NES066_AM3_Specs_and_Dwgs.pdf
PDF 2 MB Posted
- Solicitation number
- W911KB-09-R-0006
About this file
Amendment 0003 Revisied Specifications and Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-09-R-0006-0005.pdf | ||
| W911KB-09-R-0006-0004.pdf | ||
| W911KB-09-R-0006-0003.pdf | ||
| Mechanical question add 2 | — | |
| Amendment 1.pdf | ||
| Dwgs-NES066-BID2.pdf | ||
| Front end and Specs-NES066-BID2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment R0003 FAIRBANKS SATELLITE OPERATIONS FAC. NES066
FOX, ALASKA
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 45 04.00 10
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
1.2 PAYMENT
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 QUALITY CONTROL PLAN
3.2.1 Content of the CQC Plan
3.2.2 Acceptance of Plan
3.2.3 Notification of Changes
3.3 COORDINATION MEETING
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
3.4.2 CQC System Manager
3.4.3 CQC Personnel
3.4.4 Additional Requirement
3.4.5 Organizational Changes
3.5 SUBMITTALS AND DELIVERABLES
3.6 CONTROL
3.6.1 Preparatory Phase
3.6.2 Initial Phase
3.6.3 Follow-up Phase
3.6.4 Additional Preparatory and Initial Phases
3.7 TESTS
3.7.1 Testing Procedure
3.7.2 Testing Laboratories
3.7.2.1 Capability Check
3.7.2.2 Capability Recheck
3.7.3 Onsite Laboratory
3.7.4 Furnishing or Transportation of Samples for Testing
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
3.8.2 Pre-Final Inspection
3.8.3 Final Acceptance Inspection
3.9 DOCUMENTATION
3.10 SAMPLE FORMS
3.11 NOTIFICATION OF NONCOMPLIANCE
-- End of Section Table of Contents --
SECTION 01 45 04.00 10 Page 1
SECTION 01 45 04.00 10
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 3740 (2004a) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction
ASTM E 329 (2007) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
1.2 PAYMENT
Separate payment will not be made for providing and maintaining an effective Quality Control program, and all costs associated therewith shall be included in the applicable unit prices or lump-sum prices contained in the Bidding Schedule.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract Clause titled "Inspection of Construction." The quality control system shall consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. The system shall cover all construction operations, both onsite and offsite, and shall be keyed to the proposed construction sequence. The site project superintendent will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract. The site project superintendent in this context shall be the highest level manager responsible for the overall construction activities at the site, including quality and production. The site project superintendent shall maintain a physical presence at the site at all times, except as otherwise acceptable to the Contracting Officer, and shall be responsible for all construction and construction related activities at the site.
SECTION 01 45 04.00 10 Page 2
3.2 QUALITY CONTROL PLAN
The Contractor shall furnish for review by the Government, not later than 30 days after receipt of notice to proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause titled "Inspection of Construction." The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used.
The Government will consider an interim plan for the first 30 days of operation. Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the features of work included in an accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional features of work to be started.
3.2.1 Content of the CQC Plan
The CQC Plan shall include, as a minimum, the following to cover all design and construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents subcontractors, designers of record, consultants, architect/engineers (AE), fabricators, suppliers, and purchasing agents:
a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff shall implement the three phase control system for all aspects of the work specified. The staff shall include a CQC System Manager who shall report to the project superintendent.
b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.
c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the contract. The CQC System Manager shall issue letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities. Copies of these letters shall also be furnished to the Government.
d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures shall be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.
e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer shall be used.)
f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.
g. Procedures for tracking construction deficiencies from
SECTION 01 45 04.00 10 Page 3 identification through acceptable corrective action. These procedures shall establish verification that identified deficiencies have been corrected.
h. Reporting procedures, including proposed reporting formats.
i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.
3.2.2 Acceptance of Plan
Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.
3.2.3 Notification of Changes
After acceptance of the CQC Plan, the Contractor shall notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
3.3 COORDINATION MEETING
After the Preconstruction Conference, before start of construction, Postaward Conference, before start of design or construction, and prior to acceptance by the Government of the CQC Plan, the Contractor shall meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. The CQC Plan shall be submitted for review a minimum of 30 calendar days prior to the Coordination Meeting.
