B.08.03_Amendment_05.pdf
PDF 11 MB Posted
- Attached to
- Construct Conventional Munitions Maintenance Facility Federal contract opportunity
- Solicitation number
- W911KB19R0003
About this file
B.08.03 Amendment 05
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03_EIE431_structural_dwg_AM04.pdf | ||
| B.08.03_Amendent04.pdf | ||
| B.08.03_EIE431_Geotech_Data_Report_AM04.pdf | ||
| B.08.03_AM3_Specs.pdf | ||
| B.08.03_AM3_Drawings.pdf | ||
| B.08.03_Amendment3.pdf | ||
| B.08.03_EIE431_AM2_Specifications.pdf | ||
| B.08.03_Amendment02.pdf | ||
| B.08.03_EIE431_AM2_Drawings.pdf | ||
| B.08.03_EIE431_Building_6385_As-Built_Dwgs_AM2.pdf | ||
| B.08.03_Amendment1Completev2.pdf | ||
| A.2.11.3_Solic_Vol_3_EIE431_Drwgs_RTA.pdf | ||
| A.2.11.3_Solic_Vol_2_EIE431-_Combined_Specs__RTA.zip | ZIP file | |
| A.2.11.3_Solic_Vol_2_EIE431-_Combined_Specs__RTA.pdf | ||
| A.2.11.3 Solic Vol 2_EIE431- Combined Specs RTA.pdf | ||
| A.2.11.3 Solic J&A's_Redacted - Copy.pdf | ||
| A.2.11.3_Solic_Vol_1_EIE431-.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911KB19R0003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project titled F-35A Conventional Munitions Maintenance Facility, Eielson A.F.B. is being amended to revise Draw ings S-511 and S-522, revise specif ication 26 24 13 and 41 22 13.14, to post questions and answ ers from ProjNet, and to update the w age determination dated August 2, 2019.
All other terms and conditions of W911KB19R0003 remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0003
X 9B. DATED (SEE ITEM 11)
07-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2019
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
S-511 – REVISE details 101 (note 7), 103 (note 2), and 106 (note 4). Revise to say “Insulation and airspace per architectural drawings.
S-522 – REVISE detail 210. Revise note 3 to say “steel channel, C6x8.2”
b. The following drawings are added:
NONE
c. The following revised documents/sections are substituted for the superseded documents/sections:
The identifier “AM #05” appears before and after new and/or revised materials, except as noted below.
26 24 13 Switchboards - Per UFGS notes the requirement for cyber security certification in switchboards is intended for switchboards with remote operation capabilities. This does not apply to this project. REVISE to remove submittal requirements for cyber security certification.
41 22 13.14 Bridge Cranes, Overhead Electric, Top-Running – DELETE references to walkways and cross-overs and REVISE speeds of hoist, trolley and bridge.
d. The following sections are added:
NONE
e. The following sections are deleted:
NONE
f. Other:
SECTION 00 73 46 - WAGE DETERMINATIONS SCHEDULES
The following have been modified:
WAGE DET
"General Decision Number: AK2019000 1 06/14/2019
Superseded General Decision Number: AK201800 01
State: Alaska
Construction Types: Buildin g and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTR UC TION PROJECTS (does not include residential constructio n consistin g of single family homes and apartments up to and includin g 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Baco n Act for which the contract is awarded (and any solicitatio n was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classificatio n listed on this wage determinatio n at least $10.60 per hour (or the applicable wage rate listed on this wage determinatio n, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentio ned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Baco n Related Acts, includin g those set forth at 29 CFR 5.1(a)(2)-(6 0). Additional information on contractor requirements and worker protections under the EO is available at www.dol.go v/wh d/govco ntracts.
