Mechanical question
Answer to Western Mechanical question should be as follows:
1. Reference sheets M1.05 & M1.06 and specifications 23 52 00.00 10 –
2.9.3 and 23 57 10.00 10 – 2.7: No air vents or drain valves are indicated for the two air separators. Are these accessories required?
** Air vents and drain valves are required at air separators.
See revised sheet M1.07 in Amendment R0002.
2. Reference sheet M1.01: Please confirm that the fin tube heaters in Room 114 Operations Floor and Room 112 Ops Comm Equip Room are symbol BB-2 as indicated on sheet M1.04 and not symbol BB-3 as indicated on sheet M1.01.
** Confirmed. See Amendment R0002.
3. Reference the Baseboard Schedule on sheet M0.01: BB-3 is noted as being a flat plate surface radiator; basis of design is indicated to be Runtal model HD-850. HD-850 is not a Runtal model number; it is a Slant/Fin finned tube enclosure model number. What are the correct Runtal model numbers?
** Runtal model number is RF-3. See Amendment R0002.
4. What are the glycol heating pipe sizes serving the following coils:
PHC-1 (9.5 gpm); AHU-2 (55 gpm); ERV-1 PHC (5.8 gpm); ERV-1 HC (5.2 gpm)? No pipe sizes are indicated on the drawings.
** PHC-1, 1" GHS/GHR; AHU-2, 2-1/2" GHS/GHR (see revised sheet M1.02 in Amendment R0002. ERV-1 PHC and HC; 1" GHS/GHR (see revised sheet M1.01 in Amendment R0002).
** In general this is true - Section 23 52 00.00 10 applies to elements such as boilers, boiler fuel oil pumps, boiler pumps and hot water loop and Section 23 57 10.00 10 applies to elements such as heat exchangers, unit heaters, pumps and glycol solution. However, the division of Specification Sections in contracts is never perfect (e.g.
in this case the glycol feed system for the heating loop is in Section 23 52 00.00 10 and the boiler shot feeder is in Section 23 57 10.00 10). Other Specification Sections also apply to each side of the heating system, such as control valves in Section 23 09 23.13 20 BACnet
DIRECT DIGITAL CONTROL SYSTEMS FOR HAVC.
5. Reference TS 23 52 00.00 10 – 2.1 Boilers: What is the basis of design product for the heating boilers?
** Burnham Series 4F.
6. Reference TS 23 82 02.00 10 – 2.6.1 “Refrigerants shall have an Ozone Depletion Potential (ODP) of less than or equal to 0.024.” The Air Cooled Condensing Unit Schedule on sheet M0.02 requires the use of R-22 refrigerant. R-22 refrigerant (HCFC-22) has an ODP equal to 0.055 (per 40 CFR Part 82 as required by Title VI of the Clean Air Act amendments). This information can be confirmed on the EPA’s website.
Alternate refrigerants (HFC’s and blends) are available to meet the ODP requirement; please advise which of these refrigerants are acceptable.
** Midway through design the intent was to attempt LEED-NC Energy and Atmosphere Credit 4, Enhanced Refrigerant Management. This credit is no longer being pursued (see Section 01 33 29, page 8) and R-22 is the preferred refrigerant. Section 23 82 02.00 10-2.6.1 will be revised by forthcoming amendment to reflect the ODP of R-22.
7. Reference sheet M0.02: The glycol makeup unit is indicated to have a tank volume of 100 gallons. Specification 23 52 00.00 10-2.14.7.1 specifies a 50-gallon tank. Which is correct?
** Follow Specification 23_52_00.00_10-2.14.7.1.
8. Reference specification 23 52 00.00 10-2.14.4: A makeup water line is mentioned, but no makeup water line is indicated on the drawings for the boilers.
** Provide make-up water per Specification 23_52_00.00_10-2.14.1.
Size per boiler manufacturer's recommendations.
9. Reference specification 23 52 00.00 10-3.3.2 “Fuel-Oil Storage Tank Heating-Coil Piping”: No heating coil or coil piping is shown for the fuel tank.
** Paragraph 23_52_00.00_10-3.3.2 is to be deleted from the contract.
10. Reference specification 33 52 10-2.5.10 “Fuel Oil Meter”: Are these the same fuel oil meters as referenced by specification 23 52 00.00 10- 2.3.1? No fuel oil meters are shown on the drawings.
** Fuel oil meter in 33_52_10-2.5.10 is on the supply line between the bulk tank and the day tank. Meters in 23_52_00.00_10-2.3.1 are on the supply and return lines between the day tank and the boilers.
SECTION 05 40 00
COLD-FORMED METAL FRAMING
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI SG02-1 (2001) North American Specification for the Design of Cold-Formed Steel Structural Members
AISI SG03-3 (2002) Cold-Formed Steel Design Manual Set
AMERICAN WELDING SOCIETY (AWS)
AWS D1.3/D1.3M (2008) Structural Welding Code - Sheet Steel
ASTM INTERNATIONAL (ASTM)
ASTM A 1008/A 1008M (2007a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardened
ASTM A 1011/A 1011M (2007) Standard Specification for Steel, Sheet, and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability
ASTM A 123/A 123M (2002) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A 153/A 153M (2005) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A 370 (2007b) Standard Test Methods and Definitions for Mechanical Testing of Steel Products
ASTM A 653/A 653M (2007) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B 633 (2007) Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel
ASTM C 955 (2007) Load-Bearing (Transverse and Axial) Steel Studs, Runners (Tracks), and Bracing or Bridging for Screw Application of Gypsum Panel Products and Metal Plaster Bases
ASTM E 329 (2007) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J78 (1998) Steel Self Drilling Tapping Screws
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Paint 25 (1997; E 2004) Paint Specification No. 25 Zinc Oxide, Alkyd, Linseed Oil Primer for Use Over Hand Cleaned Steel Type I and Type II
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Framing Components G
a. Cross sections, plans, and/or elevations showing component types and locations for each framing application; including shop coatings and material thicknesses for each framing component.
b. Connection details showing fastener type, quantity, location, and other information to assure proper installation.
c. Drawings depicting panel configuration, dimensions, components, locations, and construction sequence if the Contractor elects to install prefabricated/prefinished frames.