During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, design activities, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting shall be prepared by the Government and signed by both the Contractor and the Contracting Officer. The minutes shall become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
The requirements for the CQC organization are a CQC System Manager, a Design Quality Manager, and sufficient number of additional qualified personnel to ensure safety and contract compliance. The Safety and Health Manager shall serve as a member of the CQC staff. Personnel identified in
SECTION 01 45 04.00 10 Page 4 the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff shall maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC staff shall be subject to acceptance by the Contracting Officer. The Contractor shall provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Complete records of all letters, material submittals, shop drawing submittals, schedules and all other project documentation shall be promptly furnished to the CQC organization by the Contractor. The CQC organization shall be responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.
3.4.2 CQC System Manager
The Contractor shall identify as CQC System Manager an individual within the onsite work organization who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager shall be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this contract.
This CQC System Manager shall be on the site at all times during construction and shall be employed by the prime Contractor. The CQC System Manager shall be assigned no other duties. An alternate for the CQC System Manager shall be identified in the plan to serve in the event of the System Manager's absence. The requirements for the alternate shall be the same as for the designated CQC System Manager.
3.4.3 CQC Personnel
In addition to CQC personnel specified elsewhere in the contract, the Contractor shall provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: civil, electrical, mechanical, structural, architectural and testing and balancing. These individuals may be employees of the prime or subcontractor; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan.
A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows.
Experience Matrix
Area Qualifications
a. Civil Graduate Civil Engineer or Construction Manager with 2 years experience in the type of work being performed on this project or technician with 5 yrs related experience
SECTION 01 45 04.00 10 Page 5
Experience Matrix
Area Qualifications
b. Mechanical Graduate Mechanical Engineer or Construction Manager with 2 yrs experience or person with 5 yrs related experience
c. Electrical Graduate Electrical Engineer or Construction Manager with 2 yrs related experience or person with 5 yrs related experience
d. Structural Graduate Structural Engineer or Construction Manager with 2 yrs experience or person with 5 yrs related experience
AM#3... DELETED TEXT ...AM#3
f. Testing, Adjusting and Balancing Specialist must be a member (TAB) Personnel of AABC or an experienced technician of the firm certified by the NEBB.
3.4.4 Additional Requirement
In addition to the above experience and/or education requirements the CQC System Manager shall have completed the course entitled "Construction Quality Management For Contractors". This course is periodically offered at Associated General Contractors of Alaska 8005 Shoon Street, Anchorage, Alaska 99518 (907) 561-5354.
3.4.5 Organizational Changes
The Contractor shall maintain the CQC staff at full strength at all times.
When it is necessary to make changes to the CQC staff, the Contractor shall revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance.
3.5 SUBMITTALS AND DELIVERABLES
Submittals, if needed, shall be made as specified in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization shall be responsible for certifying that all submittals and deliverables are in compliance with the contract requirements. When Section 23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS are included in the contract, the submittals required by those sections shall be coordinated with Section 01 33 00 SUBMITTAL PROCEDURES to ensure adequate time is allowed for each type of submittal required.
3.6 CONTROL
Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of
SECTION 01 45 04.00 10 Page 6 control shall be conducted by the CQC System Manager for each definable feature of the construction work as follows:
3.6.1 Preparatory Phase
This phase shall be performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase shall include:
a. A review of each paragraph of applicable specifications, reference codes, and standards. A copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field shall be made available by the Contractor at the preparatory inspection. These copies shall be maintained in the field and available for use by Government personnel until final acceptance of the work.
b. A review of the contract drawings.
c. A check to assure that all materials and/or equipment have been tested, submitted, and approved.
d. Review of provisions that have been made to provide required control inspection and testing.
e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.
f. A physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.
g. A review of the appropriate activity hazard analysis to assure safety requirements are met.
h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.
i. A check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.
j. Discussion of the initial control phase.
k. The Government shall be notified at least 24 hours in advance of beginning the preparatory control phase. This phase shall include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. The results of the preparatory phase actions shall be documented by separate minutes prepared by the CQC System Manager and attached to the daily CQC report. The Contractor shall instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.
SECTION 01 45 04.00 10 Page 7
3.6.2 Initial Phase
This phase shall be accomplished at the beginning of a definable feature of work. The following shall be accomplished:
a. A check of work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.
b. Verify adequacy of controls to ensure full contract compliance.
Verify required control inspection and testing.
c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.
d. Resolve all differences.
e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.
f. The Government shall be notified at least 24 hours in advance of beginning the initial phase. Separate minutes of this phase shall be prepared by the CQC System Manager and attached to the daily CQC report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.
g. The initial phase should be repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.
3.6.3 Follow-up Phase
Daily checks shall be performed to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. The checks shall be made a matter of record in the CQC documentation. Final follow-up checks shall be conducted and all deficiencies corrected prior to the start of additional features of work which may be affected by the deficient work. The Contractor shall not build upon nor conceal non-conforming work.