Modification Number Publicatio n Date 0 01/04/2019 1 01/11/2019
2 01/18/2019
3 02/22/2019
4 03/01/2019
5 03/29/2019
6 03/29/2019
7 04/12/2019
8 04/19/2019
9 06/14/2019
ASBE0 097-0 01 01/01/2018
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulatin g materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 3 8.68 21.57
HAZARD OUS MATERIAL HANDLE R
(includes preparation, wetting, stripping, removal scrapping, vacuming, baggin g, and disposing of all insulation materials, whether they contain asbestos or not, http://www.dol.gov/whd/govcontracts fro m mechanical systems).........$ 37.3 8 19.55
BOIL0 502-0 02 10/01/2017
Rates Fringes
BOILE R MA KE R......................$ 46.1 7 29.70
BRAK0 001-0 02 07/01/2018
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.8 1 19.77
Tile & Terrazzo Finisher.........$ 34.7 9 19.62
CARP1501-0 01 09/01/2016
Rates Fringes
MIL L W RIGHT.......................$ 36.7 4 22.99
CARP2520-0 03 09/01/2018
Diver
Stand-by ......................................... $ 42.65 25.66 Tender ............................................... $ 41.65 25.66 Working ........................................... $ 82.45 25.66
Piledriver
Piledriver; Skiff Operator and Rigger ...................................... $ 38.34 25.66
Sheet Stabber ............................... $ 38.34 25.66
Welder .............................................. $ 43.90 25.66
DEPTH PAY PREMIU M FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot
101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIU M WITH NO VERTIC AL ASCENT:
5-50 FEET $1.00 PER FOOT/D AY
51-100 FEET $2.00 PER FOOT/D AY
101 FEET AND ABOVE $3.00 PER FOOT/D AY
SATURA TIO N DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuo usly until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINA TIO N OF CLASSIFICATIO NS:
Employees working in any combinatio n of classificatio ns within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-0 01 09/01/2018
CARPENTER
Includin g Lather and
Dry wall Han gin g.............$ 38.3 4 25.66
* ELEC15 47-0 04 04/01/2019
CABLE SPLICER....................$ 40.03 3%+27.2 3
ELECTRICIAN......................$ 39.70 3%+27.4 8
ELEC1 547-0 05 04/01/2019
Line Constructio n
Rates
Fringes
CABLE SPLICER .......................................... $
56.05
3%+31.7 8
Linemen (Includin g Equipment
Operators, Technician) ....................... $ 54.30 3%+31.7 8
Powderman .................................................. $ 52.30 3%+31.7 8
TREE TRIMM E R ............................................ $ 36.21 3%+25.1 9
ELEV0 019-0 02 01/01/2019
ELEVAT OR MECH ANIC................$ 57.23 33.705+a+b
FOOTNO TE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Indepen dence Day;
Labor Day; Veteran's Day; Thanksgivin g Day; Friday after Thanksgivin g, and Christmas Day
ENGI0 302-0 02 01/01/2019
POWER EQUIP ME NT OPERATO R
GROUP 1 ........................................... $ 40.53 23.65
GROUP 1A ......................................... $ 42.29 23.65
GROUP 2 ........................................... $ 39.76 23.65
GROUP 3 ........................................... $ 39.04 23.65
GROUP 4............................................$
TUNNEL WORK
32.83 23.65
GROUP 1 ......................................... $ 44.58 23.65
GROUP 1A ....................................... $ 46.52 23.65
GROUP 2 ......................................... $ 43.74 23.65
GROUP 3 ......................................... $ 42.94 23.65
GROUP 4 ......................................... $ 36.11 23.65
POWER EQUIP ME NT OPERATO R CLASSIFIC ATIONS
GROUP 1: Asphalt Roller: Breakdo wn, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bendin g Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (includin g jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Do uble Drum; Ditching or Trenchin g Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollago n, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, includin g all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunnelin g Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Muckin g Machines:
Mole, Tunnel Drill, Horizontal/Directio nal Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combinatio n of power units over 300 k.w.); Scrapers-thro ugh
40 yards; Service Oiler/Service Engineer; Sidebo oms-un der
45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (includin g jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sideboo ms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermo biles and Air Tuggers;
