W911KB18R0040_AM6.pdf

PDF 4 MB Posted

Attached to
EIE390 F-35 School Age Facility Eielson AFB Alaska
Solicitation number
W911KB-18-R-0040
Issued by

About this file

W911KB-18-R-0040 AM#06

View the file

Other files

File Type Posted
W911KB18R0040_AM_09.pdf PDF
EIE390_W911KB18R0040_AM_08.pdf PDF
W911KB18R0040_AM7.pdf PDF
W911KB18R0040_AM_5.pdf PDF
redacted_JA_Pkg-1901-1904-signed.pdf PDF
W911KB18R0040_AM_4.pdf PDF
W911KB18R0040_AM3.pdf PDF
W911KB18R0040_AM2.pdf PDF
W911KB18R0040_AM_1.pdf PDF
W911KB18R0040_AM_1.pdf PDF
EIE390_Phase_1.pdf PDF
A.02.02_EIE390_Advance_Notice.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: EIE390, School Age Facility, Eielson AFB, AK

PHASE 2 PROPOSAL DUE IS EXTENDED TO Wednesday, 28 November, 2018, 2:00 PM Alaska Time. Proposals shall be submitted in accordance w ith Section 00 21 00, Paragraph 1.8, Proposal Submittals.

This Amendment provides changes to the solicitation as indicated on page 2 of this document.

YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB18R0040

X 9B. DATED (SEE ITEM 11)

13-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Nov-2018

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Amendment #06 (AM#06) 9 Nov 2018

Summary of Changes

a. The following drawings are substituted for the superseded documents/sections:

Drawing C-101: Existing power pole north of the playground area shown; sidewalk replacement from School Age Facility to Child Development Center shown.

b. The following drawings are added:

NONE

c. The following revised documents/sections are substituted for the superseded documents/sections:

The identifier “AM #06” appears before and after new and/or revised materials, except as noted below. Added text is in italics, deleted text is strikethrough text except as noted below.

00 22 20, Para. 5.5.1.2. Replacement page provided.

00 72 00, Contract Clauses. FAR Clause 52.211-10 and 52.211-12 revised. Replacement clauses provided.

01 10 00, Paragraph 2.6: Added “The demolition of the existing School Age Services Facility should not occur until the new facility is operational, but shall start no earlier than 45 days following BOD. Completion of the demolition shall be not later than 01 July 2021.”

01 10 00, Paragraph 3.3.11.1: Revised text to

• Deleted Seventy five square feet per child is required for outdoor space.

• Clarified the existing play structure versus play area to be the standard of design for the new facility.

• Clarified the requirements for chairs and benches in the outdoor play area.

• Clarified the requirements for a cover over the playground equipment.

• Clarified the requirements for shade

01 10 00, Paragraph 3.3.11.3: Revised text to clarify number and location of bicycle parking.

01 10 00, Paragraph 3.3.11.4: Clarified gate requirements.

01 10 00, Paragraph 3.3.11.8: Added paragraph clarifying the requirements for the existing path from the School Age Facility to the existing Child Development Center site.

01 10 00, Paragraph 3.7.7.5.1 and 3.7.19.1: Revised text to clarify humidification requirements.

01 10 00, Paragraph 3.8.1.7: Added requirement for contractor to provide metering unless government has one available and added a requirement for 21 day notice before a power outage.

01 10 00, Paragraph 3.8.2.8: Revised text to provide standby generator plug and breaker requirements and to specifically include mechanical cooling in the standby generator sizing.

01 10 00, Paragraph 3.12.2: Revised text to clarify the following:

• Outdoor play area equipment from Building 3303 will remain including specifically all three canopies, picnic tables, the basketball goal and the playground equipment.

• The site of the building demolition shall be sodded; seeding is removed as an option.

01 19 30.02 29, Paragraph 1.18: Deleted the statement that temporary heat will not be available.

01 19 30.02 29, Paragraph 1.26.3: Revised “5” to “15” working days.

01 19 30.02 29, Paragraph 1.34: Added para 1.31 PRECONSTRUCTION CONFERENCE to address the ECB requirement for Joint Risk Management.

Appendix A, Room Criteria Sheet OPA 001: clarified that outdoor activity space is not a “room” (bounded by walls).

Appendix A, Room Criteria Sheet OPA 001: Gate height changed from 10 feet to 6 feet. Gate requirement changed from (3) pair of 3’x10’ gates to (2) - 6’ high, 44” minimum width personnel gates.

Appendix A, Room Criteria Sheet OPA 001: Added “Follow the criteria in Section 5-8 Exterior Recreational areas in UFC 3-530-01 for illumination levels.”

Appendix A, Room Criteria Sheet OPA 001: Deleted requirement for 540 lux (50 fc) for the above illumination criteria.

Appendix A, Room Criteria Sheet OPA 002: Changed fence height to 6’. Added Requirement for

(1) - 6’ high, 44” minimum width personnel gate and (1) 10’ wide (min) x 6’ high gate. Clarified cover over the playground equipment does not serve as a shade structure.