3.6.4 Additional Preparatory and Initial Phases
Additional preparatory and initial phases shall be conducted on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.
3.7 TESTS
3.7.1 Testing Procedure
The Contractor shall perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements. Upon request, the Contractor shall furnish to the Government duplicate samples of test specimens for possible testing by the
SECTION 01 45 04.00 10 Page 8
Government. Testing includes operation and/or acceptance tests when specified. The Contractor shall procure the services of a Corps of Engineers approved testing laboratory or establish an approved testing laboratory at the project site. The Contractor shall perform the following activities and record and provide the following data:
a. Verify that testing procedures comply with contract requirements.
b. Verify that facilities and testing equipment are available and comply with testing standards.
c. Check test instrument calibration data against certified standards.
d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.
e. Results of all tests taken, both passing and failing tests, shall be recorded on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test shall be given. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the test number and date taken. An information copy of tests performed by an offsite or commercial test facility shall be provided directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this contract.
3.7.2 Testing Laboratories
3.7.2.1 Capability Check
The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel shall meet criteria detailed in ASTM D 3740 and ASTM E 329.
3.7.2.2 Capability Recheck
If the selected laboratory fails the capability check, the Contractor will be assessed the actual cost to reimburse the Government for each succeeding recheck of the laboratory or the checking of a subsequently selected laboratory. Such costs will be deducted from the contract amount due the Contractor.
3.7.3 Onsite Laboratory
The Government reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests, and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.
3.7.4 Furnishing or Transportation of Samples for Testing
Costs incidental to the transportation of samples or materials shall be borne by the Contractor. Samples of materials for test verification and
SECTION 01 45 04.00 10 Page 9 acceptance testing by the Government shall be delivered to the Corps of Engineers Division Laboratory, f.o.b.
Coordination for each specific test, exact delivery location, and dates will be made through the Area Office.
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
Near the end of the work, or any increment of the work established by a time stated in the SPECIAL CONTRACT REQUIREMENTS Clause, "Commencement, Prosecution, and Completion of Work", or by the specifications, the CQC Manager shall conduct an inspection of the work. A punch list of items which do not conform to the approved drawings and specifications shall be prepared and included in the CQC documentation, as required by paragraph DOCUMENTATION. The list of deficiencies shall include the estimated date by which the deficiencies will be corrected. The CQC System Manager or staff shall make a second inspection to ascertain that all deficiencies have been corrected. Once this is accomplished, the Contractor shall notify the Government that the facility is ready for the Government Pre-Final inspection.
3.8.2 Pre-Final Inspection
The Government will perform the pre-final inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. The Contractor's CQC System Manager shall ensure that all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled. Any items noted on the Pre-Final inspection shall be corrected in a timely manner. These inspections and any deficiency corrections required by this paragraph shall be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.
3.8.3 Final Acceptance Inspection
The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the Contracting Officer's Representative shall be in attendance at the final acceptance inspection. Additional Government personnel including, but not limited to, those from Base/Post Civil Facility Engineer user groups, and major commands may also be in attendance. The final acceptance inspection will be formally scheduled by the Contracting Officer based upon results of the Pre-Final inspection. Notice shall be given to the Contracting Officer at least 14 days prior to the final acceptance inspection and shall include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government's additional inspection cost in accordance with the contract clause titled "Inspection of Construction".
SECTION 01 45 04.00 10 Page 10
3.9 DOCUMENTATION
The Contractor shall maintain current records providing factual evidence that required quality control activities and/or tests have been performed.
These records shall include the work of subcontractors and suppliers and shall be on an acceptable form that includes, as a minimum, the following information:
a. Contractor/subcontractor and their area of responsibility.
b. Operating plant/equipment with hours worked, idle, or down for repair.
c. Work performed each day, giving location, description, and by whom. When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.
d. Test and/or control activities performed with results and references to specifications/drawings requirements. The control phase shall be identified (Preparatory, Initial, Follow-up). List of deficiencies noted, along with corrective action.
e. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.
f. Submittals and deliverables reviewed, with contract reference, by whom, and action taken.
g. Offsite surveillance activities, including actions taken.
h. Job safety evaluations stating what was checked, results, and instructions or corrective actions.
i. Instructions given/received and conflicts in plans and/or specifications.
j. Contractor's verification statement.