Horizontal/Directio nal Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevatin g Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screenin g, Washing Plant; Sideboo m (cradlin g rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: ""A"" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-po wer;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevatin g-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distributio n; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightenin g Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equip ment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNO TE: Groups 1-4 receive 10% premium while performing tunnel or undergro un d work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0 751-0 03 07/01/2018
IRONWO RK ER
BRIDGE, STRUC TU RAL,
ORNAM E NTA L, REINFO RCIN G
MACHIN ERY MOVER, RIGGER,
SHEETE R, STAGE RIGGE R,
BENDER OPERATOR ........................$ 37.90 31.48
FENCE, BARRIE R INSTALL ER ........$ 34.40 31.48
GUARDR AIL INSTALLE RS ................$ 35.14 31.48
GUARDR AIL LAYOU T MAN ................$ 35.14 31.48
HELICOPTE R, TOWER .......................$ 38.90 31.48
* LABO03 41-0 01 04/01/2019
LABORE R (South of the 63rd
Parallel & West of Longitude
138 Degrees)
GROUP 1............................................ $ 30.71 27.51
GROUP 2............................................ $ 31.71 27.51
GROUP 3............................................ $ 32.61 27.51
GROUP 3A.......................................... $ 35.89 27.51
GROUP 3B .......................................... $ 39.68 24.80
GROUP 4............................................ $ 20.28 27.51
TUNNEL S, SHAFTS, AND RAISES
GROU P 1....................$ 33.78 27.51
GROU P 2....................$ 34.88 27.51
GROU P 3....................$ 35.87 27.51
GROU P 3A ........................................$ 39.48 27.51
GROU P 3B.........................................$ 43.65 24.80
LABORE RS CLASSIFIC ATIO NS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, groutin g, curing, screedin g); Crusher Plant Laborer; Demolitio n Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardo us and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (buildin g); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Buildin g and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burnin g and Cuttin g Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chuckten der (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Layin g of Decorative Block (retainin g walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (includin g, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drillin g and Drillin g Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transferin g of grade marks, line and grade)
GROUP 4: Final Buildin g Cleanup
TUNNEL S, SHAFTS, AND RAISES CLASSIFICA TIO NS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burnin g and Cuttin g Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
* LABO09 42-0 01 04/01/2019
Laborers: North of the 63rd
Parallel & East of Longitude
138 Degrees
GROUP 1 ........................................... $ 30.71 27.51
GROUP 2 ........................................... $ 31.71 27.51
GROUP 3 ........................................... $ 32.61 27.51
GROUP 3A ......................................... $ 35.89 27.51
GROUP 3B ......................................... $ 39.68 24.80
GRO UP 4.....................$ 20.2 8 27.51
TUNNEL S, SHAFTS, AND RAISES
GROU P 1....................$ 33.78 27.51
GROU P 2....................$ 34.88 27.51
GROU P 3....................$ 35.87 27.51
GROU P 3A ........................................ $ 39.48 27.51
GROU P 3B ........................................ $ 43.65 24.80
LABORE RS CLASSIFIC ATIO NS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, groutin g, curing, screedin g); Crusher Plant Laborer; Demolitio n Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardo us and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (buildin g); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Buildin g and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
GROUP 2: Burnin g and Cuttin g Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chuckten der (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Layin g of Decorative Block (retainin g walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man to, wagon drills, air track drills; hydraulic drills);
GROUP 3B: Grade checker (setting or transferin g of grade
GROUP 4: Final Buildin g Cleanup
TUNNEL S, SHAFTS, AND RAISES CLASSIFICA TIO NS
Tunnel Track Laborer
GROUP 2: Burnin g and Cuttin g Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers.