Appendix A, Room Criteria Sheet OPA 003: Changed fence height to 6’. Added Requirement for

(1) pair of 3’ wide x 6’ high (6’ total opening width) gate.

Appendix A, Room Criteria Sheets 112A, 129, 133 and 135: Revised HVAC requirements.

d. The following sections are added:

e. The following sections are deleted:

f. Other:

SECTION 00 11 00 - STANDARD FORM (SF) 1442

The required response date/time has changed from 13-Nov-2018 02:00 PM to 28-Nov-2018 02:00 PM.

(End of Summary of Changes)

Section 00 22 20 W911KB-18-R-0040 AM6

EIE390

Section 00 22 20

5.5.1 Submission Requirements:

5.5.1 .1 Proposed Contract Duration: The offeror shall propose the contract duration where indicated in the Proposal Schedule and in the narrative provided under this Tab. Proposed contract duration shall not exceed the maximum contract duration specified in FAR 52.211-10.

5.5.1 .2 Summary Schedule: Submit a summary level schedule for integrated design and construction. Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as Tab D.

This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32

01.00 10: Project Schedule. The summary schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. For proposal purposes, utilize a Notice to Proceed date of AM #6… 04 April 2019 14 March 2019. This date is solely to assist in evaluation of offeror’s proposals and shall not be construed as a contractual NTP date. …AM #6 Offeror may use a critical path or other method of his choice; however, schedules shall be graphically represented. The proposed project schedule shall reflect the proposed contract duration. Give attention to the following features but limit narrative information to no more than three (3) pages total:

(1) Narrative:

(a) Provide the proposed contract duration.

(b) Provide a narrative, describing the design packaging plan for separate design packages, based on the Offeror’s plan for fast tracking. Describe all design and construction to be “fast-tracked” (See section 01 33

16.00 29: Design After Award). If long lead item equipment must be ordered prior to completion of a design phase, describe the requirement in the narrative and show the required ordering date in the schedule.

Complete the following matrix summarizing the proposed design package review schedule (not included in schedule narrative page limit).

1.

Submittal Package Name (e.g. Site / Utilities)

Stage (Interim, Final, Design Complete)

Submittal Date

Review Start Date

Review End Date

Review Conference Date (if applicable)

(c) Provide a narrative describing how contractor plans on coordinating design efforts with adjacent EIE405 Utilidor project. Describe the coordination, accommodations, scheduling, and procedures that will be employed to avoid conflicts and facilitate construction interfaces where required. Describe impacts and risks to schedule if EIE405 does not provide utility connection points at a time most convenient for contractor and what measures will be taken to mitigate risks to schedule and project costs.

(2) Summary Schedule:

(a) Show the design phase, including events associated with coordinating the interim and final design submittals for each package and the proper handling of the review comments for each design package (See

W911KB18R0040

SECTION 00 72 00 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) - ALTERNATE

I (APR 1984)

AM #6…

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work the new School Age Services facility ready for use not later than 1 August 2020. The time stated for completion shall include final cleanup of the premises.

The demolition of the existing School Age Services Facility should not occur until the new facility is operational, but shall start no earlier than 45 days following BOD. Completion of the demolition shall be not later than 01 July 2021.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 14 March 2019. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer. …AM #6

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

AM #6…

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,460 for each calendar day of delay until the work is completed or accepted.

The following table states the liquidated damages for delay of the interim completion dates for separate stages of the work:

Interim Completion Date

Liquidated Damages Work

1 August 2020 $2,460 Completion of new School Age Services Facility

01 July 2021 $2,460 Demolition of existing School Age Services Facility

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. …AM #6

(End of clause)

01 10 00

1.0 PROJECT OBJECTIVES

The project objective is to design and construct facilities for the military that are consistent with the design and construction practices used for civilian sector projects that perform similar functions to the military projects.

For example, a Company Operations Facility has the similar function as an office/warehouse/maintenance facility in the civilian sector; therefore the design and construction practices should be consistent with the design and construction of an office/warehouse/maintenance facility.

Comparison of Military Facilities to Civilian Facilities

Military Facility Civilian Facility School Age Care (SAC) facility School Age Child Care Center

1.1 It is the Air Force's objective that these buildings will have a 50 year useful life. The design and construction shall provide an appropriate level of quality to ensure the continued use of the facility over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project OWNER. The facility design should consider that the Air Force may repurpose the use of the facility over the 50 year life. The Corps of Engineers intent is to install products and materials of good quality that meet industry standard average life that corresponds with the period of performance of more than 25 years before a major renovation or repurpose. The design shall be flexible and adaptable to possible future uses different than the current mission to the extent practical while still meeting the operational and functional requirements defined within. The site infrastructure will have at least a 50-year life expectancy with industry-accepted maintenance and repair cycles. Develop the project site for efficiency and to convey a sense of unity or connectivity with the adjacent buildings and with the Installation as a whole.