These records shall indicate a description of trades working on the project; the number of personnel working; weather conditions encountered;
and any delays encountered. These records shall cover both conforming and deficient features and shall include a statement that equipment and materials incorporated in the work and workmanship comply with the contract. The original and one copy of these records in report form shall be furnished to the Government daily within 24 hours after the date covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, one report shall be prepared and submitted for every 7 days of no work and on the last day of a no work period. All calendar days shall be accounted for throughout the life of the contract. The first report following a day of no work shall be for that day only. Reports shall be signed and dated by the CQC System Manager. The report from the CQC System Manager shall include copies of test reports and copies of reports prepared by all subordinate quality control personnel.
3.10 SAMPLE FORMS
Sample forms enclosed at the end of this section.
SECTION 01 45 04.00 10 Page 11
3.11 NOTIFICATION OF NONCOMPLIANCE
The Contracting Officer will notify the Contractor of any detected noncompliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.
-- End of Section --
SECTION 01 45 04.00 10 Page 12
R0003 FAIRBANKS SATELLITE OPERATIONS FAC. NES066
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 40 00
COLD-FORMED METAL FRAMING
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.4 LOAD-BEARING COLD-FORMED METAL FRAMING
1.5 MAXIMUM DEFLECTION
1.6 QUALITY ASSURANCE
1.6.1 Drawing Requirements
1.6.2 Design Data Required
PART 2 PRODUCTS
2.1 STEEL STUDS, JOISTS, TRACKS, BRACING, BRIDGING AND ACCESSORIES
2.1.1 Studs and Joists of ***AM2*** 16 Gage (0.0566 Inch)***AM2*** and Heavier
2.1.2 Studs and Joists of ***AM2*** 18 Gage (0.0451 Inch) ***AM2*** and Lighter
2.1.3 Sizes, Gages, Section Modulus, and Other Structural Properties
2.2 MARKINGS
2.3 CONNECTIONS
2.4 PAINT
2.5 PLASTIC GROMMETS
PART 3 EXECUTION
3.1 FASTENING
3.1.1 Welds
3.1.2 Screws
3.1.3 Anchors
3.2 INSTALLATION
3.2.1 Tracks
3.2.2 Studs
3.2.3 Joists and Trusses
3.2.4 Erection Tolerances
3.2.5 Special Inspection and Testing for Seismic-Resisting Systems
SECTION 05 40 00 Page 1
SECTION 05 40 00
COLD-FORMED METAL FRAMING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI SG02-1 (2001) North American Specification for the Design of Cold-Formed Steel Structural Members
AISI SG03-3 (2002) Cold-Formed Steel Design Manual Set
AMERICAN WELDING SOCIETY (AWS)
AWS D1.3/D1.3M (2008) Structural Welding Code - Sheet Steel
ASTM INTERNATIONAL (ASTM)
ASTM A 1008/A 1008M (2007a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardened
ASTM A 1011/A 1011M (2007) Standard Specification for Steel, Sheet, and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability
ASTM A 123/A 123M (2002) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A 153/A 153M (2005) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A 370 (2007b) Standard Test Methods and Definitions for Mechanical Testing of Steel Products
ASTM A 653/A 653M (2007) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
SECTION 05 40 00 Page 2
ASTM B 633 (2007) Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel
ASTM C 955 (2007) Load-Bearing (Transverse and Axial) Steel Studs, Runners (Tracks), and Bracing or Bridging for Screw Application of Gypsum Panel Products and Metal Plaster Bases
ASTM E 329 (2007) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J78 (1998) Steel Self Drilling Tapping Screws
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Paint 25 (1997; E 2004) Paint Specification No. 25 Zinc Oxide, Alkyd, Linseed Oil Primer for Use Over Hand Cleaned Steel Type I and Type II
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Framing Components G
a. Cross sections, plans, and/or elevations showing component types and locations for each framing application; including shop coatings and material thicknesses for each framing component.
b. Connection details showing fastener type, quantity, location, and other information to assure proper installation.
c. Drawings depicting panel configuration, dimensions, components, locations, and construction sequence if the Contractor elects to install prefabricated/prefinished frames.
SD-03 Product Data
Steel studs,joists, tracks, bracing, bridging and accessories
SD-05 Design Data
Metal framing calculations G
SD-07 Certificates
SECTION 05 40 00 Page 3
Load-bearing cold-formed metal framing
Mill certificates or test reports from independent testing agency, qualified in accordance with ASTM E 329, showing that the steel sheet used in the manufacture of each cold-formed component complies with the minimum yield strengths and uncoated steel thickness specified. Test reports shall be based on the results of three coupon tests in accordance with ASTM A 370.