SD-03 Product Data
Steel studs,joists, tracks, bracing, bridging and accessories
SD-05 Design Data
Metal framing calculations G
SD-07 Certificates
Load-bearing cold-formed metal framing
Mill certificates or test reports from independent testing agency, qualified in accordance with ASTM E 329, showing that the steel sheet used in the manufacture of each cold-formed component complies with the minimum yield strengths and uncoated steel thickness specified. Test reports shall be based on the results of three coupon tests in accordance with ASTM A 370.
Welds
Certified copies of welder qualifications test records showing qualification in accordance with AWS D1.3/D1.3M.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials to job site and store in adequately ventilated, dry locations. Storage area shall permit easy access for inspection and handling. If necessary to store materials outside, stack off the ground, support on a level platform, and protect from the weather as approved.
Handle materials to prevent damage. Finish of the framing members shall be maintained at all times, using an approved high zinc dust content, galvanizing repair paint whenever necessary to prevent the formation of rust. Replace damaged items with new, as directed by the Contracting Officer.
1.4 LOAD-BEARING COLD-FORMED METAL FRAMING
Include top and bottom tracks, bracing, fastenings, and other accessories necessary for complete installation. Framing members shall have the structural properties indicated. Where physical structural properties are not indicated, they shall be as necessary to withstand all imposed loads.
Design framing in accordance with AISI SG03-3. Non-load-bearing metal framing, furring, and ceiling suspension systems are specified in Section 09 22 00 METAL SUPPORT ASSEMBLIES. Metal suspension systems for acoustical ceilings are specified in Section 09 51 00 ACOUSTICAL CEILINGS.
1.5 MAXIMUM DEFLECTION
a. Exterior Studs:
Deflection Criteria Exterior Finish
L/240 or L/360 Synthetic Plaster, Metal Panels L/360 Cement Plaster, Wood Veneer L/600 Brick Veneer, Stone Panels
Wall deflections shall be computed on the basis that studs withstand all lateral forces independent of any composite action from sheathing materials.
Studs abutting windows or louvers shall also be designed not to exceed 1/4 inch maximum deflection.
b. Floor Joists:
L/360 - Live load only
L/240 - Total load
c. Roof Rafters:
L/240 - Live load only
1.6 QUALITY ASSURANCE
1.6.1 Drawing Requirements
Submit framing components to show sizes, thicknesses, layout, material designations, methods of installation, and accessories.
1.6.2 Design Data Required
Submit metal framing calculations to verify sizes, gages, and spacing of members and connections. Show methods and practices used in installation.
PART 2 PRODUCTS
2.1 STEEL STUDS, JOISTS, TRACKS, BRACING, BRIDGING AND ACCESSORIES
Framing components shall comply with ASTM C 955 and the following.
2.1.1 Studs and Joists of ***AM2*** 16 Gage (0.0566 Inch)***AM2*** and Heavier
Galvanized steel, ASTM A 653/A 653M, SS Grade 50, G60 ; or carbon steel, ASTM A 1011/A 1011M, Grade 50, painted.
2.1.2 Studs and Joists of ***AM2*** 18 Gage (0.0451 Inch) ***AM2*** and Lighter
Studs and Joists of ***AM2*** 18 Gage (0.0451 Inch)***AM2*** and Lighter, Track, and Accessories (All Gages): Galvanized steel, ASTM A 653/A 653M, SS,***AM2*** Grade 33***AM2*** G60; or carbon steel, ASTM A 1008/A 1008M, Grade C, painted.
2.1.3 Sizes, Gages, Section Modulus, and Other Structural Properties
Size and gage as indicated. Steel stud deflection shall be limited to L/600 for exterior wall brick veneer construction.
2.2 MARKINGS
Studs and track shall have product markings stamped on the web of the section. The markings shall be repeated throughout the length of the member at a maximum spacing of 4 feet on center and shall be legible and easily read. The product marking shall include the following:
a. An ICBO number.
b. Manufacturer's identification.
c. Minimum delivered uncoated steel thickness.
d. Protective coating designator.
e. Minimum yield strength.
2.3 CONNECTIONS
Screws for steel-to-steel connections shall be self-drilling tapping in compliance with SAE J78 of the type, size, and location as shown on the drawings. Electroplated screws shall have a Type II coating in accordance with ASTM B 633. Screws, bolts, and anchors shall be hot-dipped galvanized in accordance with ASTM A 123/A 123M or ASTM A 153/A 153M as appropriate.
Screws bolts, and anchors shall be hot dipped galvanized in accordance with ASTM A 123/A 123M or ASTM A 153/A 153M as appropriate.
2.4 PAINT
Ungalvanized steel, if used, shall be thoroughly cleaned, phosphate treated, and coated with corrosion-inhibiting primer, SSPC Paint 25.
2.5 PLASTIC GROMMETS
Supply plastic grommets, recommended by stud manufacturer, to protect electrical wires. Prevent metal to metal contact for plumbing pipes.