1.2 Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements, are encouraged. Further, the OFFEROR is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods shall reflect this by choosing the most economical Type of Construction allowed by code for this occupancy/project allowing the funding to be reflected in the quality of interior/exterior finishes and systems selected.

1.3 SECTION ORGANIZATION

This Section is organized under 5 major “paragraphs”.

• Paragraph 1 is intended to define the project objectives and to provide a comparison between the military facility(ies) and comparable “civilian” type buildings.

• Paragraph 2 describes the scope of the project.

• Paragraph 3 provides the functional, operational and facility specific design criteria for the specific facility type included in this contract or task order.

• Paragraph 4 describes Applicable Criteria including project specific, industry, and

Federal criteria.

• Paragraph 5 contains a list of Acronyms.

2.0 SCOPE

2.1 SCHOOL AGE CARE FACILITY

Provide a School Age Care Facility to accommodate programs for 241 children ages 5-12 (K-6th grade) and 35 staff and administrative personnel. Activities are year round, 0630 to 1800 with before school, after school kindergarten care and summer programs. Peak activity during the school year is 0645-0715 (drop

EIE90 AM#06

off), 1410-1440 (after school) and 1600-1715 (pick-up). Kindergarteners are at the facility in two shifts during the school year. Students are in the building from 0630 – 1000 and from 1200 - 1800.

The project will incorporate all related civil-site, mechanical, electrical, fire suppression, utilities, pavements, site improvements, communications and other necessary supporting facilities for a complete and useable facility.

The maximum building gross area cannot exceed the following Authorized Programmed Amount of:

School Age Program Facility: 20,354 square feet (1,891SM)

The project will incorporate all related civil-site, mechanical, electrical, fire suppression, utilities, pavements, site improvements, communications and other necessary supporting facilities for a complete and useable facility.

2.2 VEHICLE PARKING

Provide vehicle parking for seventy-six (76) Personal vehicles, four (4) of which shall be ADA accessible.

Vehicles must park and children be escorted into the building. Drop-off/loading zones will not be utilized.

No Government vehicle parking is required.

2.3 SITE

Provide all site design and construction necessary to support the School Age Facility and the organizational vehicle parking. Supporting facilities include, but are not limited to, asphalt pavement, utilities, electric service, exterior and security lighting, telecommunications, fire protection and alarm systems, water, steam/condensate, sewer, storm drainage systems, storm water management and site improvements. Include Antiterrorism/Force Protection measures in the facility/site design in accordance with applicable criteria. Include applicable storm water Best Management Plans (BMPs). Provide appropriate site vegetation for unpaved areas.

Base roadways sustaining damage from construction activities shall be repaired at the Contractor’s expense after project completion. Maintain the construction site and haul route. Repair/replace damage to existing sidewalks, pavements, curb and gutter, utilities, and/or landscaping within the construction limit, adjacent to the construction site, and along the Contractor’s haul route resulting from the Contractor’s construction activities at no additional cost to the Government. Prior to construction activities, the Contractor and Contracting Officer Representative shall perform an existing condition survey. At the completion of the Task Order/contract, the Contractor and Contracting Officer Representative shall perform a final condition survey to determine repair/replacement requirements.

The Contractor shall install a temporary 6-foot high chain link fence around the site, (including any temporary storage areas). The fence shall have attached tan-colored fabric, and shall be installed to withstand strong wind loads prescribed in structural design codes and criteria paragraph 4.0.

Provide all site improvements necessary to support the new building facilities.

It is the intent that POV vehicles will depart and return from both north and south on Kodiak Street.

Additionally, accommodate the following in the design, refer to Appendices (Drawings):

• Provide for service drive for semi-truck and trailers near the kitchen entrance.

• Provide drive for fire service and emergency response vehicles.

2.4 GOVERNMENT-FURNISHED / GOVERNMENT-INSTALLED (GFGI) EQUIPMENT

Coordinate with Government on GFGI item requirements and provide suitable structural support, brackets for TVs, all utility connections, and space with required clearances for all GFGI items.

The following are also GFGI items:

All Computers and related hardware, microwave ovens, refrigerators, tables, chairs, desks, VCRs and TV's, facility data (e.g., routers, switches, modems) equipment, facility telephone switch equipment and any required UPS systems; radio transmitting equipment and associated antenna and wiring (raceway to be provided by Contractor’s A-E design); front end equipment and equipment racks associated with CATV/CCTV/Satellite TV and separate front end audio equipment not associated with a Combined Mass Notification and Paging System.

2.5 FURNITURE REQUIREMENTS

Provide furniture design for all spaces listed in Paragraph 3. Coordinate with the user to define requirements for furniture systems, movable furniture, storage systems, equipment, any existing items to be reused, etc. Early coordination of furniture design is required for a complete and usable facility.

The procurement and installation of furniture is NOT included in this contract. Furniture will be provided and installed under a separate furniture vendor/installer contract. The general contractor shall accommodate that effort with allowance for entry of the furniture vendor/installer onto this project site at the appropriate time to permit completion of the furniture installation for a complete and usable facility to coincide with the Beneficial Occupancy Date (BOD) of this project.