Welds
Certified copies of welder qualifications test records showing qualification in accordance with AWS D1.3/D1.3M.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials to job site and store in adequately ventilated, dry locations. Storage area shall permit easy access for inspection and handling. If necessary to store materials outside, stack off the ground, support on a level platform, and protect from the weather as approved.
Handle materials to prevent damage. Finish of the framing members shall be maintained at all times, using an approved high zinc dust content, galvanizing repair paint whenever necessary to prevent the formation of rust. Replace damaged items with new, as directed by the Contracting Officer.
1.4 LOAD-BEARING COLD-FORMED METAL FRAMING
Include top and bottom tracks, bracing, fastenings, and other accessories necessary for complete installation. Framing members shall have the structural properties indicated. Where physical structural properties are not indicated, they shall be as necessary to withstand all imposed loads.
Design framing in accordance with AISI SG03-3. Non-load-bearing metal framing, furring, and ceiling suspension systems are specified in Section 09 22 00 METAL SUPPORT ASSEMBLIES. Metal suspension systems for acoustical ceilings are specified in Section 09 51 00 ACOUSTICAL CEILINGS.
1.5 MAXIMUM DEFLECTION
a. ***AM3***DELETE***AM3*** Studs:
Deflection Criteria Exterior Finish
***AM3***L/240 Gypsum wall board***AM3*** L/240 or L/360 Synthetic Plaster, Metal Panels L/360 Cement Plaster, Wood Veneer L/600 Brick Veneer, Stone Panels
Wall deflections shall be computed on the basis that studs withstand all lateral forces independent of any composite action from sheathing materials.
Studs abutting windows or louvers shall also be designed not to exceed 1/4 inch maximum deflection.
b. Floor Joists:
L/360 - Live load only L/240 - Total load
c. Roof Rafters:
SECTION 05 40 00 Page 4
L/240 - Live load only
1.6 QUALITY ASSURANCE
1.6.1 Drawing Requirements
Submit framing components to show sizes, thicknesses, layout, material designations, methods of installation, and accessories.
1.6.2 Design Data Required
Submit metal framing calculations to verify sizes, gages, and spacing of members and connections. Show methods and practices used in installation.
PART 2 PRODUCTS
2.1 STEEL STUDS, JOISTS, TRACKS, BRACING, BRIDGING AND ACCESSORIES
Framing components shall comply with ASTM C 955 and the following.
2.1.1 Studs and Joists of ***AM2*** 16 Gage (0.0566 Inch)***AM2*** and Heavier
Galvanized steel, ASTM A 653/A 653M, SS Grade 50, G60 ; or carbon steel, ASTM A 1011/A 1011M, Grade 50, painted.
2.1.2 Studs and Joists of ***AM2*** 18 Gage (0.0451 Inch) ***AM2*** and Lighter
Studs and Joists of ***AM2*** 18 Gage (0.0451 Inch)***AM2*** and Lighter, Track, and Accessories (All Gages): Galvanized steel, ASTM A 653/A 653M, SS,***AM2*** Grade 33***AM2*** G60; or carbon steel, ASTM A 1008/A 1008M, Grade C, painted.
2.1.3 Sizes, Gages, Section Modulus, and Other Structural Properties
Size and gage as indicated. Steel stud deflection shall be limited to L/600 for exterior wall brick veneer construction.
2.2 MARKINGS
Studs and track shall have product markings stamped on the web of the section. The markings shall be repeated throughout the length of the member at a maximum spacing of 4 feet on center and shall be legible and easily read. The product marking shall include the following:
a. An ICBO number.
b. Manufacturer's identification.
c. Minimum delivered uncoated steel thickness.
d. Protective coating designator.
e. Minimum yield strength.
SECTION 05 40 00 Page 5
2.3 CONNECTIONS
Screws for steel-to-steel connections shall be self-drilling tapping in compliance with SAE J78 of the type, size, and location as shown on the drawings. Electroplated screws shall have a Type II coating in accordance with ASTM B 633. Screws, bolts, and anchors shall be hot-dipped galvanized in accordance with ASTM A 123/A 123M or ASTM A 153/A 153M as appropriate.
Screws bolts, and anchors shall be hot dipped galvanized in accordance with ASTM A 123/A 123M or ASTM A 153/A 153M as appropriate.
2.4 PAINT
Ungalvanized steel, if used, shall be thoroughly cleaned, phosphate treated, and coated with corrosion-inhibiting primer, SSPC Paint 25.
2.5 PLASTIC GROMMETS
Supply plastic grommets, recommended by stud manufacturer, to protect electrical wires. Prevent metal to metal contact for plumbing pipes.