PART 3 EXECUTION
3.1 FASTENING
Fasten framing members together by welding or by using self-drilling or self-tapping screws. Electrodes and screw connections shall be as required and indicated in the design calculations.
3.1.1 Welds
All welding shall be performed in accordance with AWS D1.3/D1.3M, as modified by AISI SG02-1. All welders, welding operations, and welding procedures shall be qualified according to AWS D1.3/D1.3M. All welds shall be cleaned and coated with rust inhibitive galvanizing paint. Do not field weld materials lighter than 18 gage.
3.1.2 Screws
Screws shall be of theself-drilling self-tappingtype, size, and location shown on the drawings. Screw penetration through joined materials shall not be less than three exposed threads. Minimum spacings and edge distances for screws shall be as specified in AISI SG02-1. Screws covered by sheathing materials shall have low profile heads.
3.1.3 Anchors
Anchors shall be of the type, size, and location shown on the drawings.
3.2 INSTALLATION
3.2.1 Tracks
Provide accurately aligned runners at top and bottom of partitions. Anchor tracks as indicated in design calculations. Butt weld joints in tracks or splice with stud inserts. Fasteners shall be at least 3 inches from the edge of concrete slabs.
3.2.2 Studs
Cut studs square and set with firm bearing against webs of top and bottom tracks. Position studs vertically in tracks and space as indicated in design. Do not splice studs. Provide at least two studs at jambs of doors and other openings 2 feet wide or larger. Provide jack studs over openings, as necessary, to maintain indicated stud spacing. Provide tripled studs at corners, positioned to receive interior and exterior finishes. Fasten studs to top and bottom tracks by welding or screwing both flanges to the tracks. Framed wall openings shall include headers and supporting components as shown on the drawings. Headers shall be installed in all openings that are larger than the stud spacing in a wall. In curtain wall construction, provide for vertical movement where studs connect to the structural frame. Provide horizontal bracing in accordance with the design calculations and AISI SG03-3, consisting of, as a minimum, runner channel cut to fit between and welded to the studs or hot- or cold-rolled steel channels inserted through cutouts in web of each stud and secured to studs with welded clip angles. Bracing shall be not less than the following:
LOAD HEIGHT BRACING
Wind load only Up to 10 feet One row at mid-height Over 10 feet Rows 5'-0" o.c. maximum
Axial load Up to 10 feet Two rows at 1/3 points Over 10 feet Rows 3'-4" o.c. maximum
3.2.3 Joists and Trusses
Locate each joist or truss directly above a stud. Provide doubled joists under parallel partitions wherever partition length exceeds 1/2 of joist span. Joists shall have at least 2.50 inches of bearing on steel, 4 inches on masonry, and shall be reinforced over bearings where required to prevent web crippling. Splice joists over bearings only. Lap and weld splices as indicated. Provide manufacturer's standard bridging which shall not be less than the following:
CLEAR SPAN BRIDGING
Up to 14 feet One row near center 14 to 20 feet Two rows at 1/3 points 20 to 26 feet Three rows at 1/4 points 26 to 32 feet Four rows at 1/5 points
Temporary bracing shall be provided and remain in place until work is permanently stabilized.
3.2.4 Erection Tolerances
a. Framing members which will be covered by finishes such as wallboard, plaster, or ceramic tile set in a mortar setting bed, shall be within the following limits:
(1) Layout of walls and partitions: 1/4 inch from intended position;
(2) Plates and runners: 1/4 inch in 8 feet from a straight line;
(3) Studs: 1/4 inch in 8 feet out of plumb, not cumulative; and
(4) Face of framing members: 1/4 inch in 8 feet from a true plane.
b. Framing members which will be covered by ceramic tile set in dry-set mortar, latex-portland cement mortar, or organic adhesive shall be within the following limits:
(1) Layout of walls and partitions: 1/4 inch from intended position;
(2) Plates and runners: 1/8 inch in 8 feet from a straight line;
(3) Studs: 1/8 inch in 8 feet out of plumb, not cumulative; and
(4) Face of framing members: 1/8 inch in 8 feet from a true plane.
3.2.5 Special Inspection and Testing for Seismic-Resisting Systems
Special inspections and testing for seismic-resisting systems and components shall be done in accordance with Section 01 45 35 SPECIAL
INSPECTION FOR SEISMIC-RESISTING SYSTEMS.