Tunnel shaft and raise rates only apply to workers regularly
PAIN1959-0 01 07/01/2018
NORTH OF THE 63RD PARALLEL
PAINTER
BRUSH/RO LLE R PAINT OR WALL
COVERE R.....................$ 32.09 21.09
TAPING, TEXTU RING,
STRUCT URA L PAINTING,
SANDBL ASTIN G, POT TENDER,
FINISH META L, SPRAY,
BUFFER OPERAT OR, RADON
MITIGA TIO N, LEAD BASED
PAINT ABATE M E NT, HAZARDO US
MATE RIAL HANDLER............$ 32.61 21.09
PAIN1959-0 02 07/01/2018
SOUTH OF THE 63RD PARALLEL
PAINTER
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Dry wall, Structural Steel, and
Commercial Spray .........................$ 32.09 21.09
Machine Taper/Dry wall ..............$ 32.61 21.09
Spray-San d/Blast, Epoxy and Tar Applicator ....................$ 32.61 20.09
PAIN1959-0 03 07/01/2018
GLA ZIER..........................$ 3 9.2 8 23.49
PAIN1959-0 04 07/01/2018
Rates Fringes
FLOOR LAYER: Carpet.............$ 29.1 3 14.06
PAIN1959-0 06 07/01/2018
SOUTH OF THE 63RD PARALLEL
GLAZIE R..........................$ 39.28 23.49
PLAS0867-0 01 04/01/2019
PLASTERER
North of the 63rd parallel..$ 38.13 21.68
So uth of the 6 3rd parallel..$ 37.88 21.68
PLAS0867-0 04 04/01/2019
CEME NT MASO N/CO NCR ET E FINISHE R
North of the 6 3rd parallel..$ 38.13 21.68
So uth of the 6 3rd parallel..$ 37.88 21.68
PLUM0 262-0 02 07/01/2018
East of the 141st Meridian
Plumber; Steamfitter.............$ 38.02 27.12
PLUM0 367-0 02 12/03/2018
South of the 63rd Parallel
Plumber; Steamfitter.............$ 39.00 26.70
PLUM0 375-0 02 07/01/2018
North of the 63rd Parallel
Plumber; Steamfitter.............$ 41.46 26.40
PLUM0 669-0 02 04/01/2017
SP RINKLE R FITTE R.................$ 46.0 0 23.29
ROOF0 189-0 06 04/01/2019
Rates Fringes
ROOFE R...........................$ 4 4.6 2 16.03
SHEE0 023-0 03 07/01/2018
South of the 63rd Parallel
SHEET METAL WORKER...............$ 42.70 26.40
SHEE0 023-0 04 07/01/2017
North of the 63rd Parallel
SHEET METAL WORKER...............$ 47.74 23.48
TEAM0 959-0 03 03/01/2019
TRUCK DRIVER
GROUP 1 ........................................... $ 39.94 24.12
GROUP 1A ......................................... $ 41.21 24.12
GROUP 2 ........................................... $ 38.68 24.12
GROUP 3 ........................................... $ 37.86 24.12
GROUP 4 ........................................... $ 37.28 24.12
GROUP 5 ........................................... $ 36.52 24.12
GROUP 1: Semi with Double Box Mixer; Dump Trucks (includin g rockbuggy and trucks with pups) over 40 yards up to and includin g 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys includin g attached trailers and jeeps, up to and includin g 12 axles; Ready-mix over 12 yards up to and includin g 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (includin g Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loadin g; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (includin g Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and includin g 12 yards; Partsman;
Stringin g Truck
GROUP 3: Dump Trucks (includin g Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggy mo bile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (includin g Rockbug gy and Truck with pups) up to and includin g 10 yards; Track Truck Equip ment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handlin g bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted ""A"" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with
Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Kn uckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and includin g 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Kn uckle Truck up to and includin g 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted ""A"" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and includin g 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a constructio n project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and includin g 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDER S - Receive rate prescribed for craft performing operation to which weldin g is incidental.