PART 3 EXECUTION
3.1 FASTENING
Fasten framing members together by welding or by using self-drilling or self-tapping screws. Electrodes and screw connections shall be as required and indicated in the design calculations.
3.1.1 Welds
All welding shall be performed in accordance with AWS D1.3/D1.3M, as modified by AISI SG02-1. All welders, welding operations, and welding procedures shall be qualified according to AWS D1.3/D1.3M. All welds shall be cleaned and coated with rust inhibitive galvanizing paint. Do not field weld materials lighter than 18 gage.
3.1.2 Screws
Screws shall be of theself-drilling self-tappingtype, size, and location shown on the drawings. Screw penetration through joined materials shall not be less than three exposed threads. Minimum spacings and edge distances for screws shall be as specified in AISI SG02-1. Screws covered by sheathing materials shall have low profile heads.
3.1.3 Anchors
Anchors shall be of the type, size, and location shown on the drawings.
3.2 INSTALLATION
3.2.1 Tracks
Provide accurately aligned runners at top and bottom of partitions. Anchor tracks as indicated in design calculations. Butt weld joints in tracks or splice with stud inserts. Fasteners shall be at least 3 inches from the edge of concrete slabs.
SECTION 05 40 00 Page 6
3.2.2 Studs
Cut studs square and set with firm bearing against webs of top and bottom tracks. Position studs vertically in tracks and space as indicated in design. Do not splice studs. Provide at least two studs at jambs of doors and other openings 2 feet wide or larger. Provide jack studs over openings, as necessary, to maintain indicated stud spacing. Provide tripled studs at corners, positioned to receive interior and exterior finishes. Fasten studs to top and bottom tracks by welding or screwing both flanges to the tracks. Framed wall openings shall include headers and supporting components as shown on the drawings. Headers shall be installed in all openings that are larger than the stud spacing in a wall. In curtain wall construction, provide for vertical movement where studs connect to the structural frame. Provide horizontal bracing in accordance with the design calculations and AISI SG03-3, consisting of, as a minimum, runner channel cut to fit between and welded to the studs or hot- or cold-rolled steel channels inserted through cutouts in web of each stud and secured to studs with welded clip angles. Bracing shall be not less than the following:
LOAD HEIGHT BRACING
Wind load only Up to 10 feet One row at mid-height Over 10 feet Rows 5'-0" o.c. maximum
Axial load Up to 10 feet Two rows at 1/3 points Over 10 feet Rows 3'-4" o.c. maximum
3.2.3 Joists and Trusses
Locate each joist or truss directly above a stud. Provide doubled joists under parallel partitions wherever partition length exceeds 1/2 of joist span. Joists shall have at least 2.50 inches of bearing on steel, 4 inches on masonry, and shall be reinforced over bearings where required to prevent web crippling. Splice joists over bearings only. Lap and weld splices as indicated. Provide manufacturer's standard bridging which shall not be less than the following:
CLEAR SPAN BRIDGING
Up to 14 feet One row near center 14 to 20 feet Two rows at 1/3 points 20 to 26 feet Three rows at 1/4 points 26 to 32 feet Four rows at 1/5 points
Temporary bracing shall be provided and remain in place until work is permanently stabilized.
3.2.4 Erection Tolerances
a. Framing members which will be covered by finishes such as wallboard, plaster, or ceramic tile set in a mortar setting bed, shall be within the following limits:
(1) Layout of walls and partitions: 1/4 inch from intended position;
(2) Plates and runners: 1/4 inch in 8 feet from a straight line;
SECTION 05 40 00 Page 7
(3) Studs: 1/4 inch in 8 feet out of plumb, not cumulative; and
(4) Face of framing members: 1/4 inch in 8 feet from a true plane.
b. Framing members which will be covered by ceramic tile set in dry-set mortar, latex-portland cement mortar, or organic adhesive shall be within the following limits:
(1) Layout of walls and partitions: 1/4 inch from intended position;
(2) Plates and runners: 1/8 inch in 8 feet from a straight line;
(3) Studs: 1/8 inch in 8 feet out of plumb, not cumulative; and
(4) Face of framing members: 1/8 inch in 8 feet from a true plane.
3.2.5 Special Inspection and Testing for Seismic-Resisting Systems
Special inspections and testing for seismic-resisting systems and components shall be done in accordance with Section 01 45 35 SPECIAL
INSPECTION FOR SEISMIC-RESISTING SYSTEMS.
