeled as Tab C. This activity-based schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 01.00 10: Project Schedule. The activity-based schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved defined at the appropriate detail level and logically sequenced to support and manage completion of the project. For schedule proposal purposes only, utilize a Notice to Proceed date of AM#03 6 September 2019 15 October 2019 AM#03 This date is solely to assist in evaluation of offeror’s proposals and shall not be construed as a contractual NTP date. Schedules shall be graphically represented. The proposed project schedule shall reflect the proposed contract duration.
Give attention to the following features but limit narrative information to no more than two (2) pages total:
(1) Narrative:
a) Provide proposed technical approach, mitigation strategies, and contingencies to address the risk including describing Quality Control.
b) List those features (i.e., sidewalks, landscaping, communications infrastructure, drainage swales, deep pile construction, work over winter months etc.) the construction team feels warrants special emphasis.
(2) Activity-Based Schedule:
(a) Show the overall construction phase for the facility to include demolition, for the site work, and for the utilities.
(b) Show commissioning activities.
(c) Show turnover of the facility. Identify any proposed phased turnovers. The time to complete the facility and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor- Government turnover inspections.
(d) Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedules presented (e.g., labor/subcontractor or material availability, permits, weather, etc.). Indicate the anticipated overall critical path on the schedule.
7.2. Evaluation Criteria:
7.2.1. Technical Approach: The evaluation standard has been met when the contractor demonstrates an understanding of the work that adequately addresses the contract requirements. The contractor simply stating that their technical approach stated herein will be performed in accordance with all federal, state, and local regulations will be considered unacceptable. The inclusion of numerous assumptions that significantly “assume away” contractor risk with regard to major issues or problems that may be encountered on the project will be considered unacceptable. The government places a higher value on an offer that provides proposed methods to streamline construction and demonstrates a good understanding of cold climate and seismic design and construction considerations relevant to this project. The Government will also consider whether the approach reduces susceptibility to inclement weather delays.
7.2.2. Contract Duration: The proposed contract duration will become the contractually binding completion period and will replace the duration stated in FAR 52.211-10 upon contract award. The Government will evaluate the contract duration, as proposed by the Offeror in the Proposal CLIN Schedule, not to exceed the maximum allowed duration stated in FAR 52.211-10. In assessing the reasonableness of the proposed contract duration, the Government may take into account how well the proposed summary schedule supports the proposed duration, as well as use other information, such as but not limited to independent judgment concerning logic, constraints and typical construction durations. The Government will rate a proposed contract duration matching the maximum allowed contract duration as “Acceptable.” A proposed contract duration shorter than the maximum allowed duration will receive additional rating consideration, provided it is realistic and deemed to be achievable. The Government will consider an unreasonably condensed contract duration, which places additional cost or schedule risk on the Government or which may create a risk of contract or performance failure, as a significant weakness or a deficiency, depending upon the evaluators' judgment.
7.2.3. Activity-Based Schedule: The Government will evaluate the activity-based schedule for construction of the project. The length of the schedule must match the proposed contract duration. .
If it is shorter than the Offeror’s proposed contract duration, it offers no advantage to the Government because it is non-binding, only representing a preliminary planned schedule. A schedule shorter than the proposed contract duration may indicate the Offeror is placing additional risk on the Government for any delays between the scheduled completion date and the required contract completion period.
Therefore, the Government believes that there is no valid need to shorten the schedule less than the full proposed contract duration. The Government will evaluate the schedule to assess the strength of understanding of the project scope, restrictions which must be considered in the schedule, e.g., permitting, long lead items, etc. The Government will evaluate the offeror's capability to schedule the complete project within the proposed contract duration and the realism of the schedule. A schedule that offers advantage(s) to the Government over one that merely indicates an adequate understanding of the scope, restrictions, major milestones and general understanding of the various events that can affect start and completion of construction, will receive additional consideration.
8.0 VOLUME 1 – TAB D - FACTOR 4: KEY SUBCONTRACTORS
8.1 Submission Requirements:
8.1.1 Identify the key subcontractors for chosen for this project. Submit no more than three (3) Specialized Experience forms (Attachment 3) for each Key Subcontractor AMD#1 (more than 10% of the offeror’s price or deemed a “key subcontractor” by the offeror) AMD#1 and include past performance ratings. The ratings may be from either the owner or the prime contractor if the firms were subcontractors on the cited projects. The Offeror shall document unequivocal teaming arrangements with its key subcontractors. Use the Letter of Commitment (Attachment 5) at the end of this section.
8.1.2 Evaluation Criteria:
8.1.2.1 This subfactor is comprised of two equal elements (not separately rated); Specialized Experience and Past Performance.
8.1.2.2 The Government will evaluate the specialized experience and past performance of the key subcontractors proposed for the project, in accordance with the evaluation criteria under Tab A and B, respectively and as applicable to their role on this project. No substitution will be allowed without adequate reason and possible consideration to the Government.
9.0 VOLUME 2 – TAB A – FACTOR 5: STANDARD FORM 1442, PROPOSAL DATA
SHEET, AND CONTRACT LINE ITEM SCHEDULE
9.1 GENERAL
Submit the Pro Forma information in a separate binder labeled: “Volume 2 - Pro Forma Requirements.”
9.2 Submission Requirements:
9.2.1 Submit the properly filled out and executed SF 1442, along with the CLIN Schedule, containing proposed line item and total pricing, and the proposed contract duration. See instructions in Section 00 21 00, “Instructions to Offerors.” Submit the Proposal Data Sheet (Attachment 1).
9.2.2. Supplemental Price Breakdown. If deemed necessary to evaluate the price proposals, the Government will request a price breakdown of the Contract Line items electronically identified as “Price Breakdown Information,” in Excel format. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three (3) working days after the proposal submission due date. This information may be required for the initial proposal and, if requested, for any revised proposals. This information is not an opportunity for an offeror to revise its non-price or price proposal.
9.3 Evaluation Criteria:
9.3.1 Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis. The price evaluators will also check for appearance of unbalanced line item prices. Offerors are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc., and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.
9.3.2 If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.
10.0 VOLUME 2, TAB B - REQUIRED PRE-AWARD INFORMATION
10.1. Submission Requirements:
10.1.1. Submit this information for the Contracting Officer’s determination of Offeror responsibility:
(a) Joint Venture agreement or Limited Liability company Certificate of Organization, Articles of Organization and Operating Agreement, if applicable.
(b) A list of present commitments, including the dollar value thereof, and name of the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective contractor’s performance.
(c) A certified statement listing: (1) each contract awarded within the preceding three (3) month period exceeding $1,000,000.00 in value with a brief description of the contract; and (2) each contract awarded within the preceding three (3) year period not already physically completed and exceeding $5,000,000.00 in value with a brief description of the contract. If the prospective contractor is a joint venture, each joint venture member will be required to submit the above defined certification
(d) Competed Representations and Certifications included by full text in Section 00 45 00. List any changes to SAM (System for Award Management) in 52.204-8 for FAR Clauses and 252.204- 7007 for DFAR clauses. Provide for any certification where vendor indicated in
SAM that certification would be provided with specific offer.
(e) One copy of the following information shall be provided:
(1) Proof of Financial Ability (Most recent financial statement covering assets and liabilities)
(2) Number of years the firm has been in business
(3) Name, address and telephone number of firm’s…