-- End of Section --
Amendment R0002 FAIRBANKS SATELLITE OPERATIONS FAC. NES066
FOX, ALASKA
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
SECTION 23 82 02.00 10
UNITARY HEATING AND COOLING EQUIPMENT
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SAFETY REQUIREMENTS
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 PROJECT REQUIREMENTS
1.5.1 Verification of Dimensions
1.5.2 Drawings
1.5.3 Spare Parts
PART 2 PRODUCTS
2.1 STANDARD COMMERCIAL PRODUCTS
2.2 NAMEPLATES
2.3 ELECTRICAL WORK
2.4 UNITARY EQUIPMENT, SPLIT SYSTEM
2.4.1 Air-to-Refrigerant Coil
2.4.2 Compressor
2.4.3 Refrigeration Circuit
2.4.4 Unit Controls
2.5 EQUIPMENT EFFICIENCY
2.6 UNITARY EQUIPMENT COMPONENTS
2.6.1 Refrigerant and Oil
2.6.2 Coil Frost Protection
2.6.3 Pressure Vessels
2.6.3.1 Hot Gas Muffler
2.6.3.2 Liquid Receiver
2.6.3.3 Oil Separator
2.6.3.4 Oil Reservoir
2.7 ACCESSORIES
2.7.1 Refrigerant Relief Valve/Rupture Disc Assembly
2.7.2 Refrigerant Signs
2.7.2.1 Installation Identification
2.7.2.2 Controls and Piping Identification
2.7.3 Gaskets
2.7.4 Bolts and Nuts
2.7.5 Bird Screen
2.8 FINISHES
2.8.1 Factory Coating
2.8.1.1 Equipment and Components
2.8.2 Factory Applied Insulation
2.9 SUPPLEMENTAL COMPONENTS/SERVICES
2.9.1 Refrigerant Piping
2.9.2 Ductwork
2.9.3 Temperature Controls
SECTION 23 82 02.00 10 Page 1
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Equipment
3.1.2 Mechanical Room Ventilation
3.1.3 Field Applied Insulation
3.1.4 Field Painting
3.2 CLEANING AND ADJUSTING
3.3 REFRIGERANT TESTS, CHARGING, AND START-UP
3.3.1 Refrigerant Leakage
3.3.2 Contractor's Responsibility
3.4 SYSTEM PERFORMANCE TESTS
3.5 DEMONSTRATIONS
-- End of Section Table of Contents --
SECTION 23 82 02.00 10 Page 2
SECTION 23 82 02.00 10
UNITARY HEATING AND COOLING EQUIPMENT
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING AND REFRIGERATION INSTITUTE (ARI)
ARI 210/240 (2006) Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump Equipment
ARI 270 (1995) Standard for Sound Rating of Outdoor Unitary Equipment
ARI 310/380 (2004) Standard for Packaged Terminal Air-Conditioners and Heat Pumps
ARI 320 (1998) Water-Source Heat Pumps
ARI 325 (1998) Ground Water-Source Heat Pumps
ARI 340/360 (2004) Performance Rating of Commercial and Industrial Unitary Air-Conditioning and Heat Pump Equipment
ARI 350 (2000) Sound Rating of Non-Ducted Indoor Air-Conditioning Equipment
ARI 370 (2001) Sound Rating of Large Outdoor Refrigerating and Air-Conditioning Equipment
ARI 410 (2001; 2002a) Standard for Forced-Circulation Air-Cooling and Air-Heating Coils
ARI 460 (2005) Performance Rating of Remote Mechanical-Draft Air-Cooled Refrigerant Condensers
ARI 490 (2003) Remote Mechanical-Draft Evaporatively-Cooled Refrigerant Condensers
ARI 495 (2005) Performance Rating of Refrigerant Liquid Receivers
ARI 500 (2000) Variable Capacity Positive Displacement Refrigerant Compressors and
SECTION 23 82 02.00 10 Page 3
Compressor Units for Air-Conditioning and Heat Pump Applications
ARI 700 (2004) Specifications for Fluorocarbon Refrigerants
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 127 (2007) Method of Testing for Rating Computer and Data Processing Room Unitary Air-Conditioners
ASHRAE 15 (2007; Errata 2007) Safety Code for Refrigeration
ASHRAE 34 (2007; Addendas a,b,c,d,e,f,g and h 2007) Designation and Safety Classification of Refrigerants
ASHRAE 52.1 (1992) Gravimetric and Dust-Spot Procedures for Testing Air-Cleaning Devices Used in General Ventilation for Removing Particulate Matter
ASHRAE 64 (2005) Methods of Testing Remote Mechanical-Draft Evaporative Refrigerant Condensers
AMERICAN WELDING SOCIETY (AWS)
AWS Z49.1 (2005) Safety in Welding, Cutting and Allied Processes
ASME INTERNATIONAL (ASME)
ASME BPVC SEC IX (2007) Boiler and Pressure Vessel Code;
Section IX, Welding and Brazing Qualifications
ASME BPVC SEC VIII D1 (2007) Boiler and Pressure Vessel Code;
Section VIII, Pressure Vessels Division 1
- Basic Coverage
ASSOCIATION OF HOME APPLIANCE MANUFACTURERS (AHAM)
AHAM RAC-1 (2005) Directory of Certified Room Air Conditioners
ASTM INTERNATIONAL (ASTM)
ASTM A 123/A 123M (2002) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A 153/A 153M (2005) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
SECTION 23 82 02.00 10 Page 4
ASTM A 307 (2007b) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM B 117 (2007) Standing Practice for Operating Salt Spray (Fog) Apparatus
ASTM C 1071 (2005) Standard Specification for Fibrous Glass Duct Lining Insulation (Thermal and Sound Absorbing Material)
ASTM D 520 (2000; R 2005) Zinc Dust Pigment
ASTM E 84 (2008a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM F 104 (2003) Standard Classification System for Nonmetallic Gasket Materials
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 6 (1993; R 2006) Standard for Industrial Controls and Systems Enclosures
NEMA MG 1 (2007) Standard for Motors and Generators
NEMA MG 2 (2001; Rev 1 2007) Safety Standard for Construction and Guide for Selection, Installation, and Use of Electric Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 54 (2006) National Fuel Gas Code
NFPA 70 (2007) National Electrical Code
NFPA 90A (2002; Errata 2003; Errata 2005) Standard for the Installation of Air Conditioning and Ventilating Systems
UNDERWRITERS LABORATORIES (UL)
UL 1995 (2005) Standard for Heating and Cooling Equipment
UL 207 (2001; Rev thru Nov 2004) Standard for Refrigerant-Containing Components and Accessories, Nonelectrical
UL 484 (1993; Rev thru Nov 2006) Room Air Conditioners
UL 586 (1996; Rev thru Aug 2004) Standard for High-Efficiency Particulate, Air Filter Units
UL 900 (2004) Standard for Air Filter Units
SECTION 23 82 02.00 10 Page 5
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Drawings
Drawings provided in adequate detail to demonstrate compliance with contract requirements, as specified.