-- End of Section --
SECTION 05 40 00 Page 8
SECTION TABLE OF CONTENTS
DIVISION 13 - SPECIAL CONSTRUCTION
SECTION 13 34 19
PREENGINEERED METAL BUILDINGS
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 Design Requirements
1.2.1.1 Design Analysis
1.2.1.2 Dimensions
1.2.1.3 Framing
1.2.1.4 Foundation Requirements
1.2.2 Performance Requirements
1.2.2.1 Dead Loads
1.2.2.2 Live Loads
1.2.2.3 Roof Snow Loads
1.2.2.4 Wind Loads
1.2.2.5 Seismic Loads
1.2.2.6 Collateral Loads
1.2.2.7 Deflection
1.2.2.8 Provisions for Louvers
1.2.2.9 Drift Provisions
1.2.2.10 Grounding and Lightning Protection
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Pre-Erection Conference
1.4.1.1 Pre-Roofing and Siding Installation Conference
1.4.2 Manufacturer's Technical Representative
1.4.3 Manufacturer's Qualifications
1.4.4 Qualification of Erector
1.4.5 Single Source
1.4.6 Welding
1.4.7 Structural Steel
1.4.8 Cold-Formed Steel
1.4.9 Fabrication
1.4.10 Finishes
1.5 SHIPPING, HANDLING AND STORAGE
1.5.1 Delivery
1.6 PROJECT CONDITIONS
1.6.1 Weather Limitations
1.6.2 Field Measurements
1.6.2.1 Established Dimensions for Foundations
1.6.2.2 Established Dimensions for Metal Panels
1.6.2.3 Verification Record
1.7 COORDINATION
1.8 WARRANTY
1.8.1 Building System Warranty
1.8.2 Roof System Weather-Tightness Warranty
1.8.3 Roof and Wall Panel Finish Warranty
SECTION 13 34 19 Page 1
PART 2 PRODUCTS
2.1 WALL AND ROOF MATERIALS
2.1.1 Minimum Thickness
2.1.2 Panels
2.1.2.1 Zinc-Coated Steel Sheet
2.1.2.2 Aluminum/Zinc-Coated Steel Sheet
2.1.2.3 Aluminum Sheet
2.1.2.4 Aluminum-coated Steel
2.2 FRAMING AND STRUCTURAL MEMBERS
2.2.1 Steel
2.2.2 Aluminum
2.2.3 Uncoated Steel
2.2.4 Galvanized Steel
2.2.5 Aluminum Sheet
2.2.6 Structural Tube
2.3 ACCESSORIES
2.3.1 Caps, Strips, and Plates
2.3.2 Closure Strips
2.3.3 Sealant
2.3.4 Gaskets and Insulating Compounds
2.3.5 Fasteners
2.3.5.1 Screws
2.3.5.2 End-Welded Studs
2.3.5.3 Explosive Actuated Fasteners
2.3.5.4 Blind Rivets
2.3.5.5 Bolts
2.3.6 Louvers
2.3.7 Insulation
2.3.7.1 Rigid Board Insulation
2.3.7.2 Mineral Fiber
2.3.7.3 Blanket Insulation
2.3.7.4 Insulation Retainers
2.3.8 Vapor Retarder
2.3.8.1 Vapor Retarders Separate from Insulation
2.3.9 Canopies
2.3.10 Sealant
2.3.11 Gaskets and Insulating Compounds
2.3.12 Rooftop Snow Guards
2.4 SHEET METAL FLASHING AND TRIM
2.4.1 Fabrication
2.5 FINISH
2.5.1 Shop Painting
2.5.2 Factory Color Finish
2.5.3 Testing of Factory Color Finishes
2.5.3.1 Salt Spray Test
2.5.3.2 Accelerated Weathering Test
2.5.3.3 Flexibility
2.5.3.4 Adhesion
2.5.3.5 Impact
2.5.3.6 Humidity Resistance
2.5.3.7 Specular Gloss
2.5.3.8 Formability Test
2.5.3.9 Pollution Resistance
PART 3 EXECUTION
3.1 EXAMINATION
SECTION 13 34 19 Page 2
3.2 PREPARATION
3.3 ERECTION OF STRUCTURAL FRAMING
3.4 METAL WALL PANEL INSTALLATION
3.5 ROOF PANEL INSTALLATION
3.6 METAL PANEL FASTENER INSTALLATION
3.7 FLASHING, TRIM AND CLOSURE INSTALLATION
3.8 DOOR AND FRAME INSTALLATION
3.9 WINDOW INSTALLATION
3.10 ACCESSORY INSTALLATION
3.10.1 General
3.10.2 Dissimilar Metals
3.10.3 Insulation
3.10.4 Roof and Wall Accessories and Specialties
3.10.4.1 Rooftop Snow Guards
3.11 CLEAN-UP AND PROTECTION
3.11.1 Structural Framing
3.11.2 Metal Panels
3.11.3 Touch-Up Painting
3.12 WASTE MANAGEMENT
3.13 SPECIAL INSPECTION AND TESTING FOR SEISMIC-RESISTING SYSTEMS
3.14 WARRANTY
3.14.1 MANUFACTURER'S WARRANTY
3.14.2 CONTRACTOR'S WARRANTY for INSTALLATION
3.14.3 CONTRACTOR'S TEN (10) YEAR NO PENAL SUM WARRANTY
SECTION 13 34 19 Page 3
SECTION 13 34 19
PREENGINEERED METAL BUILDINGS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2005) Manual of Steel Construction
AISC 341 (2005; Supp 2001) Seismic Provisions for Structural Steel Buildings
AISC 350 (2005) Load and Resistance Factor Design (LRFD)Specification for Structural Steel Buildings
AISC 360 (2005) Specification for Structural Steel Buildings, with Commentary