At each workstation and/or desk, provide 120 VAC duplex outlets, telephone, and data connections.

AM#05… Ceiling drops and floor outlets may be installed only where specifically permitted elsewhere in this RFP. …AM#05

Provide power, voice and data outlets to conference tables.

Provide power and data outlet at location of office equipment to include fax, printers, scanners, and copiers.

Provide CATV cable drop, data, power, and wall-mount brackets for GFGI TV/monitors.

Contractor Furnished Contactor Installed (CFCI) shelving, cabinets and lockers to be anchored.

Workstations included in the furniture design should not be pre-wired systems. Provide access to building power and comm. outlets through coordination of placement of furniture and outlets and through use of removable panels, grommets, etc.

2.6 DEMOLISH BUILDING 3303

Demolish the existing School Age Facility, Building 3303, located on Broadway Street. The existing playground equipment, fencing walls and appurtenances are to remain.

AM#06… The demolition of the existing School Age Services Facility should not occur until the new facility is operational, but shall start no earlier than 45 days following BOD. Completion of the demolition shall be not later than 01 July 2021. …AM#06

SALVAGE NOTE: New interior lighting fixtures were installed as part of a 2018 project. Fixtures shall be carefully demounted and delivered to the Base Electrical Shop prior to building demolition.

THIS PAGE INTENTIONALLY BLANK

3.3 CIVIL DESIGN AND CONSTRUCTION CRITERIA

3.3.1 General

3.3.1.1 The Design-Build contractor’s civil engineer(s) of record shall be responsible for the civil design. Work shall consist of the complete site design and construction including but not limited to:

earthwork; grading; drainage; landscaping; pavement sections for parking areas, access roads, utilities;

demolition; and coordination with architectural, structural, mechanical, electrical, environmental and fire protection disciplines. The Contractor shall consult with the Contracting Officer to coordinate with other projects occurring in the same general area simultaneously.

3.3.1.2 Design shall take into consideration topography and natural characteristics of the area, including climatic conditions, prevailing winds, areas of snow accumulation, etc. Site work shall provide a functional development requiring only routine maintenance through its design life. Site planning, development and the Contractor's operations shall at all times take into consideration that other facilities bordering the site must remain fully operational for the duration of the contract.

3.3.1.3 It shall be the Contractor's responsibility to protect existing features, which include roads, utilities, and other similar items. The Contractor will be held responsible for any damage to Government property and shall repair or replace all damaged items, in-kind, and at no cost to the Government. The Contractor shall take necessary precautions to avoid damaging Government property, and if damage occurs, shall immediately notify the Contracting Officer, both verbally and in writing.

3.3.1.4 Maintain access and utilities to adjacent facilities during construction. The traffic control plan shall include the contractor’s method for providing access to adjacent facilities as well as safety measures for pedestrians during construction of this project. Reference Specification Section 01 19 30.02 29 for additional traffic control plan requirements.

3.3.2 Topographic Survey

3.3.2.1 Reference Appendices for the topographic survey of the project site. The topographic survey is available electronically for the Contractor’s use and is available upon request. The Contractor shall review and field verify the survey information and be responsible for all additional surveys required to complete requirements of these documents.

3.3.2.2 Protection of Monuments: Existing survey monuments shall be protected from movement and damage. Damaged or disturbed monuments shall be documented and replaced, to the original order of survey accuracy, at no additional cost to the Government.

3.3.2.3 Not all underground utilities may be shown on the provided survey. Contractor shall obtain utility locates prior to starting any earthwork.

3.3.3 Haul Routes

Reference Appendices, Location and Vicinity Map for approved haul route.

3.3.4 Borrow and Disposal Sites

The Contractor shall provide all required borrow from off-Base or on-Base sources. There is a Government borrow source available. Use of the on-Base borrow source shall be approved by the Base Civil Engineer. The Government landfill is not available for non-hazardous wastes with the exception of concrete. There are disposal areas for clean concrete, concrete wastes and concrete wastes that contain asbestos on government property. Non-hazardous wastes shall be disposed of off government property.

3.3.5 Sub-Arctic Climate

Sub-arctic climate conditions exist at the project site. The design analysis shall include written descriptions, accompanied by calculations as necessary to show that all elements of the Civil Design are designed according to the principles and procedures of the Cold Climate Utilities Manual, (published by Canadian Society for Civil Engineering, 2050 Mansfield Street, Montréal, Quebec).

3.3.6 Force Protection/Antiterrorism:

The site requires Force Protection/Antiterrorism as described herein and in accordance with UFC 4-010-

01. Site to meet vehicle barrier requirements to protect facility and personnel. Installation prefers more natural type passive barriers to enclose the site, e.g. deep swales, earthen berms, large boulders.

Approved vehicle barrier swing style gates are required at the standoff distance to control vehicles at any access drives. POV parking shall be design at the proper standoff per ATFP requirements.