SD-03 Product Data
Materials and Equipment
Manufacturer's standard catalog data, at least 3 weeks prior to the purchase of a particular component, highlighted to show material, size, options, performance charts and curves, etc. in adequate detail to demonstrate compliance with contract requirements. Data shall include manufacturer's recommended installation instructions and procedures. If vibration isolation is specified for a unit, vibration isolator literature shall be included containing catalog cuts and certification that the isolation characteristics of the isolators provided meet the manufacturer's recommendations. Data shall be submitted for each specified component.
Spare Parts
Spare parts data for each different item of equipment specified.
Posted Instructions
Posted instructions, at least 2 weeks prior to Functional Performance Testing under Commissioning, including equipment layout, wiring and control diagrams, piping, valves and control sequences, and typed condensed operation instructions. The condensed operation instructions shall include preventative maintenance procedures, methods of checking the system for normal and safe operation, and procedures for safely starting and stopping the system. The posted instructions shall be framed under glass or laminated plastic and be posted where indicated by the Contracting Officer.
System Performance Tests
A schedule, at least 2 weeks prior to the start of related testing, for the system performance tests. The schedules shall identify the proposed date, time, and location for each test.
Demonstrations; G
A schedule, at least 2 weeks prior to the date of the proposed training course, which identifies the date, time, and location for
SECTION 23 82 02.00 10 Page 6 the training.
SD-06 Test Reports
Refrigerant Tests, Charging, and Start-Up; G five (5) copies of each test containing the information described below in bound 8-1/2 by 11 inch booklets. Individual reports shall be submitted for the refrigerant system tests.
a. The date the tests were performed.
b. A list of equipment used, with calibration certifications.
c. Initial test summaries.
d. Repairs/adjustments performed.
e. Final test results.
System Performance Tests five (5) copies of the report provided in bound 8-1/2 by 11 inch booklets. The report shall document compliance with the specified performance criteria upon completion and testing of the system.
The report shall indicate the number of days covered by the tests and any conclusions as to the adequacy of the system. The report shall also include the following information and shall be taken at least three different times at outside dry-bulb temperatures that are at least 5 degrees F apart:
a. Date and outside weather conditions.
b. The load on the system based on the following:
(1) The refrigerant used in the system.
(2) Condensing temperature and pressure.
(3) Suction temperature and pressure.
(4) Ambient, condensing and coolant temperatures.
(5) Running current, voltage and proper phase sequence for each phase of all motors.
c. The actual on-site setting of operating and safety controls.
d. Thermostatic expansion valve superheat - value as determined by field test.
e. Subcooling.
f. High and low refrigerant temperature switch set-points
g. Low oil pressure switch set-point.
h. Defrost system timer and thermostat set-points.
i. Moisture content.
j. Capacity control set-points.
SECTION 23 82 02.00 10 Page 7
k. Field data and adjustments which affect unit performance and energy consumption.
l. Field adjustments and settings which were not permanently marked as an integral part of a device.
SD-07 Certificates
Materials and Equipment
Where the system, components, or equipment are specified to comply with requirements of ARI, ASHRAE, ASME, or UL, proof of such compliance shall be provided. The label or listing of the specified agency shall be acceptable evidence. In lieu of the label or listing, a written certificate from an approved, nationally recognized testing organization equipped to perform such services, stating that the items have been tested and conform to the requirements and testing methods of the specified agency may be submitted. When performance requirements of this project's drawings and specifications vary from standard ARI rating conditions, computer printouts, catalog, or other application data certified by ARI or a nationally recognized laboratory as described above shall be included. If ARI does not have a current certification program that encompasses such application data, the manufacturer may self certify that his application data complies with project performance requirements in accordance with the specified test standards.
Service Organization
A certified list of qualified permanent service organizations, which includes their addresses and qualifications, for support of the equipment. The service organizations shall be reasonably convenient to the equipment installation and be able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G
Six complete copies of an operation manual in bound 8-1/2 by 11 inch booklets listing step-by-step procedures required for system startup, operation, abnormal shutdown, emergency shutdown, and normal shutdown at least 4 weeks prior to the first training course. The booklets shall include the manufacturer's name, model number, and parts list. The manuals shall include the manufacturer's name, model number, service manual, and a brief description of all equipment and their basic operating features.
Six complete copies of maintenance manual in bound 8-1/2 by 11 inch booklets listing routine maintenance procedures, possible breakdowns and repairs, and a trouble shooting guide. The manuals shall include piping and equipment layouts and simplified wiring and control diagrams of the system as installed.
1.3 SAFETY REQUIREMENTS
Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to
SECTION 23 82 02.00 10 Page 8 operating personnel shall be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices shall be installed so that proper operation of equipment is not impaired. Welding and cutting safety requirements shall be in accordance with AWS Z49.1.
1.4 DELIVERY, STORAGE, AND HANDLING
Stored items shall be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation shall be the Contractor's responsibility. Any materials found to be damaged shall be replaced at the Contractor's expense. During installation, piping and similar openings shall be capped to keep out dirt and other foreign matter.