Note: Executive Order (EO) 13706, Establishin g Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Baco n Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, includin g preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, includin g preventive care; or for reasons resultin g from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additio nal information on contractor requirements and worker protections under the EO is available at www.dol.gov/wh d/govco ntracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determinatio n lists the classificatio n and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determinatio n. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginnin g with characters other than ""SU"" or ""UAVG"" denotes that the union classificatio n and rate were http://www.dol.gov/whd/govcontracts prevailing for that classification in the survey. Example:
PLUM0 198-0 05 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processin g the wage determinatio n. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailin g wage rates are updated to reflect all rate changes in the collective bargainin g agreement (CBA) governin g this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computin g a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA201 2-00 7 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producin g the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMP LE: UAVG-O H-0 010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producin g the wage determinatio n. 08/29/2014 indicates the survey completion date for the classificatio ns and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CB A rate of the union locals from which the rate is based.
WAGE DETERMIN ATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determinatio n
* a survey underlyin g a wage determinatio n
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classificatio n and rate) ruling
On survey related matters, initial contact, includin g requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Baco n survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Constructio n Wage Determinations. Write to:
Branch of Constructio n Wage Determinations Wage and Hour Division U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the questio n in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project descriptio n, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
W911KB19R0003
END OF GENERA L DECISIO N"
Changed to:
"General Decision Number: AK20190001 08/02/2019
Superseded General Decision Number: AK20180001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.S(a)(l)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The E0 minimum wage rate will be adjusted annually. Please note that this E0 applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.l(a)(2)-(60). Additional information on contractor requirements and worker protections under the E0 is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 01/11/2019
2 01/18/2019
3 02/22/2019
4 03/01/2019
5 03/29/2019
6 03/29/2019
7 04/12/2019
8 04/19/2019
9 06/14/2019
10 08/02/2019
ASBE0097-001 01/01/2018
Rates Fringes
Asbestos Workers/Insulator https://beta.sam.gov/wage-determinalion/ AK20190001/10/document
(includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems) ..•..••.....•..•.•......• $ 38.68
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems) ......... $ 37.38
BOIL0502-002 10/01/2017
Rates
BOILERMAKER ...................... $ 46.17
BRAK0001-002 07/01/2018
Bricklayer, Blocklayer, Stonemason, Marble Mason, Rates
Tile Setter, Terrazzo Worker ..... $ 40.81
Tile & Terrazzo Finisher ......... $ 34.79
CARP1501-001 09/01/2016
21.57
19.55
Fringes
29.70
Fringes
19.77
19.62 https://beta.sam.gov/wage-determinalion/ AK20190001/10/ document
MILLWRIGHT ..........•..•.•......• $ 36.74
CARP2520-003 09/01/2018
Rates
Diver
Stand-by .................... $ 42.65
Tender ...................... $ 41.65
Working ..................... $ 82.45
Piled river
Piledriver; Skiff Operator and Rigger .................. $ 38.34
Sheet Stabber ............... $ 38.34
Welder ...................... $ 43. 90
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet
101 feet and deeper
$1.00 per foot
$2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET
101 FEET AND ABOVE
SATURATION DIVING:
$2.00 PER FOOT/DAY
$3.00 PER FOOT/DAY
Fringes
22.99
Fringes
25.66
25.66
25.66
25.66
25.66
25.66
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2018
Rates
CARPENTER
Including Lather and
Drywall Hanging ............. $ 38.34