3.3.7 Site Constraints

The project is located on Kodiak Street, between Bald Eagle Lane and French Creek Drive. The approximate area for site development is 3.7 acres extending to a fence defining the Family Housing Lease boundary on the west and north side of the site and to the intersection of Kodiak Street and French Creek Drive on the east side of the site. The site is across the street from Anderson Elementary School.

The Child Development Center is northeast of the site and on the east is a drainage basin. See Appendix drawings for more info. The primary constraints are Kodiak Street to the front of the site and family housing fencing to the rear.

The site is relatively flat with drainage swales to the north. A culvert connects one swale to another under a raised path leading from the site to the Child Development Center.

An existing power pole and guy wires are located on the northeast side of the site near the proposed location of the fire/delivery lane.

3.3.8 Site Layout and Design

3.3.8.1 General Requirements

3.3.8.1.1 The Contractor shall not site the building on top of any existing utilities in use and shall maintain a minimum of 15 feet from existing and new utilities.

3.3.8.1.2 Where new paved areas are located over existing/new buried heating utilities or when existing buried heating utilities are re-routed under paved areas the Contractor shall provide a frost transition of 5H:1V as a minimum.

3.3.8.2 Orientation of the Building

The building shall be oriented for access, maneuverability and sustainability. The front of the building is expected to face Kodiak Street.

3.3.8.3 Vehicle Traffic Systems

3.3.8.3.1 AM#05… Vehicle types are as follows:

POV Parking: Passenger vehicle up to 19 feet long

Service Drive/Parking:

Food Delivery: 18 wheel semi-tractor trailer (WB-62)

Engine-81/Engine-82

• Length - 31Ft 7In

• Width - 8ft

• Height - 10ft 10in

• Gross Vehicle Weight - 42,000 lbs

• Tire Pressure 110 PSI

Tender-85

• Length - 389 In

• Width 102in

• Height - 115in

• Gross Vehicle Weight - 78,000 lbs

• Tire Pressure 120PSI …AM#05

3.3.8.3.2 Site entrances and exits shall be designed to accommodate privately operated vehicles and shall include recirculation through the parking lot without the requirement of exiting to the street. The service drive shall be designed to accommodate a semi-tractor trailer, fire truck or largest vehicle type intended for the space, as applicable. Vehicle clearances shall be required to meet traffic safety for expected vehicle types and usage for this facility. Roads, drives and parking shall include required traffic control and road identification signage, maximum spacing between drives, right-angle turns, and limit points of conflict between traffic.

The School Age Facility will be directly across the street from Anderson Elementary School with vehicular and pedestrian traffic expected between the facilities. The designer shall utilize the services of a traffic engineer to:

1) ensure that driveway and parking entrances and exits are designed so as to minimize conflicts with the school, particularly during the peak hours for both facilities,

2) study the drop off and pick up within the parking lot to prevent vehicle queuing onto Kodiak Street, and

3) study the pedestrian crosswalks to determine whether safety improvements are required or recommended along Kodiak Street.

3.3.8.3.3 Provide maintenance/emergency access to mechanical room. The service drive will be combined with the fire/emergency access drive and dumpster service. The service drive shall accommodate an 18-wheel semi-tractor trailer (WB-62) delivery truck. AM #05… Service drive parking must accommodate service delivery truck and fire/emergency vehicles simultaneously. …AM #05 Fire/Emergency vehicle parking must be available within 33’ of a primary entrance at all times in accordance with UFC 3-600-01. The dumpster pad must have 50’ straight and clear access to the front of the dumpsters. A waste management service truck must be able to exit without backing onto a main thoroughfare. Provide a driveway detail which shows turning radii and wheel paths for emergency vehicle, delivery truck and waste management service truck.

3.3.8.4 Pedestrian Traffic Systems

Concrete sidewalks should be provided between the parking and all entrances into the building.

Sidewalks should also be provided from the cross walks to the building. Pedestrian access between the parking areas, crosswalks, and evacuation areas and the building shall be handicap accessible.

Sidewalks shall be a minimum of 6 feet wide. Where headbolt heaters are located within the sidewalks the minimum width shall be 7.5’. All sidewalks shall be a minimum 6” depth PCC. Where sidewalks cross vehicular travel ways, the sidewalk shall be design to accommodate vehicular traffic.

Space should be provided for evacuation of all individuals and should be located so that all individuals can stand at least 75’ from the structure.

3.3.8.5 Safe Gathering Area

AM #05… Provide a smooth, accessible, and unobstructed evacuation route to a safe gathering area not less than 82 75 feet from the facility for all activity rooms. …AM #05 The route must not cross any emergency vehicle access path, parking area, or street. The evacuation route must be at least 44 inches wide, and turns and bends in the route should be wider to account for use of wheelchairs. Provide gates with not less than 44 inches clear width as necessary in the play area fence. Provide sufficient outdoor lighting for the egress path to meet NFPA 101 minimum illumination requirements.

3.3.8.6 Privately Owned Vehicles (POV) Parking Requirements

3.3.8.6.1 AM #05… Site parking for privately owned vehicles (POV) should may be plan west of the building or in such location as best accommodates the design. … AM #05 The required parking is 76 spaces, 4 of which should be ADA accessible. Each standard stall shall be 9 feet wide by 20 feet long.

Three ADA accessible stalls shall be at least 8 feet wide and adjacent to a 5 foot wide access aisle. At least one ADA accessible stall shall be van accessible, 11 feet wide and adjacent to a 5 foot wide access aisle or 8 feet wide and adjacent to an 8 foot wide access aisle. Two ADA accessible stalls may share the same access aisle. Approximately 35 parking spaces shall be provided with engine block heater receptacles. Location of spaces with receptacles should be near the back for staff all day parking.

Reference Electrical Systems for additional HBO requirements. It is desirable to provide recirculation through the parking lot without the requirement of exiting to the street.

Concrete curb and gutter shall be placed between areas of asphalt and sidewalks. All other edges of asphalt pavement shall transition directly to the abutting surface to allow for drainage and to facilitate snow removal.

3.3.8.6.2 Where access driveways and parking areas are located over existing and new utilidor systems; the Contractor shall provide traffic-rated utilidor lids.

3.3.8.6.3 Provide striped, curbed, concrete or landscaped islands at the end of a line of parking stalls to prevent vehicle doors from being opened onto moving vehicles. Provide islands to accommodate turning movements and/or vehicles backing out of parking spaces wherever applicable.

3.3.8.6.4 Pavement markings shall be per Manual on Uniform Traffic Control Devices (MUTCD).

3.3.8.6.5 The Contractor shall offset the headbolt heater posts at a minimum of 18” from face of curb, edge of pavement, or edge of parking striping.

3.3.8.6.6 The minimum drive width is 24 feet.

3.3.8.7 Service Drive and Fire/Emergency Access Drive

3.3.8.7.1 Minimum service drive width is 20’. The service drive shall provide adequate space for food delivery truck (semi-tractor trailer, WB-62); emergency vehicles and dumpster pick-up, with turn arounds if required.

3.3.8.7.2 Fire lanes should be provided to within 33 feet of a primary building entrance and designed provided in accordance with UFC 3-600-01. The minimum fire lane width is 20 feet. If the fire lane is longer than 150’ a turnaround must be provided. The turnaround can be a tee.

3.3.8.7.3 The service drive shall be designed such that a fire truck can gain access as required if a delivery is currently in progress. The delivery truck may not park in the fire lane. Deliveries are made mid-day two to three times per week. Consideration must be given to the existing power pole and guy wires on the northeast side of the site near the proposed location of the fire/delivery lane.

3.3.8.7.4 Concrete curb and gutter shall be placed between areas of asphalt and sidewalks. All other edges of asphalt pavement shall transition directly to the abutting surface to allow for drainage and to facilitate snow removal.

3.3.8.8 Outdoor Walkways and Activity Area

Sidewalks, pathways and the sports court area shall be cast-in-place concrete over well compacted sub-grade. Minimum sidewalk width is 44 inches. Areas under and around playground equipment shall have surface materials that meet the shock absorbency criteria recommended by Consumer Products Safety Commission (CPSC), "Handbook for Public Playground Safety" and ASTM guidelines. Generally, poured-in place resilient safety surfaces are the best option.

3.3.8.9 Snow Removal and Storage

Snow removal and storage shall be required in the design and layout (i.e. include in storm water calculations, etc.). Storage may not block storm drainage structures.

3.3.9 Pavement Design

3.3.9.1 The Contractor shall reference UFC 3-201-01 and UFC 3-250-01 to determine the design methods and materials. The design methods are provided below:

1. The USACE Pavement Transportation Computer Assisted Structural Engineering (PCASE) program;

2. American Association of State Highway and Transportation Officials (AASHTO);

3. Applicable state Department of Transportation standards in which the project is located.

3.3.9.2 The Contractor shall reference Section 01 33 16.00 29 Design after Award for required information for the Contractor’s geotechnical report.

3.3.9.3 The minimum flexible pavement section shall consist of 2 inches of asphalt and 6 inches of base or as required by the pavement design, whichever is greater, unless specifically identified by the Government to be a gravel road. Design roads and parking areas for a life expectance of 25 years with normal maintenance.

3.3.9.4 The minimum concrete pavement thickness shall be 6”. The remaining concrete section shall be design by the Contractor.

3.3.9.5 For concrete pavements, submit joint layout plan for review and concurrence.

3.3.9.6 Pavement markings and traffic signage shall comply with the Installation requirements and with the Manual on Uniform Traffic Control Devices.

3.3.10 Site Grading and Drainage

3.3.10.1 Low Impact Development shall be utilized. The parking lot and paved surfaces sheet flows to the exterior pavement edges into bioswales or infiltration galleries which enhance the infiltration of storm water runoff into the soil. Existing bioswales on base work well. However, standing water is typically present for a few weeks during spring thaw and briefly during high rain periods. Snow storage may not be over the bioswales or infiltration galleries.