1.5 PROJECT REQUIREMENTS
1.5.1 Verification of Dimensions
The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
1.5.2 Drawings
The Contractor shall submit drawings consisting of:
a. Equipment layouts which identify assembly and installation details.
b. Plans and elevations which identify clearances required for maintenance and operation.
c. Wiring diagrams which identify each component individually and interconnected or interlocked relationships between components.
d. Foundation drawings, bolt-setting information, and foundation bolts prior to concrete foundation construction for equipment indicated or required to have concrete foundations.
e. Details, if piping and equipment are to be supported other than as indicated, which include loadings and type of frames, brackets, stanchions, or other supports.
f. Automatic temperature control diagrams and control sequences.
g. Installation details which includes the amount of factory set superheat and corresponding refrigerant pressure/temperature.
Because of the small scale of the drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. The Contractor shall carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions.
1.5.3 Spare Parts
The Contractor shall submit spare parts data for each different item of equipment specified, after approval of detail drawings and not later than
SECTION 23 82 02.00 10 Page 9 two (2) months prior to the date of beneficial occupancy. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, a recommended spare parts list for 1 year of operation, and a list of the parts recommended by the manufacturer to be replaced on a routine basis.
PART 2 PRODUCTS
2.1 STANDARD COMMERCIAL PRODUCTS
Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. The standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2 year use shall include applications of equipment and materials under similar circumstances and of similar size. The 2 years experience shall be satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures. Products having less than a 2 year field service record shall be acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown. Products shall be supported by a service organization. System components shall be environmentally suitable for the indicated locations.
2.2 NAMEPLATES
Major equipment including compressors, condensers, receivers, heat exchanges, fans, and motors shall have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment. Plates shall be durable and legible throughout equipment life and made of anodized aluminum or stainless steel.
Plates shall be fixed in prominent locations with nonferrous screws or bolts.
2.3 ELECTRICAL WORK
Electrical equipment, motors, motor efficiencies, and wiring shall be in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Electrical motor driven equipment specified shall be provided complete with motors, motor starters, and controls. Electrical characteristics shall be as shown, and unless otherwise indicated, all motors of 1 horsepower and above with open, dripproof, totally enclosed, or explosion proof fan cooled enclosures, shall be the premium efficiency type in accordance with NEMA MG 1. Field wiring shall be in accordance with manufacturer's instructions. Each motor shall conform to NEMA MG 1 and NEMA MG 2 and be of sufficient size to drive the equipment at the specified capacity without exceeding the nameplate rating of the motor. Motors shall be continuous duty with the enclosure specified. Motor starters shall be provided complete with thermal overload protection and other appurtenances necessary for the motor control indicated. Motors shall be furnished with a magnetic across-the-line or reduced voltage type starter as required by the manufacturer. Motor duty requirements shall allow for maximum frequency start-stop operation and minimum encountered interval between start and stop. Motors shall be sized for the applicable loads. Motor torque shall be capable of accelerating the connected load within 20 seconds with 80 percent of the rated voltage maintained at motor terminals during one starting period. Motor bearings shall be fitted with grease supply fittings and grease relief to outside of enclosure. Manual or automatic
SECTION 23 82 02.00 10 Page 10 control and protective or signal devices required for the operation specified and any control wiring required for controls and devices specified, but not shown, shall be provided.
2.4 UNITARY EQUIPMENT, SPLIT SYSTEM
Unit shall be an air-cooled, split system which employs a remote condensing unit, a separate indoor unit, and interconnecting refrigerant piping. Unit shall be the air-conditioning type conforming to applicable Underwriters Laboratories (UL) standards including UL 1995. Unit shall be rated in accordance with ARI 340/360. Unit shall be provided with necessary fans, air filters, coil frost protection, internal dampers, mixing boxes, supplemental heat, and cabinet construction as specified in paragraph "Unitary Equipment Components". The remote unit shall be as specified in paragraph REMOTE CONDENSER OR CONDENSING UNIT. Evaporator or supply fans shall be double-width, double inlet, forward curved, backward inclined, or airfoil blade, centrifugal scroll type. Condenser or outdoor fans shall be the manufacturer's standard for the unit specified and may be either propeller or centrifugal scroll type. Fan and condenser motors shall have totally enclosed enclosures.
2.4.1 Air-to-Refrigerant Coil
Coils shall have copper or aluminum tubes of 3/8 inch minimum diameter with copper or aluminum fins that are mechanically bonded or soldered to the tubes. Casing shall be galvanized steel or aluminum. Contact of dissimilar metals shall be avoided. Coils shall be tested in accordance with ASHRAE 15 at the factory and be suitable for the working pressure of the installed system. Each coil shall be dehydrated and sealed after testing and prior to evaluation and charging. Each unit shall be provided with a factory operating charge of refrigerant and oil or a holding charge. Unit shipped with a holding charge shall be field charged.
Separate expansion devices shall be provided for each compressor circuit.
2.4.2 Compressor
Compressor shall be direct drive, semi-hermetic or hermetic reciprocating, or scroll type capable of operating at partial load conditions. Compressor shall be capable of continuous operation down to the lowest step of unloading as specified. Compressors of 10 tons and larger shall be provided with capacity reduction devices to produce automatic capacity reduction of at least 50 percent. If standard with the manufacturer, two or more compressors may be used in lieu of a single compressor with unloading capabilities, in which case the compressors will operate in sequence, and each compressor shall have an independent refrigeration circuit through the condenser and evaporator. Each compressor shall start in the unloaded position. Each compressor shall be provided with vibration isolators, crankcase heater, thermal overloads,high and low pressure safety cutoffs and protection against short cycling.
2.4.3 Refrigeration Circuit
Refrigerant-containing components shall comply with ASHRAE 15 and be factory tested, cleaned, dehydrated, charged, and sealed. Refrigerant charging valves and connections, and pumpdown valves shall be provided for each circuit. Filter-drier shall be provided in each liquid line and be reversible-flow type.