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI SG03-3 (2002) Cold-Formed Steel Design Manual Set
AISI SG-973 (2002) Cold-Formed Steel Design Manual
AISC/AISI 121 (2004) Standard Definitions for Use in the Design of Steel Structures
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2005; Supp 1) Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2006; Errata 2006) Structural Welding Code - Steel
AWS D1.3 (1998; Errata 1998) Structural Welding Code - Sheet Steel
AWS A5.1/A5.1M (2004; Errata 2004) Carbon Steel Electrodes for Shielded Metal Arc Welding
ASTM INTERNATIONAL (ASTM)
ASTM A 1011/A 1011M (2007) Standard Specification for Steel, Sheet, and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy and
SECTION 13 34 19 Page 4
High-Strength Low-Alloy with Improved Formability
ASTM A 252 (1998; R 2002) Standard Specification for Welded and Seamless Steel Pipe Piles
ASTM A 36/A 36M (2005) Standard Specification for Carbon Structural Steel
ASTM A 463/A 463M (2006) Standard Specification for Steel Sheet, Aluminum-Coated
ASTM A 500 (2003a) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A 501 (2007) Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
ASTM A 529/A 529M (2005) Standard Specification for High-Strength Carbon-Manganese Steel of Structural Quality
ASTM A 53/A 53M (2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A 570/A 570M (1998) Standard Specification for Steel, Sheet and Strip, Carbon, Hot-Rolled
ASTM A 572/A 572M (2007) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel
ASTM A 588/A 588M (2005) Standard Specification for High-Strength Low-Alloy Structural Steel with 50 ksi (345 MPa) Minimum Yield Point, with Atmospheric Corrosion Resistance
ASTM A 606 (2004) Standard Specification for Steel Sheet and Strip, High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, with Improved Atmospheric Corrosion Resistance
ASTM A 618 (2004) Standard Specification for Hot-Formed Welded and Seamless High-Strength Low-Alloy Structural Tubing
ASTM A 653/A 653M (2007) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A 755/A 755M (2006) Standard Specification for Steel Sheet, Metallic Coated by the Hot-Dip Process and Prepainted by the Coil-Coating Process for Exterior Exposed Building
SECTION 13 34 19 Page 5
Products
ASTM A 792/A 792M (2006a) Standard Specification for Steel Sheet, 55% Aluminum-Zinc Alloy-Coated by the Hot-Dip Process
ASTM B 209 (2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B 221 (2006) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B 241/B 241M (2002) Standard Specification for Aluminum and Aluminum-Alloy Seamless Pipe and Seamless Extruded Tube
ASTM B 308/B 308M (2002) Standard Specification for Aluminum-Alloy 6061-T6 Standard Structural Profiles
ASTM B 429/B 429M (2006) Standard Specification for Aluminum-Alloy Extruded Structural Pipe and Tube
ASTM C 1363 (2005) Standard Test Method for Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus
ASTM C 518 (2004) Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus
ASTM C 553 (2002) Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications
ASTM C 578 (2008) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C 612 (2004) Mineral Fiber Block and Board Thermal Insulation
ASTM C 991 (2003) Flexible Glass Fiber Insulation for Metal Buildings
ASTM D 1308 (2002; R 2007) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D 1654 (2005) Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments
ASTM D 2224 (1978; R 1983) Standard Test Method for Mean Molecular Weight of Mineral Insulating Oils by the Cryoscopic Method
SECTION 13 34 19 Page 6
ASTM D 2244 (2007) Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates
ASTM D 2247 (2002) Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D 2794 (1993; R 2004) Resistance of Organic Coatings to the Effects of Rapid…