3.3.10.2 Building Finish Floor Elevation - The Contractor shall establish the finish floor elevation of the building 6 inches above adjacent grade to provide positive drainage away from the building.

3.3.10.3 Site Grading – The exterior grade shall slope away from the building and comply with UFC 3- 101-01 and UFC 3-201-01. Drainage for the site shall comply as a minimum with ETL 04-6, UFC 3-210- 10 and UFC 1-200-02.

The exterior grades around the building shall be at least 6 inches below the finished floor elevation, except at the doors to the building. At the doors, the difference in elevations shall conform to ABAAG requirements. In lawn areas adjacent to the building, the grades shall slope away from the building at a minimum 5 percent slope for a minimum distance of 10 feet. Site grading, parking areas, etc., shall be sloped to drain to new and/or existing stormwater systems.

3.3.10.4 Stormwater

Runoff from within the project boundaries, during construction of the project, shall be the responsibility of the Contractor. Silt laden or other environmental degrading waters shall be collected and treated prior to discharge from the project site or to infiltration areas.

Contractor shall prepare and submit a Storm Water Pollution Prevention Plan (SWPPP) to the Alaska Department of Environmental Conservation (ADEC) and the Contracting Officer for review, and conduct all construction activities in accordance with the approved plan. The plan, as a minimum, shall include the following items: methods for clearing, grubbing, excavation and embankment construction; temporary erosion and sediment control measures; Best Management Practices (BMPs); temporary and permanent drainage features; haul roads and material stockpile sites; existing drainage features and containment control; cleanup and disposal methods for petroleum products or other hazardous substances generated by construction equipment or activities. The plan shall also address BMPs for post-construction activities and operation of the facility, until stabilization occurs. Contractor is responsible for all fees associated with the National Pollutant Discharge Elimination System (NPDES), SWPPP, and ADEC review and permits. The Contractor shall be responsible for submitting Notice of Intent (NOI) and Notice of Termination (NOT) to ADEC and EPA. The Contractor shall for reference Section 01 57 34.00 29 Storm Water Pollution Prevention Measures for SWPPP requirements.

3.3.10.4.1 Storm Drainage Design

New site drainage shall maintain predominant existing drainage patterns. The site’s storm water management shall meet the requirements of the Energy Independence and Security Act (EISA) Section 438, State of Alaska Wastewater Discharge Engineering Plan Review, HPSB III.4 Stormwater Management, and any sustainability certification credits. The Contractor shall provide storm drainage calculations, including runoff and volumes from adjacent properties especially at critical structures. The storm water calculations shall be based on the appropriate storm for each requirement. For example, EISA requires the analysis of the 95th percentile storm whereas USGBC requires analysis of the 2 year and 1 year storms. In addition the contractor shall size all major drainage structures, such as culverts, manholes and curb inlets for the 10-year 24-hour storm event. While hand calculations are acceptable it is preferred that the contractor analyze the site drainage design with a storm water modeling program such as Storm Water Management Model (SWMM).

The contractor shall meet the requirements of EISA, the post-development stormwater discharge and volume shall not be greater than the pre-development values. According to the Department of Defense, pre-development is defined as prior to new construction. The contractor shall include a statement in the design analysis stating that the design meets the requirements of EISA and how it is being accomplished.

The final design shall be submitted to the State of Alaska for a Wastewater Discharge Engineering Plan Review in accordance with ADEC 18 AAC 72.600. Any associated fees for the review of the final design for approval shall be the Contractor’s responsibility. The Contractor shall provide the Letter of Non- Objection as obtained from the State of Alaska after the successful completion of the plan review.

Areas experiencing consolidated flow, such as roof drain outlets, roof drip lines, parking lots, drainage swales, etc. shall be designed with features to prevent erosion.

Runoff from roof drains and collections systems must be directed away from buildings without causing glaciation on pedestrian circulation routes or erosion.

The site is relatively flat, dropping to the north of the site. A retaining wall may be required north of the site. Storm water will be routed to drainage structures or swales which lead to bioswales or infiltration galleries. Drainage culverts, if required, shall be CMP or RCP. The collection and treatment of runoff from snow storage and paved areas shall meet ADEC, EPA, and Sustainable Design.

3.3.11 Site Structures and Amenities

3.3.11.1 Outdoor Play Areas

AM#06… Seventy–five square feet per child is required for outdoor space. The covered outdoor play structure area design for the existing School Age Facility (Building 3303) will be the standard design for the new facility. Trees and shrubs should be minimized to maintain easy site lines and for ease of maintenance.

Outdoor play areas will include a sport court, a covered play structure, an outdoor classroom and a terrace. A minimum of four outdoor tables with seating for 6 six chairs each and three permanently fixed outdoor benches are required.

If a structure is provided, Consideration must be given to lighting and snow shedding for all structures provided. Snow shall not shed from the shade structures to frequently occupied locations in the outdoor play area. Lighting will be provided to the outdoor play area and to the shade structures if used.