SECTION 23 82 02.00 10 Page 11
2.4.4 Unit Controls
Unit shall be internally prewired with a 120 volt control circuit powered by an internal transformer. Terminal blocks shall be provided for power wiring and external control wiring. Unit shall have cutoffs for high and low pressure, low oil pressure for compressors with positive displacement oil pumps, and safety interlocks on all service panels. Head pressure controls shall sustain unit operation with ambient temperature of 0 degrees F. Adjustable-cycle timers shall prevent short-cycling. Multiple compressors shall be staged by means of a time delay. Unit shall be internally protected by fuses or a circuit breaker in accordance with UL 1995. Low cost cooling shall be made possible by means of a control circuit which will modulate dampers to provide 100 percent outside air while locking out compressors.
2.5 EQUIPMENT EFFICIENCY
Units ACU-1A and ACU-1B shall have an efficiency of at least EER = 14.1.
Unit ACU-2 shall have an efficiency of at least EER = 11.8.
2.6 UNITARY EQUIPMENT COMPONENTS
Refer to SECTION 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS for construction of air handling units AHU-1 and AHU-2.
2.6.1 Refrigerant and Oil
Refrigerant shall be one of the fluorocarbon gases. Refrigerants shall have number designations and safety classifications in accordance with ASHRAE 34. Refrigerants shall meet the requirements of ARI 700 as a minimum. Refrigerants shall have an Ozone Depletion Potential (ODP) of less than or equal to ...AM#2 0.05 AM#2.... Contractor shall provide and install a complete charge of refrigerant for the installed system as recommended by the manufacturer. Lubricating oil shall be of a type and grade recommended by the manufacturer for each compressor. Where color leak indicator dye is incorporated, charge shall be in accordance with manufacturer's recommendation.
2.6.2 Coil Frost Protection
Each circuit shall be provided with a coil frost protection system which is a manufacturer's standard. The coil frost protection system shall use a temperature sensor in the suction line of the compressor to shut the compressor off when coil frosting occurs. Timers shall be used to prevent the compressor from rapid cycling.
2.6.3 Pressure Vessels
Pressure vessels shall conform to ASME BPVC SEC VIII D1 or UL 207, as applicable for maximum and minimum pressure or temperature encountered.
Where referenced publications do not apply, pressure components shall be tested at 1-1/2 times design working pressure. Refrigerant wetted carbon steel surfaces shall be pickled or abrasive blasted free of mill scale, cleaned, dried, charged, and sealed.
2.6.3.1 Hot Gas Muffler
Unit shall be selected by the manufacturer for maximum noise attenuation.
Units rated for 30 tons capacity and under may be field tunable type.
SECTION 23 82 02.00 10 Page 12
2.6.3.2 Liquid Receiver
A liquid receiver shall be provided when a system's condenser or compressor does not contain a refrigerant storage capacity of at least 20 percent in excess of a fully charged system. Receiver shall be designed, filled, and rated in accordance with the recommendations of ARI 495, except as modified herein. Receiver shall be fitted to include an inlet connection; an outlet drop pipe with oil seal and oil drain where necessary; two bull's-eye liquid level sight glass in same vertical plane, 90 degrees apart and perpendicular to axis of receiver or external gauge glass with metal guard and automatic stop valves; float switch column; and purge, charge, equalizing, pressurizing, plugged drain and service valves on the inlet and outlet connections. Receiver shall be provided with a relief valve of capacity and setting in accordance with ASHRAE 15.
2.6.3.3 Oil Separator
Separator shall be the high efficiency type and be provided with removable flanged head for ease in removing float assembly and removable screen cartridge assembly. Pressure drop through a separator shall not exceed 10 psi during the removal of hot gas entrained oil. Connections to compressor shall be as recommended by the compressor manufacturer. Separator shall be provided with an oil float valve assembly or needle valve and orifice assembly, drain line shutoff valve, sight glass, filter for removal of all particulate sized 10 microns and larger, immersion heater, and strainer.
2.6.3.4 Oil Reservoir
Reservoir capacity shall equal one charge of all connected compressors.
Reservoir shall be provided with an external liquid gauge glass, plugged drain, and isolation valves. Vent piping between the reservoir and the suction header shall be provided with a 5 psi pressure differential relief valve. Reservoir shall be provided with the manufacturer's standard filter on the oil return line to the oil level regulators.
2.7 ACCESSORIES
2.7.1 Refrigerant Relief Valve/Rupture Disc Assembly
The assembly shall be a combination pressure relief valve and rupture disc designed for refrigerant usage. The assembly shall be in accordance with ASME BPVC SEC VIII D1 and ASHRAE 15. The assembly shall be provided with a pressure gauge assembly which will provide local indication if a rupture disc is broken. Rupture disc shall be the non-fragmenting type.
2.7.2 Refrigerant Signs
Refrigerant signs shall be a medium-weight aluminum type with a baked enamel finish. Signs shall be suitable for indoor or outdoor service.
Signs shall have a white background with red letters not less than 0.5 inches in height.
2.7.2.1 Installation Identification
Each new refrigeration system shall be provided with a refrigerant sign which indicates the following as a minimum:
a. Contractor's name.
SECTION 23 82 02.00 10 Page 13
b. Refrigerant number and amount of refrigerant.
c. The lubricant identity and amount.
d. Field test pressure applied.
2.7.2.2 Controls and Piping Identification
Refrigerant systems containing more than 110 lb of refrigerant shall be provided with refrigerant signs which designate the following as a minimum:
a. Valves or switches for controlling the refrigerant flow and the refrigerant compressor.
b. Pressure limiting device(s).