ELEC1547-004 04/01/2019
Rates
CABLE SPLICER .................... $ 40.03
ELECTRICIAN ..••.....•..•.•......• $ 39.70
ELEC1547-005 04/01/2019
Line Construction
Fringes
25.66
Fringes
3%+27.23
3%+27.48
Fringes Rates
CABLE SPLICER .................... $ 56.05
Linemen (Including Equipment
Operators, Technician) .•.•......• $ 54.30
Powderman ........................ $ 52.30
TREE TRIMMER .••.....•..•.•......• $ 36.21
ELEV0019-002 01/01/2019
Rates
ELEVATOR MECHANIC ................ $ 57.23
3%+31. 78
3%+31.78
3%+31.78
3%+25.19
Fringes
33.705+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after
Thanksgiving, and Christmas Day
ENGI0302-002 01/01/2019
Rates
POWER EQUIPMENT OPERATOR
GROUP 1. .................... $ 40. 53
GROUP lA .................... $ 42.29
GROUP 2 ..................... $ 39. 76
GROUP 3 ..................... $ 39.04
Fringes
23.65
23.65
23.65
23.65
GROUP 4 ..•.....•..•.•....... $ 32.83
TUNNEL WORK
GROUP 1 •......•..•.•......• $ 44.58
GROUP lA ......•..•.•......• $ 46.52
GROUP 2 ••.....•..•.•......• $ 43. 74
GROUP 3 ••.....•..•.•......• $ 42.94
GROUP 4 •......•..•.•......• $ 36.11
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
23.65
23.65
23.65
23.65
23.65
23.65
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and
Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and
Cablecars; Cleaning Machine; Coating Machine; Concrete
Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching
Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter
Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power
Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through
40 yards; Service Oiler/Service Engineer; Sidebooms-under
45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry
Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP lA: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment
Operator; Loaders over 5 yds.; Certified Welder, Electrical
Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump
Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade
Technician; Loaders, (i.e., Elevating Grader and Material
Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under
16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: '"'A'"' Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air
Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber
Green and similar types (b) Forklifts or Lumber Carrier
(on construction job site) (c) Forklifts with Tower (d)
Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey
(air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and
Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill
Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant
Engineer shall be required on cranes over 85 tons or over
100 feet of boom.
IRON0751-003 07/01/2018
IRONWORKER
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
Rates
BENDER OPERATOR ............. $ 37.90
FENCE, BARRIER INSTALLER .... $ 34.40
GUARDRAIL INSTALLERS ........ $ 35.14
GUARDRAIL LAYOUT MAN ........ $ 35.14
HELICOPTER, TOWER ........... $ 38.90
LABO0341-001 04/01/2019
LABORER (South of the 63rd
Parallel & West of Longitude
138 Degrees)
Rates
Fringes
31.48
31.48
31.48
31.48
31.48
Fringes
GROUP 1 .•......•..•.•....... $ 30.71 27.51
GROUP 2 ..................... $ 31. 71 27. 51
GROUP 3 ..................... $ 32.61 27 .51
GROUP 3A .................... $ 35.89 27.51
GROUP 3B .................... $ 39.68 24.80
GROUP 4 ..................... $ 20.28
TUNNELS, SHAFTS, AND RAISES
GROUP 1 .................... $ 33. 78
GROUP 2 .......•..•.•......• $ 34.88
GROUP 3 .................... $ 35.87
GROUP 3A •.....•..•.•......• $ 39.48
GROUP 3B ......•..•........• $ 43. 65
LABORERS CLASSIFICATIONS
27.51
27.51
27.51
27.51
27.51
24.80
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber
Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 38: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 04/01/2019
Laborers: North of the 63rd
Parallel & East of Longitude
138 Degrees
GROUP 1. .................... $ 30. 71
GROUP 2 ..................... $ 31. 71
GROUP 3 ..................... $ 32.61
GROUP 3A .......•..•.•......• $ 35.89
GROUP 3B .................... $ 39.68
GROUP 4 .••.....•..•.•......• $ 20.28
TUNNELS, SHAFTS, AND RAISES
GROUP 1 .......•............ $ 33. 78
GROUP 2 .................... $ 34.88
GROUP 3 .................... $ 35.87
GROUP 3A ................... $ 39.48
GROUP 3B ................... $ 43.65
LABORERS CLASSIFICATIONS
27.51
27.51
27.51
27.51
24.80
27.51
27.51
27.51
27.51
27.51
24.80
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.