Darkness falls at Eielson around 1500 in the winter and every effort should be made to maximize sunlight exposure and access to ambient light in the play area. The covered outdoor playground equipment play structure from Building 3303 cannot be re-used, but shall be used as a basis of design.

A shaded area must also be provided through natural and/or artificial means. landscaping or a structure.

Natural means shall include trees no less than six (6) feet tall and no less than six (6) inches in diameter.

Artificial means shall include, but not be limited to, shade structures (gazebos, umbrellas, canvas covers, sails, etc.) and the facility. The minimum area of shall be whichever is greater; 10% of outdoor play environment surface area or 15 square feet per maximum number of children using the outdoor play environment. Trees and shrubs shall be chosen for ease of maintenance and to maintain easy site lines.

…AM#06

The Contractor shall provide an adjustable height basketball hoop and mount for the sport court and striping/markings for the sport court for one half-court basketball (Junior High Standard), two Hopscotch and two Four-Square courts.

The outdoor play area design and construction should be a separate design package so as to not delay the rest of the project. Estimate 60-90 days for AF review of the outdoor play areas. The designer for the outdoor play areas will be a certified playground inspector.

3.3.11.2 Sheds

Provide and enclosed, unheated, weather-tight, vandal-proof storage shed for play gear and maintenance equipment. Each shall be 12 feet by 12 feet. Both may be in the same structure, 12 feet by 24 feet, but should be separated by a wall with separate entrances for each. It should be readily accessible to the major play zones and be architecturally or thematically compatible with the School Age Facility, including the roof design. Ventilate the storage shed and provide concrete floors sloped to the door for drainage.

Provide visibility into the shed and eliminate blind spots created by the shed. The square footage for the shed is not considered part of the overall square footage for the facility.

3.3.11.3 Bike Rack

AM#06… The Contractor shall provide bicycle racks/parking for up to 10 twenty (20) bicycles or as prescribed by the facility. The bicycle racks shall be located in a convenient and safe location between the POV parking lot and the main entrance. …AM#06

3.3.11.4 Fencing

A site security fence is not required. However, a 6-foot minimum height fence around the outdoor play areas is required. Fencing shall be black or dark green vinyl coated chain link per UFC 4-470-14; 6-5.1.

Exposed galvanized wire, which has a highly institutional appearance, is not allowed. Fence posts shall be installed to face the outside of the outdoor play environment. Woven end of fence shall be installed on top with the links not exceeding the top rail. Top rail fence covers shall encase the top of the fence. A means shall be employed to ensure that no gap is between the bottom of the fence and the ground.

Spaces between fence components and facility shall not exceed 3.5 inches. No more than two (2) threads of the inside bolt shall be visible. When attaching the fence fabric the head of bolt shall face the inside of the outdoor play environment.

AM#06… Five gates will be required to the play area, three of which should be double gates (6’ wide opening). Five (5) gates will be required in the outdoor play area: three (3) 44-inch (min) wide x 6-foot high personnel gates; one (1) pair 3-foot wide (6-foot total opening) x 6-foot high from the playground area to the outdoor classroom area; and one (1) 10-foot (min) opening x 6-foot high gate to the playground area. The 10-foot wide (min) gate may be a double 6-foot gate. The opening must be able to accommodate an emergency vehicle such as an ambulance. Final gate requirements are dependent on the design. At least one gate shall be able to accommodate an ambulance and at least one gate to each of the playground area and to the outdoor classroom shall be able to accommodate grounds-keeping equipment. …AM#06 Security locks are desired on all gates (gate can be opened from the inside, but not the outside).

A security gate with a 20’ wide opening is required at the fire/service drive with a locking mechanism accessible by the fire department and the facility manager for deliveries.

3.3.11.5 Dumpsters

The Contractor shall provide two dumpsters for the facility. Typical dumpster size for Eielson AFB is 81"w x 79"d x 62"h. Recycling bins are not required.

Incorporate dumpster placement into an area screened with walls, fencing, or plant material. Avoid locating dumpsters along major circulation or use area. Dumpsters should be directly accessible by way of a service drive or parking lot with adequate horizontal and vertical clearance for collection vehicles.

Assume a standard, front loading 35 foot waste collection truck and provide 50 feet clear access to the front of the dumpsters. The Contractor shall confirm with Waste Management the type of vehicle that will be used to service the dumpsters. The collection truck must be able to turn around and exit without backing onto a public street.

All dumpsters should be placed on concrete pads with aprons large enough to encompass the bearing points of the service vehicle. Dumpster enclosures on Eielson AFB shall be constructed to generally model the adjacent building architecture; reference the Eielson AFB Design Guide.

The minimum classified fill underneath the concrete and base course specified shall be 12”. Provide bollard protection as needed based on site layout.

3.3.11.6 Bollards

Provide pipe bollards at the facility. These pipe bollards shall be located at the service entrance, at the…