2.7.3 Gaskets
Gaskets shall conform to ASTM F 104 - classification for compressed sheet with nitrile binder and acrylic fibers for maximum 700 degrees F service.
2.7.4 Bolts and Nuts
Bolts and nuts shall be in accordance with ASTM A 307. The bolt head shall be marked to identify the manufacturer and the standard with which the bolt complies in accordance with ASTM A 307.
2.7.5 Bird Screen
Screen shall be 0.063 inch diameter aluminum wire or 0.031 inch diameter stainless steel wire.
2.8 FINISHES
2.8.1 Factory Coating
2.8.1.1 Equipment and Components
Unless otherwise specified, equipment and component items, when fabricated from ferrous metal, shall be factory finished with the manufacturer's standard finish, except that items located outside of buildings shall have weather resistant finishes that will withstand 125 hours exposure to the salt spray test specified in ASTM B 117 using a 5 percent sodium chloride solution. Immediately after completion of the test, the specimen shall show no signs of blistering, wrinkling, cracking, or loss of adhesion and no sign of rust creepage beyond 1/8 inch on either side of the scratch mark. Cut edges of galvanized surfaces where hot-dip galvanized sheet steel is used shall be coated with a zinc-rich coating conforming to ASTM D 520, Type I.
2.8.2 Factory Applied Insulation
Refrigeration equipment shall be provided with factory installed insulation on surfaces subject to sweating including the suction line piping. Where motors are the gas-cooled type, factory installed insulation shall be provided on the cold-gas inlet connection to the motor per manufacturer's standard practice. Factory insulated items installed outdoors are not required to be fire-rated. As a minimum, factory insulated items installed indoors shall have a flame spread index no higher than 75 and a smoke
SECTION 23 82 02.00 10 Page 14 developed index no higher than 150. Factory insulated items (no jacket) installed indoors and which are located in air plenums, in ceiling spaces, and in attic spaces shall have a flame spread index no higher than 25 and a smoke developed index no higher than 50. Flame spread and smoke developed indexes shall be determined by ASTM E 84. Insulation shall be tested in the same density and installed thickness as the material to be used in the actual construction. Material supplied by a manufacturer with a jacket shall be tested as a composite material. Jackets, facings, and adhesives shall have a flame spread index no higher than 25 and a smoke developed index no higher than 50 when tested in accordance with ASTM E 84.
2.9 SUPPLEMENTAL COMPONENTS/SERVICES
2.9.1 Refrigerant Piping
Refrigerant piping for split-system unitary equipment shall be provided and installed in accordance with Section 23 23 00 REFRIGERANT PIPING.
2.9.2 Ductwork
Ductwork shall be provided and installed in accordance with Section 23 00 00
AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEM.
2.9.3 Temperature Controls
Temperature controls shall be in accordance with Section 23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.
PART 3 EXECUTION
3.1 INSTALLATION
Work shall be performed in accordance with the manufacturer's published diagrams, recommendations, and equipment warranty requirements. Where equipment is specified to conform to the requirements of ASME BPVC SEC VIII D1and ASME BPVC SEC IX, the design, fabrication, and installation of the system shall conform to ASME BPVC SEC VIII D1 and
ASME BPVC SEC IX.
3.1.1 Equipment
Refrigeration equipment and the installation thereof shall conform to ASHRAE 15. Necessary supports shall be provided for all equipment, appurtenances, and pipe as required, including frames or supports for compressors, pumps, cooling towers, condensers, and similar items.
Compressors shall be isolated from the building structure. If mechanical vibration isolators are not provided, vibration absorbing foundations shall be provided. Each foundation shall include isolation units consisting of machine and floor or foundation fastenings, together with intermediate isolation material. Other floor-mounted equipment shall be set on not less than a 6 inch concrete pad doweled in place. Concrete foundations for floor mounted pumps shall have a mass equivalent to three times the weight of the components, pump, base plate, and motor to be supported. In lieu of concrete pad foundation, concrete pedestal block with isolators placed between the pedestal block and the floor may be provided. Concrete pedestal block shall be of mass not less than three times the combined pump, motor, and base weights. Isolators shall be selected and sized based on load-bearing requirements and the lowest frequency of vibration to be isolated. Lines connected to pumps mounted on pedestal blocks shall be
SECTION 23 82 02.00 10 Page 15 provided with flexible connectors. Foundation drawings, bolt-setting information, and foundation bolts shall be furnished prior to concrete foundation construction for all equipment indicated or required to have concrete foundations. Concrete for foundations shall be as specified in Section 03 31 00.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE. Equipment shall be properly leveled, aligned, and secured in place in accordance with manufacturer's instructions.
3.1.2 Mechanical Room Ventilation
Mechanical ventilation systems shall be in accordance with Section 23 00 00
AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEM.
3.1.3 Field Applied Insulation
Field applied insulation shall be as specified in Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS, except as defined differently herein.
3.1.4 Field Painting
Painting required for surfaces not otherwise specified, and finish painting of items only primed at the factory are specified in Section 09 90 00.00 40
PAINTING AND COATING.
3.2 CLEANING AND ADJUSTING
Equipment shall be wiped clean, with all traces of…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-09-R-0006-0005.pdf | ||
| W911KB-09-R-0006-0004.pdf | ||
| W911KB-09-R-0006-0003.pdf | ||
| NES066_AM3_Specs_and_Dwgs.pdf | ||
| Amendment 1.pdf | ||
| Dwgs-NES066-BID2.pdf | ||
| Front end and Specs-NES066-BID2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .