Dwgs-NES066-BID2.pdf
PDF 17 MB Posted
- Solicitation number
- W911KB-09-R-0006
About this file
Contract Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-09-R-0006-0005.pdf | ||
| W911KB-09-R-0006-0004.pdf | ||
| W911KB-09-R-0006-0003.pdf | ||
| NES066_AM3_Specs_and_Dwgs.pdf | ||
| Mechanical question add 2 | — | |
| Amendment 1.pdf | ||
| Front end and Specs-NES066-BID2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE ALARM SEQUENCE OF OPERATIONS MATRIX
Legend:
1=Activation of supervisory alarm required only if there is a fire alarm panel and annunciator.
O=Mandatory sequence
S y s te m o u tp u t:
A c ti v a te p re d is c h a rg e a la rm a n n u n c ia to r
A c ti v a te v is ib le a n d a u d ib le rm a n n u n c ia to r a t p a n e l
V is ib le a la rm a n n u n c ia to r s h o w s rm o ri g in a ti o fo r e le v a to r p h a s e
I.
A c ti v a te v is ib le a n d a u d u p e rv is o ry a n n u n c ia to r
A c ti v a te v is ib le a n d a u d tr u b le a n n u n c ia to r
A c ti v a te a ll o c c u p a n t n o ti fi c a ti o n a p p li a n c e
R le a s e a ll d o o rs to c lo s if c n tr o ll e d b y m a g n e ti c d o o r h o ld e rs
S h u t d o w n a ir h a n d li n g fa n
D is c o n n e c t p o w e r to c o m p u te rs in ro o m
S h u td o w n e le v a to r p o w e r e v h u n t-tr ip
In it ia te
E le v a to r E m e rg e n y c a ll
P h a s e
I, C a to d s ig n a te d fl o o r
In it ia te
E le v a to r E m e rg e n y c a ll
P h a s e
I, C a lt e rn a te fl o o r
A u d ib le a n d fl a s h in g h a t a rm n u n c ia ti o n in e le v a to r c a r s e rv e d b y e le v m a c h rm
A c ti v a te
B lu e a g e n t re le a tr o b e s in p ro te c te d s p a c e
D is c h a rg e c le a n a g e n t p ro te c te d s p a c e
O p e n p re a c ti o n p ip e s p ri n k le r v a lv e
P re v e n t c le a n a g e n t a n d p re a c ti o n s y s te m a c ti v a ti o n
C lo s e a ll fi re s m o k e d a m p rs u c t p e n e tr a ti n g c o m p u te r ro o m w a ll
L o c a l s p ri n k le r a la rm a c ti v a te u p o n s p ri n k le r fl o w
System Input:
Sprinkler riser or floor water flow or pressure switch
O O O O 0 O
Sprinkler valve tamper switch
O
Elevator sprinkler flow switch (Elev mach rm only).
O O O O O O
Hydraulic elevator hoistway pit sprinkler flow switch
O O O O O O
Loss of voltage to control circuit for disconnecting elevator power (shunt trip)
O
Elevator Machine Rm Smoke Detector
O O O O O O O
Elevator Lobby fire detection device on designated floor #_1
O O O O O O
Elevator Lobby fire detection device on alternate floors
O O O O O O
Manual pull station O O O O O Smoke Detector for Release of Magnetic Door Holder
O O O O
Single break or single ground fault in fire alarm circuit
O
Duct Smoke Detector O O O First smoke detector in room protected with clean agent/pre-action system.
O O
Second smoke detector in room protected with clean agent/pre-action system.
O O 1 1 O 5 5 O O
First smoke detector below raised floor with preaction sprinkler system.
O
Second smoke detector below raised floor with preaction sprinkler system.
O O 1 1 O O O
Clean Agent Room manual release station.
O O 1 1 O 5 5 O
Loss of air pressure in single interlocked preaction sprinkler system
O
Release system abort switch (Deadman)
NOTES:
2. The operation sequence indicated here is not complete. Provide other operations in accordance with NFPA 72 and Contract documents.
3. This sequence of operations are considered to be minimum.
4. Operation of the abort switch shall prevent activation of the clean agent and opening the pre-action valve.
1. Activation of the second smoke detector or manual release station in room 114 will result in AHU shut-down and power shut down. Activation of a second smoke detector or manual release station in other rooms will only close the smoke dampers serving that room.
5. Operation of the second smoke detector or manual pull station shall initiate a 15 second delay (adjustable) after which the clean agent shall discharge and the pre-action valve shall operate. Activation of the abort switch shall prevent discharge as long as the abort switch (deadman) is activated within the 15 second time-frame. The abort switch will not override the manual pull station.
File details come from the government source that posted it. Updated .